GREEN INFRASTRUCTURE PLAN ALLEY CREEK 66 ALLEY CREEK Borough(s): Queens Community District(s): 11 Opportunities in Combined Sewer Contributory Area Acres % of Watershed New development/redevelopment 102 4% Vacant lots 9 0.4% Right-of-way 569 24% Planned ROW Projects 17 1% Other streets 402 17% Other sidewalks 151 6% Multi-family residential complexes 105 4% Commercial development with parking lots 40 2% Schools 76 3% Parks 327 14% Other public properties 2 0.1% TOTAL 1,230 53% Total Watershed Drainage Area: 4,879 acres Combined Sewer Contributory Area: 2,292 acres Combined Sewer Contributory Impervious Area: 1,490 acres Opportunity Area for Source Controls: 1,230 acres The goal is to manage stormwater from 10% of the impervious surfaces in the combined sewer contributory area. There are opportunities in 53% of the combined sewer contributory area. 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 Total Population Minority Population In Labor Force Below Poverty Level Median HH Income: $73,728 Wastewater Treatment Plant(s): Tallman Island NYSDEC Classification(s): Class I & SB – Primary and Secondary Contact, Bathing and Fishing Ecological Classification(s): Special Natural Waterfront Area (DCP) Significant Coastal Fish & Wildlife Habitats Recreational Boating and Fishing Existing Water Uses: Shoreline Uses: Residential, Recreational, Parkland and Open Space GREEN INFRASTRUCTURE PLAN ALLEY CREEK 67 PERFORMANCE AND COSTS CSO Volume Reduction (MG/yr) Capital Cost ($M) Capital Cost per Gallon Cost-Effective Grey Infrastructure Investments—Outfall & Sewer System Im- provements, CSO Facility 244 $142 $0.58 PLUS Reduced Flow 1 - - PLUS Green Infrastructure (10% Capture) 37 $72 $1.96 PLUS Tide Gate Repair and Interceptor Cleaning NA NA NA Green Strategy Total 282 $214 $0.76 Cost-Effective Grey Infrastructure Investments 244 $142 $0.58 PLUS Potential Tanks, Tunnels & Expansions NA NA NA Grey Strategy Total 244 $142 $0.58

Upload: alley-creek-watershed-plan-resources-library

Post on 09-Mar-2016

216 views

Category:

Documents


2 download

DESCRIPTION

This is a preliminary outline of the characteristics of the Alley Creek Sewershed (distinct from it’s natural watershed) and its general land uses, construction permit trends and planned Right of Way projects. Prepared by the New York City Department of Environmental Protection (NYCDEP)

TRANSCRIPT

Page 1: Proposed New York City Alley Creek Green Infrastructure Plan DRAFT, 2010

GREEN INFRASTRUCTURE PLAN

ALL

EY

CR

EEK

66

ALLEY CREEK

Borough(s): Queens

Community District(s): 11

Opportunities in Combined Sewer Contributory Area Acres % of Watershed

New development/redevelopment 102 4%

Vacant lots 9 0.4%

Right-of-way 569 24%

Planned ROW Projects 17 1%

Other streets 402 17%

Other sidewalks 151 6%

Multi-family residential complexes 105 4%

Commercial development with parking lots 40 2%

Schools 76 3%

Parks 327 14%

Other public properties 2 0.1%

TOTAL 1,230 53%

Total Watershed Drainage Area: 4,879 acres

Combined Sewer Contributory Area: 2,292 acres

Combined Sewer Contributory Impervious Area: 1,490 acres

Opportunity Area for Source Controls: 1,230 acres

The goal is to manage stormwater from 10% of the impervious surfaces in the combined sewer

contributory area. There are opportunities in 53% of the combined sewer contributory area.

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

Total

Population

Minority

Population

In Labor Force Below Poverty

Level

Median HH Income: $73,728

Wastewater Treatment Plant(s): Tallman Island

NYSDEC Classification(s): Class I & SB – Primary and Secondary Contact, Bathing and Fishing

Ecological Classification(s): Special Natural Waterfront Area (DCP)

Significant Coastal Fish & Wildlife Habitats Recreational Boating and Fishing

Existing Water Uses: Shoreline Uses: Residential, Recreational, Parkland and Open Space

GREEN INFRASTRUCTURE PLAN

ALLE

Y C

REEK

67

PERFORMANCE AND COSTS

CSO Volume

Reduction

(MG/yr)

Capital Cost

($M)

Capital Cost

per Gallon

Cost-Effective Grey Infrastructure Investments—Outfall & Sewer System Im-

provements, CSO Facility 244 $142 $0.58

PLUS Reduced Flow 1 - -

PLUS Green Infrastructure (10% Capture) 37 $72 $1.96

PLUS Tide Gate Repair and Interceptor Cleaning NA NA NA

Green Strategy Total 282 $214 $0.76

Cost-Effective Grey Infrastructure Investments 244 $142 $0.58

PLUS Potential Tanks, Tunnels & Expansions NA NA NA

Grey Strategy Total 244 $142 $0.58

Page 2: Proposed New York City Alley Creek Green Infrastructure Plan DRAFT, 2010

GREEN INFRASTRUCTURE PLAN

ALL

EY

CR

EEK

68

OPPORTUNITIES

GREEN INFRASTRUCTURE PLAN

ALLE

Y C

REEK

69