proposed public access plan pa 1.0 august 2020 exhibit a...proposed public access plan pa 1.0...
TRANSCRIPT
BCDC RESUBMITTALAugust 2020
PA 1.0Proposed Public Access PlanEXHIBIT A
Wrap Building B
Clement Avenue
Wrap Building A
Marina Bay Trail Connector
+/- 34,407 SF (+/-0.79 acres)+/- 60 Spaces
Wharf Promenade
Alameda HarborPier 3
Pier 2
Pier 1Pier 4Pier 5
Pier 6Pier 7Pier 8Pier 9Pier 10
26 25
19
15/16/18
27 21 16
5
13
D
East Pier Bay Trail
Bay Trail
Future Bay Trail Connection
M Alley
L Alley
K Alley
J Loop
J Loop
H Alley
G Alley
F Alley
D Loop
D Loop
Bay Trail
Bay Trail
Maritime Plaza
Che
stnu
t St
reet
Lafa
yette
St
reet
Schi
ller
Stre
et
Uni
on
Stre
et
Min
turn
St
reet
Alam
eda
Mar
ina
Driv
eGra
nd S
treet
Stan
ford
St
reet
Willo
w
Stre
et
Existing Wharf
EVA
I Alley
Event PlazaAmenity
Bldg
Parking
Parking
EVA
Parking
Parking
Gate
Gate
Boat Yard/Flex Space
Restrooms
Restrooms
Restrooms
Marina Green
E Loop
E Loop
Floating Dock
Parking
Footbridge
Gangway
Harbor View Park
East Park
Waterlife Park
B. East Pier
4. Harbor View Park3. Wharf Promenade2. Maritime and Commercial Core1. Marina Bay Trail Connector 5a. Waterlife Park
5b. Waterlife Park (landside) & East Park
6. Clement Ave. Open Space
• Transient Dock
• Bay Trail: Pedestrian/Multi-use
• Benches• Gangway to
Waterlife Park • Floating docks• Access to
Footbridge• Lawn• Passive Recreation
• Interim Bay Trail: Pedestrian/Multi-use• Seating• Bicycle Racks
A. Dry Boat Storage
• Urban grid extension• Visual connecions to water• Public sidewalk• Bike path
7. Clement Ave.
• Bay Trail: Pedestrian/Multi-use• Access to Grand Street Launch Facility• Grand marina dock access• Fenced/secured dry boat storage• Boat hoist• Marina commerical parking• Open Space connectors on urban grid• View corridors from Alameda Marina Dr.• Secondary pedestrian connections• Maritime amenity building (building 25/26)
• Bay Trail: Pedestrian/Multi-use• A ‘working waterfront’-an operational marina
with maritme commercial uses and docks• Historic commercial maritime storefronts and
storefront plazas• Marina entries• Marina, maritime commercial, and public
access parking• Schiller Street and Lafyette urban grid
extensions and view corridors• Pedestrian corridors• Maritime amenity building • Gated marina dock access
• Bay Trail: Pedestrian/Multi-use• Marina access• Bike access• Public access boardwalk
promenade• Seating groups• Public Art• Marina Artifacts• Nautical/shoreline landscape• Pedstrian plaza• Small group gathering
• Bay Trail: Pedestrian/Multi-use• Marina access• Bike access• Seating groups• Benches• Large and small group gathering• Barbecue/picnic• Passive park recreation• Lawn• Restrooms/showers/lockers• Storage
• Bay Trail: Pedestrian/Multi-use• Park/Bike access• Footbridge/Gangways• Active water-oriented recreation• Accessible docks• Disabled programs (BAADS)• Club/programmed activities• Educational/classes/clinics• Sailing/el toro/kayaking• Small craft put-in/paddle board• Model racing• Rentals/storage
BCDC RESUBMITTALAugust 2020
Open Space Development Plan L1.0
0’
N
80’ 160’
EXHIBIT A
Alameda Harbor Alameda Marina
Pier 8
Pier 7
Pier 6
Boat Hoist
Dry Boat Storage
Minturn Street
Union Street
Bdg 26
Bdg 25
Bdg 27
Crosswalk Crosswalk
Crosswalk
Bio
Bio
Bike racks
Restrooms
Bay
Trai
l (16
’)
Alameda Marina Drive
Cle
men
t Ave
nue
Schiller Street
Residential Wrap Building A
Bay
Trai
l (16
’)
Bay
Trai
l (16
’)
Gate
Gate
Marina Bay Trail
Connector
Pier 9
Bay T
rail (
14’-6
” in
front
of B
oat H
oist)
BCDC RESUBMITTALAugust 2020
Open Space Enlargement Plan: Marina Bay Trail Connector L1.10’ 15’ 30’ 60’
EXHIBIT A
0’ 15’ 30’ 60’
Alameda Harbor
Alameda Marina
Pier 4
Pier 3
Pier 2
Maritime Flex Space
Maritime Plaza
Crosswalk Crosswalk
Articulated Wood Seating
Schiller Street
Lafayette Street
Bdg 13
Existing Wharf
Bdg 16
Bdg 27
Bdg 19 Bdg 15, 17 & 18
Boat Yard/ Flex Space
EVA
BioBio Bio
Bio
Bike racks
Gangway
Gangway
Gangway
Schiller Street
Cle
men
t Ave
nue
Residential Wrap Building B
Residential Wrap Building A
Bay
Trai
l (16
’)
Bay
Trai
l (16
’)
Bay
Trai
l (16
’)
Gate
Wharf Promenade
Pier 5
BCDC RESUBMITTALAugust 2020
Open Space Enlargement Plan: Commercial Core L1.2EXHIBIT A
0’ 15’ 30’ 60’
Alameda Marina
Benches
ChestnutStreet
Bdg 5Restrooms
Existing Wharf
Ship Cleats
Wood Bench Seating
Bdg 13
EVAEVA
D L
oop
D L
oop
Gangway
Pier 1
Pier 2
Chestnut Lane
Cle
men
t Ave
nue
Residential Wrap Building B
Bay
Trai
l (16
’)Ba
y Tr
ail (
16’)
Bay Trail (16’)
Wharf Promenade
Harbor View Park
Bio Bio
BCDC RESUBMITTALAugust 2020
Open Space Enlargement Plan: Wharf Promenade L1.3EXHIBIT A
Alameda Marina
Public PicnicTables/Barbecue
Public PicnicTables/Barbecue
Conc Seatwall Shoreline Overlook
Conc Seatwall Shoreline Overlook
Lawn
LoadingStanfordStreet
Willow Street
Existing Grave Dock`
Footbridge
BioBio
Bio
Bio
Storage
M A
lley
Bio
Bio
L Al
ley
K Al
ley
Floating Dock
Bdg D
Restrooms
East Pier
Plaza
J Lo
op
J Lo
op
E Lo
op
D L
oopG
Alle
y
D L
oop
E Lo
op
Stanford Street
Cle
men
t Ave
nue
Bay Trail (16’)
Future Bay Trail Connnection
Bay Trail (16’)
Bay Trail (16’)Ba
y Tr
ail (
16’)
Waterlife Park
Harbor View Park
East Park
Bio Bio
BCDC RESUBMITTALAugust 2020
Open Space Enlargement Plan: Waterlife Park L1.4EXHIBIT A