proposed site plan (1:200) - wordpress.com · bathroom lobby bedroom 1 lounge lobby lobby kitchen...

1
14 1 6a 18b 3 5 Existing access road New access road - to be 'tree friendly' no dig porous surfacing 95.62 95.74 Bin store 12 parking spaces 1 2 3 4 5 6 7 8 9 10 11 12 Vegetable garden Path Path Paved patio Blockset feature Paved parking bays Gravel drive Electric charge points Blockset feature Path Path 95.59 95.66 95.80 95.91 95.97 95.78 95.77 95.63 95.87 95.97 96.04 96.01 95.97 95.85 95.50 95.38 95.54 95.83 95.63 95.36 95.13 95.34 95.53 95.58 95.07 95.22 95.46 95.42 95.23 95.03 94.97 94.72 94.94 95.05 95.18 95.02 95.53 95.20 95.23 95.08 95.03 94.80 94.71 94.82 94.95 94.78 94.78 94.62 94.35 94.40 94.51 94.52 94.56 94.56 94.59 94.80 94.95 95.35 HOUSE A Kitchen Utility WC Study Lobby Dining room Kitchen WC Lobby Lounge Lounge Kitchen Bathroom Lobby Bedroom 1 Lobby Lounge Lobby Kitchen Store Bathroom En suite Bedroom 1 Bedroom 2 Lobby Bathroom Bedroom 1 Lounge Kitchen Bedroom 1 Store En suite Kitchen Lounge Lobby Bathroom Bedroom 2 Shared Store 95.97 95.97 95.23 95.35 95.03 96.120 95.495 Gravel drive Paved parking bays 3500 4500. 0 Area of adopted highway subject to 184 licence agreement Lounge 95.345 95.345 95.000 95.000 95.000 95.000 Trees to be reinstated (9no.) NOTES. Do not scale from this drawing. Any discrepancies should be reported immediately. This drawing is to be read in conjunction with all relevant consultants, specialist manufacturers drawings and specifications. Any surveyed information incorporated within this drawing cannot be guaranteed as accurate unless confirmed by fixed dimension. CDM REGULATION NOTES: 01. IN ACCORDANCE WITH THE CDM REGULATIONS IT IS THE POLICY OF THIS PRACTICE TO 'DESIGN OUT' AS MANY IDENTIFIABLE RISKS AS POSSIBLE TO CONSTRUCTION WORKERS AND END USERS. 02. A COMPETENT CONTRACTOR SHOULD BE AWARE OF 'NORMAL' RISKS INVOLVED WITH THE CONSTRCUTION PROCESS. HOWEVER SPECIAL SAFETY PRECAUTIONS WILL NEED TO BE CONSIDERED FOR THE FOLLOWING ITEMS: A) NONE IDENTIFIED 03. SAFE METHODS AND SYSTEMS OF WORK REMAIN THE RESPONSIBILITY OF THE CONTRACTOR AND ARE IDENTIFIED IN THE CONSTRUCTION STAGE HEALTH AND SAFETY PLAN 04. RESIDUAL RISKS THAT HAVE BEEN IDENTIFIED AND CANNOT BE 'DESIGNED OUT' ARE AS FOLLOWS: A) NONE IDENTIFIED 05. IF ANY PARTY USING THIS DRAWING CONSIDERS THAT THERE ARE 'ABNORMAL' RISKS THAT HAVE NOT BEEN INDENTIFIED ABOVE THEN THE ARCHITECT SHOULD BE NOTIFIED GENERAL NOTES: 01. READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS All dimensions in millimeters. Copyright is the property of Milbank Architects Office 66, ViewPoint Derwentside Business Centre Consett Business Park Consett, Co. Durham, DH8 6BN Tel: 01207 693811 email: [email protected] Rev. Date Description Initial Client Project Title Date Scale Drawn By Checked By @A1 19/02/2019 16:47:19 1 : 200 Planning EJ DG AG(03)15 1530 Mr Peter Stott Woodlands, DL16 6LH Proposed site plan PROPOSED SITE PLAN (1:200) N A 16.09.27 Drainage redirected; garage repositioned EJ B 16.10.04 Client's revision EJ C 16.10.06 Garage relocated EJ D 16.10.26 Tree survey updated EJ E 16.11.04 Client's revision EJ F 17.01.06 New trees indicated EJ G 17.07.19 New house repositioned on site EJ H 17.08.17 House relocated EJ I 17.08.22 Client's revision EJ J 18.01.31 Proposed flat layouts revised EJ K 18.04.19 Proposed site plan updated EJ L 18.07.20 Houses A and B redesigned EJ M 18.08.17 Levels revised EJ N 18.08.23 Minor adjustment to tree positions EJ O 18.11.06 Access revised EJ P 18.11.15 Houses A and B resized EJ Q 18.11.26 Client's revision EJ R 19.01.25 Client's revision EJ S 19.02.19 Landscape revised EJ

Upload: others

Post on 10-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROPOSED SITE PLAN (1:200) - WordPress.com · Bathroom Lobby Bedroom 1 Lounge Lobby Lobby Kitchen Store Bathroom En suite Bedroom 1 Bedroom 2 Lobby Bathroom Bedroom 1 ... Consett

14

16a

18b

35

Existing access road

New access road - to be 'tree friendly' nodig porous surfacing

95.62

95.74

Bin store

12 parking spaces

1

2

3

4

5

6

7

8

9

10

11

12

Vegetable garden

Path

Path

Paved patio

Blocksetfeature

Pavedparkingbays

Graveldrive

Electricchargepoints

Blocksetfeature

Path

Path

95.59

95.66

95.80

95.91

95.97

95.78

95.77

95.63

95.87

95.97

96.04

96.01

95.97

95.85

95.50

95.38

95.54

95.83

95.63

95.36

95.13

95.34

95.53

95.58

95.07

95.22

95.46

95.42

95.23

95.03

94.97

94.72

94.94

95.05

95.18

95.02

95.53

95.20

95.23

95.08

95.03

94.80

94.71

94.82

94.95

94.78

94.78

94.62

94.35

94.40

94.51

94.52

94.56

94.56

94.59

94.80

94.95

95.35

HOUSE A

Kitchen

Utility

WC

Study

Lobby

Dining room

Kitchen

WC

Lobby

Lounge

Lounge

Kitchen

Bathroom

Lobby

Bedroom 1LobbyLounge

Lobby

Kitchen

Store

Bathroom

En suite

Bedroom 1

Bedroom 2

Lobby

Bathroom

Bedroom 1

Lounge

Kitchen

Bedroom 1

Store

En suite

Kitchen

Lounge

Lobby

Bathroom

Bedroom 2

Shared Store

95.97

95.97

95.23

95.35

95.03

96.120

95.495

Graveldrive

Pavedparkingbays

3500

45

00

. 0

Area of adoptedhighway subjectto 184 licenceagreement

Lounge

95.345

95.345

95.000

95.000

95.000

95.000

Trees to be reinstated (9no.)

NOTES.

Do not scale from this drawing.

Any discrepancies should be reported

immediately.

This drawing is to be read in conjunction withall

relevant consultants, specialist manufacturersdrawings and specifications.

Any surveyed information incorporated within

thisdrawing cannot be guaranteed as accurateunlessconfirmed by fixed dimension.

CDM REGULATION NOTES:

01. IN ACCORDANCE WITH THE CDM

REGULATIONS IT IS THE POLICY OF THIS PRACTICETO 'DESIGN OUT' AS MANY IDENTIFIABLE RISKS ASPOSSIBLE TO CONSTRUCTION WORKERS ANDEND USERS.

02. A COMPETENT CONTRACTOR SHOULD BEAWARE OF 'NORMAL' RISKS INVOLVED WITH THECONSTRCUTION PROCESS. HOWEVER SPECIAL

SAFETY PRECAUTIONS WILL NEED TO BECONSIDERED FOR THE FOLLOWING ITEMS:

A) NONE IDENTIFIED

03. SAFE METHODS AND SYSTEMS OF WORKREMAIN THE RESPONSIBILITY OF THECONTRACTOR AND ARE IDENTIFIED IN THE

CONSTRUCTION STAGE HEALTH AND SAFETYPLAN

04. RESIDUAL RISKS THAT HAVE BEEN IDENTIFIED

AND CANNOT BE 'DESIGNED OUT' ARE ASFOLLOWS:

A) NONE IDENTIFIED

05. IF ANY PARTY USING THIS DRAWINGCONSIDERS THAT THERE ARE 'ABNORMAL' RISKSTHAT HAVE NOT BEEN INDENTIFIED ABOVE THEN

THE ARCHITECT SHOULD BE NOTIFIED

GENERAL NOTES:

01. READ IN CONJUNCTION WITH ALL OTHERRELEVANT DRAWINGS

All dimensions in millimeters. Copyright is the property of Milbank Architects

Office 66, ViewPointDerwentside Business Centre

Consett Business Park

Consett, Co. Durham, DH8 6BN

Tel: 01207 693811

email: [email protected]

Rev. Date Description Initial

Client

Project

Title

Date Scale Drawn By Checked By

@A1

19/02/201916:47:19

1 :200

Planning

EJ DG

AG(03)151530

Mr Peter Stott

Woodlands, DL16 6LH

Proposed site plan

PROPOSED SITE PLAN (1:200)

N

A 16.09.27 Drainage redirected; garage repositioned EJ

B 16.10.04 Client's revision EJ

C 16.10.06 Garage relocated EJ

D 16.10.26 Tree survey updated EJE 16.11.04 Client's revision EJ

F 17.01.06 New trees indicated EJ

G 17.07.19 New house repositioned on site EJ

H 17.08.17 House relocated EJ

I 17.08.22 Client's revision EJ

J 18.01.31 Proposed flat layouts revised EJ

K 18.04.19 Proposed site plan updated EJ

L 18.07.20 Houses A and B redesigned EJ

M 18.08.17 Levels revised EJ

N 18.08.23 Minor adjustment to tree positions EJ

O 18.11.06 Access revised EJ

P 18.11.15 Houses A and B resized EJ

Q 18.11.26 Client's revision EJ

R 19.01.25 Client's revision EJ

S 19.02.19 Landscape revised EJ