prosp rpt sack lk fisher lk area; te job #9840482 sample prep gold report charge 3 - gst @ t.0% due...

19
PROSPECTING REPORT SACK EAKE FISHER LAKE AREA MAP #G 2617 KENORA DISTRICT MINING DIVISION NTS NO. 52F12SE SEPTEMBER 30 1998 by BERNARD BARTON PROSPECTOR L1C. NO S6004 ^acZ gcT\ 52F12SE2001 2.18853 FISHER LAKE 010

Upload: others

Post on 12-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

PROSPECTING REPORTSACK EAKE

FISHER LAKE AREA MAP #G 2617KENORA DISTRICT MINING DIVISION

NTS NO. 52F12SE

SEPTEMBER 30 1998

by BERNARD BARTON PROSPECTOR L1C. NO S6004

^acZ gcT\

52F12SE2001 2.18853 FISHER LAKE 010

Page 2: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

3

52F12SE2001 2.18853 FISHER LAKE

TABLE OF CONTENTS PAGE 3 INTRODUCTION

LOCATION ACCESS GEOLOGY

PAGE 3 PREVIOUS WORK PROCEDURERESULTS AND CONCLUSIONS DRILL LOG HOLE #1 AND SAMPLE RESULTS DRILL LOG HOLE# 2 AND SAMPLE RESULTS GENERAL LOCATION OF AREA PORTION OF CLAIM MAP

LOCATION OF HOLES Z DD SECTION SKETCHASSAY CERTIFICATESASSAY INVOICES

010C

/PAGE f PAGE

PAGEJ PAGE f \ PAGE* 5/6

PAGE. 7 l PAGE 11/12,

Page 3: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

3 3

INTRODUCTION4 claims 1178467-1178470 were staked by Bernard Barton to prospect on because of an anomalous gold

in lake sediment sample OGS surveyLOCATION AND ACCESS

Sack lake claims 1178467-1178470 are located in Fisher lake claim map area and the most reasonable access is by floatplane from Vermilion Bay Ont. a distance of about 20 miles south south west

GEOLOGYThe rocks in this area are graywacke mostly fine grained with an abundance of biotite and muscovite, the shear zones and quartz veins are small.There was a 60 ppb au. in a lake sediment sample by OGS and previous sampling by myself in 1995 reavealed that of 22 samples only l contained any gold values, this was sample #0697 which also contained a small amount of molydenite. It is in the area of this sample # 0697 that I diamond drilled in this leport

PREVIOUS WORKTrenching and sampling by Orchan Uranium Mines Stoat lake 1956 Electromagnetic survey by Boylen Fisher lake 1955 Trenching and sampling by Lynx Canada 1972 stripping and sampling by Barton Fisher lake 1994-95 sampling sack lake area by Barton 1995 sampling by Champion Bear Resources Sack lake, Fisher lake 1997

PROCEDUREI flew to Sack lake via Wilderness Air from Vermillion Bay Ont July 18/98 and took sample#500

then set up drill for hole #1 at 830 feet west of and 50 feet south of#1 post on claim 1178470 and drilled a hole 8.5 feet. I had to abandon hole because of a stuck bit.I then moved 6 feet east and drilled a hole 41.1 feet deep vertically and had to stop because of loss of water

in a fracture in the hole.I flew back on July 22/98 and logged the core on July 23 and slit the core for sampling.

8 samples were taken and sent to Accurassay lab in Thunder Bay for assaying for gold, assay results are maked on drill log and the core is stored at the home of Bernard Barton

RESULTS AND CONCLUSIONSI do not believe that this vein and this sampled area are the source of the 60 ppb au sediment sample in

Sack lake . More work should be done in ihis areareport by Bernard Barton prospector lie. no. s6004

*r /

Page 4: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

HUDSON

Big Trout Loke

Fort Atbony

Moosonee

'. , v I

*'S a von t Loke

Page 5: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

v ' •••- ' . l/'

210668V r\ K ?' ; \ J\fy

- '^•.VS 1'Vi,(i\'.:-m^M^'' : . , .rM^^'.' :-•; '. -:.i-m^-?'--; :-

Page 6: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

#104454

K1178J67 -'

K1178468Si

y..--' *u

'/c

-r "^c e

K 1178470

Sack Lake

SJ

x; v

Page 7: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

-e

Qu.

St* T f fiy.

Page 8: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

DIAMOND DRILL RECORDNo. L__ Page —' __

'roiect No. __. . Group --

'roject Name

Hoie No. +3—I

Province ——Q-IWQT-A

Length -.0J—±-

Obiective —d---*?-*-'—Drilling Co

Casing Left in Hole ^**?^,..

imarks

FootageFrom To

O e. e-'

B.

DESCRIPTION

-SM^- ^' (''i

Dip. Collar ____ —

Etch Test Depth Rdg. Tn.o

Sample No.

From

O* li j

To

'htocation Sketch North

LengthAU

-z -

i i

NTS Tract

l Claim Scale: 1"-1000'

Page 9: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

DIAMOND DRILL RECORDHole No. 2L.... Page jL.__^

Pf , v CCt Ne

Project Na

H .j i e Mo.

P r i; vi ri c C

) (~-i rot i n

me SACK 4-A*je. — ̂ -. -.

O, — — —Gjyt . .....

Kiffl. Q iff. V/ s n, e. Y* i.*- /(E. "Ai

- "?^" */' t,OAt Pfi^^jt'Z'

Length , 4 '.* '. ^Tl- — .- -

Bea-ii^' 1 - .-T--® ' i ~ ' ' ~~Dip V CI* T tt-*4 / , .

Ei^^tli -

rr,^ mpnrpd i3ajL ] 9

Drilling P,n 'Se?, i^

Core Ssze ~J/^ jtn^r&cji __ .^ ... —— Casing l pft in Hnlfi A/OO/f.

———————— -.

Foo'

Fr:m iige

T, -i

m

4 J. l'

\

\

\i

i

i

i\1\

\\

i1i

i

^i/vc*^("if* d

DESCRIPTIO

r OK^W #fo*drt**, TT •ie*~'(c. r,,*

-f-^ ^ ^ - ^^/oJ2^v ko-nci* Of fc- '

^afo-*L..S &U' C.

N

-^- , btattt'r t^e-ffi^^^^rv-f : R*/, af^a-t/t" TCA

— A 4)' y9- '~ z* 'G 3. 3" * rtnV - i., /A/A* 'j^T*ii ̂ v o 7 #5"* 7i:j4

•^/^"V o x,/

/-^"" fa i//.o" Q*V/.

'

7 ^ y /"^ t G? t/ O V* *? C /0 .

" 7 ^ ̂ y^ ryiot-^Ct. ^l/- t-i/ujrc ^ ' 1^-^VvtO^X /WM^C^^/f* ^ TV^iX

^f rxX y T^^O f*i--* ,

Cawtfrt.^ fr-t i C T C A

7"v - ̂ S^ /^ y™""^ P y N

^3 i/ *y — 2JS.& ' *j?l^ — f f" of o f'- rf . ~f~i\ t /i w ~

P/n ,-fnr /^ r*. f~ f cfi* T^/t

•1,5.4- ZS'S, \ fli^k , c^y***xAle ulkxt j

^J^iz-^-J-

3. ^ S - -^

Y 7~^ ^ Jr - ———!/ J Ot^f&ff^ GfiffAfC. fati

'

^^- a^ffr St/rrt/cod ^ec/h Jew /o- /fi^/u* -p

l*S**f ; Ai ea^Lfrf-tTtL ^fetfi,;-,,*.

rfJC#.

Ten **xt'/^- Gr -yirxf oo/Cc/

^.^•SJi;vCC vJ^-o-v* OeK^*^.^ ^ /-X- y^t

-v/o ^ VA/ At/- ^^ Ai-ffrtTt ,' ' -—

? j *4 k*tr -^ s;A ̂ ^^iA/i^J^

Dip : Collar

i Etch Test Depth Rdg. True

-- ——— .-.. — -.. — .- ———————— .,. ———

Sample No.

C? 295.

c*Sf"3

^

From i To

0,3 i i-^f

Length

~

1

3

^ocationl 0"" * — —

•b-. . •* s:

^i/3J-2.' 6

J2 /,*j ^ V^L ^2 - 3

i

Sketch

4

North

iTract __ ...^ —

Scale. 1"; 1000'

j1

i

5j

1 i ;

t

j

0*2^ *f ^*/-*?

^^ 37*5"

\! 1

i ij

JL5?:C?

,^

\ ; r

j

Z-i ! <5

r

ii * '

3.5 ^ 6

: i !

.a O"(9 /"t/ o T to

@*~fa *"f y

f

i' i

i

3A-^ *f0 3

*4Q 3 Y/-'!

l

i

4 6i* *^ j -c t*

!' f

ii j

——— ' — ex* (oQ)———— ̂ ^

Page 10: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

ACCURASSAY LABORATORIESA DIVISION QF ASSAY LABORATORY SERVICES //VC.

Benard Barton Box 254 Dryden, Ontario P8N 2Y8 Fax (807) 937-4309

n 1070 LITHIUM DRIVE UNIT ?Page THUNDER BAY, ONTARIO P7B6G3

PHONE (807) 623-6448 FAX (807) 623-6820

July 27, 1998

9840483

SAMPLE # Accurassay Customer

12 check

500500

Gold ppb

^ <5

Gold Oz/i

Certified By

18 9589E:o9i88T 1^551/93/60

Page 11: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

/VCCUKAb^ttASSAY

V"- J"-- A -T' /~-V 1*^1 l f C**AT OR 1 1 S

.pjv.'JiOjs' (Jfr-r..-T;.-M.,,'mift

Benan-f Barton Box 254 Dryden, Onlario P8N 2Y8 Fax (807) 937^4309

107OLfTHiUM DRIVE, UNIT 2THUNDER BAV. ONTARIO P?B 6G3

PHONE '807 1, 623-6448 i AX (807: 623-6820

Jul 27.

SAMPLE # Accurassay Customer pob

123456789 check

890891892893894895896897897

Oz/"'

^ 0.001S *'5 *

<5 ^.001<5 ^'0001<5 <0.001<5 ^.001

Certified By. ,.

Page 12: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

-i

*

LABORATORIES' (A DIVISION OF ASSAY LABORATORY SERVICES, INC.)

MINERAL ASSAYERS, ENVIRONMENTAL CHEMISTS, ANALYTICAL CONSULTANTS

1070 Lllhlum Drive. Unit 2- THUNDER BAY, ON P7B 6G3 Tel.: 1807) 623-6448 Fax:(807)623-6820

rton, Mr. Bernard .O.BQX254

P8N2Y8

; TE

Job #9840482 Sample Prep Gold Report Charge

3 - GST @ T.0%

Due 30 AUG 98

Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ - '

37807

DATE 31-JUL-.98CUSTOMER ORDER NO.

WORK ORDER NO.

333

S3.82 S8.69 S4.50

Freight

Total Amount

3( .56 .52 .50

•32

00

90

Page 13: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

ACCURASSAY LABORATORIES(A DIVISION OF ASSAy LABORATORY SERVICES, INC.) MINERAL ASSAYERS. ENVIRONMENTAL CHEMISTS,ANALYTICAL CONSULTANTS

1070 Lithium Drive, Unit 2, THUNDER BAY, ON P7B 6G3 Tel.: (807) 623-6448 Fax: (SOT) 623-6820

31-JUL-98CUSTOMER ORDER NO.Barton, Mr. Bernard

P.O. Box 254 DRYDEN, ON P8N 2Y8

Page 14: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

^ . . . Ministry OfOntario y^*^***™*and Mines

Declaration of Assessment Work Performed on Mining LandMining Act. Subsection 65(2) end 64(3), ft.8,0.1MO

Transaction Number (office uee)

[Aseetsment

rf subsections 65(2) and 66(3) of the Mining Act. Under section 8 of the review the assessment work and correspond with the mining land holder. Recorder, Ministry of Northern Development and Mines, 6th Floor,

52F12SE2001 2.18853 FISHER LAKE 900

Instructions: - For work performed on Crown Lands before recording a claim, use form 0240. - Please type or print in ink.

1. Recorded holder(s) (Attach a list if necessary) . j asName

' a r L- r?Cltenl^Rrnber

Address Tel Number

Fax Number

7^- (70?—^-

r - 9Name Client Number

Telephone Number"Address

Fax Number

2. Type of work performed: Check ( s ) and report on only ONE of the following groups for this declaration.

D Geotechnical: prospecting, surveys, rVj Physical: drilling, stripping, - f— i assays and work under section 18 (regs) Y— ' trenching and associated assays ' — '

Work Type . . -

T)C.lt.UAJ6- (^ ̂ ^ ̂ ^j

Dates Work Performed Ffom /? .0-7 . *?v TO 3-5 &1 12:

Day j Man* | Year Day | Mor* | YaarGlobal Poelttoning System Data (11 available) Township/Area

f~(-^her- ^tXCrfM or G-Plan Number

G- 3.6/7

Rehabilitation

Office UseCommodity — —

Total S Value of ^ Work Claimed ol . VV^

NTS Reference ~ - - "

Mining Diviskjn Vx^GL^

Resident Geologist V District f^ffL^U -

Please remember to: - obtain a work permit from the Ministry of Natural Resources as required;- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for assigning work;'- include two copies of your technical report.

3. Person or companies who prepared the technical report (Attach a list if necessary)Name .

T

Tele Number 7J

Address Fax Number

Name Telephone Number

4. Certification by Recorded Holder or Agent

l, AT, , do hereby certify that l have personal knowledge of the facts set' (Print Name)

forth in this Declaration of Assessment Work having caused the work to be performed or witnessed the same during or after its completion and, to the best of my knowledge, the annexed report is true.Signature of Recorded Holder^or Agent

Telephone NumberAgent's Addressfat 2.0-5-i v\ ~T /k Q

Fax Number

•70 r s-0241 (O2M)

Page 15: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

5. Work to be recorded and distributed. Work can only be assigned to claims that are contiguous (adjoining) to the mining land where work was performed,' at the time work was performed. A map showing the contiguous Hnk^.,.7 must accompany this form. , - . - 1 -'V * - ? ^

Mining Claim Number. Or rf work was done on other eligible mining land, show in this column the location number Indicated on the claim map.

•geg

eg

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

TB 7827

1234567

1234568

K 117X^70/C .//7*^7

/C inttk*t \Cl* Lt(* cl

lumber of Claim Units. For other mining land, list hectare*.

16 ha

12

2

J

l

i

l™* " " "

-~

,--

-

' :

Column Totals

l .o-r y ̂ vtjjcti — /M v S&a r-

Value of work performed on this claim or other' mining land.

S26, 825

- 0

S 8, 892

fjtuz—

-~

—- -- . .-— .

- - - - - - -

- -

2/1*

Value of work applied to this claim.

N/A

S 2 4, 000

14.000

*'?( C2 1 CO

-y-o o **V-OG^

too^. _

-

-

. -

1

&U8

Value of work assigned to other mining claims.

S24,000

0

0

/3.0G, —

—. — -

--

I2.GO

Bank. Value of work to be distributed at a future date.

S2.825

0

S4.892

-~.

-^

^- — - — — — v —

•- .*

- — ----

. — .-...

- - — --

- - .-.,'--" .

: .-

- ——

J , do hereby certify that the above work credits are eligible under(Print Fufl Nan*)

subsection 7 (1) of the Assessment Work Regulation 6/96 for assignment to contiguous claims or for application to the claim where the work was done.Signature of Recorded Holder or Agent Authorized in Wrjj Date

6. Instructions for cutting back credits that are not approved.

Some of the credits claimed in this declaration may be cut back. Please check (*- ) in the boxes below to show how

you wish to prioritize the deletion of credits:Q- 1. Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated, {^t- 2. Credits are to be cut back starting with the claims listed last, working backwards; or Q 3. Credits are to be cut back equally over all claims listed in this declaration; or D 4. Credits are to be cut back as prioritized on the attached appendix or as follows (describe):

Note: If you have not indicated how your credits are to be deleted, credits will be cut back from the Bank first, followed by option number 2 if necessary.

For Office Use Only_______________Received Stamp Deemed Approved Date

Date Approved

Date Notification Sent

Total Value of Credit Approved

Approved tor Recording by Mining Recorder (Signature)

Page 16: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

Ontario Ministry ofNorthern Developmentand Mines

Statement of Costs for Assessment Credit

Transaction Number (office use)

Personal information collected on this form is obtained under the authority of subsection 6(1) of the Assessment Work Regulation 6/96. Under section 8 of the Mining Act, the information is a public record. This information will be used to review the assessment work and correspond with the mining land holder. Questions about this collection should be directed to the Chief Mining Recorder, Ministry of Northern Development and Mines, 6th Floor, 933 Ramsey Lake Road, Sudbury, Ontario, P3E 6B5.

Work Type

J)ia moAvl J)M//!/!*;

/-f s s au , w0\* -j

Associated Costs (e.g. supplies,V

•i~ AsJe^f M^plan-t(f

Units of WorkDepending on the type of work, list the number of hours/days worked, metres of drilling, kilo metres of grid line, number of samples, etc.

^ 3* L f^tk-9 s- c* — , 0 4i\

mobilization and demobilization).

/^/y^ ^L]^ l * 1

'

Cost Per Unit of work

fl ^0, * 0

f /f, f rt

—— ' — r\ ir" r\-RECfcWtU

Total Cost

——k ————— ———

9 7^? . 0 cf 30. 'C

7 f/. (*oi —Transportation Costs

^ 00

Food and Lodging Costs

Q (S - -f s rro kf,c

Total Value of Assessment Work 3 117

Calculations of Filing Discounts:

1. Work filed within two years of performance is claimed at 10007o of the above Total Value of Assessment Work.2. If work is filed after two years and up to five years after performance, it can only be claimed at 5007o of the Total

Value of Assessment Work. If this situation applies to your claims, use the calculation below:

TOTAL VALUE OF ASSESSMENT WORK x 0.50 = Total $ value of worked claimed.

Note:- Work older than 5 years is not eligible for credit.- A recorded holder may be required to verify expenditures claimed in this statement of costs within 45 days of a request for verification and/or correction/clarification. If verification and/or correction/clarification is not made, theMinister may reject all or part of the assessment work subT'^ec1 .

Certification verifying costs:

, do hereby certify, that the amounts shown are as accurate as may(please print full name)

reasonably be determined and the costs were incurred while conducting assessment work on the lands indicated on

the accompanying Declaration of Work form as

to make this certification.

(recorded holder, agent, or state company position with signing authority)l am authorized

0212 (02/96)

Signature Date

Page 17: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

OntarioMinistry of Ministere duNorthern Development Developpement du Nordand Mines et des Mines

Geoscience Assessment Office 933 Ramsey Lake Road

November 4, 1998 6th FloorSudbury, Ontario

CHAMPION BEAR RESOURCES LTD. P3E 6B5 2005-9TH STREET, S..W.,CALGARY, ALBERTA Telephone: (888) 415-9846 T2T-3C4 Fax: (877)670-1555

Visit our website at: www.gov.on.ca/MNDM/MINES/LANDS/mlsmnpge.htm

Dear Sir or Madam: Submission Number: 2.18853

Status Subject: Transaction Number(s): W9810.00127 Deemed Approval

We have reviewed your Assessment Work submission with the above noted Transaction Number(s). The attached summary page(s) indicate the results of the review. WE RECOMMEND YOU READ THIS SUMMARY FOR THE DETAILS PERTAINING TO YOUR ASSESSMENT WORK.

If the status for a transaction is a 45 Day Notice, the summary will outline the reasons for the notice, and any steps you can take to remedy deficiencies. The 90-day deemed approval provision, subsection 6(7) of the Assessment Work Regulation, will no longer be in effect for assessment work which has received a 45 Day Notice. Allowable changes to your credit distribution can be made by contacting the Geoscience Assessment Office within this 45 Day period, otherwise assessment credit will be cut back and distributed as outlined in Section #6 of the Declaration of Assessment work form.

Please note any revisions must be submitted in DUPLICATE to the Geoscience Assessment Office, by the response date on the summary.

If you have any questions regarding this correspondence, please contact Bruce Gates by e-mail at [email protected] or by telephone at (705) 670-5856.

Yours sincerely,

ORIGINAL SIGNED BYBlair KiteSupervisor, Geoscience Assessment OfficeMining Lands Section

Correspondence ID: 13038

Copy for: Assessment Library

Page 18: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

Work Report Assessment Results

Submission Number: 2.18853

Date Correspondence Sent: November 04, 1998 Assessor: Bruce Gates

Transaction Number

W9810.00127

Section:16 Drilling PDRILL

First Claim Number

1178470Township(s) l Area(s)

FISHER LAKE

Status

Deemed Approval

Approval Date

October 28, 1998

Correspondence to:

Resident Geologist Kenora, ON

Assessment Files Library Sudbury, ON

Recorded Holder(s) and/or Agent(s):

Seymour Sears WAWA, ON

CHAMPION BEAR RESOURCES LTD. CALGARY, ALBERTA

Page:1Correspondence ID: 13038

Page 19: PROSP RPT SACK LK FISHER LK AREA; TE Job #9840482 Sample Prep Gold Report Charge 3 - GST @ T.0% Due 30 AUG 98 Terms net 30 days, 151* per month orrovepdue accounts. ' \ V , ' ^ -

Hawkcliff1210598

oy 2OATS Or

M OV O 3 1998

L/ __l

-"Vi

1150023 "i )

'. iakt S /i^^, t__x" L...

52F12SE2001 2.18853 FISHER LAKE 200

Warclub 1 . - J K 18702^ J-^

l

THE INFOR APPEARS C HAS BEEf" FROM VARK AND ACCU! GUARANTt WISHING K ING CLAIMS SULT WITH RECORDER, NORTHERI MENTANDJi DITIONAL ON THE ST LANDS SHO

4493 0 30'