Page 1: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Prospect (GB)

Limited

Flood Risk Assessment & Drainage Strategy

Union Street Clitheroe

Ironside Farrar Limited 3 Worsley Court

High Street Worsley

Manchester M28 3NJ

30250/SRG

June 2017

Page 2: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

Prepared By: S.R. Gough

Checked By: S.A. Pope

Page 3: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

Ironside Farrar Limited Page 1 June 2017

CONTENTS 1. Introduction 2. Site Description

3. Proposed Development

4. Planning Policy 5. Forms of Flooding 6. Development and Drainage 7. Conclusions 8. Recommendations APPENDICES Appendix A Location Plan Appendix B Existing Site Plan Appendix C Topographical Survey Appendix D Aerial and Site Photographs Appendix E Environment Agency Flood Risk map Appendix F Sewer Records Appendix G Consultation with United Utilities Appendix H Proposed Development & Drainage Appendix I Hydraulic Calculations Appendix J Envirocheck Flood Data

Page 4: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

Ironside Farrar Limited Page 2 June 2017

DEVELOPMENT AT UNION STREET

CLITHEROE FLOOD RISK ASSESSMENT

& DRAINAGE STRATEGY

1.0 Introduction

This Flood Risk Assessment and Drainage Strategy have been prepared by Ironside Farrar Limited on behalf of Prospect (GB) Limited in connection with a planning application for residential development of land off Union Street, Clitheroe. In accordance with National Planning Policy Framework (NPPF) and the associated Technical Guidance document, flood risk must be assessed for all sources including tidal (from the sea), fluvial (from rivers), pluvial (from land), groundwater, sewer and artificial water bodies (e.g reservoirs, canals, major water supply infrastructure etc.). More specifically, the development of any site must be carried out in such a way as to mitigate any potential flood risk, both on and off site from all sources of flooding.

2.0 Site Description

The application site comprises a parcel of land, measuring approximately 1.34ha in area. It is situated to the north of Beech Road and is located at the west fringe of the built-up area of Clitheroe, approximately 1km to the west of the town centre (grid reference SD 73278 41778). The extent of the area to which the application relates is shown on the enclosed site location plan (see Appendix A and B) and is identified by the redline boundary. The almost rectangular site is presently one large field with short grass used for grazing; access is directly from Union Street in the south west corner of the site. There are adjacent residential properties to the west and south of the site on Meadow Avenue and Greenfield Avenue. The site is surrounded on the north and east by other open fields used mainly for grazing livestock and private gardens. A hedge forms the north and east boundary with a ditch running along the base; the ditch continues away to the west along the north of the existing gardens of Meadow View. There is a public footpath extending from Union Street to the south-east corner of the site where it meets a further path running along the hedge just outside

Page 5: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

Ironside Farrar Limited Page 3 June 2017

the eastern boundary. In the centre of the site there is a shallow, ephemeral pond and a shallow ditch on the western boundary that runs to the north-west corner of the site to join the ditch described above. There are some mature trees within the hedges surrounding the site but no trees in the main body of the site Topographically, the site generally falls from east to west. The level at the eastern end of Union Street is 62.28m and the southern boundary rises to 65.00m in the south-east corner of the site. The eastern boundary is relatively level with a slight rise to the north where the level is 66.11m. Along the northern boundary, the levels fall again to the north-west corner where the site level is 61.81m and the ditch level 60.98m. The topographical survey is included in Appendix C and a selection of photographs, together with an aerial photo is included in Appendix D to illustrate the site at the present day.

3.0 Proposed Development

The proposals for the land off Union Street comprise a residential development of up to 36 units with associated access, parking and landscaping. Access is via a new road to be constructed as an extension of Union Street and open space will be provided at the south of the site adjacent to the existing residential development; a foul pumping station will also be in the north-east corner of the site. An indicative layout of the development is shown on the Proposed Development and Drainage Layout attached at Appendix H.

4.0 Planning Policy

The National Planning Policy Framework (NPPF) sets out the Government’s policy on meeting the challenges of climate change, flooding and coastal change. The NPPF states that: “Planning plays a key role in helping shape places to secure radical reductions in greenhouse gas emissions, minimising vulnerability and providing resilience to the impact of climate change, and supporting the delivery of renewable and low carbon energy and associated infrastructure. This is central to the economic, social and environmental dimensions of sustainable development.

Page 6: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

Ironside Farrar Limited Page 4 June 2017

Local planning authorities should adopt proactive strategies to mitigate and adapt to climate change taking full account of flood risk, coastal change and water supply and demand consideration.” This Flood Risk Assessment proposes recommendations to facilitate the proposed development so that it takes into account flood risk at all stages of the development.

4.1 Sequential and Exception Test

Based on the location of the development on the site in Flood Zone 1 all development (including ‘More Vulnerable’) is deemed appropriate according to NPPF, therefore the development is appropriately situated and the Sequential Test is not required.

4.2 Exception Test

NPPF classifies the development as ‘More Vulnerable’, however as the site is located within Flood Zone 1 the Exception Test is not required.

5.0 Forms of Flooding

The Technical Guidance to the National Planning Policy Framework requires all forms of flooding to be considered.

5.1 Flooding from Rivers

The Environment Agency Flood Risk map and river network is included as Appendix E.

It can be seen from the map that the site is located in Flood Zone 1 with a chance of flooding of less than 0.1% (or 1 in 1000). The nearest open main watercourse is the River Ribble located approximately 450m to the west of the site. The site is therefore not considered to be at risk of flooding from rivers.

5.2 Flooding from the Sea

The Environment Agency Flood Risk map is included as Appendix E.

It can be seen from the map that the site is located in Flood Zone 1 with a chance of flooding of less than 0.1% (or 1 in 1000).

Page 7: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

Ironside Farrar Limited Page 5 June 2017

The site is therefore not considered to be at risk of flooding from the sea.

5.3 Flooding from Land

Intense rainfall, often of short duration, that is unable to soak into the ground or enter drainage systems can run quickly off land and result in local flooding. Reference should be made to the Envirocheck Flood Data included in Appendix J. The EA/NRW flood data indicates the site has potential flood depths of up to 0.3m along the ditch on the western boundary in all events up to the 1000-year return period event. The flow direction is indicated towards the north at velocities between 0.5 and 1.00m/s and the 1000year Hazard Rating along the western boundary is in the Low to Medium rating.

Only the land to the east of the site is at levels above the site with potential for surface run-off onto the site from the adjacent land but there is a ditch along this boundary that will intercept overland flows and direct them to the north. The finished floor levels of the development will ensure any overland flows are directed away from the proposed buildings. Reference should also be made to section 6 relating to the site drainage.

5.4 Flooding from Groundwater

During the walkover survey, there was some evidence of waterlogging on the site around the shallow, ephemeral pond on the site; two ponds are present but the land surrounding both is not waterlogged. The BGS (British Geological Society) data included in Appendix J shows the site to be located in an area with potential for groundwater flooding of property situated below ground level; the ESI Groundwater Flood Map indicates the site to be at Negligible risk. A site investigation has been undertaken in March 2017 and reference should be made to E3P Report reference 11-525-r1 for the full details. During this investigation, monitoring points were installed and the report comments: “Groundwater was encountered in TP109 during the site investigation as a moderate inflow at 1.10m bgl associated with a band of peat. Subsequent monitoring recorded groundwater from just below the surface to 1.5m bgl.”

Page 8: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

Ironside Farrar Limited Page 6 June 2017

Site levels will ensure finished floor levels are set above existing ground levels. The site is therefore not considered to be at risk of flooding from groundwater.

5.5 Flooding from Sewers

The record of Public Sewers has been obtained from United Utilities and is included in Appendix F. There is a 225mm dia. surface water sewer that enters the site on the southern boundary but then terminates in the site. Further investigation on site has revealed the surface water sewer is connected to a 525mm dia. culverted ordinary watercourse that enters the site in the south-east corner of the site from the public footpath corridor and then runs along the southern boundary to the west along Union Street. At the manhole in the junction with Queen Street, the culvert is 1.70m deep. United Utilities have been consulted with regards to flooding from the public sewerage system in Appendix G and their response is awaited.

The site itself is therefore considered to be at very low risk of flooding from sewers but the final drainage proposals for the site will need to be agreed with United Utilities.

5.6 Flooding from Reservoirs, Canals and Other Artificial Sources

There are no artificial sources of flooding near the site. The site is therefore not at risk of flooding from artificial sources.

6.0 Development and Drainage

In line with common practice, it is proposed the surface water discharge from the proposed development should mimic that from the existing site. The site is considered greenfield and the run-off rates have been assessed for the site using the IoH Report 124 and result in a Qbar flow of 10.6l/s and flows from the development will be restricted to this rate.

Page 9: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

Ironside Farrar Limited Page 7 June 2017

A connection to the existing culverted watercourse at the south west of the site is possible and the Sketch Drainage Layout included in Appendix H has been prepared to demonstrate the site can be developed without increasing flood risk elsewhere. Attenuation will be included in the system in the form of oversized pipes and off-line cellular storage with a flow control introduced to limit the flows. The hydraulic calculations included in Appendix I indicate the flows from the development can be restricted to 10.6l/s in all events up to the 100year (including 30% climate change allowance). Due to the topography and nature of the development, it will be necessary to raise existing site levels to ensure a gravity surface water connection, including the required attenuation, can be made to the existing culverted watercourse. Further details of the proposed drainage system will need to be agreed with United Utilities and Lancashire CC LLFA. The site investigation undertaken at the site recorded the following ground conditions: Top Soil Top soil has been recorded in all of the exploratory whole locations to a maximum depth of 0.40m bgl. In a number of locations small amounts of anthropogenic material were recorded.

Made Ground Made Ground has been recorded in three locations at the site, though as discussed rare anthropogenic material has been recorded within the Top-Soil. The three area of Made Ground occur is discrete areas and do not appear to be related to any specific historical feature. Drift Drift deposits at the site comprise of both a predominantly sandy gravelly CLAY and a sandy, gravelly silty CLAY. The CLAY strata were recorded as being variable in strength with depth in some locations but generally increased with depth. However, the CLAY was recorded as being very soft, low strength in TP109 from 1.40m bgl, soft low strength from 1.70bgl in TP103 and 1.50mbgl to 1.70mbgl in TP106. A PEAT horizon was recorded in TP109 immediately to the northeast of the area of standing water though other exploratory locations did not record it. This indicates the PEAT is not laterally extensive though further investigation beneath the body of standing water is recommended once it has been drained. Solid Solid strata has not been recorded during this investigation but BGS records from approximately 1.0km to the west indicates bedrock to be at 38mbgl. The site investigation concluded that infiltration will not be suitable on the site. A foul drainage connection can be made to the public sewers in Queen Street or Meadow Avenue via a foul pumping station in the north of the site.

Page 10: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

Ironside Farrar Limited Page 8 June 2017

7.0 Conclusions

• The site is located within Flood Zone 1 with a low probability of flooding.

• The site is at a low risk of flooding from other sources.

• The site is presently considered to be greenfield and the Qbar flow

is 10.6l/s; flows from the development will be restricted to this figure in all events up to the 100 year with a 30% allowance for climate change.

• Attenuation can be provided in the form of oversized underground

pipes and off-line cellular storage.

• Infiltration SUDS techniques are not suitable on the site.

• Foul drainage may be connected to the existing public combined sewer in Queen Street or Meadow Avenue via a foul pumping station.

8.0 Recommendations

• Suitable tried and tested planning conditions shall be agreed to address the drainage of the site in accordance with the flood risk assessment & drainage strategy.

• Following initial consultation, further discussions should take place with United Utilities and Lancashire CC LLFA with a view to connecting the development to the existing culverted watercourse.

• Attenuation will need to be incorporated into the surface water drainage to ensure flows are limited to the specified discharge rate.

• A foul pumping station should be included in the foul drainage

design.

• SUDS measures should not be included within the detailed drainage system.

• The external levels shall be adjusted locally to ensure overland

flood routes exist through the development for use in exceptional circumstances; levels for the development will need to be raised to ensure gravity connection to the surface water system.

Page 11: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

APPENDIX A

Site Location Plan

Page 12: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been
Page 13: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

APPENDIX B

Existing Site Plan

Page 14: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been
Page 15: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

APPENDIX C

Topographical Survey

Page 16: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been
Page 17: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

APPENDIX D

Aerial & Site Photographs

Page 18: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been
Page 19: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street to the West.

Southern Site Boundary. Site from South East corner.

Eastern end of Union Street.

Page 20: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Public Footpath to South East of site. Eastern site boundary to the South.

View West along Northern boundary. Northern boundary to the East.

Page 21: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Western boundary to the South. Informal ‘Pond’ area in centre of site.

View North along Western boundary. View West to Union street.

Page 22: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

APPENDIX E

Environment Agency Flood Risk Map

Page 23: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been
Page 24: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Order Details

Site DetailsSite at 373280, 441780

Order Number:Customer Ref:National Grid Reference:Slice:Site Area (Ha):Search Buffer (m):

105484524_1_130250373280, 441780A0.011000

Tel:Fax:Web:

0844 844 99520844 844 9951www.envirocheck.co.uk

Page 16 of 17A Landmark Information Group Service v50.0 21-Nov-2016

Detailed River Network Map - Slice A

Detailed River Network Map (1:10,000)

Page 25: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

APPENDIX F

Existing Sewer Records

Page 26: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been
Page 27: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

APPENDIX G

Consultation with United Utilities

Page 28: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

1

Simon Gough

From: Simon GoughSent: 04 June 2017 06:57To: Wastewater Developer ServicesCc: Perry, Graham; 'Johnson Mulk'Subject: Union Street, Clitheroe(30250)Attachments: 30250_App A.pdf; 30250_App F.pdf; 30250_App H.pdf; 30250 ExRunOff.pdf; 30250

Wastewater_predevelopment_enquiry 170602.doc

On behalf of our client Prospect (GB) Limited please find attached a Predevelopment Enquiry for a  proposed residential development at Union Street,  Clitheroe  Documents attached include:  

Wastewater predevelopment enquiry form 

30250/AppA ‐ Location Plan 

30250/AppF ‐ Sewer Records 

30250/AppH – Preliminary Development & Drainage 

Existing Run‐Off Flow Calculation                          Please can you consider the details attached and confirm the proposed surface water discharge  is acceptable into the adjacent culverted watercourse. Please can you also confirm acceptance of foul discharge into the foul public sewers at a suitable location via a pumping station.  Please also confirm if there are any flooding incidents from the sewer system in the vicinity of the site.  Regards Simon Gough | Director | Ironside Farrar | 3 Worsley Court | Worsley | Manchester |M28 3NJ |  Tel: 0161 703 8801 | Fax: 0161 703 8279 | Mobile: 07717 023091 I Web:ironsidefarrar.com  

Please consider the environment before printing this e-mail. Ironside Farrar Limited is a limited company registered in Scotland, registration number: 109330 registered address: 111 McDonald Road, Edinburgh, EH7 4NW.  

Page 29: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

WWPDE1114 1

This form is for all first time enquiries you may have when planning your development. If your enquiry relates to advice on connection points and discharge rates, please complete all sections, providing as much information as you have available. You will notice some fields are marked as optional, all other fields are mandatory. For all other enquiries, please complete Sections 1, 2, 7 and 8. When answering the yes/no questions please mark an ‘x’ in the appropriate box. All enquiries must be accompanied by a site location plan, clearly identifying the site boundary. Once completed, please return this form by email to [email protected] or post to United Utilities, Developer Services and Planning, Warrington North Wastewater Treatment Works, Gatewarth Industrial Estate, Off Liverpool Road, Warrington, WA5 1DS. We aim to respond to enquiries within 15 working days from receipt of your completed enquiry form.

Section 1: About you

Applicant Agent (if applicable)

Name Johnson Mulk SIMON GOUGH

Company name Prospect (GB) Limited IRONSIDE FARRAR LIMITED

Home or company address (including postcode)

Prospect (GB) Limited, Unit 5, Meridian Business Park, Hansby Drive Hunts Cross, Speke L24 9LG

3 WORSLEY COURT, WORSLEY, MANCHESTER, M28 3NJ

Contact telephone number (a mobile number is fine) 0151 448 5720 0161 703 8801

Email [email protected] [email protected]

What is your enquiry? Foul connection points / discharge rates for proposed residential development.

Who should we send the enquiry response to? Applicant Agent Both X

Section 2: About your site

Site name Union Street, Clitheroe

Site address (or nearest main road) Union Street, Clitheroe

Nearest postcode BB7 2LY

Site grid reference (mid point) X: 341840 Y: 438587

Approx. number of dwellings 36

Approx. numbers of non-household units 0

Total site area (hectares) 1.34

Development area - hectares (Optional) Residential 1.34 Commercial Industrial

Estimated onsite date (Optional) October 2017

Estimated first occupation (Optional)

Does the site have planning permission?

Full Yes No X Application submitted Planning Ref

(if applicable)

Outline Yes No X Application submitted Planning Ref

(if appropriate)

Have you approached us about this site previously? Yes No X

If yes, please provide Ref No. &/or contact

details

Wastewater predevelopment enquiry

Page 30: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

WWPDE1114 2

Section 3: Your site drainage strategy

Type of site GREENFIELD (Go to Q 3.1) X BROWNFIELD

(Go to Q 3.2)

3.1 Greenfield site (Optional) Confirmed attachment:

Please provide full calculations to show existing greenfield run off rates Yes X No

3.2 Brownfield site (Optional) Confirmed attachment:

Please provide a plan showing existing foul water drainage from this site to the public sewer network (including location of existing drains, pipe sizes and points of connection) Yes No X

Please provide a plan showing the existing surface water drainage from this site to the public sewer network, including location of existing drains, pipe sizes and points of connection Yes No X

Will this development produce trade effluent? Yes No X

If yes, have you applied for a trade effluent consent from United Utilities? Yes No N/A

Do you intend to discharge highways drainage to the public sewer network? Yes X No

If yes, to which sewer? Proposed SW system

Section 4: Foul water connection

Are you proposing to use an existing connection to the public sewer? Yes No X

If yes, please provide manhole number or grid reference number If no, please provide the proposed flow rate and connection points (litres per second) 5l/s

Is the foul water discharge to be pumped? Yes X No

Section 5: Surface water connection

If you are proposing to connect surface water to a public sewer, please attach evidence that all options for Sustainable Urban Drainage Systems (SUDs) have been explored in accordance with part H of the Building Regulations 2010.

Details of SUDs can be found at http://www.ciria.com/sudsdesign_guidance.htm

How do you propose to drain surface water from the site? SUDs (Go to Section 6) X

Discharge to public sewer (Go to Q5.1)

(5.1) Does the site have existing surface water connections to the public sewer?

Yes (Go to Q5.2) No

(Go to Q5.3) X

(5.2) Proposed surface water discharging to public sewer via existing connection Yes No

(Go to Q5.3)

X Are you proposing to use an existing connection?

If yes, please provide manhole number or grid reference number & proposed flow rates N/A

(5.3) Proposed surface water discharging to public sewer via a new connection Qbar rate 10.6l/s

Adjacent watercourse If a new connection point is required, please provide proposed point of connection and proposed flow rates (litres per second)

Have you completed a flood risk assessment in support of your planning application? Yes No X

Is the surface water to be controlled? (Optional) Yes X No

Is the surface water to be pumped? (Optional) Yes No X

Page 31: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

WWPDE1114 3

Section 6: Development details (Optional)

Is the development part of a larger site that will be developed in phases or will be subject to separate planning applications?

If yes, please provide details below Yes No X

Phase No.

1 2 3 4 5 6 7

Start date on site

Anticipated date of first occupation

Anticipated completion date

No. of dwellings

Sustainability code for dwellings

Public houses and/or restaurants

No. of seats

Floor space (m2)

Hotels: Total No. of beds

Schools: Total No. of pupils

Hospitals: Total No. of beds

Nursing homes: Total No. of beds

Retail units: Total No. of units

Office space: Total No. of units

Industrial / manufacturing: Total No. of units

Other: Foul water (litres per second)

Section 7: Supporting information Please confirm you have included all supporting information in relation to your enquiry

Site location plan Yes X No

Site boundary Yes X No

Proposed drainage layout plan (optional) Yes No X

Indicative layout plan (optional) Yes X No

Calculations in support of proposed flow rates or run off rates (optional) Yes X No

Flood risk assessment (if appropriate) Yes No X

Section 8: Declaration

I understand that the submission of this form is to be treated as a preliminary enquiry and the information may be subject to change. In particular, I understand that the information United Utilities Water Limited provides in response is valid only in conjunction with the information provided in relation to this enquiry, any changes to regulation or development layout will

invalidate our response.

Name (please print) SIMON GOUGH Signature

Company IRONSIDE FARRAR Date 02/06/17

For United Utilities use only

Date received UUW Ref No. United Utilities Water Limited, Haweswater House, Lingley Mere Business Park, Lingley Green Avenue, Warrington, WA5 3LP. Registered in England and Wales. Registered number 2366678.

Page 32: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

APPENDIX H

Proposed Development &

Drainage Layout

Page 33: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

6

3

.

8

5

6

3

.

8

0

6

4

.

4

0

6

4

.

1

5

6

4

.

9

0

6

4

.

6

0

6

4

.

0

0

6

3

.

7

0

6

3

.4

56

3

.2

5

6

3

.4

0

6

3

.5

0

6

3

.6

0

6

3

.3

0

6

3

.4

0

6

3

.4

0

6

2

.8

5

6

3

.0

0

6

3

.1

5

6

3

.3

0

6

3

.

3

0

6

3

.

4

5

6

3

.

6

0

6

3

.

7

5

6

3

.

9

5

(61.075)750mmØ1:400

(61.123)62.46

Ex 525mmØ Culvert

Ex MHC.L 62.58mI.L 60.87m

62.75

Ex 525mmØ Culvert

(60.967)

750mmØ 1:400

62.97

64.50

(61.226)

64.15

900mmØ 1:400

63.34

150m

@ 1

:60

(60.

813)

(60.

417)

150m

@ 1

:150

(60.

053)

(59.

859)

150m

@ 1

:150

63.85

900mmØ1:400

900m

1:4

00

(61.

154)

63.09

(61.

210)

(61.

334)

900m

1:4

00

900m

1:4

00

(61.

398)

63.65

63.00

(61.

500)

63.35

900m

1 :4

00

(61.445)

(61.300)150mmØ @ 1:150

150mmØ @ 1:150

(61.187)

(61.007)

(61.392)

900mmØ 1:400

900mmØ 1:400

63.67

60m

300mmØ 1:190

65.00

6

4

.

4

0

Off-line CellularStorage 36m³x 0.4m I.L 62.00mabove 30 year W.L

Off-line Cellular Storage123m³x 0.4m deep I.L 62.00mabove 30 year W.L

Proposed ControlManhole with vortexflow control to limitflows to 10.6l/s(equivalent to Qbar) inall events up to andincluding the 100 yearevent +30% ccallowance.

Off-line Cellular Storage32m³x 0.4m deep I.L 62.00mabove 30 year W.L

Off-line Cellular Storage92m³x 0.4m deep I.L 62.00mabove 30 year W.L

Off-line Cellular Storage60m³x 0.4m deep I.L 62.00mabove 30 year W.L

2

1

16

17

18

19

21

23

24

25

27

28

29

30

31

32

33

34

36

35

H

o

3

4

5

20

6

7

8

9

10

11

12

13

14

15

22

26

H

o

B

e

C

B

e

C

B

e

C

*

*

*

*

R

o

R

o

*

*

*

*

R

o

R

o

*

*

H

o

H

o

*

C

h

W

o

W

o

F

o

x

F

o

x

F

o

x

F

o

x

SVP

C

h

B

e

C

B

e

C

B

e

C

C

h

B

r

B

r

B

r

C

h

B

r

C

h

C

h

F

o

x

F

o

x

B

r

W

E

T

W

E

L

L

T

A

N

K

E

R

H

A

R

D

S

T

A

N

D

I

N

G

H

A

R

D

S

T

A

N

D

I

N

G

K

I

O

S

K

W

o

W

o

B

r

Ex F

oul S

ewer

150mmØ Gravity FoulConnection to existingfoul sewer in KirkAvenue

RISI

NG

MAI

N

WO

RISING MAIN

RIS

ING

MAI

N

RIS

ING

MAI

N

PROPOSED FFL's ARESHOWN ± 750mm

[email protected]

EnvironmentalPlannersCivilEngineers

LandscapeArchitectsGraphicDesign

EnvironmentalConsultants

EDINBURGH BELLSHILL

Tel. 0161 703 8801 Fax. 0161 703 82793 Worsley Court MANCHESTER M28 3NJ

IronsideFarrar

Checked ByDrawnOriginal Size Copyright Acknowledgement Drawing No.

Ordnace Survey©©Crown Copyright.All rights reserved.Licence No. AL100017966.

Date Scale

Title

Quality Ass. Client

North Point Project

Revision

UKAS 005QualityAssuranceISO 9001:2008SGS CertificateGB02/54539

Union StreetClitheroe

Prospect (GB)Limited

Proposed Development& Drainage Layout

KD SRG

March 17 1:500

30250/App HA1

AutoCAD SHX Text
stna
AutoCAD SHX Text
62.62
AutoCAD SHX Text
stnb
AutoCAD SHX Text
62.51
AutoCAD SHX Text
stnc
AutoCAD SHX Text
62.65
AutoCAD SHX Text
stnd
AutoCAD SHX Text
63.04
AutoCAD SHX Text
stne
AutoCAD SHX Text
64.87
AutoCAD SHX Text
stnf
AutoCAD SHX Text
65.37
AutoCAD SHX Text
stng
AutoCAD SHX Text
65.49
AutoCAD SHX Text
stnh
AutoCAD SHX Text
66.09
AutoCAD SHX Text
stni
AutoCAD SHX Text
66.05
AutoCAD SHX Text
stnj
AutoCAD SHX Text
66.33
AutoCAD SHX Text
stnk
AutoCAD SHX Text
66.63
AutoCAD SHX Text
62.58
AutoCAD SHX Text
62.51
AutoCAD SHX Text
62.50
AutoCAD SHX Text
62.47
AutoCAD SHX Text
62.45
AutoCAD SHX Text
62.43
AutoCAD SHX Text
62.40
AutoCAD SHX Text
62.40
AutoCAD SHX Text
62.32
AutoCAD SHX Text
62.38
AutoCAD SHX Text
62.41
AutoCAD SHX Text
62.47
AutoCAD SHX Text
62.52
AutoCAD SHX Text
62.69
AutoCAD SHX Text
62.60
AutoCAD SHX Text
62.71
AutoCAD SHX Text
62.79
AutoCAD SHX Text
62.83
AutoCAD SHX Text
62.93
AutoCAD SHX Text
62.91
AutoCAD SHX Text
62.83
AutoCAD SHX Text
62.70
AutoCAD SHX Text
62.54
AutoCAD SHX Text
62.51
AutoCAD SHX Text
62.46
AutoCAD SHX Text
62.48
AutoCAD SHX Text
62.48
AutoCAD SHX Text
62.52
AutoCAD SHX Text
62.57
AutoCAD SHX Text
62.70
AutoCAD SHX Text
62.65
AutoCAD SHX Text
62.60
AutoCAD SHX Text
62.62
AutoCAD SHX Text
62.57
AutoCAD SHX Text
62.64
AutoCAD SHX Text
62.73
AutoCAD SHX Text
62.85
AutoCAD SHX Text
62.97
AutoCAD SHX Text
63.05
AutoCAD SHX Text
63.01
AutoCAD SHX Text
62.92
AutoCAD SHX Text
62.76
AutoCAD SHX Text
62.71
AutoCAD SHX Text
63.78
AutoCAD SHX Text
63.50
AutoCAD SHX Text
63.20
AutoCAD SHX Text
63.04
AutoCAD SHX Text
62.51
AutoCAD SHX Text
62.58
AutoCAD SHX Text
62.64
AutoCAD SHX Text
62.67
AutoCAD SHX Text
62.70
AutoCAD SHX Text
62.73
AutoCAD SHX Text
62.66
AutoCAD SHX Text
62.65
AutoCAD SHX Text
62.69
AutoCAD SHX Text
62.60
AutoCAD SHX Text
62.55
AutoCAD SHX Text
62.54
AutoCAD SHX Text
62.51
AutoCAD SHX Text
62.49
AutoCAD SHX Text
62.68
AutoCAD SHX Text
62.67
AutoCAD SHX Text
62.84
AutoCAD SHX Text
62.89
AutoCAD SHX Text
63.00
AutoCAD SHX Text
63.04
AutoCAD SHX Text
63.27
AutoCAD SHX Text
63.26
AutoCAD SHX Text
63.46
AutoCAD SHX Text
63.49
AutoCAD SHX Text
63.58
AutoCAD SHX Text
62.96
AutoCAD SHX Text
62.85
AutoCAD SHX Text
62.61
AutoCAD SHX Text
62.46
AutoCAD SHX Text
62.57
AutoCAD SHX Text
62.56
AutoCAD SHX Text
62.53
AutoCAD SHX Text
62.48
AutoCAD SHX Text
64.28
AutoCAD SHX Text
64.27
AutoCAD SHX Text
62.61
AutoCAD SHX Text
62.44
AutoCAD SHX Text
62.24
AutoCAD SHX Text
61.89
AutoCAD SHX Text
61.35
AutoCAD SHX Text
61.22
AutoCAD SHX Text
61.13
AutoCAD SHX Text
61.25
AutoCAD SHX Text
61.20
AutoCAD SHX Text
61.76
AutoCAD SHX Text
61.63
AutoCAD SHX Text
61.13
AutoCAD SHX Text
65.69
AutoCAD SHX Text
65.58
AutoCAD SHX Text
65.13
AutoCAD SHX Text
65.14
AutoCAD SHX Text
65.08
AutoCAD SHX Text
65.05
AutoCAD SHX Text
65.07
AutoCAD SHX Text
65.03
AutoCAD SHX Text
65.12
AutoCAD SHX Text
65.06
AutoCAD SHX Text
65.06
AutoCAD SHX Text
64.99
AutoCAD SHX Text
66.27
AutoCAD SHX Text
66.34
AutoCAD SHX Text
66.49
AutoCAD SHX Text
66.44
AutoCAD SHX Text
66.47
AutoCAD SHX Text
63.41
AutoCAD SHX Text
63.86
AutoCAD SHX Text
64.14
AutoCAD SHX Text
64.40
AutoCAD SHX Text
65.08
AutoCAD SHX Text
64.98
AutoCAD SHX Text
64.96
AutoCAD SHX Text
65.40
AutoCAD SHX Text
65.03
AutoCAD SHX Text
65.02
AutoCAD SHX Text
65.09
AutoCAD SHX Text
65.52
AutoCAD SHX Text
65.39
AutoCAD SHX Text
65.49
AutoCAD SHX Text
66.08
AutoCAD SHX Text
66.05
AutoCAD SHX Text
65.99
AutoCAD SHX Text
65.68
AutoCAD SHX Text
65.99
AutoCAD SHX Text
65.99
AutoCAD SHX Text
66.15
AutoCAD SHX Text
66.30
AutoCAD SHX Text
66.35
AutoCAD SHX Text
66.40
AutoCAD SHX Text
66.52
AutoCAD SHX Text
66.51
AutoCAD SHX Text
66.53
AutoCAD SHX Text
66.52
AutoCAD SHX Text
66.49
AutoCAD SHX Text
66.48
AutoCAD SHX Text
62.59
AutoCAD SHX Text
62.69
AutoCAD SHX Text
62.54
AutoCAD SHX Text
65.31
AutoCAD SHX Text
65.19
AutoCAD SHX Text
65.29
AutoCAD SHX Text
65.52
AutoCAD SHX Text
65.47
AutoCAD SHX Text
65.54
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL62.64
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL62.98
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL62.58
AutoCAD SHX Text
G
AutoCAD SHX Text
62.45
AutoCAD SHX Text
G
AutoCAD SHX Text
62.86
AutoCAD SHX Text
G
AutoCAD SHX Text
62.63
AutoCAD SHX Text
G
AutoCAD SHX Text
62.46
AutoCAD SHX Text
G
AutoCAD SHX Text
62.28
AutoCAD SHX Text
G
AutoCAD SHX Text
62.38
AutoCAD SHX Text
G
AutoCAD SHX Text
62.45
AutoCAD SHX Text
G
AutoCAD SHX Text
62.47
AutoCAD SHX Text
FH
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
TP
AutoCAD SHX Text
BT
AutoCAD SHX Text
WM
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
62.68
AutoCAD SHX Text
62.59
AutoCAD SHX Text
62.53
AutoCAD SHX Text
62.53
AutoCAD SHX Text
62.46
AutoCAD SHX Text
62.42
AutoCAD SHX Text
62.58
AutoCAD SHX Text
62.66
AutoCAD SHX Text
62.82
AutoCAD SHX Text
62.94
AutoCAD SHX Text
64.73
AutoCAD SHX Text
64.70
AutoCAD SHX Text
64.64
AutoCAD SHX Text
64.56
AutoCAD SHX Text
64.52
AutoCAD SHX Text
64.50
AutoCAD SHX Text
64.60
AutoCAD SHX Text
64.80
AutoCAD SHX Text
65.00
AutoCAD SHX Text
64.15
AutoCAD SHX Text
63.92
AutoCAD SHX Text
63.83
AutoCAD SHX Text
63.59
AutoCAD SHX Text
63.41
AutoCAD SHX Text
63.58
AutoCAD SHX Text
63.82
AutoCAD SHX Text
64.00
AutoCAD SHX Text
64.03
AutoCAD SHX Text
64.05
AutoCAD SHX Text
63.52
AutoCAD SHX Text
63.23
AutoCAD SHX Text
63.01
AutoCAD SHX Text
62.93
AutoCAD SHX Text
62.89
AutoCAD SHX Text
62.27
AutoCAD SHX Text
63.01
AutoCAD SHX Text
63.25
AutoCAD SHX Text
63.36
AutoCAD SHX Text
63.44
AutoCAD SHX Text
62.91
AutoCAD SHX Text
62.87
AutoCAD SHX Text
62.77
AutoCAD SHX Text
62.57
AutoCAD SHX Text
62.42
AutoCAD SHX Text
62.43
AutoCAD SHX Text
62.44
AutoCAD SHX Text
62.62
AutoCAD SHX Text
62.82
AutoCAD SHX Text
63.02
AutoCAD SHX Text
62.76
AutoCAD SHX Text
62.47
AutoCAD SHX Text
62.33
AutoCAD SHX Text
62.19
AutoCAD SHX Text
62.10
AutoCAD SHX Text
62.23
AutoCAD SHX Text
62.29
AutoCAD SHX Text
62.41
AutoCAD SHX Text
62.43
AutoCAD SHX Text
62.44
AutoCAD SHX Text
62.47
AutoCAD SHX Text
62.19
AutoCAD SHX Text
62.21
AutoCAD SHX Text
62.07
AutoCAD SHX Text
61.90
AutoCAD SHX Text
61.75
AutoCAD SHX Text
61.60
AutoCAD SHX Text
61.78
AutoCAD SHX Text
61.99
AutoCAD SHX Text
62.17
AutoCAD SHX Text
62.12
AutoCAD SHX Text
61.95
AutoCAD SHX Text
61.89
AutoCAD SHX Text
61.72
AutoCAD SHX Text
61.49
AutoCAD SHX Text
61.38
AutoCAD SHX Text
61.76
AutoCAD SHX Text
61.96
AutoCAD SHX Text
61.96
AutoCAD SHX Text
61.86
AutoCAD SHX Text
61.81
AutoCAD SHX Text
61.47
AutoCAD SHX Text
61.31
AutoCAD SHX Text
61.42
AutoCAD SHX Text
61.50
AutoCAD SHX Text
61.63
AutoCAD SHX Text
61.69
AutoCAD SHX Text
61.80
AutoCAD SHX Text
61.97
AutoCAD SHX Text
62.10
AutoCAD SHX Text
62.03
AutoCAD SHX Text
62.17
AutoCAD SHX Text
62.33
AutoCAD SHX Text
62.27
AutoCAD SHX Text
64.36
AutoCAD SHX Text
64.37
AutoCAD SHX Text
EL68.59
AutoCAD SHX Text
EL67.97
AutoCAD SHX Text
EL68.30
AutoCAD SHX Text
EL68.01
AutoCAD SHX Text
EL67.48
AutoCAD SHX Text
EL65.18
AutoCAD SHX Text
EL70.08
AutoCAD SHX Text
EL63.61
AutoCAD SHX Text
EL66.24
AutoCAD SHX Text
EL63.59
AutoCAD SHX Text
EL66.18
AutoCAD SHX Text
EL66.16
AutoCAD SHX Text
EL66.35
AutoCAD SHX Text
EL66.62
AutoCAD SHX Text
EL66.82
AutoCAD SHX Text
RL66.79
AutoCAD SHX Text
RL69.94
AutoCAD SHX Text
RL70.11
AutoCAD SHX Text
RL71.26
AutoCAD SHX Text
RL70.50
AutoCAD SHX Text
RL71.41
AutoCAD SHX Text
RL72.17
AutoCAD SHX Text
RL69.32
AutoCAD SHX Text
RL69.16
AutoCAD SHX Text
RL68.69
AutoCAD SHX Text
RL68.69
AutoCAD SHX Text
RL68.38
AutoCAD SHX Text
RL65.02
AutoCAD SHX Text
RL68.94
AutoCAD SHX Text
RL65.66
AutoCAD SHX Text
62.13
AutoCAD SHX Text
61.97
AutoCAD SHX Text
61.85
AutoCAD SHX Text
65.50
AutoCAD SHX Text
65.45
AutoCAD SHX Text
65.56
AutoCAD SHX Text
65.54
AutoCAD SHX Text
65.57
AutoCAD SHX Text
65.51
AutoCAD SHX Text
65.49
AutoCAD SHX Text
65.61
AutoCAD SHX Text
65.59
AutoCAD SHX Text
65.63
AutoCAD SHX Text
65.42
AutoCAD SHX Text
65.28
AutoCAD SHX Text
65.26
AutoCAD SHX Text
65.54
AutoCAD SHX Text
65.43
AutoCAD SHX Text
65.39
AutoCAD SHX Text
65.49
AutoCAD SHX Text
65.71
AutoCAD SHX Text
65.68
AutoCAD SHX Text
65.82
AutoCAD SHX Text
65.68
AutoCAD SHX Text
65.51
AutoCAD SHX Text
64.99
AutoCAD SHX Text
66.32
AutoCAD SHX Text
66.17
AutoCAD SHX Text
66.41
AutoCAD SHX Text
61.03
AutoCAD SHX Text
61.10
AutoCAD SHX Text
61.09
AutoCAD SHX Text
61.10
AutoCAD SHX Text
65.01
AutoCAD SHX Text
65.18
AutoCAD SHX Text
65.39
AutoCAD SHX Text
65.51
AutoCAD SHX Text
65.04
AutoCAD SHX Text
64.31
AutoCAD SHX Text
64.08
AutoCAD SHX Text
63.79
AutoCAD SHX Text
60.98
AutoCAD SHX Text
60.99
AutoCAD SHX Text
61.13
AutoCAD SHX Text
61.01
AutoCAD SHX Text
61.09
AutoCAD SHX Text
61.47
AutoCAD SHX Text
61.87
AutoCAD SHX Text
61.81
AutoCAD SHX Text
61.95
AutoCAD SHX Text
61.81
AutoCAD SHX Text
62.40
AutoCAD SHX Text
62.37
AutoCAD SHX Text
62.51
AutoCAD SHX Text
62.79
AutoCAD SHX Text
62.84
AutoCAD SHX Text
62.76
AutoCAD SHX Text
62.48
AutoCAD SHX Text
PS
AutoCAD SHX Text
66.05
AutoCAD SHX Text
66.06
AutoCAD SHX Text
66.10
AutoCAD SHX Text
66.03
AutoCAD SHX Text
65.80
AutoCAD SHX Text
65.55
AutoCAD SHX Text
65.47
AutoCAD SHX Text
65.25
AutoCAD SHX Text
65.17
AutoCAD SHX Text
65.29
AutoCAD SHX Text
65.46
AutoCAD SHX Text
65.35
AutoCAD SHX Text
65.46
AutoCAD SHX Text
65.38
AutoCAD SHX Text
61.35
AutoCAD SHX Text
61.34
AutoCAD SHX Text
61.33
AutoCAD SHX Text
61.55
AutoCAD SHX Text
61.56
AutoCAD SHX Text
61.90
AutoCAD SHX Text
61.91
AutoCAD SHX Text
63.36
AutoCAD SHX Text
63.29
AutoCAD SHX Text
62.93
AutoCAD SHX Text
62.67
AutoCAD SHX Text
62.42
AutoCAD SHX Text
62.24
AutoCAD SHX Text
61.99
AutoCAD SHX Text
65.51
AutoCAD SHX Text
65.11
AutoCAD SHX Text
64.62
AutoCAD SHX Text
64.27
AutoCAD SHX Text
64.00
AutoCAD SHX Text
63.40
AutoCAD SHX Text
65.59
AutoCAD SHX Text
65.71
AutoCAD SHX Text
65.56
AutoCAD SHX Text
65.60
AutoCAD SHX Text
65.67
AutoCAD SHX Text
66.11
AutoCAD SHX Text
66.20
AutoCAD SHX Text
65.97
AutoCAD SHX Text
63.18
AutoCAD SHX Text
63.28
AutoCAD SHX Text
63.28
AutoCAD SHX Text
63.81
AutoCAD SHX Text
63.90
AutoCAD SHX Text
63.81
AutoCAD SHX Text
64.40
AutoCAD SHX Text
64.72
AutoCAD SHX Text
65.0
AutoCAD SHX Text
65.5
AutoCAD SHX Text
65.5
AutoCAD SHX Text
63.0
AutoCAD SHX Text
63.5
AutoCAD SHX Text
64.0
AutoCAD SHX Text
64.5
AutoCAD SHX Text
62.0
AutoCAD SHX Text
62.5
AutoCAD SHX Text
61.5
AutoCAD SHX Text
62.0
AutoCAD SHX Text
62.5
AutoCAD SHX Text
63.0
AutoCAD SHX Text
63.5
AutoCAD SHX Text
66.0
AutoCAD SHX Text
64.5
AutoCAD SHX Text
64.0
AutoCAD SHX Text
65.0
AutoCAD SHX Text
65.5
AutoCAD SHX Text
STATION
AutoCAD SHX Text
EASTING
AutoCAD SHX Text
NORTHING
AutoCAD SHX Text
LEVEL (m)
AutoCAD SHX Text
COORDINATED STATIONS
AutoCAD SHX Text
A
AutoCAD SHX Text
373202.647
AutoCAD SHX Text
441714.899
AutoCAD SHX Text
62.616
AutoCAD SHX Text
373229.837
AutoCAD SHX Text
B
AutoCAD SHX Text
441711.344
AutoCAD SHX Text
62.514
AutoCAD SHX Text
373278.345
AutoCAD SHX Text
373184.301
AutoCAD SHX Text
D
AutoCAD SHX Text
C
AutoCAD SHX Text
441744.776
AutoCAD SHX Text
441728.077
AutoCAD SHX Text
63.035
AutoCAD SHX Text
62.649
AutoCAD SHX Text
373309.111
AutoCAD SHX Text
373302.934
AutoCAD SHX Text
373298.812
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
441663.492
AutoCAD SHX Text
441635.020
AutoCAD SHX Text
441699.506
AutoCAD SHX Text
65.373
AutoCAD SHX Text
65.489
AutoCAD SHX Text
64.869
AutoCAD SHX Text
373307.004
AutoCAD SHX Text
H
AutoCAD SHX Text
441610.122
AutoCAD SHX Text
66.093
AutoCAD SHX Text
373336.486
AutoCAD SHX Text
373325.779
AutoCAD SHX Text
373314.276
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
I
AutoCAD SHX Text
441597.221
AutoCAD SHX Text
441579.062
AutoCAD SHX Text
441603.613
AutoCAD SHX Text
66.328
AutoCAD SHX Text
66.625
AutoCAD SHX Text
66.053
AutoCAD SHX Text
441900
AutoCAD SHX Text
441800
AutoCAD SHX Text
441700
AutoCAD SHX Text
441600
AutoCAD SHX Text
373200
AutoCAD SHX Text
441700
AutoCAD SHX Text
441600
AutoCAD SHX Text
373300
AutoCAD SHX Text
373400
AutoCAD SHX Text
UNION STREET
AutoCAD SHX Text
UNION STREET
AutoCAD SHX Text
QUEEN STREET
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
EXISTING HOUSES
AutoCAD SHX Text
EXISTING HOUSES
AutoCAD SHX Text
EXISTING HOUSES
AutoCAD SHX Text
EXISTING HOUSES
AutoCAD SHX Text
EXISTING HOUSES
AutoCAD SHX Text
EXISTING HOUSE
AutoCAD SHX Text
EXISTING HOUSES
AutoCAD SHX Text
EXISTING HOUSES
AutoCAD SHX Text
EXISTING HOUSES
AutoCAD SHX Text
EXISTING HOUSES
AutoCAD SHX Text
EXISTING HOUSES
AutoCAD SHX Text
EXISTING HOUSES
AutoCAD SHX Text
EXISTING HOUSES
AutoCAD SHX Text
CONC. POST & TIMBER PANEL FENCE
AutoCAD SHX Text
CONC. POST & TIMBER PANEL FENCE
AutoCAD SHX Text
TIMBER POST & RAIL FENCE
AutoCAD SHX Text
TIMBER POST & RAIL FENCE
AutoCAD SHX Text
TIMBER C/B FENCE
AutoCAD SHX Text
C/B WIRE FENCE
AutoCAD SHX Text
BARBED WIRE FENCE
AutoCAD SHX Text
STEEL SECURITY FENCE
AutoCAD SHX Text
BRICK WALL
AutoCAD SHX Text
BARBED WIRE FENCE
AutoCAD SHX Text
WATERLOGGED
AutoCAD SHX Text
TIMBER C/B FENCE
AutoCAD SHX Text
BUSHES &
AutoCAD SHX Text
BRAMBLES
AutoCAD SHX Text
IL60.87
AutoCAD SHX Text
750 DIAM
AutoCAD SHX Text
FOW
AutoCAD SHX Text
UTL
AutoCAD SHX Text
PUBLIC FOOTPATH
AutoCAD SHX Text
PUBLIC FOOTPATH
AutoCAD SHX Text
GARADENS
AutoCAD SHX Text
GARADENS
AutoCAD SHX Text
GARADENS
AutoCAD SHX Text
GARADENS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
SHED
AutoCAD SHX Text
GARADENS
AutoCAD SHX Text
GARADENS
AutoCAD SHX Text
GARADENS
AutoCAD SHX Text
GARADENS
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
TRACK
AutoCAD SHX Text
TRACK
AutoCAD SHX Text
as
AutoCAD SHX Text
opp
AutoCAD SHX Text
UNION STREET
AutoCAD SHX Text
opp
AutoCAD SHX Text
as
AutoCAD SHX Text
as
AutoCAD SHX Text
opp
AutoCAD SHX Text
as
AutoCAD SHX Text
as
AutoCAD SHX Text
opp
AutoCAD SHX Text
opp
AutoCAD SHX Text
as
AutoCAD SHX Text
opp
AutoCAD SHX Text
opp
AutoCAD SHX Text
as
AutoCAD SHX Text
as
AutoCAD SHX Text
opp
AutoCAD SHX Text
as
AutoCAD SHX Text
opp
AutoCAD SHX Text
as
AutoCAD SHX Text
opp
AutoCAD SHX Text
as
AutoCAD SHX Text
opp
AutoCAD SHX Text
opp
AutoCAD SHX Text
as
AutoCAD SHX Text
as
AutoCAD SHX Text
as
AutoCAD SHX Text
as
AutoCAD SHX Text
opp
AutoCAD SHX Text
as
AutoCAD SHX Text
as
AutoCAD SHX Text
opp
AutoCAD SHX Text
as
AutoCAD SHX Text
opp
AutoCAD SHX Text
as
AutoCAD SHX Text
as
AutoCAD SHX Text
opp
Page 34: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

APPENDIX I

Hydraulic Calculations

Page 35: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 1

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Existing Runoff

Date March 2017 Designed by srg

File Checked by

Micro Drainage Source Control 2016.1

ICP SUDS Mean Annual Flood

©1982-2016 XP Solutions

Input

Return Period (years) 100 Soil 0.450Area (ha) 1.310 Urban 0.000SAAR (mm) 1179 Region Number Region 10

Results l/s

QBAR Rural 10.6QBAR Urban 10.6

Q100 years 22.0

Q1 year 9.2Q30 years 18.0

Q100 years 22.0

Page 36: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 1

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

STORM SEWER DESIGN by the Modified Rational Method

Design Criteria for Storm

©1982-2016 XP Solutions

Pipe Sizes STANDARD Manhole Sizes STANDARD

FSR Rainfall Model - England and WalesReturn Period (years) 2 Add Flow / Climate Change (%) 0

M5-60 (mm) 20.400 Minimum Backdrop Height (m) 0.000Ratio R 0.256 Maximum Backdrop Height (m) 0.000

Maximum Rainfall (mm/hr) 0 Min Design Depth for Optimisation (m) 1.200Maximum Time of Concentration (mins) 30 Min Vel for Auto Design only (m/s) 1.00

Foul Sewage (l/s/ha) 0.000 Min Slope for Optimisation (1:X) 500Volumetric Runoff Coeff. 0.750

Designed with Level Soffits

Time Area Diagram for Storm

Time

(mins)

Area

(ha)

Time

(mins)

Area

(ha)

0-4 0.344 4-8 0.244

Total Area Contributing (ha) = 0.588

Total Pipe Volume (m³) = 153.600

Network Design Table for Storm

PN Length

(m)

Fall

(m)

Slope

(1:X)

I.Area

(ha)

T.E.

(mins)

Base

Flow (l/s)

k

(mm)

HYD

SECT

DIA

(mm)

Section Type Auto

Design

1.000 22.000 0.055 400.0 0.064 4.00 0.0 0.600 o 900 Pipe/Conduit1.001 21.000 0.053 396.2 0.098 0.00 0.0 0.600 o 900 Pipe/Conduit1.002 23.000 0.058 396.6 0.051 0.00 0.0 0.600 o 900 Pipe/Conduit

2.000 25.000 0.063 396.8 0.059 4.00 0.0 0.600 o 900 Pipe/Conduit

1.003 49.500 0.124 399.2 0.067 0.00 0.0 0.600 o 900 Pipe/Conduit

Network Results Table

PN Rain

(mm/hr)

T.C.

(mins)

US/IL

(m)

Σ I.Area

(ha)

Σ Base

Flow (l/s)

Foul

(l/s)

Add Flow

(l/s)

Vel

(m/s)

Cap

(l/s)

Flow

(l/s)

1.000 0.00 4.23 61.500 0.064 0.0 0.0 0.0 1.56 992.7 0.01.001 0.00 4.46 61.445 0.162 0.0 0.0 0.0 1.57 997.5 0.01.002 0.00 4.70 61.392 0.213 0.0 0.0 0.0 1.57 997.0 0.0

2.000 0.00 4.27 61.398 0.059 0.0 0.0 0.0 1.57 996.7 0.0

1.003 0.00 5.23 61.334 0.339 0.0 0.0 0.0 1.56 993.7 0.0

Page 37: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 2

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

Network Design Table for Storm

©1982-2016 XP Solutions

PN Length

(m)

Fall

(m)

Slope

(1:X)

I.Area

(ha)

T.E.

(mins)

Base

Flow (l/s)

k

(mm)

HYD

SECT

DIA

(mm)

Section Type Auto

Design

3.000 22.000 0.055 400.0 0.046 4.00 0.0 0.600 o 900 Pipe/Conduit

1.004 22.500 0.056 401.8 0.079 0.00 0.0 0.600 o 900 Pipe/Conduit1.005 12.500 0.031 403.2 0.045 0.00 0.0 0.600 o 900 Pipe/Conduit1.006 19.000 0.048 395.8 0.014 0.00 0.0 0.600 o 750 Pipe/Conduit1.007 43.000 0.108 398.1 0.065 0.00 0.0 0.600 o 750 Pipe/Conduit1.008 8.000 0.042 190.5 0.000 0.00 0.0 0.600 o 300 Pipe/Conduit

Network Results Table

PN Rain

(mm/hr)

T.C.

(mins)

US/IL

(m)

Σ I.Area

(ha)

Σ Base

Flow (l/s)

Foul

(l/s)

Add Flow

(l/s)

Vel

(m/s)

Cap

(l/s)

Flow

(l/s)

3.000 0.00 4.23 61.266 0.046 0.0 0.0 0.0 1.56 992.7 0.0

1.004 0.00 5.47 61.210 0.464 0.0 0.0 0.0 1.56 990.5 0.01.005 0.00 5.61 61.154 0.509 0.0 0.0 0.0 1.55 988.7 0.01.006 0.00 5.83 61.123 0.523 0.0 0.0 0.0 1.40 618.7 0.01.007 0.00 6.35 61.075 0.588 0.0 0.0 0.0 1.40 616.9 0.01.008 0.00 6.46 60.967 0.588 0.0 0.0 0.0 1.14 80.3 0.0

Page 38: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 3

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

PIPELINE SCHEDULES for Storm

Upstream Manhole

©1982-2016 XP Solutions

PN Hyd

Sect

Diam

(mm)

MH

Name

C.Level

(m)

I.Level

(m)

D.Depth

(m)

MH

Connection

MH DIAM., L*W

(mm)

1.000 o 900 1 63.600 61.500 1.200 Open Manhole 21001.001 o 900 2 63.350 61.445 1.005 Open Manhole 21001.002 o 900 3 63.610 61.392 1.318 Open Manhole 2100

2.000 o 900 4 64.150 61.398 1.852 Open Manhole 2100

1.003 o 900 5 63.850 61.334 1.616 Open Manhole 2400

3.000 o 900 6 64.500 61.266 2.334 Open Manhole 2100

1.004 o 900 7 63.340 61.210 1.230 Open Manhole 24001.005 o 900 8 63.090 61.154 1.036 Open Manhole 21001.006 o 750 9 62.940 61.123 1.067 Open Manhole 21001.007 o 750 10 62.750 61.075 0.925 Open Manhole 21001.008 o 300 11 62.480 60.967 1.213 Open Manhole 2100

Downstream Manhole

PN Length

(m)

Slope

(1:X)

MH

Name

C.Level

(m)

I.Level

(m)

D.Depth

(m)

MH

Connection

MH DIAM., L*W

(mm)

1.000 22.000 400.0 2 63.350 61.445 1.005 Open Manhole 21001.001 21.000 396.2 3 63.610 61.392 1.318 Open Manhole 21001.002 23.000 396.6 5 63.850 61.334 1.616 Open Manhole 2400

2.000 25.000 396.8 5 63.850 61.335 1.615 Open Manhole 2400

1.003 49.500 399.2 7 63.340 61.210 1.230 Open Manhole 2400

3.000 22.000 400.0 7 63.340 61.211 1.229 Open Manhole 2400

1.004 22.500 401.8 8 63.090 61.154 1.036 Open Manhole 21001.005 12.500 403.2 9 62.940 61.123 0.917 Open Manhole 21001.006 19.000 395.8 10 62.750 61.075 0.925 Open Manhole 21001.007 43.000 398.1 11 62.480 60.967 0.763 Open Manhole 21001.008 8.000 190.5 62.580 60.925 1.355 Open Manhole 1500

Page 39: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 4

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

Simulation Criteria for Storm

©1982-2016 XP Solutions

Volumetric Runoff Coeff 0.750 Additional Flow - % of Total Flow 0.000Areal Reduction Factor 1.000 MADD Factor * 10m³/ha Storage 2.000

Hot Start (mins) 0 Inlet Coeffiecient 0.800Hot Start Level (mm) 0 Flow per Person per Day (l/per/day) 0.000

Manhole Headloss Coeff (Global) 0.500 Run Time (mins) 60Foul Sewage per hectare (l/s) 0.000 Output Interval (mins) 1

Number of Input Hydrographs 0 Number of Offline Controls 0 Number of Time/Area Diagrams 0Number of Online Controls 1 Number of Storage Structures 5 Number of Real Time Controls 0

Synthetic Rainfall Details

Rainfall Model FSR Profile Type SummerReturn Period (years) 2 Cv (Summer) 0.750

Region England and Wales Cv (Winter) 0.840M5-60 (mm) 20.400 Storm Duration (mins) 30

Ratio R 0.256

Page 40: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 5

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

Online Controls for Storm

©1982-2016 XP Solutions

Hydro-Brake Optimum® Manhole: 11, DS/PN: 1.008, Volume (m³): 23.3

Unit Reference MD-SHE-0144-1060-1400-1060Design Head (m) 1.400

Design Flow (l/s) 10.6Flush-Flo™ CalculatedObjective Minimise upstream storage

Application SurfaceSump Available YesDiameter (mm) 144

Invert Level (m) 60.967Minimum Outlet Pipe Diameter (mm) 225

Suggested Manhole Diameter (mm) 1200

Control Points Head (m) Flow (l/s) Control Points Head (m) Flow (l/s)

Design Point (Calculated) 1.400 10.6 Kick-Flo® 0.880 8.5Flush-Flo™ 0.408 10.6 Mean Flow over Head Range - 9.2

The hydrological calculations have been based on the Head/Discharge relationship for theHydro-Brake Optimum® as specified. Should another type of control device other than a Hydro-Brake Optimum® be utilised then these storage routing calculations will be invalidated

Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s)

0.100 5.2 1.200 9.9 3.000 15.2 7.000 22.80.200 9.7 1.400 10.6 3.500 16.4 7.500 23.60.300 10.4 1.600 11.3 4.000 17.4 8.000 24.30.400 10.6 1.800 11.9 4.500 18.5 8.500 25.00.500 10.5 2.000 12.5 5.000 19.4 9.000 25.70.600 10.3 2.200 13.1 5.500 20.3 9.500 26.40.800 9.4 2.400 13.7 6.000 21.21.000 9.0 2.600 14.2 6.500 22.0

Page 41: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 6

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

Storage Structures for Storm

©1982-2016 XP Solutions

Cellular Storage Manhole: 3, DS/PN: 1.002

Invert Level (m) 62.000 Safety Factor 2.0Infiltration Coefficient Base (m/hr) 0.00000 Porosity 0.95Infiltration Coefficient Side (m/hr) 0.00000

Depth (m) Area (m²) Inf. Area (m²) Depth (m) Area (m²) Inf. Area (m²)

0.000 60.0 0.0 1.300 0.0 0.00.100 60.0 0.0 1.400 0.0 0.00.200 60.0 0.0 1.500 0.0 0.00.300 60.0 0.0 1.600 0.0 0.00.400 60.0 0.0 1.700 0.0 0.00.401 0.0 0.0 1.800 0.0 0.00.600 0.0 0.0 1.900 0.0 0.00.700 0.0 0.0 2.000 0.0 0.00.800 0.0 0.0 2.100 0.0 0.00.900 0.0 0.0 2.200 0.0 0.01.000 0.0 0.0 2.300 0.0 0.01.100 0.0 0.0 2.400 0.0 0.01.200 0.0 0.0 2.500 0.0 0.0

Cellular Storage Manhole: 4, DS/PN: 2.000

Invert Level (m) 62.000 Safety Factor 2.0Infiltration Coefficient Base (m/hr) 0.00000 Porosity 0.95Infiltration Coefficient Side (m/hr) 0.00000

Depth (m) Area (m²) Inf. Area (m²) Depth (m) Area (m²) Inf. Area (m²)

0.000 92.0 0.0 1.300 0.0 0.00.100 92.0 0.0 1.400 0.0 0.00.200 92.0 0.0 1.500 0.0 0.00.300 92.0 0.0 1.600 0.0 0.00.400 92.0 0.0 1.700 0.0 0.00.401 0.0 0.0 1.800 0.0 0.00.600 0.0 0.0 1.900 0.0 0.00.700 0.0 0.0 2.000 0.0 0.00.800 0.0 0.0 2.100 0.0 0.00.900 0.0 0.0 2.200 0.0 0.01.000 0.0 0.0 2.300 0.0 0.01.100 0.0 0.0 2.400 0.0 0.01.200 0.0 0.0 2.500 0.0 0.0

Cellular Storage Manhole: 5, DS/PN: 1.003

Invert Level (m) 62.000 Safety Factor 2.0Infiltration Coefficient Base (m/hr) 0.00000 Porosity 0.95Infiltration Coefficient Side (m/hr) 0.00000

Page 42: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 7

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

Cellular Storage Manhole: 5, DS/PN: 1.003

©1982-2016 XP Solutions

Depth (m) Area (m²) Inf. Area (m²) Depth (m) Area (m²) Inf. Area (m²)

0.000 32.0 0.0 1.300 0.0 0.00.100 32.0 0.0 1.400 0.0 0.00.200 32.0 0.0 1.500 0.0 0.00.300 32.0 0.0 1.600 0.0 0.00.400 32.0 0.0 1.700 0.0 0.00.401 0.0 0.0 1.800 0.0 0.00.600 0.0 0.0 1.900 0.0 0.00.700 0.0 0.0 2.000 0.0 0.00.800 0.0 0.0 2.100 0.0 0.00.900 0.0 0.0 2.200 0.0 0.01.000 0.0 0.0 2.300 0.0 0.01.100 0.0 0.0 2.400 0.0 0.01.200 0.0 0.0 2.500 0.0 0.0

Cellular Storage Manhole: 7, DS/PN: 1.004

Invert Level (m) 62.000 Safety Factor 2.0Infiltration Coefficient Base (m/hr) 0.00000 Porosity 0.95Infiltration Coefficient Side (m/hr) 0.00000

Depth (m) Area (m²) Inf. Area (m²) Depth (m) Area (m²) Inf. Area (m²)

0.000 123.0 0.0 1.300 0.0 0.00.100 123.0 0.0 1.400 0.0 0.00.200 123.0 0.0 1.500 0.0 0.00.300 123.0 0.0 1.600 0.0 0.00.400 123.0 0.0 1.700 0.0 0.00.401 0.0 0.0 1.800 0.0 0.00.600 0.0 0.0 1.900 0.0 0.00.700 0.0 0.0 2.000 0.0 0.00.800 0.0 0.0 2.100 0.0 0.00.900 0.0 0.0 2.200 0.0 0.01.000 0.0 0.0 2.300 0.0 0.01.100 0.0 0.0 2.400 0.0 0.01.200 0.0 0.0 2.500 0.0 0.0

Cellular Storage Manhole: 8, DS/PN: 1.005

Invert Level (m) 62.000 Safety Factor 2.0Infiltration Coefficient Base (m/hr) 0.00000 Porosity 0.95Infiltration Coefficient Side (m/hr) 0.00000

Depth (m) Area (m²) Inf. Area (m²) Depth (m) Area (m²) Inf. Area (m²)

0.000 36.0 0.0 0.800 0.0 0.00.100 36.0 0.0 0.900 0.0 0.00.200 36.0 0.0 1.000 0.0 0.00.300 36.0 0.0 1.100 0.0 0.00.400 36.0 0.0 1.200 0.0 0.00.401 0.0 0.0 1.300 0.0 0.00.600 0.0 0.0 1.400 0.0 0.00.700 0.0 0.0 1.500 0.0 0.0

Page 43: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 8

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

Cellular Storage Manhole: 8, DS/PN: 1.005

©1982-2016 XP Solutions

Depth (m) Area (m²) Inf. Area (m²) Depth (m) Area (m²) Inf. Area (m²)

1.600 0.0 0.0 2.100 0.0 0.01.700 0.0 0.0 2.200 0.0 0.01.800 0.0 0.0 2.300 0.0 0.01.900 0.0 0.0 2.400 0.0 0.02.000 0.0 0.0 2.500 0.0 0.0

Page 44: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 9

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

1 year Return Period Summary of Critical Results by Maximum Level (Rank1) for Storm

©1982-2016 XP Solutions

Simulation CriteriaAreal Reduction Factor 1.000 Additional Flow - % of Total Flow 0.000

Hot Start (mins) 0 MADD Factor * 10m³/ha Storage 2.000Hot Start Level (mm) 0 Inlet Coeffiecient 0.800

Manhole Headloss Coeff (Global) 0.500 Flow per Person per Day (l/per/day) 0.000Foul Sewage per hectare (l/s) 0.000

Number of Input Hydrographs 0 Number of Offline Controls 0 Number of Time/Area Diagrams 0Number of Online Controls 1 Number of Storage Structures 5 Number of Real Time Controls 0

Synthetic Rainfall DetailsRainfall Model FSR Ratio R 0.256

Region England and Wales Cv (Summer) 0.750M5-60 (mm) 20.400 Cv (Winter) 0.840

Margin for Flood Risk Warning (mm) 300.0Analysis Timestep 2.5 Second Increment (Extended)

DTS Status ONDVD Status ON

Inertia Status OFF

Profile(s) Summer and WinterDuration(s) (mins) 15, 30, 60, 120, 180, 240, 360, 480, 600

Return Period(s) (years) 1, 30, 100Climate Change (%) 0, 0, 30

PN

US/MH

Name Storm

Return

Period

Climate

Change

First (X)

Surcharge

First (Y)

Flood

First (Z)

Overflow

Overflow

Act.

Water

Level

(m)

1.000 1 15 Winter 1 +0% 61.5821.001 2 15 Winter 1 +0% 61.5521.002 3 15 Winter 1 +0% 100/180 Winter 61.5122.000 4 120 Winter 1 +0% 100/180 Winter 61.4961.003 5 120 Winter 1 +0% 100/120 Winter 61.4963.000 6 120 Winter 1 +0% 100/60 Winter 61.4941.004 7 120 Winter 1 +0% 100/60 Summer 61.4941.005 8 120 Winter 1 +0% 100/30 Winter 61.4931.006 9 120 Winter 1 +0% 30/60 Winter 61.4921.007 10 120 Winter 1 +0% 30/60 Winter 61.4901.008 11 120 Winter 1 +0% 1/15 Summer 61.484

PN

US/MH

Name

Surcharged

Depth

(m)

Flooded

Volume

(m³)

Flow /

Cap.

Overflow

(l/s)

Pipe

Flow

(l/s) Status

Level

Exceeded

1.000 1 -0.818 0.000 0.01 8.0 OK1.001 2 -0.793 0.000 0.03 17.8 OK1.002 3 -0.780 0.000 0.03 22.1 OK2.000 4 -0.802 0.000 0.00 3.0 OK1.003 5 -0.738 0.000 0.02 16.6 OK

Page 45: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 10

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

1 year Return Period Summary of Critical Results by Maximum Level (Rank1) for Storm

©1982-2016 XP Solutions

3.000 6 -0.672 0.000 0.00 1.9 OK1.004 7 -0.616 0.000 0.03 17.9 OK1.005 8 -0.561 0.000 0.04 18.1 OK1.006 9 -0.381 0.000 0.04 17.2 OK1.007 10 -0.335 0.000 0.03 17.3 OK1.008 11 0.217 0.000 0.18 10.6 SURCHARGED

PN

US/MH

Name

Surcharged

Depth

(m)

Flooded

Volume

(m³)

Flow /

Cap.

Overflow

(l/s)

Pipe

Flow

(l/s) Status

Level

Exceeded

Page 46: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 11

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

30 year Return Period Summary of Critical Results by Maximum Level (Rank1) for Storm

©1982-2016 XP Solutions

Simulation CriteriaAreal Reduction Factor 1.000 Additional Flow - % of Total Flow 0.000

Hot Start (mins) 0 MADD Factor * 10m³/ha Storage 2.000Hot Start Level (mm) 0 Inlet Coeffiecient 0.800

Manhole Headloss Coeff (Global) 0.500 Flow per Person per Day (l/per/day) 0.000Foul Sewage per hectare (l/s) 0.000

Number of Input Hydrographs 0 Number of Offline Controls 0 Number of Time/Area Diagrams 0Number of Online Controls 1 Number of Storage Structures 5 Number of Real Time Controls 0

Synthetic Rainfall DetailsRainfall Model FSR Ratio R 0.256

Region England and Wales Cv (Summer) 0.750M5-60 (mm) 20.400 Cv (Winter) 0.840

Margin for Flood Risk Warning (mm) 300.0Analysis Timestep 2.5 Second Increment (Extended)

DTS Status ONDVD Status ON

Inertia Status OFF

Profile(s) Summer and WinterDuration(s) (mins) 15, 30, 60, 120, 180, 240, 360, 480, 600

Return Period(s) (years) 1, 30, 100Climate Change (%) 0, 0, 30

PN

US/MH

Name Storm

Return

Period

Climate

Change

First (X)

Surcharge

First (Y)

Flood

First (Z)

Overflow

Overflow

Act.

Water

Level

(m)

1.000 1 180 Winter 30 +0% 61.9781.001 2 180 Winter 30 +0% 61.9781.002 3 180 Winter 30 +0% 100/180 Winter 61.9782.000 4 180 Winter 30 +0% 100/180 Winter 61.9781.003 5 180 Winter 30 +0% 100/120 Winter 61.9783.000 6 180 Winter 30 +0% 100/60 Winter 61.9761.004 7 180 Winter 30 +0% 100/60 Summer 61.9761.005 8 180 Winter 30 +0% 100/30 Winter 61.9731.006 9 180 Winter 30 +0% 30/60 Winter 61.9701.007 10 180 Winter 30 +0% 30/60 Winter 61.9691.008 11 180 Winter 30 +0% 1/15 Summer 61.967

PN

US/MH

Name

Surcharged

Depth

(m)

Flooded

Volume

(m³)

Flow /

Cap.

Overflow

(l/s)

Pipe

Flow

(l/s) Status

Level

Exceeded

1.000 1 -0.422 0.000 0.01 5.1 OK1.001 2 -0.367 0.000 0.02 11.9 OK1.002 3 -0.314 0.000 0.02 14.3 OK2.000 4 -0.320 0.000 0.01 4.6 OK1.003 5 -0.256 0.000 0.02 19.8 OK

Page 47: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 12

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

30 year Return Period Summary of Critical Results by Maximum Level (Rank1) for Storm

©1982-2016 XP Solutions

3.000 6 -0.190 0.000 0.01 3.5 OK1.004 7 -0.134 0.000 0.03 18.9 OK1.005 8 -0.081 0.000 0.04 18.1 OK1.006 9 0.097 0.000 0.04 16.6 SURCHARGED1.007 10 0.144 0.000 0.03 17.4 SURCHARGED1.008 11 0.700 0.000 0.18 10.6 SURCHARGED

PN

US/MH

Name

Surcharged

Depth

(m)

Flooded

Volume

(m³)

Flow /

Cap.

Overflow

(l/s)

Pipe

Flow

(l/s) Status

Level

Exceeded

Page 48: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 13

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

100 year Return Period Summary of Critical Results by Maximum Level(Rank 1) for Storm

©1982-2016 XP Solutions

Simulation CriteriaAreal Reduction Factor 1.000 Additional Flow - % of Total Flow 0.000

Hot Start (mins) 0 MADD Factor * 10m³/ha Storage 2.000Hot Start Level (mm) 0 Inlet Coeffiecient 0.800

Manhole Headloss Coeff (Global) 0.500 Flow per Person per Day (l/per/day) 0.000Foul Sewage per hectare (l/s) 0.000

Number of Input Hydrographs 0 Number of Offline Controls 0 Number of Time/Area Diagrams 0Number of Online Controls 1 Number of Storage Structures 5 Number of Real Time Controls 0

Synthetic Rainfall DetailsRainfall Model FSR Ratio R 0.256

Region England and Wales Cv (Summer) 0.750M5-60 (mm) 20.400 Cv (Winter) 0.840

Margin for Flood Risk Warning (mm) 300.0Analysis Timestep 2.5 Second Increment (Extended)

DTS Status ONDVD Status ON

Inertia Status OFF

Profile(s) Summer and WinterDuration(s) (mins) 15, 30, 60, 120, 180, 240, 360, 480, 600

Return Period(s) (years) 1, 30, 100Climate Change (%) 0, 0, 30

PN

US/MH

Name Storm

Return

Period

Climate

Change

First (X)

Surcharge

First (Y)

Flood

First (Z)

Overflow

Overflow

Act.

Water

Level

(m)

1.000 1 240 Winter 100 +30% 62.3351.001 2 240 Winter 100 +30% 62.3351.002 3 240 Winter 100 +30% 100/180 Winter 62.3332.000 4 240 Winter 100 +30% 100/180 Winter 62.3321.003 5 240 Winter 100 +30% 100/120 Winter 62.3323.000 6 240 Winter 100 +30% 100/60 Winter 62.3361.004 7 240 Winter 100 +30% 100/60 Summer 62.3361.005 8 240 Winter 100 +30% 100/30 Winter 62.3461.006 9 240 Winter 100 +30% 30/60 Winter 62.3521.007 10 240 Winter 100 +30% 30/60 Winter 62.3631.008 11 240 Winter 100 +30% 1/15 Summer 62.370

PN

US/MH

Name

Surcharged

Depth

(m)

Flooded

Volume

(m³)

Flow /

Cap.

Overflow

(l/s)

Pipe

Flow

(l/s) Status

Level

Exceeded

1.000 1 -0.065 0.000 0.01 7.5 OK1.001 2 -0.010 0.000 0.02 16.8 OK1.002 3 0.041 0.000 0.02 13.4 SURCHARGED2.000 4 0.034 0.000 0.02 12.4 SURCHARGED1.003 5 0.098 0.000 0.02 17.7 SURCHARGED

Page 49: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Ironside Farrar Ltd Page 14

3 Worsley Court Union Street

Walkden Clitheroe

Manchester M28 3NJ Proposed SW Layout

Date June 2017 Designed by srg

File 30250 Proposed SW 1706... Checked by

Micro Drainage Network 2016.1

100 year Return Period Summary of Critical Results by Maximum Level(Rank 1) for Storm

©1982-2016 XP Solutions

3.000 6 0.170 0.000 0.01 5.5 SURCHARGED1.004 7 0.226 0.000 0.05 32.2 SURCHARGED1.005 8 0.292 0.000 0.08 38.0 SURCHARGED1.006 9 0.479 0.000 0.07 30.3 SURCHARGED1.007 10 0.538 0.000 0.04 18.1 SURCHARGED1.008 11 1.103 0.000 0.18 10.6 FLOOD RISK

PN

US/MH

Name

Surcharged

Depth

(m)

Flooded

Volume

(m³)

Flow /

Cap.

Overflow

(l/s)

Pipe

Flow

(l/s) Status

Level

Exceeded

Page 50: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Union Street File Ref: 30250/SRG Clitheroe

APPENDIX J

Envirocheck Flood Data

Page 51: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Order Details

Site DetailsSite at 373280, 441780

Order Number:Customer Ref:National Grid Reference:Slice:Site Area (Ha):Search Buffer (m):

105484524_1_130250373280, 441780A0.011000

Tel:Fax:Web:

0844 844 99520844 844 9951www.envirocheck.co.uk

Page 9 of 17A Landmark Information Group Service v50.0 21-Nov-2016

EA/NRW Suitability Map - Slice A

EA/NRW Surface Water 1000 Year Return Depth Map (1:10,000)

Page 52: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Order Details

Site DetailsSite at 373280, 441780

Order Number:Customer Ref:National Grid Reference:Slice:Site Area (Ha):Search Buffer (m):

105484524_1_130250373280, 441780A0.011000

Tel:Fax:Web:

0844 844 99520844 844 9951www.envirocheck.co.uk

Page 12 of 17A Landmark Information Group Service v50.0 21-Nov-2016

EA/NRW Suitability Map - Slice A

EA/NRW Surface Water 1000 Year Return Velocity and Flow Direction Map (1:10,000)

Page 53: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Order Details

Site DetailsSite at 373280, 441780

Order Number:Customer Ref:National Grid Reference:Slice:Site Area (Ha):Search Buffer (m):

105484524_1_130250373280, 441780A0.011000

Tel:Fax:Web:

0844 844 99520844 844 9951www.envirocheck.co.uk

Page 15 of 17A Landmark Information Group Service v50.0 21-Nov-2016

EA/NRW Suitability Map - Slice A

EA/NRW Surface Water 1000 Year Return Hazard Rating Map (1:10,000)

Page 54: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Order Details

Site DetailsSite at 373280, 441780

Order Number:Customer Ref:National Grid Reference:Slice:Site Area (Ha):Search Buffer (m):

105484524_1_130250373280, 441780A0.011000

Tel:Fax:Web:

0844 844 99520844 844 9951www.envirocheck.co.uk

Page 2 of 4A Landmark Information Group Service v15.0 21-Nov-2016

BGS Flood Data Map - Slice A

BGS Flood Data (1:50,000)

Page 55: Prospect (GB) Limited Flood Risk Assessment & Drainage ... · FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY 1.0 Introduction This Flood Risk Assessment and Drainage Strategy have been

Order Details

Site DetailsSite at 373280, 441780

Order Number:Customer Ref:National Grid Reference:Slice:Site Area (Ha):Search Buffer (m):

105484524_1_130250373280, 441780A0.011000

Tel:Fax:Web:

0844 844 99520844 844 9951www.envirocheck.co.uk

Page 3 of 4A Landmark Information Group Service v15.0 21-Nov-2016

ESI Groundwater Flood Map - Slice A

ESI Groundwater Flood Map (1:50,000)