Proven Waste Gasification Technology- Recent operating conditions and measures for scale-up-
World Waste to Energy City Summit London
10/5/2016
NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD
Nobuhiro Tanigaki
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
2
Contents
1. Company Overview Group Structure
Company Profile
Business Field
2. Key Advantages for Deployment in the UK(1) Flexibility
(2) Reliability
First two years operation
Measures for Scale-up of gasification
References
3. Summary
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
3
Contents
1. Company Overview Group Structure
Company Profile
Business Field
2. Key Advantages for Deployment in the UK(1) Flexibility
(2) Reliability
First two years operation
Measures for Scale-up of gasification
References
3. Summary
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
4
1.1. NIPPON STEEL & SUMITOMO METAL Group
ArcelorMittal(Luxembourg) NSSMC
(Japan) Hebei Group(China) BaoSteel Group
(China) POSCO(S. Korea)
96.1
50.145.8
43.939.3
Top 5 Global Crude Steel Producers(2013FY)
JPY/EUR = 142,8
Wuhan Group
(China)
The World’s 2nd Largest Crude Steel Producer
(Million tons)
NSSMC Group
Revenue 38,628 m € (as of 31 Mar. 2014)
Capital Stock 2,938 m € (as of 30 Sep. 2013)
Employees(consolidated)
84,361 (as of 31 Mar. 2014)
Recent
Activity
Merger of Nippon Steel Corporation and
Sumitomo Metal Industries Ltd. in 2012
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
5
1.2. Group Structure
〈Steelmaking〉
NIPPON STEEL &
SUMITOMO METAL
CORPORATION
〈System solutions〉
NS Solutions
Corporation
〈New Materials〉
NIPPON STEEL &
SUMIKIN MATERIALS
Co., Ltd.
〈Chemicals〉
NIPPON STEEL &
SUMIKIN CHEMICAL
Co., Ltd.
〈Engineering〉
NIPPON STEEL &
SUMIKIN
ENGINEERING
Co., Ltd.
(NSENGI)
NIPPON STEEL & SUMITOMO METAL CORPORATION (NSSMC) GROUP
Environmental solutions, Steel Plant, Marine Construction, Building
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
6
1.3. Main Products for Energy from Waste
Direct Melting System (DMS)
Proven “WASTE” Gasification Technology
The world’s highest number of facilities (46 orders)
The world’s largest facility capacity (250,000 t/annual)
The world’s longest-term operation (37 years)
Waste Tire Pyrolysis Technology (2004- )
Incineration via Steinmüller Babcock Environment GmbH
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
7
Contents
1. Company Overview Group Structure
Company Profile
Business Field
2. Key Advantages for Deployment in the UK(1) Flexibility
(2) Reliability
First two years operation
Measures for Scale-up of gasification
References
3. Summary
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
8
2.1. Flexibility
Syngas
Waste FlexibilityMainly MSW or RDF with other waste
This system has high waste flexibility and
requires no pre-treatment.
No pre-treatment
High temperature gasification (>1,800 C)
Double damper system (max. 800 mm)
CfD EligibleContinuous syngas measuring
Stable combustion
Approx. 5.9 MJ/m3N based on 9.1 MJ/kg-waste
refer to N.Tanigaki et. al. Waste Management
1,800℃
400-
500 ℃
600
-800 ℃Sewage sludge Bottom ash Landfill Waste Clinical Waste
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
9
2.2. Reliability
(1) Technical Reliability
Should have commercial plants, not demonstration (References)
Well proven (Capacity, Operating conditions)
Should know “WASTE”
(2) Company Reliability
Should have strong financial condition
Capability for EPC
Single responsibility => Bankable technology
Especially for gasification technologies, the following are the most important
factors for deploying in the market;
1) operating data (operating conditions)
2) Commercial References and Scale-up (capacity)
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
10
2.2. Reliability - First two years operation -
- First two years operation works well.
- Due to the local issues*, the maintenance and other shut-down periods are
longer than that in Europe. However, the ratios of unexpected shut-down are
quite low.
* boiler and turbine inspection period, lack of waste and maintenance etc.
- No.1 No.2 No.1 No.2
Operation hours hours 7272 7272 7206 7425
unexpected Shut-down hours 184 168 34 42
maintenance etc. hours 1304 1320 1520 1293
MCR t/h
Average t/h 9.4 9.4 8.8 9.1
9.4
1st year 2nd year
* When the shut-down is shorter than 1 hour, it is counted as 1 hour
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
11
2.3. Reliability - Measures for Scale-up of Gasification -
Scale-up of gasification technology is one of the technical issues.
- Gasification reaction in the gasifier.
- optimization of waste charging and combustion conditions.
Our gasification (Direct Melting System) gradually expands its capacity, during 35
years and leach the capacity of 14 t/h per line.
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
12
2.3. Reliability - References -
46 references
37 years operation
10,000 - 250,000 t/a
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
13
2.3.1. Shin-Moji Plant
Location / Purchaser
Kitakyushu City, Japan
Fuel
Municipal solid waste
Incombustibles
Sewage sludge
Capacity
3 x 10 t/h
9 100 - 12 000 kJ/kg
Largest Waste
Gasification Plant in
operation
Year of Start Up
2007
NSENGI Scope of Supply
Full Turn key, Operation & Maintenance
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
14
2.3.2. Narumi Plant - Co-Gasification of Bottom Ash -
Bottom ash recycling is not allowed
.
The municipality has no landfill site
Need solutions. Co-Gasification and recycling
87% reduction of final landfill amount
Location / Purchaser
Nagoya City, Japan
Fuel
Municipal solid waste
Bottom ash
Incombustibles
Combustibles
Capacity
2 x 11 t/h
6 500 kJ/kg
Year of Start Up
2009
NSENGI Scope of Supply
Full Turn key
BTO
Operation & Maintenance
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
15
2.3.3. Kita-Nagoya Plant
Location / Purchaser
Kita-Nagoya City, Japan
Fuel
Municipal solid waste
Capacity
2 x 14 t/h
Largest Waste gasification
Year of Start Up
-
(awarded at 11th Dec. 2015)
NSENGI Scope of Supply
Full Turn key
BTO
Operation & Maintenance
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
16
3. Summary
NSENGI Group has a capability to provide various solutions for clients.
(gasification, incineration and others)
The Direct Melting System can achieve both the energy and material
recovery from waste without any pre- and post treatment.
Technology reliability of gasification such as capacity, availability and
performance is the key issue for deploying in the UK.
Especially, scale-up of gasification technology is one of the key technical
issues. NSENGI has overcome this issue with scaling-up step by step.
The Direct Melting System, which as the proven capacity and availability, is
one of the most reliable gasification technology in the world.
Copyright©2015 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
17
Thank you very much for your attention
Contact:
M. Sc. Nobuhiro TanigakiTechnical Manager
Professional Engineer JP
NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD.
European Office