providing right solutions for your ships · 1. standard schedule 1w 2w 3w 4w 5w 6w 7w 8w 9w 10w 11w...

11
PROVIDING RIGHT SOLUTIONS FOR YOUR SHIPS

Upload: others

Post on 28-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PrOvIDIng rIghT SOluTIOnS for your ships · 1. Standard Schedule 1W 2W 3W 4W 5W 6W 7W 8W 9W 10W 11W 12W 13W 14W 15W 16W 17W 18W 19W 20W Total Kick-off meeting 1 Onboard survey 1 Pre-engineering

PrOvIDIng rIghT

SOluTIOnSfor your

ships

Page 2: PrOvIDIng rIghT SOluTIOnS for your ships · 1. Standard Schedule 1W 2W 3W 4W 5W 6W 7W 8W 9W 10W 11W 12W 13W 14W 15W 16W 17W 18W 19W 20W Total Kick-off meeting 1 Onboard survey 1 Pre-engineering

Total engineering and design with 3D modeling

Products supply

Installation Onboard

Turnkey Solution

ToTal EnginEEring SoluTionfor rETrofiTTingTechcross provides ship owners who are looking

for retrofitting Ballast Water Management System

with the total engineering solution.

STanDarD

• Onboard survey for pre-engineering • Plan approval drawing for class / ship owner• Installation material supply• BWMS supply• Commissioning / Test

OPTIOn

• 3D installation drawing • Installation onboard• Supervising• BWMP• Turnkey solution

Page 3: PrOvIDIng rIghT SOluTIOnS for your ships · 1. Standard Schedule 1W 2W 3W 4W 5W 6W 7W 8W 9W 10W 11W 12W 13W 14W 15W 16W 17W 18W 19W 20W Total Kick-off meeting 1 Onboard survey 1 Pre-engineering

1. Standard

Schedule 1W 2W 3W 4W 5W 6W 7W 8W 9W 10W 11W 12W 13W 14W 15W 16W 17W 18W 19W 20W Total

Kick-off meeting 1

Onboard survey 1

Pre-engineering 2

Contract 2

Approval drawing 1.5

Approval of ship owner / class 3

Installation & manufacturing drawing 3

Fabrication of installation material 3

Customs clearance& shipping 3

Installation & test 2

(unit : week)

- Total 20 weeks after Kick-off meeting- 14 weeks after Contract

2. Procurement of Long-term materialsBWMS 17

Butterfly V/V 8

Production

(12weeks)

Production

(8weeks)

Export shipping

(3weeks)

Test

(2weeks)

Master Schedule

MasterSchedule 1

Page 4: PrOvIDIng rIghT SOluTIOnS for your ships · 1. Standard Schedule 1W 2W 3W 4W 5W 6W 7W 8W 9W 10W 11W 12W 13W 14W 15W 16W 17W 18W 19W 20W Total Kick-off meeting 1 Onboard survey 1 Pre-engineering

Process

installation

onboard survey(3D scanning) onboard survey onboard survey

installation test

Kick-off meeting Onboard survey Pre-engineering

Approval drawingApproval of ship owner/class

Contract

Installation & test

Fabrication of installation material

Customs clearance & shipping

Installation & manufacturing drawing

Surveys on possibility of ECS installation

Makes a installation report included quotation according to the onboard survey

Draws detailed PNID, BWMS arrangement and wiring diagram before the installation of ECS

Manufactures material for installation ECS

Receives drawing approval from ship owner and class

Designs the drawing for installation of piping and outfitting

Process 2

ECS supply

Page 5: PrOvIDIng rIghT SOluTIOnS for your ships · 1. Standard Schedule 1W 2W 3W 4W 5W 6W 7W 8W 9W 10W 11W 12W 13W 14W 15W 16W 17W 18W 19W 20W Total Kick-off meeting 1 Onboard survey 1 Pre-engineering

3D Modeling Process

Panoramic view around ballast pump

1

3D modeling program view 3

Finish 5

3D view (point data)2

Isometric view4

3DModeling 3

Page 6: PrOvIDIng rIghT SOluTIOnS for your ships · 1. Standard Schedule 1W 2W 3W 4W 5W 6W 7W 8W 9W 10W 11W 12W 13W 14W 15W 16W 17W 18W 19W 20W Total Kick-off meeting 1 Onboard survey 1 Pre-engineering

Installation Reference

Shipyard : JapanShip owner : ClosedModel : ECS2000B X 2setsInstallation place : E/R floorDate : January 2012

88K Bulk Carrier

Shipyard : KoreaShip owner : KoreaModel : ECS300A X 1setInstallation place : E/R floorDate : 2006

700TEU Container

Shipyard : ChinaShip owner : KoreaModel : ECS900A X 1setInstallation place : E/R floorDate : August 2009

27K Bulk CarrierShipyard : ChinaShip owner : KoreaModel : ECS1200A X 2setsInstallation place : E/R floorDate : November 2010

73K Bulk Carrier

Reference 4

Page 7: PrOvIDIng rIghT SOluTIOnS for your ships · 1. Standard Schedule 1W 2W 3W 4W 5W 6W 7W 8W 9W 10W 11W 12W 13W 14W 15W 16W 17W 18W 19W 20W Total Kick-off meeting 1 Onboard survey 1 Pre-engineering

Product 5

Product

ECU(Electro

Chamber Unit)

ANU•�Dimension (5000T) : W800 X D600

X H1654 (220kg) •�Dimension (10000T) : W1200 X

D600 X H1654 (308kg)•�Neutralizing Agent : Sodium

thiosulfate•�Mixture Ratio : 2(Fresh Water) :

1(Neutralizing Agent)•�Control : Automatic control by

PLC(Programmable Logic Controller)•�Composition : Tank, Control Panel,

Pump, Agitator, Level Sensor, Solenoid Valve, Display Panel

TSU•�Dimension�:������������������������

W470 × D450 × H1347 (100kg) •�Control�:�Automatic control

by PLC(Programmable Logic Controller)•�Composition�:�CLX Sensor, Pump,

Filter, Solenoid valve, PLC•�TRO(Total Residual Oxidant)

concentration measure.

ANU(Auto

Neutralization Unit)

TSU(TRO Sensor

Unit)

150 TYPE•�Dimension : W790 X D564

X H863 (380kg)•�Treatment Capacity :

150㎥/h•�Electrodes : Module Type•�Component : EM(1ea),

PRU(1ea)

300 TYPE•�Dimension : W1140 X D688

X H863 (480kg) •�Treatment Capacity :

300㎥/h•�Electrodes : Module Type•�Component : EM(2ea),

PRU(2ea), EPJ(1ea), ESJ(1ea)

450 TYPE•�Dimension : W1490 X D688

X H863 (580kg)•�Treatment Capacity :

450㎥/h•�Electrodes : Module Type•�Component : EM(3ea),

PRU(3ea), EPJ(1ea), ESJ(1ea)

600 TYPE•�Dimension : W1840 X D688

X H863 (680kg) •�Treatment Capacity :

600㎥/h•�Electrodes : Module Type•�Component : EM(4ea),

PRU(4ea), EPJ(1ea), ESJ(1ea)c

1000 TYPE•�Dimension : W2000 X

D1125 X H865 (1200kg) •�Treatment Capacity :

1000㎥/h•�Electrodes : Module Type•�Component : EM(4ea),

PRU(8ea), EPJ(4ea), ESJ(1ea)

Page 8: PrOvIDIng rIghT SOluTIOnS for your ships · 1. Standard Schedule 1W 2W 3W 4W 5W 6W 7W 8W 9W 10W 11W 12W 13W 14W 15W 16W 17W 18W 19W 20W Total Kick-off meeting 1 Onboard survey 1 Pre-engineering

Product 5

Product

PDE• Dimension (A2) : W600 X D630 X

H1500 (175kg) • Dimension (12) : W700 × D530 ×

H1500 (270kg) • Dimension (24) : W700 × D700 ×

H1900 (310kg)• Control : Strong surge-protection,

Remote magnet connect, Automatic / Manual mode selection Rectifier Control Module is control and monitoring of the PRU.

Automatic / Manual System control variables to maintain the preset disinfection performance.• Composition : RTU, CPC, PMU,

HUB, Modbus Gate way

T-strainer • Type : Straight, Angle•�Flange’s bolt-hole arrangement is

straddle.•�Flow direction symbol attached on

the body one side.•Be careful to take out the filter.•�When installed, be careful of the

front and the back.

PDE(Power

Distributor Equipment)

FMU•�Monitors operation of ballast

pump and allows ECS to operate upon ballasting•Fluid Temperature : -10℃~60℃

FMU(Flow Meter

Unit)

CSU•�Measures electrical conductivity

of sea water and sends to CPC

CSU(Conductivity Sensor Unit)

FTS •�Measures temperature of

freshwater

FTS(Freshwater Temperature

Sensor)

CPC•�Window based S/W (software)•�Main control of ECS at cargo

control room

CPC(Control PC

& S/W)

T-strainer

Page 9: PrOvIDIng rIghT SOluTIOnS for your ships · 1. Standard Schedule 1W 2W 3W 4W 5W 6W 7W 8W 9W 10W 11W 12W 13W 14W 15W 16W 17W 18W 19W 20W Total Kick-off meeting 1 Onboard survey 1 Pre-engineering

Global A/S Network

AsiaSingapore / Jason ElectronicsJapan / Uzushio Electric Co., LtdChina / Winkong Marine Engineering Co., LtdChina / Dalian Ftz Zhongyi Int’l Industry&Trade Co., Ltd.

Hong Kong / Hongkong United DockyardsTaiwan / Reson Electronics Int’l IncIndia / NorincoUAE / Seven Sea Services

AmericasUSA / Far-East Marine ServiceBrazil / Gehr International

EUROPEGreece / Pera Marine Ltd.Germany / Sam ElectronicsNetherland / Wetering Rotterdam

Poland / Marine Technical Services LtdCroatia / Belam agency and service Ltd.

OceaniaNew Zealand / Titan Marine Engineering

AfricaSouth Africa / Hanam

Network 6

Page 10: PrOvIDIng rIghT SOluTIOnS for your ships · 1. Standard Schedule 1W 2W 3W 4W 5W 6W 7W 8W 9W 10W 11W 12W 13W 14W 15W 16W 17W 18W 19W 20W Total Kick-off meeting 1 Onboard survey 1 Pre-engineering
Page 11: PrOvIDIng rIghT SOluTIOnS for your ships · 1. Standard Schedule 1W 2W 3W 4W 5W 6W 7W 8W 9W 10W 11W 12W 13W 14W 15W 16W 17W 18W 19W 20W Total Kick-off meeting 1 Onboard survey 1 Pre-engineering

WWW.TeChCrOSS.COM

COPyrIghTⓒ 2013 TeChCrOSS InC.

All rIghTS reServeD.

Tel. +82 51 603 3500

Fax. +82 51 603 3599

[email protected]