provision of advance meter reading (amr) services for ... · pdf fileprovision of advance...

9
Provision of Advance Meter R eading (AMR) Services for Electricity S SE Business Contract Customers

Upload: phamdung

Post on 10-Feb-2018

232 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Provision of Advance Meter Reading (AMR) Services for ... · PDF fileProvision of Advance Meter Reading (AMR) Services for Electricity SSE Business Contract Customers

Provision of Advance Meter Reading (AMR) Services for ElectricitySSE Business Contract Customers

Page 2: Provision of Advance Meter Reading (AMR) Services for ... · PDF fileProvision of Advance Meter Reading (AMR) Services for Electricity SSE Business Contract Customers

In line with the Government’s commitment to reduce carbon emissions through lowering

energy consumption, SSE fully support customers in installing AMR meters.

SSE supply customers have the choice of AMR services, either direct with an AMR

Provider or SSE’s own AMR solution through the customers existing supply contract.

Benefits of AMR Metering

Accurate and Timely Electricity Bills

Improved Budgeting and Forecasting

Tariff Optimisation (Subject to contract)

Improved Energy Management

Improved Energy Efficiency

Reduction in Carbon Emissions

What is AMR Metering?

We will arrange for your existing electricity NHH (non half-hourly) meters to be removed

and replaced with an AMR meter. The new AMR meter will effectively mean an end to

estimated invoices as the meter sends readings via the mobile phone network to our Data

Collector which is then used for your billing.

AMR meters are dialled daily and the Half Hourly consumption is available to view on a web

based application or sent directly to the customer for use with energy management

software.

In turn the accurate data enables you to see when your site(s) are using their energy which

allows you to take the appropriate actions to lower their consumption. The exception

reporting facility within this service will enable you to set your own parameters and alarms.

The service provider uses GSM/GPRS communications to retrieve data from the AMR

meters and Vodafone, O2, T-Mobile and Orange networks to enable them to successfully

deploy the service throughout the majority of England, Wales and Scotland.

Page 3: Provision of Advance Meter Reading (AMR) Services for ... · PDF fileProvision of Advance Meter Reading (AMR) Services for Electricity SSE Business Contract Customers

Standard SSE AMR Package

SSE’s annual AMR price is based on a rental arrangement with standard meter

replacement costs. SSE offers an AMR Solution to its supply customers as part of their

supply contract.

Our AMR package comprises of 5 Key Areas

Provision of AMR Meter – (Rental)

Installation of AMR Meter – (Carried out during working hours)

Ongoing Maintenance – (AMR Meter/Communications hardware)

Access to a web based application or HH data sent direct to the customer

Meter Readings – (Automated read for billing)

The on-going cost for the above package is the difference between the annual cost of the

AMR service and the non-AMR service. The annual AMR charge replaces the existing

metering agency pass-through charge element of the current annual standing charge and is

then recovered with the energy supply invoice in 12 or 4 instalments. (The agency pass-

through charge is levied for the inclusion of the following third party service roles; Meter

Operator, Meter Asset Provider, Data Collector, Data Aggregator, and Data Retriever.)

So, in real terms this represents no net adjustment for monthly billed sites and an increase

of £74.40 per annum (£18.60 per quarter) for quarterly billed sites when compared against

current non-AMR agency charges.

Quarterly Billed (Profile Class 01-04)

Non-AMR AMR Annual Adjustment Quarterly Adjustment

£15.60 £90.00 £74.40 £18.60

Monthly Billed (Profile Class 05-08)

Non-AMR AMR Annual Adjustment Monthly Adjustment

£105.05 £105.05 - -

Where additional work/costs are incurred these will be borne by the customer – see

Additional costs page

Page 4: Provision of Advance Meter Reading (AMR) Services for ... · PDF fileProvision of Advance Meter Reading (AMR) Services for Electricity SSE Business Contract Customers

Direct AMR Package

If arrangements are made direct with an AMR service provider of your choosing we would

ask that you let us know in advance of any installation work taking place or registration of

your sites so that we are able to appoint the relevant agents. Failure to do so may result in

problems receiving actual readings for billing.

As you will already be paying the metering agency charge direct to the agent you are in

contract with, we will reduce the standing charge by the difference between the annual cost

of the AMR service and the non-AMR service.

So, in real terms this represents no net adjustment for quarterly billed sites and a reduction

of £87.05 per annum (£7.25 per month) for monthly billed sites when compared against

current non-AMR agency charges.

Monthly Billed (Profile Class 05-08)

Non-AMR AMR Annual Adjustment Monthly Adjustment£105.05 £18.00 -£87.05 -£7.25

Quarterly Billed (Profile Class 01-04)

Non-AMR AMR Annual Adjustment Quarterly Adjustment£15.60 £15.60 - -

Page 5: Provision of Advance Meter Reading (AMR) Services for ... · PDF fileProvision of Advance Meter Reading (AMR) Services for Electricity SSE Business Contract Customers

Aborted meter installations /reasons which could delay an AMR program

Metal unhinged cut-outs

Incorrect sized meter tails

Blocked meter

Asbestos Panelling

Shared supplies through one fuse

Incorrect access details

Low mobile phone signal strength

Remote access sites may require special arrangements for visits

Pre-site visits

Completion of the AMR site survey form (overleaf) could identify AMR meter installations

problem in advance and limit delays to the AMR program.

Page 6: Provision of Advance Meter Reading (AMR) Services for ... · PDF fileProvision of Advance Meter Reading (AMR) Services for Electricity SSE Business Contract Customers

SSE AMR SITE SURVEY

Site Address: Date:

Post Code:

Meter Serial Number:

Meter location on site:

Mobile Phone signal strength adj to meter position: None High Medium LowNetwork Provider:On Site Parking: Y / N

If no on site parking, nearest available parking for Ford Transit van:

Site Contact:Telephone No:

Photo of Meter Position. (Electronic copy required)

Any other equipment fitted to meter board will possibly need to be moved by your contractors, to enable AMR meter to be installed.

Show incoming service cable and main fuses.

Second photo of meter required in close-up.

Page 7: Provision of Advance Meter Reading (AMR) Services for ... · PDF fileProvision of Advance Meter Reading (AMR) Services for Electricity SSE Business Contract Customers

SSE’s AMR Solution - Additional Costs

Additional work/costs not included within SSE's Standard AMR package includes:

a) The Replacement of oversized/undersized meter tails. Replacement of the tails between

the meter and the distribution board are the responsibility of the customer and may incur a

charge from customers own electrician.

b) Cut-out fuses rated higher than the size of the meter may require electrical work to

balance load or a supply upgrade at the customer’s expense. Any damage to metering

equipment as a result of over loading will be charged to the customer.

c) If a supply upgrade to CT metering is required in order to install AMR metering it will be

arranged between the customer and the local distribution network operator.

d) Out of hours Installation –

Weekday - (installations commencing outside the hours of 7am-7pm).

Weekend - (installations commencing outside Monday to Friday hours or on Bank Holidays)

costs will be higher than at weekdays.

e) Any distribution work to split shared supplies will need to be arranged by the customer

through the distribution network operator.

f) Remote tariff changes after meter installation. (Notification of change of tariff should be

arranged prior to the AMR installations).

g) Supply and installation of High Gain and Yagi Aerial

h) Supply and installation of external contractor for load switching

For further information on AMR metering please contact the SSE AMR Project Manager.

We recommend that you proceed with the AMR Metering service through SSE. If you are

approached by another Service Provider offering a similar service it is suggested you

contact us to discuss the services available and the associated costs.

SSE offers an AMR Metering solution to you by using Bglobal as its preferred AMR Service

Provider. Information correct as at February 2011

Page 8: Provision of Advance Meter Reading (AMR) Services for ... · PDF fileProvision of Advance Meter Reading (AMR) Services for Electricity SSE Business Contract Customers

Data Presentment Options

Half-hourly data is delivered daily by our appointed agent via a web platform with login and password or via CSV output file (Web Data Link).

Options are as follows:

Option 1: Web Analyser –

Advance Level Permissions

(Recommended for Group Contracts)

Consumption graphing ability as Standard versionReporting permissions as Standard versionAbility to set alarms and schedule reportsElectricity analysis facilitiesPerformance AnalysisBase load AnalysisLeague Table Production

Option 2: Web Data Link

Alternative Service

Consumption data in downloadable

format

Page 9: Provision of Advance Meter Reading (AMR) Services for ... · PDF fileProvision of Advance Meter Reading (AMR) Services for Electricity SSE Business Contract Customers

AMR FAQ

• What happens to the AMR service once the supply contract ends and the customer moves supplier?

The SSE solution is a rental arrangement which lasts the life of the meter (10 years). When the supply contract ends the leasing arrangement continues, regardless of the supplier. If the meter is removed the metering should be passed back to the AMR Provider

• Can you work with other supplier’s AMR Solution? I.e. meters that were installed by previous supplier?

It is the intention of SSE to appoint a Data Retriever that can read any suppliers AMR meters. Where we are unable to read the suppliers meter we will either appoint another Data Retriever or fit one of our meters that can be read.

• Can SSE work with other AMR providers?

SSE has contractual agreements with all major AMR providers and can appoint the AMR provider of the customer’s choice in most cases.

• What happens if the meter cannot be dialled?

Details of sites which can not be dealt with are flagged up to the meter operator. If the case is a loss of signal we will contact the customer to see if they wish to remain on AMR or wish to revert to a manual meter read.

• What is the data lag time on the web service?

Day +1