pssa and saa framwwork 2014
TRANSCRIPT
-
8/10/2019 PSSA and SAA Framwwork 2014
1/11
Unified Framework forPSSA and SAA withRelevant Safety
Requirements
Dr. Ahmed Bassyouni
Aerospace Consultant315 [email protected]
Dr. Ahmed BassyouniAerospace Consultant
1
-
8/10/2019 PSSA and SAA Framwwork 2014
2/11
-
8/10/2019 PSSA and SAA Framwwork 2014
3/11
Preliminary System Safety Assessment (PSSA) is used to
evaluate planned architecture against the SFHA
requirements and allocate these and new derived safety
requirements to equipment and ITEMS (software, AEH,
hardware)
The difference between the PSSA and the SSA is that the
PSSA is a method to evaluate proposed architectures and
derive system safety requirements for each; whereas theSSA is a verification that the implemented design meets
both the qualitative and quantitative safety requirements
defined in the AFHA, SFHA and PSSA.
PSSA Structure and Function
Dr. Ahmed BassyouniAerospace Consultant
3
-
8/10/2019 PSSA and SAA Framwwork 2014
4/11
Dr. Ahmed BassyouniAerospace Consultant
4
PSSA Structure and Function
PSSA Structure and contents should follow the Templatesof the Japanese JCAP and the Federal FAA Organizations of
Aircraft certifications.
The basic structure of the PSSA shall include the following contents:
1. Introduction
2. System description
3. System Boundary and Operations
4. Hazard Assessment
5. Safety Objectives6. Safety Assessment
7. Derived Safety Requirements
-
8/10/2019 PSSA and SAA Framwwork 2014
5/11
PSSA
Safety Obje for FMEA
Define Mitg & Val
Faults impact Safety
FDAL & IDAL HW,SW
DSR Derived Safety Req
Define Severity Levels
Define Mitig Method
Define Val method
Support Certificate
FHA Func. Haz. Ana
FTA Fault Tree Ana
Failure Conditions
Failure Rates/detect
Prob. of Root Causes
Severity Levels
Safety Master Plan
CCM Com Cause Ana
Input & Output of PSSA
PSSA has to provide the DSR and techniques to Eliminate Hazard
Dr. Ahmed BassyouniAerospace Consultant
5
-
8/10/2019 PSSA and SAA Framwwork 2014
6/11
1. Identify the hazards and failure conditions for Aircraft
Systems components2. Assess the Severity and Establish Safety Objectives system
components
3. Overview the System Reliability Analysis
4. Develop FMEA, and FMES
5. Develop Mitigation Strategies to reduce risk6. Determine Effectiveness of Mitigation Strategies
[Acceptable Risk]
7. Develop DSR for LG components
8. Verify Implementation of Mitigation Strategies
Safety Validation and verification Tasks
1.Updating the PSSA/SSA Contents
2.Updating the PASA/ASA Contents
Dr. Ahmed BassyouniAerospace Consultant
6
-
8/10/2019 PSSA and SAA Framwwork 2014
7/11
Updating PSSA/SSA
Dr. Ahmed BassyouniAerospace Consultant
7
-
8/10/2019 PSSA and SAA Framwwork 2014
8/11
PSSA
DSR
Safety Plan for Developing PSSA and SSA
Dr. Ahmed BassyouniAerospace Consultant
8
Verify & Update
SHFA , FC tables
Update Equipment
Tech. Specs. FC
Tables
Verify & Update
FTA diagrams
CCA(CMA, PRA,ZSA)
FMEA
SSA
OCT
NOV
DEC
MAR
JAN
FEB
ATA-32 Landing Gear System
-
8/10/2019 PSSA and SAA Framwwork 2014
9/11
In addition to PSSA/SSA it is recommendedto perform a PASA/ASA
PASA: Preliminary Aircraft Safety Assessment
ASA: Aircraft Safety Assessment
The PASA/ASA assesses the A/C level FC coming from aircraft level
FHA that combine failures of several systems that are not studied
or cannot be studied at system level.
It allows identification of the Development Assurance Levels
(DAL) for aircraft functions.
Updating PSSA/SSA, PASA/ASA
Dr. Ahmed BassyouniAerospace Consultant
9
-
8/10/2019 PSSA and SAA Framwwork 2014
10/11
Updating PSSA/SSA, PASA/ASA
Dr. Ahmed BassyouniAerospace Consultant
10
-
8/10/2019 PSSA and SAA Framwwork 2014
11/11
System Safety Assessment (SSA)
The SSAshall include quantitative analysis of critical failureconditions.
Failure rates from FMEA documents and risk times shall be
placed into FTAs to calculate the probability of failureconditions.
The mitigated RPNs shall be considered for Risk Assessment
Dr. Ahmed BassyouniAerospace Consultant
11