Public Buildings Night April 10,2014

Upload: vanessa-glenn

Post on 04-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Public Buildings Night

April 10,2014

Summary• Over $70 million of building projects• 6 new buildings• 7 renovations or additions

Crawford Yard• Renovation/Addition of yard at Crawford

and Tecumseh• Demolition of yard at Pillette and Adstoll

• $500,000

Various Renovations Willistead Manor

• Roofing Project – Donation received from the community of $54k • Repairs to Coach House • Copper eaves trough replacement

Various Renovations Willistead Manor

• Improved park accessibility• Repair drainage around manor

Oakwood Community Centre

• Community centre owned by school board• Must transition out• Options: addition to South Windsor Arena

or renovate another location

• $1.8 Million

Emergency Operations Centre• Replace existing centre at Goyeau Fire

station which is limited• Need for backup power, better technology

access• Options: new build or renovation

• $1.5 Million

Art Gallery

• Renovation of first floor Art Gallery to house Museum and improve cultural hub

• Renovation of Baby House• $3.402 Million

Libraries• Addition to Optimist Community centre• Renovation to Budimir Library

• $ 7.0 million

Libraries• Complete renovation of Mill and Sandwich

old fire station• Move into Devonshire Mall location

• $ 7.0 million

2 Fire Halls

• Chandler and Milloy• Daytona and Northwood

• $9.0 million

Fed Ex Project at Airport

• 3 new buildings totalling 72,000 sq. ft.

• $15.0 Million

New City Hall

• Constructed next to old City Hall

• $34.7 Million

New City Hall

• Rejected designs