public forum proposed 20-year facilities plan january 16 & 31, 2008 6:30 – 8:00 pm
DESCRIPTION
PUBLIC FORUM Proposed 20-Year Facilities Plan January 16 & 31, 2008 6:30 – 8:00 pm. Thank you for your interest in the future of Center Grove Schools. We look forward to hearing your thoughts. Presentation Format. During the presentation, please make a note of any questions you may have - PowerPoint PPT PresentationTRANSCRIPT
1
PUBLIC FORUMProposed 20-Year Facilities Plan
January 16 & 31, 20086:30 – 8:00 pm
2
Thank you for your interest in the future of Center Grove Schools.
We look forward to hearing your thoughts.
3
Presentation Format
During the presentation, please make a note of any questions you may have
Following the presentation, there will be an opportunity for comments and suggestions, as well as questions and answers
4
AGENDA
History of Facilities Studies Maintenance Plan Demographics Elementary Plan Total Building Plan Financing Plan High School Renovation
5
History of Facilities Studies
1998 – Study by Dr. Boyd
2002 – Study by Dr. Boyd
2002 - Advisory Committee
2004 - Advisory Committee
2006 – Advisory Committee
6
1998 Report Build additional middle school Increase student capacities at each
elementary school through building additions “Site limitations exist at West Grove, North
Grove, and Maple Grove but not at other four sites”
History of Facilities Studies
7
2002 Studies Based on ISU Demographic Projections Several options presented by committee
Open 7th elementary school in 2004 Open 8th elementary school in 2006 Move Transportation/Maintenance building Move Central Office
History of Facilities Studies
8
2004 Facility Advisory Committee Based on new ISU Demographic Study
Build new Maple Grove facility Design so that the new school could have
another school that would adjoin the building in the future
Share HVAC, kitchen equipment, and mechanical facilities
Expand high school
History of Facilities Studies
9
2006 Facilities Advisory Committee Used 600 students per elementary school as “functional
capacity” Renovate NG and WG
Increase size of cafeteria and gym Add classrooms and office space Add large group instruction areas Add storage
Develop plan for new central office When district size grows to 10,000 students
8 elementary schools 3 middle schools 1 high school
History of Facilities Studies
10
Maintenance Plan
Committed to keeping our buildings clean, well-maintained, and safe for all staff and students.
11
20-YEAR FACILITY MAINTENANCE PLAN
Each of our nine schools and other district-owned buildings were thoroughly examined
Evaluations were completed regarding HVAC Roof Technology Infrastructure Kitchen equipment Plumbing Electrical
12
Center Grove Building Maintenance/ Capital Expenditures Plan
2015 $2,524,000
2016 $1,228,250
2017 $2,171,500
2018 $1,815,500
2019 $ 564,500
2020 $1,043,250
Annual Maintenance Expenses for all Facilities
Corporation Total through 2020 - $24,536,950
2008 $2,157,5002009 $2,749,0002010 $3,672,5002011 $2,026,0002012 $1,814,5002013 $1,335,2502014 $1,435,200
13
Demographics
CGCSC Enrollment Projections
14
Enrollment & Demographics
Study Data Considered
2002 (Boyd - ISU)
2004 (Boyd - ISU)
2006 (IBRC - IU) 04-07-2006
2007 (CGCSC) 11-07-2007
15
District Enrollment
History through 2001
Boyd 2002 Study
History 2001-07
Boyd 2004 Study
IU 2006 Study
CGCS Projections
4000
5000
6000
7000
8000
9000
10000
110001992-1
993
1994-1
995
1996-1
997
1998-1
999
2000-2
001
2002-2
003
2004-2
005
2006-2
007
2008-2
009
2010-2
011
2012-2
013
2014-2
015
2016-2
017
2018-2
019
2020-2
021
2022-2
023
2024-2
025
16
High School Enrollment
History to2001
2002 Boyd Study
History2001-07
2004 Boyd Study
2006 IU Study
1600
1800
2000
2200
2400
2600
2800
3000
3200
3400
1992-1
993
1994-1
995
1996-1
997
1998-1
999
2000-2
001
2002-2
003
2004-2
005
2006-2
007
2008-2
009
2010-2
011
2012-2
013
2014-2
015
2016-2
017
2018-2
019
2020-2
021
2022-2
023
2024-2
025
CGCSC Projections
17
Enrollment & Demographics
The Board endorses these enrollment projections for long-term planning purposes.
The proposed Facility Plan is based on enrollments projected through 2026-27: Elementary 4,614 Middle school 2,479 High School 3,190 TOTAL 10,284
18
Proposed Elementary Plan
Committed to providing the best facilities and academic programs for our students.
19
EFFICIENCY
Getting maximum use of facility for minimum expense
Considerations Energy Staffing Transportation
State Expectations Trends across Indiana
20
Efficiency – Elementary Schools
We intend to provide outstanding academic programs.
Recommended school size for maximum efficiency: Elementary - 650-750 pupils per school Middle School - 1000-1200 pupils per school
21
Analysis of our Elementary Schools
Four Existing Buildings Can Meet Efficiency Requirements:
Maple Grove, Pleasant Grove, and Sugar Grove can already accommodate 650-750 students.
Center Grove requires addition/renovation to accommodate 650-750.
22
Analysis of our Elementary Schools
West Grove Built in 1967 42,724 square feet 12.5 acres Septic system
North Grove Built in 1965 46,190 square feet 11.26 acres
It is not feasible to renovate or add on to either school to accommodate 650-750 students due to building
and site restrictions.
Two Existing Buildings Do Not Meet Efficiency Requirements:
23
Analysis of WG and NG to Maintain Equity
We believe that all elementary schools should have equitable learning conditions and opportunities.
West Grove and North Grove do not have the same features as the other four elementary schools: Science lab Large group instruction room Large cafeteria Wide hallways Large teacher workroom Large media center Sprinkler system Appropriate classroom space for full day kindergarten
24
Analysis of WG and NGto Maintain EQUITY
Cost to make these facilities equitable to other four elementary schools (MG, PG, SG, CG)
$8 million plus for EACH school
This does not include additional classrooms to increase student capacity and program needs, such as full day kindergarten, English as a New Language (ENL), and GT or High Ability.
25
Renovate or Build?
Renovate North Grove and West Grove
Estimated Cost:
$16-17 Million
Annual Savings to the General Fund:
$0
This “solution” does not allow expanded programs in the classroom
Cost Comparisons
Build New Elementary School
Estimated Cost:
$18-20 Million
Annual Savings to the General Fund:
$500,000 per year
This solution allows us to operate more efficiently and expand academic programs.
26
Renovate or Build?
Requirements:Science labLarge group instruction roomLarge cafeteriaWide hallwaysLarge teacher workroomLarge media centerIncreased student capacityAppropriate classroom space for full day kindergarten
Renovation of West Grove & North Grove Facilities
Restrictions:Load-bearing concrete block construction does not allow for widening hallways or changing room configurationLot sizes do not allow additions for increased capacityWest Grove is on septic system, requiring costly sewer tie-inProposed location of I-69 exchange at Smith Valley Road
27
Proposed Elementary Plan
Reduce from six to five elementary schools in 2010 (enrollment projection: 3,623)
Build new elementary school south and adjacent to Sugar Grove (Maple Grove model) to open in 2010
Close West Grove & North Grove, summer of 2010
Projected to need sixth elementary school in 2014 (enrollment projection: 4,060)
Projected to need seventh elementary school in 2027 (enrollment projection: 4,614)
28
Distribution of StudentsGoal – To reduce from 6 to 5 elementary schools for maximum
efficiency
2007 Official Enrollment
2010 Projected Enrollment
CGES 551 721
MGES 677 721
NGES 492 (54 in GT) -0-
PGES 417 721
SGES 693 721
WGES 570 -0-
New School -0- 724
TOTAL 3400 3608
29
Benefits of Proposed Elementary Plan
Facility Modern, energy-efficient building Lower Maintenance
maintain one new building, rather than two older ones Meets efficiency goal of serving 650-750 students Easily accommodates high-tech multimedia
classrooms New building is longer-term facility solution, due to
modern construction techniques allowing for future flexibility
New Elementary School
30
Benefits of Proposed Elementary Plan
Reduced Staffing Possible Reduction of 5 Certified Positions,
5 Support Staff Positions Reassignment of Certified Positions Reassignment of 14 Support Staff
Positions Potential Annual Savings in the General
Fund is approximately $500,000
31
Staff Adjustments 2008
CG, MG, SG, WG, NG, and PG 6 Principals 6 Counselors 6 Art teachers 6 PE teachers 6 Music teachers 6 Kitchen staffs 6 Custodial supervisors 6 Office staffs
(nurse assistant, media assistant, secretary-treasurer, office assistant)
2010 New School and CG, MG, SG, & PG
5 Principals (and one asst. principal) 5 Counselors 5 Art teachers 5 PE teachers 5 Music teachers 5 Kitchen staffs 5 Custodial supervisors 5 Office staffs
(nurse assistant, media assistant, secretary-treasurer, office assistant)
Staff reductions will save approximately $500,000 per year.We believe that changes can be handled through retirements and resignations.
32
Benefits of Proposed Elementary Plan
Increased Efficiency One elementary school is less expensive to operate
than two Provides savings to General Fund Gives us ability to expand programs to ensure
academic excellence Gifted/High Ability Program English as a New Language Program World Languages offerings Academic offerings at Middle School and High School
levels Full Day Kindergarten
33
Summary of Proposed Elementary Plan
Currently Six Elementary Buildings Built: 1965 – 2006
The two oldest buildings are NGE and WGE
Instructional Space: 42,724 – 74,550 sq. ft. The two smallest buildings are NGE and WGE
Acreage: 11.26 – 121.35 acres The two smallest sites are NGE and WGE
Recommendation: Close North Grove and West Grove; Build additional elementary schools in 2010, 2014 (or when
needed), and 2027 (or when needed)
34
Proposed Facilities Plan
Meeting High Expectations for Excellence
35
Proposed 20-Year Facilities Plan
Renovation For many years, we have used a 20-year
cycle to schedule remodeling Keeps buildings up to date
Every building will be renovated, beginning with: High School Renovation – summer, 2009 Center Grove Elementary – January, 2010 Pleasant Grove Elementary – 2012
36
Proposed 20-Year Facilities Plan
Construction New elementary school – 2010 Sixth elementary school on Maple Grove
site – 2014 or later (when needed)
Third middle school – 2026 Seventh elementary school – 2027
37
In the next five (5) years, we will raze the old maintenance and transportation
buildings the two residential houses on Morgantown Rd Old Maple Grove
However, NG and WG have commercial value
Disposal of Unneeded Facilities
Proposed 20-Year Facilities Plan
38
Summary of Proposed 20-Year Facility
Renovation Over the next 20 years, every building will be renovated
ConstructionOver the next 20 years, four new schools will be built
Three elementary schools
One middle school
DisposalIn the next five years, seven buildings will be sold or razed
39
Financing Plan
“The good news is, we can complete this
20-Year Plan without raising the tax rate.”
40
Fund Expenditures Funding Source
General Salaries/Wages, Fringe Benefits, Purchases
State Support, Fees, Property Taxes, Excise Taxes, Interest
Debt Service
Short Term Interest, Outstanding Bonds, Textbook Rental Shortages
Property Taxes
Capital Projects
Building Projects, Renovation, Technology, Equipment, Maintenance, Emergency, Utilities, Professional Fees
Property Taxes
School Funding in Indiana
41
Financing Major Projects Through 2015
Assumption about future assessed valuation growth is critical:
Actual 2007: $2,520,158,340 Projected 2015: $3,415,847,142 Projected 2027: $4,638,310,955
For the past decade, the average increase for AV has been 12%.
The above figures for assessed valuation are based on 4% increase for 7 years 3% increase for next 8 years 2% increase thereafter
42
This proposed plan includes 5 major building projects that total $143.5 million before 2015: High School renovation Center Grove Elementary renovation New Elementary School Pleasant Grove Elementary renovation Sixth Elementary School
However, we will request money only when needed.
Financing Major Projects Through 2015
43
Assumption about future assessed valuation growth is critical.
Beginning in 2015, we project a period of at least 8 years with no major building projects.
Financial goal is to maintain the tax rate at 41 cents in the Debt Service Fund. The tax rate is the only aspect of local taxes that the
school corporation can control
Financing Major Projects Through 2015
44
Johnson County Tax Rate Comparison2007
45
High School Renovation
Preparing for growth and equipping students with 21st Century Skills
46
High School Renovation Timeline
March 17, 2008 School Board review and approval of
scope/curriculum
May 2008 Finalize facility scope and budget
March 2009 Architect design completed and contracts awarded
January 2009-November 2011 Construction and Completion
47
Public Forum
Comments, SuggestionsQuestions and Answers