Public Information Meeting
State Project No. 095-254Rehabilitation of Bridge No. 00901
U.S. Route 202/Route 67Over Housatonic River
New Milford, Connecticut
Thursday, October 5, 2017 at 7:00 pmJohn Pettibone Community Center
2 Pickett District RoadNew Milford, CT
![Page 2: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/2.jpg)
Project Location MapProject Location Map
N
![Page 3: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/3.jpg)
IntroductionsIntroductions
• Connecticut Department of Transportation–Rabih Barakat – Transportation Principal Engineer
-Andrew Cardinali – Transportation Supervising Engineer
-Dobieslawa Kania– Transportation Project Engineer
• Hardesty & Hanover–Steven Harlacker – Principal Associate
• CME Associates, Inc.–Donald Wurst – Department Manager
–Mark Gardner – Project Engineer
• Connecticut Department of Transportation–Rabih Barakat – Transportation Principal Engineer
-Andrew Cardinali – Transportation Supervising Engineer
-Dobieslawa Kania– Transportation Project Engineer
• Hardesty & Hanover–Steven Harlacker – Principal Associate
• CME Associates, Inc.–Donald Wurst – Department Manager
–Mark Gardner – Project Engineer
![Page 4: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/4.jpg)
Department’s RoleDepartment’s Role
• Systematically inspect bridges for deficiencies and schedule the rehabilitation of structures
• Oversee the development of technical drawings and bid documents on projects
• Administration and inspection during construction
• Systematically inspect bridges for deficiencies and schedule the rehabilitation of structures
• Oversee the development of technical drawings and bid documents on projects
• Administration and inspection during construction
![Page 5: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/5.jpg)
Project Needs and GoalsProject Needs and Goals
• Maintain a safe crossing over the Housatonic River for vehicles traveling on US Route 202/Route 67
• Rehabilitation and strengthening of bridge to extend service life
• Minimize disturbance for the traveling public during construction
• Improve roadway ride-ability for traveling public
• Maintain a safe crossing over the Housatonic River for vehicles traveling on US Route 202/Route 67
• Rehabilitation and strengthening of bridge to extend service life
• Minimize disturbance for the traveling public during construction
• Improve roadway ride-ability for traveling public
![Page 6: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/6.jpg)
Project OverviewProject Overview
• Project is in preliminary design stage
– We are looking for your input
• Rehabilitation of bridge to repair deteriorated elements
• Strengthening of deficient truss connections to rate for HL-93 loading
• Preventive maintenance to ensure extended service life
• Project is in preliminary design stage
– We are looking for your input
• Rehabilitation of bridge to repair deteriorated elements
• Strengthening of deficient truss connections to rate for HL-93 loading
• Preventive maintenance to ensure extended service life
![Page 7: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/7.jpg)
Bridge No. 00901(Veterans Memorial Bridge)
Bridge No. 00901(Veterans Memorial Bridge)
• Built in 1953
• Major rehabilitation project in 2000– full deck replacement,
substructure/superstructure repairs, sidewalk and railing replacement, full painting
• Gusset plate strengthening completed in 2011
• Single-span steel through truss structure supported by two abutments
• Built in 1953
• Major rehabilitation project in 2000– full deck replacement,
substructure/superstructure repairs, sidewalk and railing replacement, full painting
• Gusset plate strengthening completed in 2011
• Single-span steel through truss structure supported by two abutments
![Page 8: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/8.jpg)
Existing Geometry
• Total Structure Length = approx. 332’
• Bridge curb-to-curb width = 30’-0” (13’ lanes, 2’ shoulders)
• Min. Vertical Clearance above Roadway: 15’-5” (centerline)
• ADT (2014): 30,700 vehicles per day
– 4% Truck Traffic
– 13,000 Eastbound and 17,700 Westbound
Existing Condition Ratings
• Deck: “7” Good
• Superstructure: “4” Poor
• Substructure: “6” Satisfactory
• Structure Evaluation: “4” Poor
Structure Appraisals
• Deck Geometry: “4”
• Approach Roadway Alignment: “6”
• Scour Critical: “8” (Stable)
• Waterway Adequacy: “6”
Existing Geometry
• Total Structure Length = approx. 332’
• Bridge curb-to-curb width = 30’-0” (13’ lanes, 2’ shoulders)
• Min. Vertical Clearance above Roadway: 15’-5” (centerline)
• ADT (2014): 30,700 vehicles per day
– 4% Truck Traffic
– 13,000 Eastbound and 17,700 Westbound
Existing Condition Ratings
• Deck: “7” Good
• Superstructure: “4” Poor
• Substructure: “6” Satisfactory
• Structure Evaluation: “4” Poor
Structure Appraisals
• Deck Geometry: “4”
• Approach Roadway Alignment: “6”
• Scour Critical: “8” (Stable)
• Waterway Adequacy: “6”
Bridge No. 00901(Veterans Memorial Bridge)
Bridge No. 00901(Veterans Memorial Bridge)
![Page 9: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/9.jpg)
South Elevation
Bridge No. 00901(Veterans Memorial Bridge)
Bridge No. 00901(Veterans Memorial Bridge)
West Approach (Looking East)
Note: Sidewalk along North Fascia
![Page 10: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/10.jpg)
Typical Bridge Curb and Railing
Bridge No. 00901(Veterans Memorial Bridge)
Bridge No. 00901(Veterans Memorial Bridge)
Typical Overlay
![Page 11: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/11.jpg)
Typical Leaking at Deck Panel Joints
Note: Active Rust on Stringer and Beam
Bridge No. 00901(Veterans Memorial Bridge)
Bridge No. 00901(Veterans Memorial Bridge)
Typical Underside of Deck and Truss
![Page 12: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/12.jpg)
Communication Conduits – North Fascia
Bridge No. 00901(Veterans Memorial Bridge)
Bridge No. 00901(Veterans Memorial Bridge)
Typical Rocker Bearing (West Abutment)
![Page 13: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/13.jpg)
Northeast Wingwall (Typical)
Bridge No. 00901(Veterans Memorial Bridge)
Bridge No. 00901(Veterans Memorial Bridge)
East Abutment
West Abutment
![Page 14: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/14.jpg)
Proposed Rehabilitation Measures:
• Structural steel repairs to truss members, gusset plates, and portal bracing
• Clean and paint all bearings
• Field touch-up painting of steel at repair locations and localized areas of missing paint
• Patch the reinforced concrete deck and sidewalk
• Placement of waterproofing membrane and new 3” thick overlay
• Deck joint replacement
• Replace bridge rail to meet new standards
• Repair pedestrian rail as necessary
• Anchor superstructure to substructure to resist stream flow forces and debris accumulation
• Mill and pave the approach roadways
• Clean the scuppers/drainage system
• Substructure patching
Proposed Rehabilitation Measures:
• Structural steel repairs to truss members, gusset plates, and portal bracing
• Clean and paint all bearings
• Field touch-up painting of steel at repair locations and localized areas of missing paint
• Patch the reinforced concrete deck and sidewalk
• Placement of waterproofing membrane and new 3” thick overlay
• Deck joint replacement
• Replace bridge rail to meet new standards
• Repair pedestrian rail as necessary
• Anchor superstructure to substructure to resist stream flow forces and debris accumulation
• Mill and pave the approach roadways
• Clean the scuppers/drainage system
• Substructure patching
Bridge No. 00901(Veterans Memorial Bridge)
Bridge No. 00901(Veterans Memorial Bridge)
![Page 15: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/15.jpg)
Bridge No. 00901:Roadway Plan
Bridge No. 00901:Roadway Plan
![Page 16: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/16.jpg)
Bridge No. 00901:Elevation
Bridge No. 00901:Elevation
![Page 17: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/17.jpg)
Bridge No. 00901:Sections
Bridge No. 00901:Sections
![Page 18: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/18.jpg)
Impacts to traffic on U.S. Route 202/67:
• Bridge work will occur in 4 stages of off-peak lane closures• The four stages of off-peak lane closures will involve the closure of
the four quadrants (northeast, southeast, northwest, southwest) and stages will be fully complete before next stage is started.
• Uniformed flagmen or local police will control alternating one-way traffic
• Three full closures will be required of the entire bridge• Full closure required for: milling, waterproofing membrane, and
paving
• All closures will occur overnight
• Shoulder closures will be required to repair the bridge rail.
Bridge No. 00901:Maintenance & Protection of Traffic
Bridge No. 00901:Maintenance & Protection of Traffic
![Page 19: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/19.jpg)
Bridge No. 00901: Maintenance & Protection of Traffic (cont.)
Bridge No. 00901: Maintenance & Protection of Traffic (cont.)
![Page 20: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/20.jpg)
Advanced signage will be placed to urge traffic to use the following detours:
• Traffic will be directed to Still River Drive over the Housatonic River then North on Grove Street to Bridge Street.
• There will be a signed passenger vehicle detour for traffic originating from/going to US Route 7 North of the bridge
• Boardman Rd to Housatonic Ave to Young’s Field Rd
• Low railroad bridge on Boardman Rd
Bridge No. 00901:Detour for Overnight Bridge Roadway
Closures
Bridge No. 00901:Detour for Overnight Bridge Roadway
Closures
![Page 21: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/21.jpg)
Bridge No. 00901 –U.S. Route 202/67 over Housatonic
River
Detour Plan
Bridge No. 00901 –U.S. Route 202/67 over Housatonic
River
Detour Plan
![Page 22: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/22.jpg)
Bridge No. 00901 –U.S. Route 202/67 over Housatonic
River
Detour Plan
Bridge No. 00901 –U.S. Route 202/67 over Housatonic
River
Detour Plan
Note: Passenger vehicles only because of low clearance bridge on route
![Page 23: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/23.jpg)
Department of TransportationDivision of Rights of Way
(ROW)
Department of TransportationDivision of Rights of Way
(ROW)
Michelle MillerProject Coordinator
2800 Berlin TurnpikeP.O. Box 317546
Newington, CT 06131-7546
Michelle MillerProject Coordinator
2800 Berlin TurnpikeP.O. Box 317546
Newington, CT 06131-7546
![Page 24: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/24.jpg)
FunctionFunction
• Acquire all property/property rights necessary for transportation projects.
• Acquire all property/property rights necessary for transportation projects.
![Page 25: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/25.jpg)
Statutory References Statutory References
• State of Connecticut
C.G.S. Sections 13a-73 & 13a-98e
• Federal
Uniform Relocation Assistance and Real
Properties Acquisition Act of 1970, as amended.
• State of Connecticut
C.G.S. Sections 13a-73 & 13a-98e
• Federal
Uniform Relocation Assistance and Real
Properties Acquisition Act of 1970, as amended.
![Page 26: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/26.jpg)
Property Impacts Property Impacts
• Total Acquisitions
• Partial Acquisitions
• Easements
• Construction Easements
• Rights
* Note: Specific impacts are subject to change as the design progresses.
• Total Acquisitions
• Partial Acquisitions
• Easements
• Construction Easements
• Rights
* Note: Specific impacts are subject to change as the design progresses.
![Page 27: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/27.jpg)
ROW Acquisition ProcessROW Acquisition Process• Letter of Intent to Acquire
• Valuation
• Offer of Just
Compensation
• Negotiation
• Acquisition• Agreement
• Eminent Domain/Condemnation » 6 month appeal period
• Letter of Intent to Acquire
• Valuation
• Offer of Just
Compensation
• Negotiation
• Acquisition• Agreement
• Eminent Domain/Condemnation » 6 month appeal period
![Page 28: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/28.jpg)
Timing for Acquisitions Timing for Acquisitions
• All property rights must be acquired by the Project Advertisement Date
• Current Project Advertisement Date: 2/27/2019
• All property rights must be acquired by the Project Advertisement Date
• Current Project Advertisement Date: 2/27/2019
![Page 29: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/29.jpg)
Right-of-Way ImpactsRight-of-Way Impacts
Anticipated Impacts to Adjacent Properties
• Construction easement need for storage of materials and equipment at southwest corner and access for barge at northeast corner
Anticipated Impacts to Adjacent Properties
• Construction easement need for storage of materials and equipment at southwest corner and access for barge at northeast corner
N
![Page 30: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/30.jpg)
Utility ImpactsUtility Impacts
The following utilities will require protection within the project limits:
• Overhead communication wires along the north side
• Electrical conduits and gas main mounted to lower chord of the south truss
• Communication conduits under sidewalk on north side
The following utilities will require protection within the project limits:
• Overhead communication wires along the north side
• Electrical conduits and gas main mounted to lower chord of the south truss
• Communication conduits under sidewalk on north side
![Page 31: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/31.jpg)
Project Cost and ScheduleProject Cost and Schedule
Schedule
• Construction Start: Spring 2020
• Completion: Fall 2020
Cost
• Total construction cost for the project is currently
estimated at $3,400,000
• Rehabilitation of this bridge will be undertaken using
State and Federal Funds under the “National
Highway Performance” Program and “Surface
Transportation Program – Other Urban” Program.
The cost and schedule are preliminary and are subject
to change.
Schedule
• Construction Start: Spring 2020
• Completion: Fall 2020
Cost
• Total construction cost for the project is currently
estimated at $3,400,000
• Rehabilitation of this bridge will be undertaken using
State and Federal Funds under the “National
Highway Performance” Program and “Surface
Transportation Program – Other Urban” Program.
The cost and schedule are preliminary and are subject
to change.
![Page 32: Public Information Meeting · 2017-10-10 · Public Information Meeting State Project No. 095-254 Rehabilitation of Bridge No. 00901 U.S. Route 202/Route 67 Over Housatonic River](https://reader035.vdocuments.net/reader035/viewer/2022070821/5f1eb597ac9550333b1aa38c/html5/thumbnails/32.jpg)
Contact InformationContact Information
Thank You
Questions and Comments
Dobieslawa Kania – Transportation Engineer
Connecticut DOT
2800 Berlin Turnpike
P.O. Box 317546
Newington, CT 06131
Email: [email protected]
Phone:860-594-3389
Thank You
Questions and Comments
Dobieslawa Kania – Transportation Engineer
Connecticut DOT
2800 Berlin Turnpike
P.O. Box 317546
Newington, CT 06131
Email: [email protected]
Phone:860-594-3389