public particiation notice board poster · generic poster used for notice boards “balancing...
TRANSCRIPT
PUBLIC PARTICIATION – NOTICE BOARD POSTER
PUBLIC PARTICIATION – NOTICE BOARD POSTER
PUBLIC PARTICIPATION – SITE NOTICE
GENERIC POSTER USED FOR NOTICE BOARDS
“Balancing Growth with Resilience”
Proposed Developments: 1) Construction of Potable Water Reservoir (to be constructed on a 30m x 30 m area at the Swakopmund
Smallholdings area) 2) Creation Of A Public Road (Portions 180 and 181 of Remainder of Portion B of Swakopmund Town and
Townlands No.41 into 12 portions and Remainder) Proponent: Swakopmund Municipality, Erongo Region Environmental Assessment Practitioner: Erongo Consulting Group Competent Authority: Ministry of Environment & Tourism
Erongo Consulting Group has been duly apointed by the Swakopmund Municipality, to professionally underatke and complete an Environmental & Social Impact Assessment (ESIA) and the Environmental Monitoring and Management Plan (EMMP) in order to obtain Environnmental Clearance Certificates (ECCs), as per the legal requirements of the Environmental Management Act (Act No. 7 of 2007), and Environmrntal Impact Assessment Regulations (GN 30 in Government Gazette 4878 of February 6th 2012). The proposed two (2) developments – Construction of a Potatable Water Reservoir & Creation of Public Road / Street, may not be undertaken without Environmental Clearance Certificates (ECCs) as enshrined in the Environmental Management Act (Act 7 of 2007) and its Regulations. The EIA Process and the purpose of these two EIA studies is to identify the direct and indirect impacts that the developments will have on the natural resources, eco-system, and the socio-economic dimensions of the neighbouring communities and populations. Interested and Affected Parties (IAPs) are hereby invited to register and participate in the public consultation process - to give input, comments, and opinions in writing not later than 31 July 2020. COMMENTING PERIOD: 17 – 31 July 2020, 1700 Hours +264-81-277-2797 or +264-85-277-2797 Stakeholders Engagement: Due to the prevailing COVID19 Lockdown in Erongo Region, and as a precautionary measure, no physical interface will take. Please submit your comments in writing not later than 31 July 2020. Email: [email protected] / [email protected]
Commissioning & Operations | Project Delivery | Energy | Research | Environmental Sciences | Sustainability & Resilience | DRR | Planning & Consulting | Trainings | SHEQ | Waste
Management | Advisory Services | Management Consulting
ENVIRONMENTAL CLEARANCE NOTICE
Public Participation Notice in terms of Regulation No. 29, Section 21
under the Environmental Management Act (Act No. 7 of 2007)
NEWSPAPER ADVERT – NEW ERA, FRIDAY 10 JULY 2020
NEWSPAPER ADVERT – NAMIB TIMES, FRIDAY 17 JULY 2020
PUBLIC PARTICIPATION – FACEBOOK POST
LIST OF CONSULTED STAKEHOLDERS / I&APS
Name Organization Contacts Paulina Engelbrecht - Environmental Officer
Swakopmund Municipality +264 64 410 4438
Johanna Angolo, Town Planner Swakopmund Municipality +264 64 410 4433
Trophimus Haiduwa, GIS Coordinator Swakopmund Municipality +264 64 410 4433
Dinina Hamupembe, Technician: Projects Swakopmund Municipality +264 64 410 4423
Chief Regional Officer Erongo Regional Council [email protected]
Anet Kotting, Chairperson Hospitality Association of Namibia [email protected]
Glory Madzura SAIPA Swakopmund [email protected]
Clara Matatari Environmental Defense 0812402654
Geoffrey Kapembe Stakeholder [email protected]
Josephine Twatuka Stakeholder 0852401261
Ingplan Civil Engineers Project Managers +264 61 245 539