Design Development Update

New PK-5 Claremont Road School - Design Development Update Public Presentation to FTPS BOE on 12 November 2015

Page 2: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

Project Goals

MISSION STATEMENT To build environmentally friendly, healthy,

learning spaces;

In a way that is supportive of the School

District’s academic mission;

So that the Claremont Road School building will

serve as a model of innovative strategies for

conserving resources.

HIGH PERFORMANCE GOALS • Energy Star 90 (26.9 Kbtu/SF)

• 50% Water Use Reduction

• 100% Daylighting In All Instructional Spaces

• Provide High Quality Indoor Air Environment

– Low VOC Materials

– Displacement Ventilation

– Monitoring of CO2

• Maintain High Acoustical Quality Of School

Page 3: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

STAKEHOLDERS Team included administrators, educators, & staff

Hands-on involvement by Dr. John Ravally, James Strimple, Rick Goetz,

Connie Coriell, Dr. Jeff Charney, Roberta Mitchell, Rebekah Solomon,

Brian Bonanno, Dr. Brenda Sofield, Dr. John Roberts, Albert Fico,

Madlen Rizkalla, Tania Kelly, Miguel Rivera, Evelyn Rutledge, John

Haney, Lonni Mountainland, & Margaret DeBlasi

SCHEMATICS Schematic Design Meetings every 2 weeks

Building Tour to view LEED features & options

Discussion on Circulation, Room Adjacencies, Layouts, Sizes,

Instructional Activities, and Space Utilization

Discussion on Site Orientation & Site Development

DESIGN DEVELOPMENT Design Development Meetings every 2 weeks

Discussion on Furniture Layouts & Equipment

Discussion on Materials, Finishes, Supervision, Safety,

Security, Utilization, Maintenance and Operations

Design Process

Page 4: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

Updated Site Plan

New PreK-5 Elementary School located on BOE Claremont Road property with target FES capacity of 853-948 (based on 6cr/grade plus 2 PK, 3 PKSE, and 6 SE CRs = Total 47 CRs)

Page 5: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

Updated Floor Plan

2nd Floor

1st Floor

Page 6: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

View of Main Entrance

Page 7: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

View of Bus Entrance

Page 8: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

Side View from Loop Road

Page 9: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

View of Courtyard (facing North)

Page 10: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

View of Courtyard (facing South)

Page 11: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

Overall Front Elevation (showing Gym Wing)

Page 12: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

Pre-K Special Ed Classroom

Page 13: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

Kindergarten Classroom

Page 14: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

1st Grade Classroom

Page 15: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

Media Center Layout

Page 16: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

Science and Art Classrooms

Science Classroom Art Classroom

Page 17: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

Gymnasium Wing Layout

Page 18: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

Summer/Fall 2015 Remainder of

Capital & ESIP Work

Spring/Fall/Winter 2015 – Design

Claremont to NJ DOE Final Edu. Approval

Winter/Spring 2016 – Code Reviews, Bidding & Award

Summer 2016 to Summer 2017 –

Additions & Alterations @ SGS

Summer 2016 to Summer 2018 –

Claremont Hillcrest Elizabeth

Bus Routes (Planning 2017-18

for Fall 2018 Implementation)

ES/MS Grade Reconfiguration

(Planning 2015-18 for Fall 2018)

ONE LESS MOVE Successful FALL 2018

Summer 2015 to Fall 2018

Referendum Milestones

Page 19: Public Presentation to FTPS BOE on 12 November 2015 Design ...€¦ · Public Presentation to FTPS BOE on 12 November 2015 . Project Goals MISSION STATEMENT To build environmentally

Construction Management Services

Construction Schedule