puget sound energy’s journey implementing an integrated ... ac slide decks...may 7 – 9, 2019...

31
May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution #82307

Upload: others

Post on 27-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

May 7 – 9, 2019

Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

#82307

Presenter
Presentation Notes
Instructions: Insert your presentation title, presenter name(s), job title(s), companies, and session ID number (SID #) Tip: A lot of attendees will take pictures of slides. We recommend mentioning that the slides will be available following the conference and the link will be shared at the end of the session.
Page 2: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

About the SpeakersKhanh NguyenSAP IT Technical Lead, Puget Sound EnergyEmail: [email protected]

Jacob GeorgeSAP Sr. IT Analyst, Puget Sound EnergyEmail: [email protected]

Cesar LuccheseManaging Director, AccentureEmail: [email protected]

Presenter
Presentation Notes
The attendees want to know who you are. Give a brief introduction to help them remember you! Instructions: Fill out your name(s) Title and company Provide a short background (one or two sentences) Fun fact about yourself (optional) Tips: If you don’t have a second speaker, feel free to remove the other columns and change the title to “About the Speaker.” If you have a third speaker, feel free to add additional columns.
Page 3: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Key OutcomesHow PSE is working to provide a better experience for our customers by transforming the way we work together.

How PSE fuels the digital utility by transforming PSE Operations.

Share what we learn along the way and leave with tip.

Presenter
Presentation Notes
Instructions: List three things you hope attendees can learn and bring back to their organizations after attending your session. Tip: This will help the engagement of attendees in your session.
Page 4: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

About Puget Sound Energy Headquarters: Bellevue, WA

• 3,000 employees

Service Area• 6,000-square-mile service territory• 10 Washington state counties

Customers• 1.1 million electric customers• 800,000 natural gas customers

IT: PSE’s Trusted Technology Provider• FUEL the DIGITAL UTILITY

Presenter
Presentation Notes
Instructions: Add the bulk of the presentation content in these “content” slides. Feel free to add as many “content” slides as needed in any slide layout. Tip: We recommend keeping the total amount of slides to 20-25 to help stay within the suggested 30-minute timeline.
Page 5: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

About Accenture’s Utilities Industry Group

+15,000skilled utilities industry professionals

RELATIONSHIPSwith +200 of the world’s leading utilities

Access to wider SAP PRACTICE INVESTMENTin differentiated capabilities

Working with 9 of the 10 top utilities on the Global FORTUNE 500

Realworld OO Systems B.V.

Industry executive FORUMSAccenture International Utilities and Energy Conference (IUEC) Accenture Smart Grid Leadership Network

@Accenture_Util Visit www.accenture.com/utilitiesAccenture Utilities Watch our Accenture Utilities channel

Copyright © 2019 Accenture. All rights reserved.

+50,000 SAP practitioners

21 Liquid Studios and 17 Innovation Centers focused on SAP Solutions

Page 6: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Customer Focus @ PSE – Get To ZeroGuiding Principles

Presenter
Presentation Notes
Instructions: Add the bulk of the presentation content in these “content” slides. Feel free to add as many “content” slides as needed in any slide layout. Tip: We recommend keeping the total amount of slides to 20-25 to help stay within the suggested 30-minute timeline.
Page 7: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Drivers for Change

SAPOne System of

RecordAsset Data

Customer DataWork Orders

GIS Integration

• Enables self service (app, web, IVR, etc.)• Allows for tighter appointment booking• Provides visibility into status of requests• Enables proactive notifications to

customers about work status

Better Customer ExperienceCustomer Interface

• Assigns Work Orders to available and capable personnel

• Optimizes scheduling based on factors such as priority, location, skills

• Sends dispatched work to mobile device and SAP

Improved SchedulingClickSchedule

• Syncs scheduled work for field worker daily to mobile device

• Allows for easier, quicker time allocation at work order completion

• Provides visibility into real-time status of work orders

Mobility in the FieldSAP Work Manager

• Streamlines work orders, with tasks for different teams on a single order

• Increases visibility into status of jobs• Move to a digital platform

Simplified Work ManagementNotifications & Work Orders

Presenter
Presentation Notes
Instructions: Add the bulk of the presentation content in these “content” slides. Feel free to add as many “content” slides as needed in any slide layout. Tip: We recommend keeping the total amount of slides to 20-25 to help stay within the suggested 30-minute timeline.
Page 8: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Laying the operational foundation

Optimizing work scheduling through automation based on defined business rules and priorities.

Creating a mobile workforcethrough state-of-the-art rugged tablets and ability to receive, record, and complete work from the field

Streamlining the work lifecyclewith a simplified, proactive process for managing work, better ability to track costs, and real-time visibility into field operations

Page 9: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Challenges & OpportunitiesChallenges Opportunities

Page 10: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Innovations – SAP

Operations routed through Click and released to field

Notification

Operation

Work Order

Notification is created in SAP

Work order automatically created and routed to appropriate group

Operation

Operation

Work for multiple teams is tied to a single work order through

operations

1

2

3

Operations completed in the field from mobile device

Work order updated in SAP

Existing Notification Type to New Order Type

Single Order

Revisit Operation

Page 11: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Scheduling Challenges

Paper Base

Process

Manual Dispatch Process

bckloged PAPER DRIVEN

Individual vs. Crews

Variation Business

Unitsbacklogged TRIBAL KNOWLEDGE

BACKLOGGEDVaried Geography

Dedicate Resources backlogged

Page 12: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Innovations – ClickSchedulePolygons for ‘Huddle’ concept

– Mass Assign Polygons to Resources

– View Future Polygon Assignments

Display Return Reason Popup– New form providing dropdown of

reason codes to apply to operation(s)

Page 13: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Innovations – Work Manager

Visual Indicators• Appointment with Date and

Time of commitment to the customer

• Safety Notes maintained for the customer/premise

• Work Order Operation Status

• Local changes

Page 14: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Innovations – Work ManagerMaterial Detail Summary Form

• Material listed by Work Order numberMaterial Sorted Summary Form

• Material aggregated to see quantity

Page 15: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Innovations – Work ManagerScreens built for enabling end user to perform the meter install, remove and replace action

Highlights• Obtain data that is already

maintained in SAP with ability to edit if needed

• Capture GPS location of the install

Page 16: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Innovations – Work Manager

Improve overall usability based on feedback from the end user

Scenarios• Collect Payment Process• Meter Networking

Services Disconnect Process• Meter Ops – Meter Action

Completion Process

Solution Continuous Improvement

Page 17: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

COLLECT PAYMENT PROCESS - BEFORE

Page 18: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Collect Payment Process – Step 1

Take Meter Reading

Page 19: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Collect Payment Process – Step 2

Navigate to the Notification Task Screen

Page 20: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Collect Payment Process – Step 3

Add a Completion task to indicate action taken in the field

Page 21: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Collect Payment Process – Step 4

Select the appropriate Code Group and Code

This will enable the payment details fields

Page 22: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Collect Payment Process – Step 5

Maintain Payment information

Page 23: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

COLLECT PAYMENT PROCESS - AFTER

Page 24: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Collect Payment Process – Step 1

Complete the Meter Reading form by selecting the appropriate Code Group and Code

Click on the “Collect Payment” checkbox

Page 25: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Collect Payment Process – Step 2

Automatically routed to Add Task Screen with prepopulated information

Payment related fields will be enabled

Page 26: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Lessons LearnedOpen Houses WorkshopsDevice Pilots

IWM HyperCare HubTraining Go-Live Weekend On the Job Training

An IWM “coffee chat” session

Page 27: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Summary

Job completion 81 % increasing

Meeting Appointments

Making Due Dates

Data Quality Improving

If Domino’s can do it to deliver your pizza, so can we.

I believe this is the right way for PSE to go.

Full Adoption by Field Employees

Page 28: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Q&AFor questions after this session, contact us.

Speaker: Khanh Nguyen, Puget Sound EnergyEmail: [email protected]: Khanh Nguyen

Speaker: Jacob George, Puget Sound EnergyEmail: [email protected]: Jacob George

Speaker: Cesar Lucchese, AccentureEmail: [email protected]: Cesar Lucchese

Presenter
Presentation Notes
Instructions: DO NOT DELETE THIS SLIDE Include your preferred contact information for attendees to reach out to with any questions.
Page 29: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Access the slides from 2019 ASUG Annual Conference here: http://info.asug.com/2019-ac-slides

Presentation Materials

Presenter
Presentation Notes
Instructions: DO NOT DELETE THIS SLIDE No action needed.
Page 30: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Take the Session Survey.

We want to hear from you! Be sure to complete the session evaluation on the SAPPHIRE NOW and ASUG Annual Conference mobile app.

Presenter
Presentation Notes
Instructions: DO NOT DELETE THIS SLIDE. No action needed. You’ll receive the survey results for your session within one or two weeks following the conference. Tip: Please encourage your attendees to take the survey!
Page 31: Puget Sound Energy’s Journey Implementing an Integrated ... AC Slide Decks...May 7 – 9, 2019 Puget Sound Energy’s Journey Implementing an Integrated Work Management Solution

Let’s Be Social.Stay connected. Share your SAP experiences anytime, anywhere.

Join the ASUG conversation on social media: @ASUG365 #ASUG

Presenter
Presentation Notes
Instructions: DO NOT DELETE THIS SLIDE No action needed.