pulling system hose just got easier
DESCRIPTION
TM. by. Monthly Payments* Start At $ 617. Pulling System Hose Just Got Easier. Trends in the Construction Industry 1990’s. Mechanization & innovation to improve productivity and labor efficiency on large events. Trends in the Construction Industry 2000’s. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/1.jpg)
Pulling System Hose Just Got Easier
by TM
Monthly Payments* Start
At
$ 617
![Page 2: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/2.jpg)
Trends in the Construction Trends in the Construction IndustryIndustry
1990’s1990’s
Mechanization & innovation to improve productivity and labor efficiency on large
events.
![Page 3: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/3.jpg)
Trends in the Construction Trends in the Construction IndustryIndustry
2000’s2000’sMechanization & automation to make concrete
construction easier, safer, faster, for all events; large or small.
![Page 4: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/4.jpg)
Yesterday system hose was pulled this way...Yesterday system hose was pulled this way...
• Hard, physical work
• Requires plenty of strong men
• Labor intensive and costly man hours
• Prone to injury and Work Comp claims
• High rate of “no shows”
• Worst job in concrete
3
6
2
5
4
7 8
10
91
![Page 5: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/5.jpg)
Today we move system hose this way...Today we move system hose this way...
• Effortless
• Much fewer men
• Pour faster with larger diameter hose
• Breakdown hose less often and move sections quicker
• Virtually eliminate hose pulling injuries
• Machines shows up everyday & don’t get tired
2 men do the work of a whole crew, regardless of hose diameter!
1 2
![Page 6: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/6.jpg)
Hi Flotation Tires standard
Skinny Tires optional
3 lifting points
13 hpelectric start gas engine
Clamps lift and rotate the hose hydraulically
Weight: Ground Pressure Data: 885 lbs Hi Floats = 7.0 psi under each tire
Adjustable height control panel
2 wheel hydraulic drive
with power steer
Clamps 4” and 5”diameter hose
The solution to moving hose in the
21st century.
TM
![Page 7: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/7.jpg)
S.O.D. Driving into position
Front HoseHogFront HoseHogTMTM Positions Line for Easy Placement Positions Line for Easy Placement
Operator easily maneuvers line into position
![Page 8: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/8.jpg)
S.O.D. Driving into position
Rear HoseHogRear HoseHogTMTM Drags Excess Line Out Of The Way Drags Excess Line Out Of The Way
Operator easily moves hose in any direction
![Page 9: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/9.jpg)
S.O.D. Driving into position
- Quick set up
- Effortless operation
- Faster productivity
- Utilize larger diameter hose
- Significantly reduce labor
- Less breaking down of the line
- Reduces fatigue and injuries
BenefitsBenefits
![Page 10: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/10.jpg)
Increase ProductivityIncrease Productivity
• Smaller diameter hose is often used just to reduce the weight being dragged.
• Small diameter hose plugs up more often and causes unnecessary delays.
• HoseHog offers the opportunity to use larger diameter hose to increases productivity without increasing labor.
• The HoseHog increases production by: *
30% on precast 20% on metal deck*
after contractors became acclimated to the HoseHog which averages 3 or 4 pours
![Page 11: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/11.jpg)
Increase ProductivityIncrease Productivity
Frequent breaking down of the line results in lengthy delays.HoseHog allows for multiple sections to be broken down.
HoseHog can quickly drag hose line long distances!
![Page 12: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/12.jpg)
Increase ProductivityIncrease Productivity
2 HoseHogs are able to drag 120’ of full 5” line.
![Page 13: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/13.jpg)
Reduce Crew SizeReduce Crew Size
1 tip man and 2 HoseHog operators. That’s all!
![Page 14: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/14.jpg)
Action Photo’s
![Page 15: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/15.jpg)
Old Hooks and Rope Method• 12,500 sq. ft.
• 6–10 men (3”- 5” line)
• Lengthy placement times
• Hardest & worse job in concrete
• $20 per hour labor factor
• 48 - 80 man hours
• Labor Cost = $960 - $1,600
Total Labor Savings
$640 - $1280
Actual savings may vary.These figures were provided from
a concrete contractor in NC.
Before
New Hose Hog Method• 12,500 sq. ft.
• 2 men (4” - 5” line)
• Quicker placement times
• Safe and effortless operation
• $20 per hour labor factor
• 16 man hours
• Labor Cost = $320
After
Contractors Labor SavingsContractors Labor Savings
![Page 16: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/16.jpg)
Work SaferWork Safer
No physical pulling of the line equates to:
• Fewer lost days due to injury• Fewer back injuries• Fewer Workman Comp claims• Lower MOD factors
![Page 17: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/17.jpg)
Dangerous Work EnvironmentDangerous Work Environment
Hose pulling leads to injuries as a result of strains, falls, and tripping.
Falls are especially hazardous on elevated decks and around Nelson studs.
![Page 18: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/18.jpg)
Construction Related Back Construction Related Back InjuriesInjuries
Cause more days away from work verses any other body part.
Back injuries make up over 21% of construction injuries and over 10% of all work related injuries.
![Page 19: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/19.jpg)
Within the construction industry, Concrete ranks 4th highest in terms of back injuries.
Construction Related Back Construction Related Back InjuriesInjuries
![Page 20: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/20.jpg)
Why should you consider a HoseHogWhy should you consider a HoseHog™™??
• Labor Savings
• Production Increases
• Reduce Labor Requirements
• Increase Profitability
![Page 21: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/21.jpg)
Without HoseHog™
Labor intensive
Tough Physical Work
Injury Prone
With HoseHog™
3-man crew
Less fatigue
Fewer injuries
![Page 22: Pulling System Hose Just Got Easier](https://reader036.vdocuments.net/reader036/viewer/2022070402/568137de550346895d9f7ea2/html5/thumbnails/22.jpg)
Financing Programs AvailableCall 1-906-482-7252 www.somero.com
Every HoseHog Optional Accessories Includes: Available:
Two Power Units Skinny Tires 13 hp Robin America Gas Engine Lift Harness Hi-Flotation Tires Additional Hose Pans Two Hose Pans Spare Parts Kit Operator and Parts Manuals On-Site Operator Training
TM