pump-out cementing sleeve - watson packerwatsonpacker.com/docs/pump-out_cementing_sleeve.pdf ·...

1
www.watsonpacker.com 432.552.0102 REV. 04/2014 50 WATSON PACKER LLC PRICE BOOK Pump-Out Cementing Sleeve e Pump-Out Cementing Sleeve is used for cementing tubing strings in both cased and open holes. It allows for internal parts to be pumped out after the cementing process leaving a full open bore with no loss of tubing strength. Available in any material necessary to meet customer needs. A basket or packer placed below the sleeve provides a seal-point for pumping cement up the outside of the tubing string. Operations Simplicity is the key to the Pump-Out Plug Cementing Sleeve. Pressure applied to the trip ball moves the lower piston past the cementing ports allowing cement to be pumped outside the tubing string. After the desired amount of cement has been placed the wiper plug is pumped down to the sleeve and moves the upper piston and outer sleeve over the cementing ports. Pins are then sheared and the upper and lower pistons are pumped out of the bottom of the tool leaving a full and unrestricted opening through the sleeve. e outer sleeve is locked in the closed position. Size Min I.D. Max O.D. read Connection I.D. After Pump-out Part Number 2 1.00 3.250 2 EUE 1.92 22020 2 1.25 3.750 2 EUE 2.40 22027 3 1.25 4.410 3 EUE 2.90 22035 4 1.25 4.625 4 NU 3.45 22040 4 1.25 5.500 4 8RD 3.97 22045 5 1.25 6.130 5 8RD 4.62 22055 * Other sizes and connections available on request Specification Guide

Upload: trankhanh

Post on 01-Feb-2018

277 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Pump-Out Cementing Sleeve - Watson Packerwatsonpacker.com/docs/Pump-Out_Cementing_Sleeve.pdf · Pump-Out Cementing Sleeve The Pump-Out Cementing Sleeve is used for cementing tubing

www.watsonpacker.com • 432.552.0102

rev. 04/2014 50 wat s o n pac ker llc p ri c e b o o k

Pump-Out Cementing SleeveThe Pump-Out Cementing Sleeve is used for cementing tubing strings in both cased and open holes. It allows for internal parts to be pumped out after the cementing process leaving a full open bore with no loss of tubing strength. Available in any material necessary to meet customer needs. A basket or packer placed below the sleeve provides a seal-point for pumping cement up the outside of the tubing string.

OperationsSimplicity is the key to the Pump-Out Plug Cementing Sleeve. Pressure applied to the trip ball moves the lower piston past the cementing ports allowing cement to be pumped outside the tubing string. After the desired amount of cement has been placed the wiper plug is pumped down to the sleeve and moves the upper piston and outer sleeve over the cementing ports. Pins are then sheared and the upper and lower pistons are pumped out of the bottom of the tool leaving a full and unrestricted opening through the sleeve. The outer sleeve is locked in the closed position.

Size Min I.D. Max O.D. Thread Connection

I.D. After Pump-out Part Number

23⁄8 1.00 3.250 23⁄8 EUE 1.92 22020

27⁄8 1.25 3.750 27⁄8 EUE 2.40 22027

31⁄2 1.25 4.410 31⁄2 EUE 2.90 22035

4 1.25 4.625 4 NU 3.45 22040

41⁄2 1.25 5.500 41⁄2 8RD 3.97 22045

51⁄2 1.25 6.130 51⁄2 8RD 4.62 22055

* Other sizes and connections available on request

Specification Guide