Page 1: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Boston Water and Sewer Commission

Pump Station Condition Assessments (A Proven and Defensible Approach)

Mark Richards - Brown and Caldwell Patrick Greeley – Boston Water and Sewer Commission

Page 2: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

•  Background and Drivers •  Methods Ø  Typical Findings

(non BWSC specific)

Ø  Prioritization and Grouping (non BWSC specific)

•  Next Steps

Boston Water and Sewer Commission

Outline

Brown and Caldwell

Page 3: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

• Commission funds and maintains CIP • CIP includes prioritized list of repairs and upgrades

• Independent and defensible review

Project Drivers

Brown and Caldwell 3

Page 4: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Brown and Caldwell 4

1 – Combined Station 4 – Sanitary Stations 4 – Stormwater Stations 1 – Booster Station

Background

Page 5: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Section 2: Methods

Page 6: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Project Methods

Brown and Caldwell 6 Brown and Caldwell 6 Brown and Caldwell 6

+

Brown and Caldwell 6

Defensible list of prioritized projects 3

Credible, objective data 1

Proven prioritization process 2

Page 7: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

BWSC : Step-by-Step Procedure

Brown and Caldwell 7

1. Historical Data Review 2. Computerized Database / Tablet 3. Consequence of Failure Review 4. Field Visits

• Field assessment (Condition and Performance)

• Field Tests 5.Asset Criticality “model” / Prioritization 6.Projects/ Recommendations

Page 8: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

• O&M Manuals / Reports • As-built Drawings • Site visits / traffic review • Interviews with Operators • Existing Photos

Step 1: Data Review

Brown and Caldwell 8

Page 9: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Step 2: Customize Database / Tablet

Brown and Caldwell 9

Page 10: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

(Asset Type) – Owner Input

Brown and Caldwell 10

ü Civil/Site Assets ü Buildings and Structures ü Pump, Motors, and

Equipment ü Piping and Valves ü HVAC ü Electrical Systems,

VFDs ü Standby Power Systems ü Instrumentation and

Control Systems

1: Low Consequence

5: High Consequence

Step 3a: Consequence of Failure

Page 11: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

(Station) – Owner Input

Brown and Caldwell 11

ü UPPS ü Austin ü Commonweal

th ü Sullivan ü Symphony ü Public Alley ü Summer ü Trilling Way ü Port Norfolk ü Notting Hill

Low Consequence

High Consequence

Station Flow (weight =0.6) Critical Customers (weight =1.0) Sensitive Waters (weight =0.8) Difficulty of Repair (weight =0.4) Growth Area (weight =0.3) Response Time (weight =0.8) etc… etc… . .

1: Low

10: High

Parameters (weighting)

Step 3b: Consequence of Failure

Parameter Score

Station Score

X =

X =

Page 12: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

•  .

12

Team scoring for each asset

Condition Excellent Slight visible degradation Visible degradation Integrity of component moderately compromised Integrity of component severely compromised

12

1

2

3

4

5

Step 4a: Field Visits

Page 13: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

13

Team scoring for each asset

13

Performance Component functioning as intended In-service, but higher than expected O&M In-service, but function is impaired In-service, but function is highly impaired Component is not functioning as intended

1 2 3 4 5

Step 4b: Field Visits

Age Adjustment 0- 50% of useful life → No adjustment 50-75% of useful life → Performance (+1) 75-100% of useful life → Performance (+2)

Brown and Caldwell

Page 14: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Brown and Caldwell 14

Condition and Performance Regions

Brown and Caldwell 14

1 2 3 4 5

1 Region 1

No Immediate Action Region 2 Region 4 Immediate Corrective

Action

2

3 Initiate More Detailed Inspection

4 Region 3 Schedule Near Term Corrective

Action WO

Region 5 Replace / Refurbish 5 Co

nditi

on R

anki

ng

Performance Ranking 1 2 3 4 5

1 Region 1

No Immediate Action Region

2 Region 4

Immediate Corrective

Action

2

3 Initiate More Detailed

Inspection

4 Region 3 Schedule Near Term Corrective

Action WO

Region 5 Replace / Refurbish 5

Cond

ition

Ran

king

Performance Ranking

Step 4c: Field Visit

Safety, Reliability, Operability

Urgency

Page 15: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Section 3: Typical Findings (non-BWSC specific)

Page 16: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Summary of Common Field Test Findings 1. Capacity / Drawdown Tests 2. Data Logger 3. Vibration

Brown and Caldwell 16

Page 17: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Summary of Common Electrical and HVAC Findings

Brown and Caldwell 17

• Local HMI / local operator interface • Egress lighting • NFPA 820 compliance / Intrinsically

safe devices / ventilation • Surge suppression • Gas monitoring / alarms • Secondary pump controls • Smoke vs. fire detectors

Page 18: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Summary of Common Hydraulic / Mechanical Findings

Brown and Caldwell 18

•  Station Bypass Potential •  Equipment Assess Removal

Page 19: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Summary of Common Structural Findings

Brown and Caldwell 19

• Hatches • Ladders • Cracked Walls / Structures

Page 20: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Brown and Caldwell 20

Station XYZ

Highest Scoring Assets

Brown and Caldwell 20

Total Number of Assets Reviewed = 96

Asset Asset Type Comments Asset Region

Roof Structural Damage membrane, evidence of leakage

4

Pump 2 Pumps High vibration, leaking seal 4

Control Panel Electrical No local HMI 3

Exhaust Fan HVAC Noise, No gas monitoring 2

Page 21: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

(Criticality of assets)

Brown and Caldwell 21

C&P Regio

n (1-5)

Station Consequen

ce of Failure

Asset Type

Consequence of

Failure (1-5)

Asset Criticality

score

Step 5a: Criticality Review “Model”

Brown and Caldwell

Likelihood of failure

Page 22: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Section 4: Prioritization / Grouping

Page 23: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Asset Priority

Brown and Caldwell 23

Brown and Caldwell 23

Asset Prioritization Summary

Asset Priority Percentile Priority 1 (0-2 years) 90’th-% to 100’th-% Priority 2 (2-5 years) 70’th-% to 90’th-%

Priority 3 50’th % to 70’th-% Priority 4 0-% to 50’th-%

Page 24: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

High Criticality Asset and Projects

Brown and Caldwell 24

Brown and Caldwell 24

High Criticality (Priority)

Asset

Project 2 High

Priority

Project 1 High

Priority

Project 3 High

Priority

Page 25: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Brown and Caldwell 25

Overall Summary of Criticality Prioritization

Summary Asset Prioritization Summary and Costs

Priority Percentile Assets Count Total Cost ($)

Priority 1 90% to 100% 39 $XXX,XXX,XXX

Priority 2 70% to 90% 71 $XXX,XXX,XXX

Priority 3 50% to 70% 102 No cost estimate

Priority 4 0% to 50% 174 No cost estimate

Page 26: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Brown and Caldwell 26

Prioritize CIP expenditures to maximize criticality reduction

Brown and Caldwell 26

Like

lihoo

d of

Fai

lure

Consequence of Failure

High Criticality

Low Criticality

Station and Asset Type Score

Ass

et R

egio

n (C

&P

)

Page 27: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Grouping of Projects By Station

Brown and Caldwell 27

Priority Summary by Pump Station

Station Priority 1 Priority 2 Total Cost ($) Asset Count Cost ($) Asset Count Cost ($)

Station 1 3 ------- 13 ------- ------- Station 2 4 ------- 9 ------- ------- Station 3 9 ------- 1 ------- ------- Station 4   ------- 4 ------- ------- Station 5   ------- 4 ------- ------- Station 6 4 -------   ------- ------- Station 7 1 ------- 2 ------- ------- Station 8   ------- 2 ------- ------- Station 9   ------- 3 ------- ------- Station 10   ------- 3 ------- ------- Grand Total 39 ------- 71 ------- -------

Brown and Caldwell

Page 28: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Grouping of Projects by Asset Type

Brown and Caldwell 28

Priority Summary by Asset Type

Asset Type Priority 1 Priority 2 Total Cost ($) Asset Count Cost ($) Asset Count Cost ($)

Building 2 ------- 6 ------- ------- Centrifugal Pumps 5 ------- 5 ------- ------- Cranes   ------- 2 ------- ------- Electrical Infra. 6 ------- 10 ------- ------- Electrical Power 3 ------- 2 ------- ------- Generators 1 ------- 2 ------- ------- HVAC 1 ------- 3 ------- ------- Instrumentation 3 ------- 4 ------- ------- Motors 3 -------   ------- ------- Odor Control 1 -------   ------- ------- Piping   ------- 22 ------- ------- SCADA 2 ------- 4 ------- ------- Submersible Pumps 7 ------- 2 ------- ------- Wetwell 5 ------- 8 ------- ------- VFD   ------- 1 ------- ------- Total 39 ------- 71 ------- -------

Page 29: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Brown and Caldwell 29

Prioritize and Group expenditures to maximize criticality reduction

Brown and Caldwell 29

Like

lihoo

d of

Fai

lure

Consequence of Failure

High Criticality

Low Criticality

Station and Asset Type Consequence

Ass

et R

egio

n (C

&P

)

Page 30: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Section 5: Next Steps

Page 31: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Next Steps

Brown and Caldwell 31

•  Reviewing higher priority projects with BWSC staff

•  Further grouping of project by station •  Further grouping of projects by asset type

Page 32: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

MOBILIZATION DATA ANALYSIS &

FORM

CONDITION ASSESSMEN

T

CRITICALITY

ANALYSIS

PREPARE FINAL

REPORT

DETERMINE COSTS

Summary

Brown and Caldwell 32

Step 1 Proper planning and input

Step 2 Field time

Step 3 Defensible, prioritized improvements

TOOLS •  Electronic condition

assessment forms

•  Computer tablet (C&P Regions) •  Data loggers •  Vibration

•  Criticality

prioritization model

Page 33: Pump Station Condition Assessments (A Proven and ... Water and Sewer Commission Pump Station Condition Assessments (A Proven and Defensible Approach) Mark Richards - Brown and Caldwell

Questions?