PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation & Control Dte., PSEB, 220KV S/Stn., Ablowal, Patiala. To 1. All EIC/CEs/Distribution in PSEB. 2. Chief Engineer/P&M, PSEB, Ludhiana. 3. Chief Engineer/Enforcement, PSEB, Patiala. 4 All Dy.CEs/SEs/Distribution in PSEB. They are requested to send copy of this circular to their Sr. Xens and SDOs 5. All Dy. CEs/SEs/P&M in PSEB. They are requested to send copy of this circular to their Sr. Xens and SDOs 6. All Dy.CEs/Directors/Enforcement & EA & MMTS. They are requested to send copy of this circular to their Sr. Xens and SDOs Memo No. 19408/19548/SO/PRC/LD-38 Dated: 4.1.2010 Subject: Relaxation/Rescheduling of Power Regulatory Measures on Industries. Due to improvement in Power supply Position and decrease in load on the system, following relaxations were given through various telephone messages as under: 1 Industrial consumers feeding from Cat-II feeders (except Induction and Rolling mill consumers) were allowed to observe weekly off day from 0800 hours to 2100 hours instead of 0800 hours to 0800 hours of next day w.e.f 15.12.09 to 31.1.2010 2 Arc/Induction furnace and Rolling mill consumers were allowed to use power from 2100 hours to 0600 hours during weekly off days. Thus these consumers were to observe weekly off day from 0600 hours to 2100 hours instead of 2100 hour to 2100 hours w.e.f 15.12.09 to 31.1.2010. Days of weekly off day remained unchanged. 3 On account of Curfew in Ludhiana on 7.12.09, all industrial consumers of Ludhiana being fed from Cat - 2 & 3 feeders (Including Arc/Induction and Rolling Mills) whose weekly off day was falling on 8.12.09 to 13.12.09 were relaxed from observing weekly off days on these dates. Director/PR&C for Chief Engineer/SO&C, PSEB, Patiala CC: 1 Chairman, PSEB & All Members/PSEB. 2. Secretary/Punjab State Electricity Regulatory Commission, 220-221, Sector-34-A, Chandigarh. 3. OSD to Chairman, PSEB, Patiala. 4. Chief Engineer/Commercial, PSEB, Patiala. 5. Chief Engineer/QI & TA, PSEB, Patiala. 6. Director/I.R., PSEB, Patiala. 7. Director/Technical, PSEB, Patiala. He is requested to endorse the same to Dy.Secy./Services-III & Dy.Secy./Tech.I, II & III, PSEB, Patiala. 8. Director/I.T., PSEB Patiala for putting the above circular on PSEB web-site. 9. Dy.Director/Sr.XEN/CBC, PSEB, Patiala, Ludhiana & Jalandhar.

Upload: lamnhu

Post on 05-Feb-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

PUNJAB STATE ELECTRICITY BOARD

PR Circular No. 01/2010 Dated 4.1.2010

From The Chief Engineer/SO&C, Power Regulation & Control Dte., PSEB, 220KV S/Stn., Ablowal, Patiala.

To 1. All EIC/CEs/Distribution in PSEB. 2. Chief Engineer/P&M, PSEB, Ludhiana. 3. Chief Engineer/Enforcement, PSEB, Patiala. 4 All Dy.CEs/SEs/Distribution in PSEB. They are requested to send copy of this

circular to their Sr. Xens and SDOs 5. All Dy. CEs/SEs/P&M in PSEB. They are requested to send copy of this circular

to their Sr. Xens and SDOs 6. All Dy.CEs/Directors/Enforcement & EA & MMTS. They are requested to send

copy of this circular to their Sr. Xens and SDOs

Memo No. 19408/19548/SO/PRC/LD-38

Dated: 4.1.2010

Subject: Relaxation/Rescheduling of Power Regulatory Measures on Industries. Due to improvement in Power supply Position and decrease in load on the

system, following relaxations were given through various telephone messages as under:

1 Industrial consumers feeding from Cat-II feeders (except Induction and Rolling mill consumers) were allowed to observe weekly off day from 0800 hours to 2100 hours instead of 0800 hours to 0800 hours of next day w.e.f 15.12.09 to 31.1.2010

2 Arc/Induction furnace and Rolling mill consumers were allowed to use power from 2100 hours to 0600 hours during weekly off days. Thus these consumers were to observe weekly off day from 0600 hours to 2100 hours instead of 2100 hour to 2100 hours w.e.f 15.12.09 to 31.1.2010. Days of weekly off day remained unchanged.

3 On account of Curfew in Ludhiana on 7.12.09, all industrial consumers of Ludhiana being fed from Cat - 2 & 3 feeders (Including Arc/Induction and Rolling Mills) whose weekly off day was falling on 8.12.09 to 13.12.09 were relaxed from observing weekly off days on these dates.

Director/PR&C for Chief Engineer/SO&C, PSEB, Patiala CC: 1 Chairman, PSEB & All Members/PSEB. 2. Secretary/Punjab State Electricity Regulatory Commission,

220-221, Sector-34-A, Chandigarh. 3. OSD to Chairman, PSEB, Patiala. 4. Chief Engineer/Commercial, PSEB, Patiala. 5. Chief Engineer/QI & TA, PSEB, Patiala. 6. Director/I.R., PSEB, Patiala. 7. Director/Technical, PSEB, Patiala. He is requested to endorse the same to

Dy.Secy./Services-III & Dy.Secy./Tech.I, II & III, PSEB, Patiala. 8. Director/I.T., PSEB Patiala for putting the above circular on PSEB web-site. 9. Dy.Director/Sr.XEN/CBC, PSEB, Patiala, Ludhiana & Jalandhar.

Page 2: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

PUNJAB STATE ELECTRICITY BOARD

P.R. Circular No 02/2010 Dated: 05.02.2010 From

The Chief Engineer/S.O.&C,

Power Regulation & Control Dte.,

PSEB, 220KV S/Stn., Ablowal, Patiala.

To

1. All EIC/CEs/Distribution in PSEB.

2. Chief Engineer/P&M, PSEB, Ludhiana.

3. Chief Engineer/Enforcement, PSEB, Patiala.

4. All Dy.CEs/SEs/Distribution in PSEB.

5. All Dy.CEs/SEs/P&M in PSEB.

6. All Dy.CEs/Directors/Enforcement & EA&MMTS.

7. All Addl.SEs/Sr.XENs/Distribution along with 5 spare copies for further

distribution amongst XENs/AEEs/AEs.

8. All Addl.SEs/Sr.XENs/P&M, Grid Mtc. & Distribution.

9. All Addl. SEs/Sr.XENs/Enforcement & EA&MMTS.

Memo No. 20492/20632 /SO/PRC/LD-38 Dated: 05.02.2010

Subject: COMPULSORY WEEKLY OFF-DAY ON INDUSTRIES.

Due to increase in additional demand from agriculture sector, it has been decided

to impose Compulsory Staggered Weekly Off day for one day on all General Industries (Large

Supply, Medium Supply, Small Power) including Arc & Induction Furnace Consumers being fed

through category- II & Category-III feeders w.e.f 08.02.2010 till further instructions. The

compulsory weekly Off-day shall not be applicable on General Industrial Consumers including

Arc & Induction Furnace Consumers being fed from Category-I feeders, Urban Pattern Supply

3 Phase 3 wire, 3 phase 4 Wire Feeders & Rural (AP) feeders.

These instructions will be applicable w.e.f 8.2.2010 and industrial consumers

being fed from Cat-II feeders will continue to observe weekly off days from 0800 hours to

2130/2200 hours and Arc Induction and Rolling Mill consumers being fed from Cat-II & Cat-III

feeders will continue to observe weekly off days from 0600 to 2130/2200 hours depending upon

end of Peak Load Hour Restrictions upto 7.2.2010 as already intimated

The following schedule for Compulsory Weekly Off-day shall be observed:

Page 3: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

S.No. Name of Distribution Weekly Off-day

Circle

1. Amritsar (City & Suburban) and Monday

Ferozepur Circle

2. Gurdaspur, Nawanshahar Circle Tuesday

3. Faridkot, Hoshiarpur Wednesday

4. Ludhiana (Suburban), Muktsar and Thursday

Tarn Taran Circle

5 Ropar & Bathinda Circle Friday

6. Mohali & Kapurthala Circle Saturday

7. Sangrur, Khanna Circle (except Sunday

Mandi Gobindgarh), Patiala Circle

and Jalandhar Circle

Regarding Ludhiana (City East & City West Circles) & Mandi Gobindgarh, the

staggered Weekly Off-day for General Industries including Arc & Induction Furnaces shall be

observed as per details given below:-

Ludhiana (City East & West) Mandi Gobindgarh

(Area to remain off) (Area to remain off)

MONDAY 66KV Dhandari Kalan-II 66KV S/Stn. Talwara

66KV Focal Point, Phase-VIII (T/F T-1,T-2, T-3 & T-4)

66KV Focal Point-I 66KV Oasis Enterprises feeder

66KV Ludhiana Steel (E/F 66KV S/S Talwara)

66KV Mahavir Spg.

66KV Haibowal

66KV Billet Factory

66KV Sambhav Spg. Mills

TUESDAY 66KV Indra Park 66KV S/Stn.Amloh Road,

66KV D.C.Complex Mandi Gobindgarh

66KV Model Town

66KV Vardhman Spg.Mills

66KV Punjab Concast

220KV Dhandari Kalan-B

66KV Upper India

WEDNESDAY 66KV Giaspura i) 220KV S/S G-II M.Gobindgarh

(Transformer T-2, T-4 & T-6)

220KV Jamalpur ii) 66KV Punjab Forging Feeder

66KV Nurewal (E/F 220KV S/Stn.G-II)

66KV Vishav Karma

66KV Jail Road

66KV Urban Estate Dugri

THURSDAY 66KV Sahnewal i) 66KV S/Stn. Grain Market

66KV Transport Nagar (T/F T-1, T-2 & T-3)

66KV Avery ii) 66KV Nabha Feeder

Page 4: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

66KV Aarti Steel (E/F 220KV S/Stn.G-I)

220KV Sahnewal

66KV Balloke

66KV Oswal Woolen Mills

FRIDAY 66KV Kanganwal i) 220KV S/S G-I M.Gobindgarh

66KV Hero (T/F T-1 & T-4)

66KV Ralson ii) 66KV Central S/Stn.

66KV Vardhman Spl.Steel (T/F T-1, T-2 & T-3)

66KV Railway Traction iii) 66KV S/Stn. Focal Point

66KV GT Road

66KV Gill Road

SATURDAY 220KV Dhandari Kalan-A i) 66KV Dutt Feeder

66KV Ferozepur Road (E/F 220 KV S/S G-I)

66KV Amaltas ii) 66KV Bassi Feeder

66KV South City (E/F 220 KV S/S G-I)

66KV Sharu Steel iii) a) 66KV Bhatia Feeder

66KV Chandigarh Road b) 66KV Punjab Steels feeder

66KV Sharu Industries (w.e.f. 5.2.08)

c) 66KV K.C.Soni feeder

(w.e.f. 2.11.07)

(E/F 66KV S/S Amloh Road)

iv) 66KV Bhiwani Indl. Feeder

(E/F 220 KV S/S G-I)

SUNDAY 66KV Dholewal i) 66KV Modern Feeder

66KV Aarti International (E/F 220 KV S/S G-I)

66KV Gaunsgarh ii) 66KV Jyoti Bansal Feeder

66KV Millerganj (E/F 220 KV S/S G-I)

66KV Rockman

66KV Basant Park

66KV Happy Forging

If any S/Stn. has not been covered in the above list, the concerned Dy.CE/SE/DS

may intimate to this office, so that weekly off of that S/Stn. is fixed accordingly.

The timings of Off-day for General Industry will be from 08.00 hrs. to 08.00 hrs. of

next day (i.e. for example, the Weekly Off-day for Monday will start at 08.00 hrs. on Monday and

end at 08.00 hrs. on Tuesday).

The timings of Weekly Off-day in respect of Arc & Induction Furnace & Rolling

Mill Consumers (irrespective of category of feeders) will be from the expiry of Peak Load Hours

of previous day to the expiry of Peak Load Hours of Off-day. For example if the timings of Peak

Load Hours Restrictions are from 19.00 hrs. to 22.00 hrs. then the Weekly Off-day for Monday

will start at 22.00 hrs. on Sunday and end at 22.00 hrs. on Monday.

Page 5: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

All Continuous Process/Essential Industries (declared by this office) fed through

Independent Feeders shall be exempted from observing Compulsory Weekly Off-days. The

Essential Services viz. Government Hospitals, Railway Stations, Railway Installations, Defence

& Military Installations, P&T Installations, All India Radio/T.V., Water Supply & Sewerage

Installations and News Paper Printing Presses/News Service Installations will be exempted from

observing Compulsory Weekly Off-day. Milk Plants, Milk Processing Plants, Milk Chilling Units,

Ice Factories, Cold Storages, Oil Depots/L.P.G Depots, Poultry Farms, Ice Candy Units and

Exclusively Bread Mfg. Units will also be exempted from observing Compulsory Weekly Off-day.

The Evening Peak Load Hours Restrictions on Large Supply consumers shall

remain applicable as here to fore.

It is clarified that those Large supply industrial consumers who have taken

permission for running some load during Peak Load Hours on payment of Peak Load Exemption

Charges (PLEC) as per P.R.Circular No. 02/98 & 9/2007 (except Continuous Process/Essential

Industries, mentioned above) shall not be allowed to use the same during Weekly Off-days

including Peak Load Hours. The Peak Load Exemption Charges (PLEC) for the Off-days shall

not be levied. However, all general Industrial Consumers including Arc & Induction Furnace

Consumers shall be allowed to avail eligible exemption as admissible to them as per P.R.

Circular No. 02/98 dated 28.04.98 i.e. the exemption which is eligible to them without payment

of PLEC during Peak Load Hours Restrictions.

The penalty on defaulting consumers who do not observe Weekly Off-days as

per schedule will be levied as per P.R. Circular No. 07/2004 dated 05.07.04 & 08/2004 dated

19.07.04.

It is requested to get these instructions noted from all concerned consumers well

in advance and ensure meticulous compliance of these instructions. These instructions may

also be got displayed on the Grid Sub-Station and Complaint

Centers besides informing various offices of Industrial Associations.

These instructions can also be down loaded from PSEB’s Website

www.psebindia.org.

Director/PR&C,

Encl: As above for Engineer-in-Chief/S.O & C,

PSEB, Patiala.

Page 6: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

CC: 1) Chairman, PSEB & All Members/PSEB.

2) Secretary/Punjab State Electricity Regulatory Commission, 220-21,

Sector-34 A, Chandigarh.

3) O.S.D. to Chairman, PSEB, Patiala.

4) Chief Engineer/Commercial, PSEB, Patiala.

5) Chief Engineer/QI & TA, PSEB, Patiala.

6) Director/I.R., PSEB, Patiala.

7) Director/Technical, PSEB, Patiala. He is requested

to endorse the same to Dy.Secy./Services- III &

Dy.Secy./Tech. I, II & III, PSEB, Patiala.

8) Director/I.T., PSEB, Patiala for putting the

above Circular on PSEB Web-site.

9) Dy.Director/Sr.Xen/CBC, PSEB, Patiala, Ludhiana & Jalandhar.

Page 7: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

PUNJAB STATE ELECTRICITY BOARD

P.R. Circular No 03/2010

Dated: 18.3.2010

From

The Chief Engineer/S.O.&C,

Power Regulation & Control Dte.,

PSEB, 220KV S/Stn., Ablowal, Patiala.

To

1. All EIC/CEs/Distribution in PSEB.

2. Chief Engineer/P&M, PSEB, Ludhiana.

3. Chief Engineer/Enforcement, PSEB, Patiala.

4. All Dy.CEs/SEs/Distribution in PSEB.

5. All Dy.CEs/SEs/P&M in PSEB.

6. All Dy.CEs/Directors/Enforcement & EA&MMTS.

7. All Addl.SEs/Sr.XENs/Distribution along with 5 spare copies for further

distribution amongst XENs/AEEs/AEs.

8. All Addl.SEs/Sr.XENs/P&M, Grid Mtc. & Distribution.

9. All Addl. SEs/Sr.XENs/Enforcement & EA&MMTS.

Memo No.21596/21736 /SO/PRC/LD-38 Dated: 18.3.2010

Subject: Additional Power Regulatory Measures.

Due to increase in demand in power supply it is decided to impose additional

power regulatory measures with immediate effect for One week w.e.f. 19.3.2010 to 25.3.2010

on Industrial consumer feeding from Category-II, III & IV feeder as under:

1 Category-II feeders: Industrial consumer feeding from Cat-II feeders will

observe weekly off day for 58/58.5 hours instead of 24 hours (1 day). Thus the

consumers whose weekly off day falls on 19.3.2010 (Friday) will observe weekly off day

w.e.f end of Peak Load Hour Restriction of 18.3.10 (Thursday) up to 0800 hours of

21.3.2010 (Sunday) and so on.

2 Arc Induction Furnace and rolling mill consumers: Arc Induction Furnace and

rolling mill consumers, irrespective of the feeder, will observe weekly off day for two days

instead of One day being observed presently. Thus the consumers whose weekly of day

falls on 19.3.2010, will observe weekly off day for 19.32010 to 20.3.2010 and so on.

3 Continuous process industrial consumers: The industrial consumer having

continuous process status, feeding from Cat-IV feeders will observe Peak Load Hours

Restrictions for 12 hours instead of 3 hours being observed presently. Thus these

consumers will observe Peak Load Hours Restrictions from 1830/1900 hours to

0630/0700 hours w.e.f 18.3.10 to 24.3.10 (One week) depending upon the time of start

of Peak Load Hour Restrictions. However, industries other than continuous process

industries like essential/IT industries will observe peak load restriction for 3 hours.

The consumers are requested to download the information regarding Peak Load

Restrictions/weekly off days from the PSEB website. They are asked to visit the website

of the PSEB on regular basis in future.

The field officers are requested to display the relevant Circulars on the Notice Boards

of Complaint Centres as well as Sub Divn Offices/Grid Sub Stations.

Page 8: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

The consumers are also requested to watch newspapers for information.

The Relevant information is also being conveyed to PSEB field officers and selected

representatives of Industrial associations. The consumers can also get this information

on Telephone from field officers.

Director/PR&C,

for Chief Engineer/S.O & C,

PSEB, Patiala.

CC: 1) Chairman, PSEB & All Members/PSEB.

2) Secretary/Punjab State Electricity Regulatory Commission, 220-21,

Sector-34 A, Chandigarh.

3) O.S.D. to Chairman, PSEB, Patiala.

4) Chief Engineer/Commercial, PSEB, Patiala.

5) Chief Engineer/QI & TA, PSEB, Patiala.

6) Director/I.R., PSEB, Patiala.

7) Director/Technical, PSEB, Patiala. He is requested

to endorse the same to Dy.Secy./Services- III &

Dy.Secy./Tech. I, II & III, PSEB, Patiala.

8) Director/I.T., PSEB, Patiala for putting the

above Circular on PSEB Web-site.

9) Dy.Director/Sr.Xen/CBC, PSEB, Patiala, Ludhiana & Jalandhar.

Page 9: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

PUNJAB STATE POWER CORPORATION LIMITED

P.R. Circular No 04/2010

Dated: 12.05.2010

From

The Chief Engineer/S.O.&C,

Power Regulation & Control Dte.,

Powercom, 220KV S/Stn., Ablowal, Patiala.

To

1. All EIC/CEs/Distribution in PSPCL.

2. Chief Engineer/P&M, PSPCL, Ludhiana.

3. Chief Engineer/Enforcement, PSPCL, Patiala.

4. All Dy.CEs/SEs/Distribution in PSPCL.

5. All Dy.CEs/SEs/P&M in PSPCL.

6. All Dy.CEs/Directors/Enforcement & EA&MMTS.

7. All Addl.SEs/Sr.XENs/Distribution along with 5 spare copies for further

distribution amongst XENs/AEEs/AEs.

8. All Addl.SEs/Sr.XENs/P&M, Grid Mtc. & Distribution.

9. All Addl. SEs/Sr.XENs/Enforcement & EA&MMTS.

Memo No. 853/993 /SO/PRC/LD-38 Dated: 12.05.2010

Subject: COMPULSORY WEEKLY OFF-DAY ON INDUSTRIES.

In super session to PR Circular 3/2010, it was decided to impose following additional

power regulatory measures on all General Industries (Large Supply, Medium Supply, Small

Power) including Arc & Induction Furnace Consumers being fed through category- II, III & IV

feeders w.e.f 20.3.10 to 29.3.10 onwards as under:

S No. Category of

consumer on

which

additional

power

regulatory

measures

imposed

Timings of

weekly off

day/Descriptio

n of PR

measures

Date of

applicability

Remarks

(A)1 General

Consumers

fed from Cat-

II feeder

except Arc

Induction

and Rolling

Mill

consumers

58/58.5 hours

instead of 24

hours (1 day)

20.3.10 to

29.3.10

These consumers whose 1st weekly off day

was falling on 20.3.2010 (Saturday) were to

observe weekly off day w.e.f end of Peak

Load Hour Restriction of 19.3.10 (Friday)

up to 0800 hours of 22.3.2010 (Monday)

and so on.

2 -do- One weekly 30.3.10 to If 1st Weekly off day of the consumer was

Page 10: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

off day

6.4.10 falling on 30.3.10, it was applicable from

0800 hours of 30.3.10 up to 0800 hours of

31.3.1.0 & so on.

3

-do- Two days

weekly off day

instead of

One weekly

off day

7.4.10 to

15.4.10

If 1st Weekly off day of the consumer was

falling on 7.4.10 it was applicable from 0800

hours of 7.4.10 up to 0800 hours of 9.4.1.0

& so on

4 -do- 58/57.5 Hours

Instead of 2

days

16.4.10 to

3.5.10

If 1st Weekly off day of the consumer was

falling on 17.4.10 it was applicable from end

of peak load hours restrictions of 16.4.10 up

to 0800 hours of 19.4.1.0 & so on

5

-do-

34/33.5 Hours

Weekly off

day

applicable

4.5.10 to

11.5.10

If 1st weekly off day of the consumer was

falling on 3.5.2010, the consumer was to

observe weekly off days from end of Peak

load hours restrictions hours of 2.5.10 up to

0800 hours of 4.5.2010 and so on.

6 -do- 2 weekly off

days instead

of 34/33.5

hours

12.5.10 to

onwards

If 1st weekly off day of the consumer was

falling on 11.5.10, it was applicable from

0800 hours of 11.5.10 to 0800 hours of

13.5.10 and so on.

(B) 1. Arc,

Induction

and Rolling

Mill

consumers

feeding from

Cat-II & III

feeders

3 weekly off

days instead

of one weekly

off day

20.3.10 to

29.3.10

The consumer, whose 1st weekly of day

was falling on 20.3.2010, was to observe

weekly off day for 20.3.2010 to 22.3.2010

and so on. (From end of Peak load hour

restriction of 19/3/10 to end of PLHRs of

22.3.10)

2

-do- One Weekly

off day

applicable

30.3.10 to

6.4.10

If 1st Weekly off days of the consumer was

falling on 30.3.10, it was applicable from

end of peak load hours of 29.3.10 up to

end of peak load hours of 30.3.1.0 & so on.

3

-do- Two Weekly

off days

applicable

7.4.10 to

15.4.10

Consumer, whose 1st weekly off day was

falling on 7.4.10 was also to observe 2nd

weekly off day on 8.4.10 and so on.

4

-do-

58/57.5 Hours

instead of two

weekly off

days

16.4.10 to

3.5.10

Those consumers whose 2nd weekly off day was falling on 16.4.2010 were to observe weekly off day up to 0800 hours of 17.4.10 (instead of up to end of peak load hours restrictions of 16.4.10) and so on.

Page 11: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

5

-do-

34/33.5 Hours 4.5.10 to

7.5.10

If first weekly off day of the consumer was

falling on 3.5.2010 , it was applicable from

end of peak load hours restrictions hours of

2.5.10 up to 0800 hours of 4.5.2010 and so

on.

6

-do- 2 days weekly

off days

8.5.10 to

Onwards

The consumer whose 2nd weekly off day

was to end at 08:00 hrs of 08-05-10 will

now be applicable up to end of peak load

restriction hours of 08-05-10 and so on.

PEAK LOAD

HOURS

RESTRICTIO

NS

(C) 1 Continuous

Process

industrial

(Cat-IV)

Consumers

12 Hours

peak load

hours

restrictions

Instead of 3

hours

20.3.10 to

29.3.10

(with 100%

PLE)

16.4.10 to

3.5.10

(with 75%

PLE refer

para D)

1) These consumers were to observe Peak

Load Hours Restrictions from 1830/1900

hours to 0630/0700 hours (or 1900/1930 to

0700/0730) depending upon the time of

start of Peak Load Restrictions timings.

These consumers who had been allowed to

use some load during Peak load hours,

could use that load for 12 hours but will be

charged only for 3 hours.

2) Normal 3 hours PLHRs remained

applicable on other industries like essential/

IT industry.

2 UPS 3 phase

3 wire

feeders

3 hours peak

load

restrictions

23.3.10 to

29.3.10

Peak load hours restrictions on these

consumers were withdrawn w.e.f 30.3.10 till

further orders. It was also decided that no

peak load violation charges are to be levied

on these consumers, if they could not have

observed peak load hours restrictions.

PEAK LOAD

EXEMPTION

(D) Industrial

Consumers

feeding from

Cat-II, III & IV

(continuous

process

industry)

feeders

Peak Load

Exemptions

were curtailed

to the extent

of 75% of

PLE allowed

7.4.10 to

3.5.10

Applicable

only for

continuous

process

industries

(Cat-IV

feeder) the

100% Peak load exemption remained

applicable with 3 hours peak load hours

restrictions for industrial consumer being

fed from Cat-I feeders, IT Industry and

essential industries covered under PR

Circular 12/98 dated 3.8.98 and other

exempted categories of industries like cold

storages/Slaughter houses with partly cold

storage load Ice factories, poultry farms, Ice

candy plants, milk plants/milk chilling units

Page 12: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

consumers

were

allowed to

use PLE up

to the extent

of 75%

allowed.

and exclusively bread manufacturing units.

All other terms and conditions of PR Circular No. 2/2010 dated 5.2.10 including penalty for

violation remained unchanged. The instructions to switch off mixed category-II feeders

for 4 hours during weekly off days were also withdrawn w.e.f 6.5.10 to onwards.

Note: Peak Load Exemption charges are to be levied on the consumer to the

extent of 75% for the period the peak load exemption usage was curtailed to 75%.

The consumers were requested to download the information regarding Peak Load

Restrictions/weekly off days from the PSEB website. They were asked to visit the website of

the PSEB on regular basis in future.

The field officers were requested to display the relevant Circulars on the Notice Boards

of Complaint Centres as well as Sub Divn Offices/Grid Sub Stations.

The Relevant information is also being conveyed to PSEB field officers and selected

representatives of Industrial associations. The consumers could also get this information on

Telephone from field officers.

Dy. Chief Engineer / PR&C

For Chief Engineer / SO&C

PSPCL, Patiala.

CC: 1) Chairman, PSEB & All Members/PSPCL.

2) Secretary/Punjab State Electricity Regulatory Commission, 220-21, Sector-34 A, Chandigarh. 3) O.S.D. to Chairman, PSEB, Patiala. 4) Chief Engineer/Commercial, PSPCL, Patiala. 5) Chief Engineer/QI & TA, PSPCL, Patiala. 6) SE/I.R., PSPCL, Patiala. 7) SE/Technical, PSPCL, Patiala. He is requested to endorse the same to Dy.Secy./Services- III & Dy.Secy./Tech. I, II & III, PSPCL, Patiala. 8) SE/I.T., PSPCL, Patiala for putting the

above Circular on PSEB Web-site. 9) Addl SE/Sr.Xen/CBC, PSPCL, Patiala, Ludhiana & Jalandhar.

Page 13: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

PUNJAB STATE POWER CORPORATION LIMITED

P.R. Circular No. 5/2010

Dated: 31.5.10

From

Engineer-in-Chief /Commercial

Punjab State Power Corporation Limited

Patiala.

To

1. All EIC/CEs/Distribution in PSPCL.

2. Chief Engineer/P&M, PSPCL, Ludhiana.

3. Chief Engineer/Enforcement, PSPCL, Patiala.

4. All Dy.CEs/SEs/Distribution in PSPCL.

5. All Dy.CEs/SEs/P&M in PSPCL.

6. All Dy.CEs/SEs/Enforcement & EA&MMTS.

7. All Addl.SEs/Sr.XENs/Distribution along with 5 spare copies for further

distribution amongst XENs/AEEs/AEs.

8. All Addl.SEs/Sr.XENs/P&M, Grid Mtc. & Distribution along with 5 spare copies.

9. All Addl. SEs/Sr.XENs/Enforcement & EA&MMTS along with 5 spare copies.

Memo No. 1413/1553 /SO/PRC/LD-38 Dated 31.5.10

Subject: COMPULSORY WEEKLY OFF-DAYS ON INDUSTRIES. - RELAXATIONS

PSPCL has filed a Petition before PSERC regarding imposing power cuts and

other regulatory measures which has been approved by PSERC and accordingly it is decided

that following categories of consumers will be exempted from observing compulsory weekly off

days.

1. All Continuous Process Industries (declared) being fed from through Independent feeders.

2. Essential services covered under PR Circular No. 12/98. 3. Essential Industries covered under PR Circular No. 12/98. 4. Other exempted categories such as cold storage, ice factories, ice candy plants,

slaughter houses, poultry farms and exclusively bread manufacturing units. The evening peak load hours restrictions on large supply consumers shall remain

applicable as here to fore.

It is clarified that those Large supply industrial consumers who have taken permission for

running some load during peak load hours on payment of peak Load Exemption Charges

(PLEC) as per PR Circular No. 2/98 and 9/2007 (except Continuous Process/Essential

Industries and exempted categories mentioned above) shall not be allowed to use the same

during weekly off days including Peak Load Hours nor the Peak Load Exemption Charges

(PLEC) for the off-days shall be levied.

The penalty on defaulting consumers who do not observe Weekly Off-days as per

schedule will be levied as per P.R. Circular No. 07/2004 dated 05.07.04 & 08/2004 dated

19.07.04.

The consumers are requested to down load the above instructions from PSPCL website.

www.psebindia.org.

Page 14: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

It is requested to get these instructions noted from all concerned consumers well in

advance and ensure meticulous compliance of these instructions. These instructions may also

be got displayed on the Grid Sub-Station and Complaint Centers besides informing various

offices of Industrial Associations.

SE / ISB,

for Er-in-Chief/Commercial,

PSPCL, Patiala.

CC:

1) Chairman, PSPCL & All Members/PSPCL.

2) Secretary/Punjab State Electricity Regulatory Commission, 220-21,

Sector-34 A, Chandigarh.

3) O.S.D. to Chairman, PSPCL, Patiala.

4) Er-in-Chief /Commercial, PSPCL, Patiala.

5) Chief Engineer/QI & TA, PSPCL, Patiala.

6) Director/I.R., PSPCL, Patiala.

7) SE/Technical, PSPCL Patiala. He is requested

to endorse the same to Dy.Secy./Services- III &

Dy.Secy./Tech. I, II & III, PSPCL, Patiala.

8) SE/I.T., PSPCL, Patiala for putting the

above Circular on PSPCL Web-site.

9) Addl SE/Sr.Xen/CBC, PSPCL, Patiala, Ludhiana & Jalandhar.

Page 15: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

PUNJAB STATE POWER CORPORATION LIMITED

P.R. Circular No. 6/2010

Dated: 31.5.10

From

Engineer-in-Chief /Commercial

Punjab State Power Corporation Limited

Patiala.

To

1. All EIC/CEs/Distribution in PSPCL.

2. Chief Engineer/P&M, PSPCL, Ludhiana.

3. Chief Engineer/Enforcement, PSPCL, Patiala.

4. All Dy.CEs/SEs/Distribution in PSPCL.

5. All Dy.CEs/SEs/P&M in PSPCL.

6. All Dy.CEs/SEs/Enforcement & EA&MMTS.

7. All Addl.SEs/Sr.XENs/Distribution along with 5 spare copies for further

distribution amongst XENs/AEEs/AEs.

8. All Addl.SEs/Sr.XENs/P&M, Grid Mtc. & Distribution along with 5 spare copies.

9. All Addl. SEs/Sr.XENs/Enforcement & EA&MMTS along with 5 spare copies.

Memo No. 1778/1918 /SO/PRC/LD-38 Dated 31.5.10

Subject: PR Circular 9/2007 - Levy of Peak Load Exemption Charges and imposition of

weekly off day restrictions – Amendment Thereof

All Large Supply Consumers except Essential Services (such as Hospitals, Railway

Stations, Railway Installations, Defence & Military Installations, All India Radio/T.V.,

Water Supply & Sewerage Installations, P&T Installations and News Service

Installations etc.) are required to observe Evening Peak Load Hours restrictions. As

per P.R. Circular No. 9/2007, exemptions from observing Peak Load Restrictions

are being allowed as per their request, to Large Supply consumers against payment

of Peak Load Exemption Charges as fixed by the Board in addition to normal tariff.

A peak load policy was prepared and submitted to Hon ‘able Punjab State

Electricity Regulatory Commission for approval. As per approval of PSERC, it is

decided to amend PR Circular 9/2007 as under:

1 Dy CEs/SE/DS will allow PLE up to 100 KW (instead of 100 KW).

2 Peak Load Exemption charges will remain unchanged and will be applicable.

3 Peak Load Exemption above 100 KW will be issued by the office of Engineer-in-

Chief /Commercial.

4 The condition to avail PLE for minimum 6 months in first instance and for minimum 3

months in subsequent instance has been substituted with one month. Now the

industrial consumers will be allowed to increase/decrease/withdraw peak load

exemption after one month of its grant whether in first or in subsequent instance.

5 Peak load exemption issued to consumers up to 31.5.10 will not be extended further

in paddy season except for following categories of consumers:

Page 16: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

Categories of consumers entitled to PLH exemptions:

(a) Information Technology based industries. (b) Essential industries i.e Fertilizer Plants (except N.F.L. Bathinda and N.F.L. Nangal

(New), Gas Plants, Sugar Mills, Vanspati Mills, Milk Plants, Milk processing Plants,

Malt processing plants, Breweries & Distilleries, Roller Floor mills, Railway

workshops, oil Depots/L.P.G. Depots, Drugs & Pharmaceuticals Units, Environment

Treatment Plants (E.T.P Plants )/ Pollution Control Equipment. and other exempted

categories such as cold storages, ice factories, ice candy plants, slaughter houses,

poultry farms and exclusively bread manufacturing units.

(c) Central sectors PSUs i.e NFLs, Railway workshops, Punjab Govt. Sponsored projects such as PACL & SIEL and cement manufacturers obtaining fly ash from the thermal plants of Powercom.

(d) Continuous process industries declared as such by the competent authority designated by Powercom.

(e) There will be no curtailment in Peak load exemption or extension in peak load hour restrictions in case of consumers at sr no.5(a) to 5(d) above.

6 Applications of consumers not falling in the essential industries and exempted categories enumerated above but seeking exemptions from PLH restrictions will be dealt with as below:

i) First preference will be given to the consumers who had regularly obtained PL exemptions in the previous years. In case adequate power to accommodate all such exemptees is not likely to be available, then the permissible load in the case of all exemptees will be reduced on pro- rata basis.

ii) If power availability makes it possible to accommodate more consumers, then Powercom will, one month before it proposes to grant PLEs, seek applications from intending consumers and further PLH exemption, will be granted on first come first served basis.

7 The consumers who are running their TG/DG sets with synchronization of PSPCL system will continue to get PLE on day to day basis in case of breakdown of their TG/DG sets subject to availability of power on real time basis. The consumer who have been allowed to use some load during peak

load hour restrictions against the payment of Peak Load Exemption Charges,

will not use this load (except continuous process/essential industry and other

exempted industry to which exemption from observing weekly off days is

allowed) during weekly off days and nor the payment of Peak Load Exemption

Charges will be charged to them.

8 It is once again reiterated that the peak load exemption allowed to any consumer will not entitle him to claim it as a matter of right since peak load exemption can be withdrawn by the PSPCL completely/partially keeping in view the system constraints/power availability during peak load exemption period.

9 The other terms and conditions on the subject including penalty for violation remains unchanged.

SE / ISB,

for Er-in-Chief/Commercial,

PSPCL, Patiala.

Page 17: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

CC:

1) Chairman, PSPCL & All Members/PSPCL.

2) Secretary/Punjab State Electricity Regulatory Commission, 220-21,

Sector-34 A, Chandigarh.

3) O.S.D. to Chairman, PSPCL, Patiala.

4) Er-in-Chief /Commercial, PSPCL, Patiala.

5) Chief Engineer/QI & TA, PSPCL, Patiala.

6) Director/I.R., PSPCL, Patiala.

7) SE/Technical, PSPCL Patiala. He is requested

to endorse the same to Dy.Secy./Services- III &

Dy.Secy./Tech. I, II & III, PSPCL, Patiala.

8) SE/I.T., PSPCL, Patiala for putting the

above Circular on PSPCL Web-site.

9) Addl SE/Sr.Xen/CBC, PSPCL, Patiala, Ludhiana & Jalandhar.

Page 18: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

PUNJAB STATE POWER CORPORATION LIMITED

P.R. Circular No 07/2010

Dated: 29.07.2010

From

The Chief Engineer/Commercial,

Power Regulation & Control Dte.,

Powercom, 220KV S/Stn., Ablowal, Patiala.

To

1. All EIC/CEs/Distribution in PSPCL.

2. Chief Engineer/P&M, PSPCL, Ludhiana.

3. Chief Engineer/Enforcement, PSPCL, Patiala.

4. All Dy.CEs/SEs/Distribution in PSPCL.

5. All Dy.CEs/SEs/P&M in PSPCL.

6. All Dy.CEs/Directors/Enforcement & EA&MMTS.

7. All Addl.SEs/Sr.XENs/Distribution along with 5 spare copies for further

distribution amongst XENs/AEEs/AEs.

8. All Addl.SEs/Sr.XENs/P&M, Grid Mtc. & Distribution.

9. All Addl. SEs/Sr.XENs/Enforcement & EA&MMTS.

Memo No. 2574/2714/SO/PRC/LD-38 Dated: 29.7.10

Subject: COMPULSORY WEEKLY OFF-DAY ON INDUSTRIES.

As per the availability of power regulatory measures were taken in the month of

May & June of 2010 through various telephone messages by this office. Details of

weekly off days applicable to Industrial consumer during these months are listed below:

1

2 3 4 5

S No. Category of

consumer on

which

additional

power

regulatory

measures

imposed

Timings of

weekly off

day/Descriptio

n of PR

measures

Date of

applicability

Remarks

(A)1 General

Consumers

fed from Cat-

II feeder

except Arc

Induction

and Rolling

Mill

2 weekly off

days.

12.5.10 to

onwards

If 1st weekly off day of the

consumer was falling on 11.5.10,

it was applicable from 0800 hours

of 11.5.10 to 0800 hours of

13.5.10 and so on.

As per PR circular 4/2010 dated

Page 19: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

consumers 12.5.10

2 -do- 1 weekly off

day.

w.e.f.

28.5.10 to

6.6.10

The consumer whose 1st weekly

off day was falling on 27.5.10, was

not to observe 2nd weekly off day

on 28.5.10 and so on.

3

-do- Relaxation

from

observing

weekly off

day.

7.6.10 to

19.6.10

No weekly off day was applicable

during this period

4 -do- One weekly

off day

20.6.10 to

onwards

The consumers were required to

observe one weekly off day from

0800 hrs of weekly off day to 0800

hours of next day

5

-do-

Relaxation

from

observing

weekly off

day.

25.6.10 to

28.6.10 and

1.7.10 to

5.7.10

The consumers were not required

to observe any weekly off day

during this period

6 -do-

(B) 1. Arc,

Induction

and Rolling

Mill

consumers

feeding from

Cat-II & III

feeders

2 days weekly

off days

8.5.10 to

Onwards

The consumer whose 2nd weekly

off day was to end at 08:00 hrs of

08-05-10 will now be applicable up

to end of peak load restriction

hours of 08-05-10 and so on.

As per PR circular 4/2010 dated

12.5.10

2

-do- 1 weekly off

day.

w.e.f.

28.5.10 to

31.5.10

The consumer whose 1st weekly

off day was falling on 27.5.10, was

not to observe 2nd weekly off day

on 28.5.10 and so on.

3

-do- Two Weekly

off days

applicable

1.6.10 to

6.6.10

Consumer, whose 1st weekly off

day was falling on 1.6.10 was also

to observe 2nd weekly off day on

2.6.10 and so on.

4

-do-

One weekly

off day

7.6.10 to

7.6.10

The consumers were to observe

only first weekly off day

5 Relaxation 8.6.10 to The consumers were not required

Page 20: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

-do- from

observing

weekly off

days

19.6.10 to observe any weekly off day during this period

6

-do- One weekly

off day

20.6.10 to

21.6.10

The consumers were allowed to

observe only one weekly off day

from end of peak load hour of

19.6.10 to end of PLHR of 20.6.10

and so on.

7 -do- Two weekly

off days

22.6.10 to

onwards

except

relaxation at

Sr. No. 8

The consumer whose weekly off

day was falling on 21.6.10 were

also to observe 2nd weekly off day

on 22.6.10

8 -do- Relaxation

from

observing

weekly off

days

25.6.10 to

28.6.10 and

1.7.10 to

5.7.10

The consumers were not required

to observe any weekly off day

during this period

Note: 1) Mixed Cat-II feeders (Mixed feeders only) are to be switched off from Grid S/Stn

during their weekly off days (applicable to General industry being fed from Cat-II

feeders) from 1000 to 1200 hours and 1500 to 1700 hours.

2) Weekly off day for all industrial consumers under the jurisdiction of Patiala Circle

falling on 27.6.10 was relaxed, on account of Disturbance in supply on 23.6.10. This

was a one time relaxation and thereafter from 28.6.10 the consumers are required to

observe weekly off day as applicable/intimated from time to time.

The consumers were requested to download the information regarding Peak Load

Restrictions/weekly off days from the PSPCL website. They were asked to visit the website of

the PSPCL on regular basis in future.

The field officers were requested to display the relevant Circulars on the Notice Boards

of Complaint Centres as well as Sub Divn Offices/Grid Sub Stations.

The Relevant information is also being conveyed to PSPCL field officers and

selected representatives of Industrial associations. The consumers could also get this

information on Telephone from field officers.

This issues with the approval of competent authority.

Dy Chief Engineer / ISB,

for Chief Engineer/Commercial,

PSPCL, Patiala.

Page 21: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

CC: 1) Chairman, PSEB & All Members/PSPCL.

2) Secretary/Punjab State Electricity Regulatory Commission, 220-21,

Sector-34 A, Chandigarh.

3) O.S.D. to Chairman, PSEB, Patiala.

4) Chief Engineer/Commercial, PSPCL, Patiala.

5) Chief Engineer/QI & TA, PSPCL, Patiala.

6) SE/I.R., PSPCL, Patiala.

7) SE/Technical, PSPCL, Patiala. He is requested

to endorse the same to Dy.Secy./Services- III &

Dy.Secy./Tech. I, II & III, PSPCL, Patiala.

8) SE/I.T., PSPCL, Patiala for putting the

above Circular on PSEB Web-site.

10) Addl SE/Sr.Xen/CBC, PSPCL, Patiala, Ludhiana & Jalandhar.

Page 22: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

PUNJAB STATE POWER CORPORATION LIMITED

P.R. Circular No 08/2010

Dated: 13.08.2010 From The Chief Engineer/Commercial, Power Regulation & Control Dte., Powercom, 220KV S/Stn., Ablowal, Patiala. To

1. All EIC/CEs/Distribution in PSPCL. 2. Chief Engineer/P&M, PSPCL, Ludhiana. 3. Chief Engineer/Enforcement, PSPCL, Patiala. 4. All Dy.CEs/SEs/Distribution in PSPCL. 5. All Dy.CEs/SEs/P&M in PSPCL. 6. All Dy.CEs/Directors/Enforcement & EA&MMTS. 7. All Addl.SEs/Sr.XENs/Distribution along with 5 spare copies for further

distribution amongst XENs/AEEs/AEs. 8. All Addl.SEs/Sr.XENs/P&M, Grid Mtc. & Distribution. 9. All Addl. SEs/Sr.XENs/Enforcement & EA&MMTS.

Memo No. 2925/3065/SO/PRC/LD-38 Dated: 13.8.10

Subject: COMPULSORY WEEKLY OFF-DAY ON INDUSTRIES.

As per the availability of power regulatory measures/relaxations were imposed in

the month of July of 2010 through various telephone messages by this office. Details of

weekly off days applicable to Industrial consumer during these months are listed below:

1 2 3 4 5

S No. Category of

consumer on

which

additional

power

regulatory

measures

imposed

Timings of

weekly off

day/Descriptio

n of PR

measures

Date of

applicability

Remarks

(A)1 General

Consumers

fed from Cat-

II feeder

except Arc

Induction

and Rolling

Mill

consumers

Relaxation

from

observing

weekly off

day.

1.7.10 to

5.7.10

As per PR circular 7/2010

2 -do- Relaxation

from

observing

weekly off

6.7.10 to

15.7.10

The consumers were not

required to observe any

weekly off day during this

Page 23: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

day. period

3

-do- One weekly

off day

16.7.10 to

19.7.10

Only one weekly off day

was applicable

4 -do- Relaxation from

observing

weekly off day.

20.7.10 to

28.7.10

The consumers were not

required to observe any

weekly off day during this

period

5

-do-

One weekly

off day of

13.5/14 hours

29.7.10 to

onwards

The consumers were to

observe weekly off day

from 0800 hrs to end of

peak load hour restrictions

(B) 1. Arc,

Induction

and Rolling

Mill

consumers

feeding from

Cat-II & III

feeders

Relaxation

from

observing

weekly off

day.

1.7.10 to

5.7.10

As per PR circular 7/2010

2

-do- Relaxation

from

observing

weekly off day

6.7.10 to

14.7.10

The consumers were not

required to observe any

weekly off day during this

period

3

-do- One weekly

off day

15.7.10 to

18.7.10

Only one weekly off day

was applicable

4

-do-

Two weekly

off days

19.7.10 to

19.7.10

If 1st weekly off day of

consumer was on 18.7.10,

he was to observe 2nd

weekly off day on 19.7.10

and so on

5

-do-

Relaxation

from

observing

weekly off

days

20.7.10 to

28.7.10

The consumers were not required to observe any weekly off day during this period

6

-do- Two weekly

off days of

16.5/17 hours

each

29.7.10 to

onwards

The consumers were to

observe weekly off day

from 0600 hrs to end of

peak load hour restrictions

Page 24: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

Note: 1) Mixed Cat-II feeders (Mixed feeders only) are to be switched off from Grid S/Stn

during their weekly off days (applicable to General industry being fed from Cat-II

feeders) from 1000 to 1200 hours and 1500 to 1700 hours as per PR Circular 7/2010

dated 29.7.10.

The consumers were requested to download the information regarding Peak Load

Restrictions/weekly off days from the PSPCL website. They were asked to visit the website of

the PSPCL on regular basis in future.

The field officers were requested to display the relevant Circulars on the Notice Boards

of Complaint Centres as well as Sub Divn Offices/Grid Sub Stations.

The Relevant information is also being conveyed to PSPCL field officers and

selected representatives of Industrial associations. The consumers could also get this

information on Telephone from field officers.

This issues with the approval of competent authority.

Dy Chief Engineer / ISB,

for Chief Engineer/Commercial,

PSPCL, Patiala.

CC: 1) Chairman, PSEB & All Members/PSPCL.

2) Secretary/Punjab State Electricity Regulatory Commission, 220-21,

Sector-34 A, Chandigarh.

3) O.S.D. to Chairman, PSEB, Patiala.

4) Chief Engineer/Commercial, PSPCL, Patiala.

5) Chief Engineer/QI & TA, PSPCL, Patiala.

6) SE/I.R., PSPCL, Patiala.

7) SE/Technical, PSPCL, Patiala. He is requested

to endorse the same to Dy.Secy./Services- III &

Dy.Secy./Tech. I, II & III, PSPCL, Patiala.

8) SE/I.T., PSPCL, Patiala for putting the

above Circular on PSEB Web-site.

11) Addl SE/Sr.Xen/CBC, PSPCL, Patiala, Ludhiana & Jalandhar.

Page 25: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

PUNJAB STATE POWER CORPORATION LIMITED

P.R. Circular No 09/2010

Dated: 27.09.2010

From

The Chief Engineer/Metering,

PSPCL, Patiala.

To

1. All EIC/CEs/Distribution in PSPCL.

2. Chief Engineer/P&M, PSPCL, Ludhiana.

3. Chief Engineer/Enforcement, PSPCL, Patiala.

4. All Dy.CEs/SEs/Distribution in PSPCL.

5. All Dy.CEs/SEs/P&M in PSPCL.

6. All Dy.CEs/Directors/Enforcement & EA&MMTS.

7. All Addl.SEs/Sr.XENs/Distribution along with 5 spare copies for further

distribution amongst XENs/AEEs/AEs.

8. All Addl.SEs/Sr.XENs/P&M, Grid Mtc. & Distribution.

9. All Addl. SEs/Sr.XENs/Enforcement & EA&MMTS.

Memo No. 3971/4111 /SO/PRC/LD-38 Dated: 27.09.2010

Subject: Policy Regarding grant of Continuous Process Status to

Industry and providing Independent feeder – Reconstitution of

Committee

In continuation to PR Circular 8/2003 dated 23.7.03, it is

decided to reconstitute the committee consisting of following officers

and representative of industry nominated by PSERC for grant of

Continuous Process Status/ Independent feeder to Industrial

consumers.

1 Director/Distribution, PSPCL Chairman

2 Er-in-Chief/CE/DS concerned Member

3 Er-in-Chief/CE Incharge

Power Regulation Member

4 Mr Akshay Bector, Managing Director,

M/s Bector Food Specialities Ltd,

Theing Road, Phillaur, District Jalandhar Member

5 Dy Chief Engineer/SE, Incharge Power Regulation Conveyor

Other terms and conditions of PR Circular 8/2003 will remain

unchanged

Dy Chief Engineer / PR&C,

for Chief Engineer/Metering,

PSPCL, Patiala.

Page 26: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

CC: 1) Chairman, PSPCL & All Members/PSPCL.

2) Secretary/Punjab State Electricity Regulatory Commission, 220-21,

Sector-34 A, Chandigarh.

3) Mr Akshay Bector, Managing Director, M/s Bector Food Specialities Ltd,

Theing Road, Phillaur, District Jalandhar

4) O.S.D. to Chairman, PSPCL, Patiala.

5) Chief Engineer/Commercial, PSPCL, Patiala.

6) Chief Engineer/QI & TA, PSPCL, Patiala.

7) SE/I.R., PSPCL, Patiala.

8) SE/Technical, PSPCL, Patiala. He is requested

to endorse the same to Dy.Secy./Services- III & Dy.Secy./Tech. I, II &

III, PSPCL, Patiala.

9) SE/I.T., PSPCL, Patiala for putting the above Circular on PSEB Web-site.

10) Addl SE/Sr.Xen/CBC, PSPCL, Patiala, Ludhiana & Jalandhar.

Page 27: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

PUNJAB STATE POWER CORPORATION LIMITED

P.R. Circular No 10/2010

Dated: 30.09.2010

From

The Chief Engineer/Metering,

PSPCL, Patiala.

To

1. All EIC/CEs/Distribution in PSPCL.

2. Chief Engineer/P&M, PSPCL, Ludhiana.

3. Chief Engineer/Enforcement, PSPCL, Patiala.

4. All Dy.CEs/SEs/Distribution in PSPCL.

5. All Dy.CEs/SEs/P&M in PSPCL.

6. All Dy.CEs/Directors/Enforcement & EA&MMTS.

7. All Addl.SEs/Sr.XENs/Distribution along with 5 spare copies for further

distribution amongst XENs/AEEs/AEs.

8. All Addl.SEs/Sr.XENs/P&M, Grid Mtc. & Distribution.

9. All Addl. SEs/Sr.XENs/Enforcement & EA&MMTS.

Memo No. 4914/5054 /SO/PRC/LD-38 Dated: 30.09.2010

Subject: Grant of Peak Load Exemption to General Industrial

Consumers.

To avoid delay in grant of Peak Load Exemption to General LS

consumers, it is intimated that general industrial consumers, who had

applied for Peak Load Exemption above 100 KW in this office or in the

office of respective Chief Engineer/DS, are allowed to use Peak Load

Exemption w.e.f. 1.10.10 onwards up to 31.5.11 as per their

requirement (maximum up to 90% sanctioned contract demand).

sanction letters are being issued separately.

The consumers seeking Peak Load Exemption above 100 KW,

who have not already applied to this office should apply immediately

through e-mail, fax or post directly to this office.

Dy Chief Engineer / PR&C,

for Chief Engineer/Metering,

PSPCL, Patiala.

Page 28: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

CC: 1) Chairman, PSPCL & All Members/PSPCL.

2) Secretary/Punjab State Electricity Regulatory Commission, 220-21,

Sector-34 A, Chandigarh.

3) Mr Akshay Bector, Managing Director, M/s Bector Food Specialities Ltd,

Theing Road, Phillaur, District Jalandhar

4) O.S.D. to Chairman, PSPCL, Patiala.

5) Chief Engineer/Commercial, PSPCL, Patiala.

6) Chief Engineer/QI & TA, PSPCL, Patiala.

7) SE/I.R., PSPCL, Patiala.

8) SE/Technical, PSPCL, Patiala. He is requested

to endorse the same to Dy.Secy./Services- III & Dy.Secy./Tech. I, II &

III, PSPCL, Patiala.

9) SE/I.T., PSPCL, Patiala for putting the above Circular on PSEB Web-site.

11) Addl SE/Sr.Xen/CBC, PSPCL, Patiala, Ludhiana & Jalandhar.

Page 29: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

PUNJAB STATE POWER CORPORATION LIMITED

P.R. Circular No.11/2010

Dated: 12.10.2010

From

Chief Engineer/Metering

Punjab State Power Corporation Limited

Patiala.

To

1. All EIC/CEs/Distribution in PSPCL.

2. Chief Engineer/P&M, PSPCL, Ludhiana.

3. Chief Engineer/Enforcement, PSPCL, Patiala.

4. All Dy.CEs/SEs/Distribution in PSPCL.

5. All Dy.CEs/SEs/P&M in PSPCL.

6. All Dy.CEs/SEs/Enforcement & EA&MMTS.

7. All Addl.SEs/Sr.XENs/Distribution

8. All Addl.SEs/Sr.XENs/P&M, Grid Mtc. & Distribution.

9. All Addl. SEs/Sr.XENs/Enforcement & EA&MMTS.

Memo No. 6967/7087/SO/PRC/LD-38 Dated 12.10.2010

Subject: COMPULSORY WEEKLY OFF-DAYS ON IT BASED INDUSTRIES -

RELAXATIONS

As per clarification given by Hon' able Punjab State Electricity

Regulatory Commission following categories of consumers will be exempted from

observing compulsory weekly off days.

1. All Continuous Process Industries (declared) being fed from through

Independent feeders. 2. Essential services covered under PR Circular No. 12/98.

3. Essential Industries covered under PR Circular No. 12/98. 4. Other exempted categories such as cold storage, ice factories, ice candy

plants, slaughter houses, poultry farms and exclusively bread

manufacturing units. 5. Information Technology based industries.

The PR Circular 5/2010 dated 31.5.10 may be treated as amended up to

this extent.

Dy Chief Engineer/PR&C

for Chief Engineer/Metering,

PSPCL, Patiala.

Page 30: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

CC:

1) Chairman, PSPCL & All Members/PSPCL.

2) Secretary/Punjab State Electricity Regulatory Commission, 220-21,

Sector-34 A, Chandigarh.

3) O.S.D. to Chairman, PSPCL, Patiala.

4) Er-in-Chief /Commercial, PSPCL, Patiala.

5) Chief Engineer/QI & TA, PSPCL, Patiala.

6) Director/I.R., PSPCL, Patiala.

7) SE/Technical, PSPCL Patiala. He is requested to endorse the same to

Dy.Secy./Services- III & Dy.Secy./Tech. I, II & III, PSPCL, Patiala.

8) SE/I.T., PSPCL, Patiala for putting the above Circular on PSPCL Web-

site.

9) Addl SE/Sr.Xen/CBC, PSPCL, Patiala, Ludhiana & Jalandhar.

Page 31: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

PUNJAB STATE POWER CORPORATION LIMITED

P.R. Circular No 12/2010 Dated: 03.11.2010

From

Chief Engineer/Power Purchase & Regulation,

PSPCL, Patiala.

To

1. All EIC/CEs/Distribution in PSPCL.

2. Chief Engineer/P&M, PSPCL, Ludhiana.

3. Chief Engineer/Enforcement, PSPCL, Patiala.

4. All Dy.CEs/SEs/Distribution in PSPCL.

5. All Dy.CEs/SEs/P&M in PSPCL.

6. All Dy.CEs/Directors/Enforcement & EA&MMTS.

7. All Addl.SEs/Sr.XENs/Distribution along with 5 spare copies for further

distribution amongst XENs/AEEs/AEs.

8. All Addl.SEs/Sr.XENs/P&M, Grid Mtc. & Distribution.

9. All Addl. SEs/Sr.XENs/Enforcement & EA&MMTS.

Memo No. 81618301 /SO/PRC/LD-38 Dated: 03.11.2010

Subject: COMPULSORY WEEKLY OFF-DAY ON INDUSTRIES.

As per the availability of power regulatory measures/relaxations were imposed in

the month of August of 2010 through various telephone messages by this office. Details

of weekly off days applicable to Industrial consumer during these months are listed

below:

1 2 3 4 5

S No. Category of

consumer on

which

additional

power

regulatory

measures

imposed

Timings of

weekly off day

/ Description

of PR

measures

Date of

applicability

Remarks

(A)1 General

Consumers

fed from Cat-

II feeder

except Arc

Induction

and Rolling

Mill

consumers

One weekly

off day of

14.5/15 hours

29.7.10 to

31.7.10

The consumers were to

observe weekly off day

from 0800 hrs to end of

PLHRs of weekly off day

2 -do- Relaxation

from

1.8.10 to

3.8.10

The consumers were not

required to observe any

Page 32: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

observing

weekly off

day.

11.8.10 to

15.8.10

18.8.10 to

31.8.10,

4.9.10 to

30.9.10 and

10.10.10 to

onwards

weekly off day during this

period

3 -do- One weekly

off day

4.8.10 to

10.8.10

16.8.10 to

17.8.10,

1.9.10 to

3.9.10 and

1.10.10 to

9.10.10

Only one weekly off day

was applicable from 0800

hours of weekly off day to

0800 hrs of next day

(B) 1. Arc,

Induction

and Rolling

Mill

consumers

feeding from

Cat-II & III

feeders

Two weekly of

days of

16.5/17 hours

each

29.7.10 to

31.7.10

The consumers were to

observe weekly off day

from 0600 hrs to end of

PLHRs of weekly off days

2 -do- Relaxation

from

observing

weekly off

day.

1.8.10 to

3.8.10

11.8.10 to

15.8.10

18.8.10 to

31.8.10,

4.9.10 to

30.9.10 and

10.10.10 to

onwards

The consumers were not

required to observe any

weekly off day during this

period

3

-do- Two weekly

off days

4.8.10 to

10.8.10

If 1st weekly off day of

consumer was on 3.8.10,

he was to observe 2nd

weekly off day on 4.8.10

and so on. If 1st weekly off

day was on 4.8.10 the

consumer was to observe

weekly of days from end of

Page 33: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

16.8.10 to

17.8.10,

1.9.10 to

3.9.10 and

1.10.10 to

9.10.2010

PLHRs of 3.8.10 to end of

PLHRs of 5.8.10 and so

on.

The consumers were requested to download the information regarding Peak Load

Restrictions/weekly off days from the PSPCL website. They were asked to visit the

website of the PSPCL on regular basis in future.

The field officers were requested to display the relevant Circulars on the Notice Boards

of Complaint Centres as well as Sub Divn Offices/Grid Sub Stations.

The Relevant information is also being conveyed to PSPCL field officers and

selected representatives of Industrial associations. The consumers could also get this

information on Telephone from field officers.

This issues with the approval of competent authority.

Dy Chief Engineer / P R,

for Chief Engineer/PP&R,

PSPCL, Patiala.

CC: 1) Chairman, PSPCL & All Members/PSPCL.

2) Secretary/Punjab State Electricity Regulatory Commission, 220-21,

Sector-34 A, Chandigarh.

3) O.S.D. to Chairman, PSPCL, Patiala.

4) Chief Engineer/Commercial, PSPCL, Patiala.

5) Chief Engineer/QI & TA, PSPCL, Patiala.

6) SE/I.R., PSPCL, Patiala.

7) SE/Technical, PSPCL, Patiala. He is requested

to endorse the same to Dy.Secy./Services- III &

Dy.Secy./Tech. I, II & III, PSPCL, Patiala.

8) SE/I.T., PSPCL, Patiala for putting the

above Circular on PSEB Web-site.

12) Addl SE/Sr.Xen/CBC, PSPCL, Patiala, Ludhiana & Jalandhar.

Page 34: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

PUNJAB STATE POWER CORPORATION LIMITED

P.R. Circular No.13/2010

Dated: 28-12-2010

From

Engineer-in-Chief /PP&R,

Punjab State Power Corporation Limited

Patiala.

To

1. All EIC/CEs/Distribution in PSPCL.

2. Chief Engineer/P&M, PSPCL, Ludhiana.

3. Chief Engineer/Enforcement, PSPCL, Patiala.

4. All Dy.CEs/SEs/Distribution in PSPCL.

5. All Dy.CEs/SEs/P&M in PSPCL.

6. All Dy.CEs/SEs/Enforcement & EA&MMTS.

7. All Addl.SEs/Sr.XENs/Distribution

8. All Addl.SEs/Sr.XENs/P&M, Grid Mtc. & Distribution.

9. All Addl. SEs/Sr.XENs/Enforcement & EA&MMTS.

Memo No.9613/9753/SO/PRC/LD-38 Dated 28-12-10

Subject: Power Regulatory Measures on Industrial Consumers

Due to increase in demand, it was decided to impose power regulatory

measure on industrial consumers w.e.f. 4-12-2010 to 14-12-2010. These

regulatory measures were relaxed w.e.f. 15.12.2010 onwards.

1. Two weekly off days on Arc/induction and rolling mill consumers

feeding from category-II and III feeders. Timings of weekly off days

were from 0700 hrs to end of peak load restriction hours i.e. 2100 hrs.

These consumers were allowed to use load from end of peak load

restriction hours i.e. 2100 hours to 0700 hours of next day. If first

weekly off day of these consumers was falling on 3-12-2010, they

were to observe second weekly off day on 4.12.2010 and so on.

2. One weekly off day on general industrial consumers feeding from

category-II feeders. Timings of weekly off days were from 0800 hrs to

end of peak load restriction hours i.e. 2100 hrs. These consumers were

allowed to use load from end of peak load restriction hours i.e. 2100

hrs to 0800 hrs of next day.

Note:- Days of weekly off days remained unchanged as already

intimated.

Page 35: PUNJAB STATE ELECTRICITY BOARDfiles2.pspcl.in/pdf/pr_1_13.pdf · PUNJAB STATE ELECTRICITY BOARD PR Circular No. 01/2010 Dated 4.1.2010 From The Chief Engineer/SO&C, Power Regulation

Dy. Chief Engineer/PR

for Er-in-Chief/PP& R PSPCL

Patiala

CC:

1) Chairman, PSPCL & All Members/PSPCL.

2) Secretary/Punjab State Electricity Regulatory Commission,

220-21,

Sector-34 A, Chandigarh.

3) O.S.D. to Chairman, PSPCL, Patiala.

4) Er-in-Chief /Commercial, PSPCL, Patiala.

5) Chief Engineer/QI & TA, PSPCL, Patiala.

6) Director/I.R., PSPCL, Patiala.

7) SE/Technical, PSPCL Patiala. He is requested to endorse the same to

Dy.Secy./Services- III & Dy.Secy./Tech. I, II & III, PSPCL, Patiala.

8) SE/I.T., PSPCL, Patiala for putting the above Circular on PSPCL Web-

site.

9) Addl SE/Sr.Xen/CBC, PSPCL, Patiala, Ludhiana & Jalandhar.