putting technology to_work_reviving_new_yorks_200_year_old_city_hall

31
Putting Technology to Work: Reviving New York’s 200-Year-Old City Hall Given by: Shawn Pressley, VP Project Management Systems, Hill International Info 360: AIIM Expo & Conference March 23, 2011

Upload: questexconf

Post on 22-Nov-2014

431 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Putting Technology to Work:

Reviving New York’s 200-Year-Old City Hall

Given by: Shawn Pressley,

VP Project Management Systems, Hill International

Info 360: AIIM Expo & Conference

March 23, 2011

Page 2: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

What you’ll learn

• Why streamlined project team communication and collaboration are

crucial to delivering projects on-time and on-budget.

• How online collaboration and project management systems drive the

successful management of projects like New York City Hall.

• How quickly and easily a project collaboration system can be deployed—

typically within 24 hours—to provide immediate value to your project.

Page 3: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Agenda

1. The Challenge: Construction Complexity & Risk

2. The Solution: Information & Process Management

3. The Benefit: Reduced Risk, Improved Returns

Page 4: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Agenda

1. The Challenge: Construction Complexity & Risk

2. The Solution: Information & Process Management

3. The Benefit: Reduced Risk, Improved Returns

Page 5: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Hill International projects

Road and railways

Resorts and hotels Research and

healthcare facilities

Renewable energy

sources

Community spaces

National landmarks/Government facilities

Page 6: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Complex project teams

SubcontractorsSubcontractors Subcontractors

Subcontractors

Architect/ Engineer

Town Planners

Quantity Surveyor

Services Consultants

Engineer

General

Contractor

Project

Manager

Client

Geotechnical Engineers

Page 7: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Complex information flows

SubcontractorsSubcontractors Subcontractors

Subcontractors

Architect/ Engineer

Town Planners

Quantity Surveyor

Services Consultants

Engineer

General

Contractor

Project

Manager

Client

Geotechnical Engineers

Page 8: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

New York City Hall project snapshot

Project Team:

• 3 city agencies

• 3 general contractors

• 12 subcontractors

• 1 construction manager

Project Information:

• 450 people

• 18,000 project mails

• 6,000 project documents

Project:

• Houses Mayor’s Office, City Council

• Standing since 1803

• Last update in 1950s

• Major structural renovation needed

Page 9: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

“Knowledge is Power”

But it can be a liability if not managed well:

Efficiency: “I can’t find it. I have 400 new emails…”

Accuracy: “Who has the latest version?”

Security: “Why was HE cc’d?”

Loss: “Did I forget to cc you?”

Page 10: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Project risks are a growing problem

Security

Legal Claims

Efficiency

Page 11: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

• 700% over budget ($3B - $22B)

• 5 years behind schedule

• $150 Million in claims

Poorly-managed risk makes headlines

Page 12: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Agenda

1. The Challenge: Construction Complexity & Risk

2. The Solution: Information & Process Management

3. The Benefit: Reduced Risk, Improved Returns

Page 13: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

The Solution: Online collaboration platform

Page 14: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Reduce risk by managing

information capture, control and complexity

Page 15: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Online collaboration delivers better results

� Neutral online platform

� Secure information management

� Flexible for users to employ their own processes

� Auditable data trail

� Unlimited users

� Unlimited document storage and distribution

� Powerful search functionality

Page 16: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

SentInbox

DocumentRegister

SentInbox

DocumentRegister

SentInbox

DocumentRegister

Online collaboration is neutral & secure

SentInbox

DocumentRegister

SentInbox

DocumentRegister

Client

Contractor

Subcontractors

Consultant

PM

Architect/Engineer

SentInbox

DocumentRegister

Page 17: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Flexible to manage multiple parties & processes

Enterprise systems

Easy and fast to deploy

Industry specific functionality

SharePoint 2010

Web Services APIs

Page 18: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

SubcontractorSubcontractor Subcontractor

Subcontractor

Cost Consultant

Quantity Surveyor

Engineer

ServicesConsultants

Architect

Provides Complete Project Data Capture

Client

PM

General Contractor

Page 19: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Provides unlimited storage, training & support

$

Unlimited

Usage &Storage

Licensing

Training &Support

Usage &Storage

Licensing

Page 20: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

$

Unlimited

Training & Support

Usage & Storage

Licensing

For unlimited users on a project

Page 21: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Complete record for facility management

Facility Manager

PM

Page 22: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Agenda

1. The Challenge: Construction Complexity & Risk

2. The Solution: Information & Process Management

3. The Benefit: Reduced Risk, Improved Returns

Page 23: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Project risks can be reduced

Security

Legal Claims

Efficiency

Page 24: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Project team benefits & reduced risk

• Easier communication and

collaboration between staff and

project team members

• Fewer redundant work efforts to

distribute information quickly and get

responses to information requests

• Reduced risk of project error due to

miscommunication or working from

wrong document versions

• Clearly articulated responsibilities

and action items in workflows

• Shorter ramp-up time

Page 25: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Project stakeholder benefits & reduced risk

• Reliable protection of profit margins

• Improved services and staff resourcing

efficiencies, creating capacity to attract

new clients

• Secure intellectual capital

• Reduced regulatory burden and risk of

non-compliance

• Reduced risk of claims and losses, with

complete project records and audit trails

Page 26: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Increased returns

� Less time spent searching for documents

� Fewer administrative man-hours

� Faster critical responses to project

information requests

Page 27: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Increased returns:

66% less time spent searching for information

6 minutes

2 minutes

Search time for each document

- 66%

Page 28: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Increased returns:

40% faster responses to RFIs

10 days

6 days

- 40%

Time spent waiting for requests for

information

Page 29: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Increased returns:

80% less administrative hours needed

5 days

1 day

Time spent collecting, duplicating and

transmitting 1 complete project record

- 80%

Page 30: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Online collaboration brings measurable results

By streamlining project team communication and

collaboration, we can:

1. Positively affect efficiency to ensure on-time and on-budget completion.

2. Reduce and mitigate risk associated with project complexity, team

complexity, and information management.

3. Provide immediate value to a project by getting project teams working

together quickly and keeping them productive.

Page 31: Putting technology to_work_reviving_new_yorks_200_year_old_city_hall

Thank you!

Shawn Pressley

VP of Project Management, Hill International

[email protected]

Leigh Jasper

CEO, Aconex

[email protected]