pvps annual reportpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · the company has...
TRANSCRIPT
![Page 1: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/1.jpg)
Podtatranská vodárenská prevádzková spoločnosť, a. s.
PVPS ANNUALREPORT
![Page 2: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/2.jpg)
4 Basic data6 Statutory bodies
of the company 8 Key data
10 Company´s chief executive officer‘s word of Introduction
12 Company‘s organizational structure
14 Company‘s performance15 Water production 15 Selected operational data
16 Fulfillment overview of key production indicators
17 2,156 written opinions18 Water loss reduction18 Water meters 19 Breakdowns in water mains network20 Sewage and treatment 21 Sewage system breakdowns 21 Volumetric indicators21 Selected operating data22 Examination of quality23 Water quality
24 Customers25 Customer services26 Satisfaction survey 27 Price for production
28 Human resources29 Employees structure 30 Age structure of the employees
30 Educational structure of the employees
31 Social area31 Education of employees31 Internal communication32 Occupational health and safety
33 Slovakia-wide employee skills competition in water sector
34 Environment 34 Environmental education and awareness 34 World water day35 Photography contest for employees36 Corporate presence in shopping centres36 Excursions for schools
2015Annual Report // PVPS, a. s. // 2015
contents
ANNUAL REPORT 20152
![Page 3: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/3.jpg)
36 Slovakia-wide campaign „Let us connect“37 Support of regional activities38 ISO
39 Innovations40 Care for property, plant and equipment40 Repairs by company staff41 Planned repairs realised41 Investment projects41 Repairs by external staff
43 Financial part 44 Balance sheet46 Profit and loss statement47 Cash flow statement48 Independent auditor‘s report 50 Report by the Supervisory Board51 Intentions for the Year 2016
52 Contacts
contents
ANNUAL REPORT 2015 3
![Page 4: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/4.jpg)
ANNUAL REPORT 20154
![Page 5: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/5.jpg)
Business Title: Podtatranská vodárenská
prevádzková spoločnosť, a. s.Company Headquarters:
Hraničná 662/17 058 89 Poprad
Date of Incorporation: 21 December 2004
Legal Form: Public Limited CompanyBusiness Identification
Number /BIN/: 36 500 968
VAT Identification Number: SK 2021918459
Registered Capital: 33 200,- €Tel: 00421/052/7873 115Fax: 00421/052/7873 167
E-mail: [email protected] in:
the Commercial Register of the District Court in Prešov in
Section Sa, Insert No: 10301/PDate of Incorporation:
21 December 2004
Net Turnover as of the Year 2015:
23 384 048 €Profit/Loss Result for the
Accounting Period prior to Taxation (EBT):
1 346 728 €Profit/Loss Result for the
Accounting Period following Taxation:
1 034 784 €EBT/Turnover Ratio:
1 346 728 / 23 384 048 = 5,76 %
background data
• operation of category I public water supply networks
• operation of category I public sewerage networks
• intermediation of trade and services within the scope of free trades
• building of constructions and their alternations
• construction supervision, engineering constructions – water management projects
• laboratory analyses of water, excluding official measurements
• assembly, repairs, maintenance, expert inspections and expert tests of electrical equipment
• business activities within the field of hazardous waste management and the management of other than hazardous waste
The main goal of the company is to adhere to the entire scope of its business activities and to secure that the connection of the inhabitants to water supply and sewerage network is as large as possible.
PODTATRANSKÁ VODÁRENSKÁ PREVÁDZKOVÁ SPOLOČNOSŤ, PLC. PROVIDES FOR THE FOLLOWING ACTIVITIES WITHIN THE TERRITORY OF ITS OPERATION:
• developmental procedures for drinking water supplies and sewerage networks and waste water treatment
• production and supplies of drinking water for the population, industry, and agriculture
• wastewater draining from towns and villages, waste water treatment
• protection of water sources
• laboratory analyses – chemical, microbiological and biological analyses of water
The company does not have an organizational unit abroad.
scope of business activities
ANNUAL REPORT 2015 5
![Page 6: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/6.jpg)
profileof the companycorporate statutary bodies
as of 31/12/2015
ANNUAL REPORT 20156
![Page 7: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/7.jpg)
The Board of DirectorsCHAIRMAN
RNDr. Tomáš Paclík
MEMBERS OF THE BOARDPhilippe Guitard
Ing. Martin Bernard, MBAIng. Robert Tencer
Ing. Peter Martinka
The Supervisory Board CHAIRMAN
JUDr. Štefan Bieľak (until: 30 June 2015)Ing. Ján Mlynár (from: 01 July 2015)
MEMBERS OF THE BOARDIng. Jozef Havrila
Mgr. Zuzana NebusováEtienne Petit
Ing. Jana SedlákováMgr. Daniela Rúrová
Igor IľkoIng. Štefan Kováč
Mgr. Ján Hrabák, Ph.D.
Executive Management of the Company
CHIEF EXECUTIVE OFFICER, CEO
Ing. Robert Tencer
FINANCE MANAGER, CFOIng. Eva Sýkorová
PRODUCTION MANAGER, CPOIng. Mikuláš Kovaľ
SALES MANAGER, CSMIng. Patrik Tkáč, PhD., ACCA
ANNUAL REPORT 2015 7
![Page 8: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/8.jpg)
key data2015as of the year
ANNUAL REPORT 20158
![Page 9: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/9.jpg)
Number of employees as of 31. 12. 2015: 523
Water volume produced: 15,117 thousand m3
Treated sewage water volume: 32,779 thousand m3
Number of breakdowns in the water network: 1,921
Number of breakdowns in the sewerage network: 119
Water loss in the water network: 27.2 %
Number of contractual customers: 43,749
Number of invoicing water meters: 45,230
Number of received telephone calls on the Customer Care Line: 9,502
Number of visits to company premises: 25,388
Number of the points of supply: 48,514
key dataCompany auditor: KPMG Slovensko Ltd.Dvořákovo nábrežie 10 811 02 Bratislava
ANNUAL REPORT 2015 9
![Page 10: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/10.jpg)
WORD of Introduction
WearesubmittingyoutheannualreportthatrepresentstheactivityandtheresultsofPodtatranskávodárenskáspoločnosť,plc.fortheyear2015.AsamemberofthegroupVeoliaVoda,PVPS,plc.remainsaninnovativeandcustomer-orientedcompanythatisdevelopinginamodernway.Theoperationofthewatermainsaswellasthesewermainsformorethan305thousandpeopleinTatraandSpišregionsinthedistrictsofPoprad,SpišskáNováVes,Levoča,Kežmarok,GelnicaandStaráĽubovňa,belongstothemostimportantactivities.Thecompanyhasawell-establishedandfunctioningintegratedmanagementsystem(ISO9001,ISO14001,ISO18001andISO50001).TheauditingcompanyTÜVSÜDSlovakias.r.o.evaluatedpositivelythesetISM
Dear business partners, dear colleagues,
company’s chief executive officer’s
ANNUAL REPORT 201510
![Page 11: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/11.jpg)
goals,processperformance,theirmonitoringandtheexpertknowledgeoftheemployees.Thesuccessfullycompletedauditconfirmedthatallfoursystemsarehenceforthmain-tainedincompliancewiththerequirementsoftherespectivestandards.Thelatestcustomersatisfactionsurveyconfirmedrepeatedlythatcustomersaresatisfiedwithourservicesandweachievedacustomersatisfactionlevelof90,3%.Electronicservicesforourcustomersarebecomingastandardwayofcommunicationbetweenbuyersandourcustomercentres.Wehavealsoregisteredarisinginterestintheservicessuchas„MyCustomerAccount“,„TextMessageInformation“or„ElectronicInvoice.“Ourcompanysupportsthedevelopmentoftheenvironmentaleducationengaging
studentsaswellastheirteachersthroughitslong-termeducationalprojectsforschoolsintheabovementionedregions.WeorganizepresentationsofourcompanyontheoccasionoftheWorldWaterDayandwealsoofferourcustomersapossibilitytohavetheirowndrinkingsourcesanalysedofferingthemabetterprice.Thementionedactivi-tieshavehadapositivefeedbackinpublic.ThecompanysupportsmassmediacampaignsthatareorganizedundertheauspicesoftheAssociationofWaterCompanieswhosefullmemberweare.ThroughitsSlovakia-wideactivities,theyhaveapositiveimpactontheawarenessofourinhabitantsandourcustomers.Thustheyprovidethemwithinformationontheenvironmentalprotection.
LastlyIwouldliketosincerelythankfortheeffortsmadeandtheexcellentworktoallouremployeesasitwouldbeimpossibletoreachthesetgoalswithoutthem.MythanksbelongtotheentiremanagementofPVPS,plc.andPodtatranskávodárenskáspoločnosť,plc.,tothemembersoftheBoardofDirectorsandtothemembersoftheSupervisoryBoardfortheirsupportandofcoursetoallourcustomers,suppliersandbusinesspartners.
Ing.RobertTencer
ChiefExecutiveOfficerofPVPS,plc.
ANNUAL REPORT 2015 11
![Page 12: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/12.jpg)
FINANCE AND TAXES DEPARTMENT
ACCOUNTING DEPARTMENT
PLANNING, PRICING AND CONTROLLING DEPARTMENT
CENTRAL PROCUREMENT DEPARTMENT
Finance manager
section
ADMINISTRATION
DEPARTMENT FOR CIVIL PROTECTION AND HEALTH
AND SAFETY AT WORK
LEGAL AND ORGANISATIONAL
DEPARTMENTcompany’sorgan zat onal structure
ANNUAL REPORT 201512
![Page 13: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/13.jpg)
Sales manager
section
CUSTOMER CARE CENTRE BACK OFFICE
CUSTOMER CARE CENTRE FRONT OFFICE
GENERAL ASSEMBLY
SUPERVISORY BOARD
BOARD OF DIRECTORS
CEO SECTION
Production manager
section
ADMINISTRATION
TECHNICAL OPERATIONS DEPARTMENT
WATER PRODUCTION AND DISTRIBUTION
OPERATION SITE STARÁ ĽUBOVŇA
OPERATION SITE SPIŠSKÁ NOVÁ VES
MAIN TECHNOLOGIST DEPARTMENT
SEWERAGE AND WASTE WATER MANAGEMENT
OPERATION TECHNICAL SERVICES
CONTROL ROOM AND GIS
HR DEPARTMENT
IT DEPARTMENT
QUALITY SUPERVISION
ANNUAL REPORT 2015 13
![Page 14: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/14.jpg)
company’s performance
ANNUAL REPORT 201514
![Page 15: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/15.jpg)
company’s performance
Public water mains administered byPVPS, plc. are supplied mainly from
underground water sources. However,there are also such locations in our
scopeofactivitywherethecollectionofsurfacewateristhemainsourceofdrink-
ingwaterforthepublicwatermains.Thewateristreatedbymeansofwatermana-
gement inawatertreatmentunitand inthiswayqualitypropertiesfordrinkingwa-
terareachieved.The care of the property operated by our
companyisdividedintoregularandirregularmaintenance. Regular maintenance includes
thecareforwatersources,collection-pointob-jects, water accumulation, pumping stations,
watermainsnetworkandthereplacementofwatermetersforourcustomers.
Irregular maintenance includes activities suchaseliminationofemergenciesinthenetworkof
public water mains, repairs in the area of watermains valves, replacement of hydrant network,
eventually reductionvalvesandother fittings.Se-lectedwaterreservoirsandfurtheroperationalob-
jectswererepairedwithinthescopeoftheirregularmaintenance.
InthedistrictsofPopradandKežmarokdrinkingwa-teroutagesoccurredbecauseofsevereweathercondi-
tionsinthevillagesToporecandAbrahámovce.Because
ofinsufficientcapacityofwaterresourcesdrinkingwa-terdeliveredbywatertanktruckswasprovided.Onthebasisofproblemsthatoccurduringtheopera-tionofpublicwatermainsduringtheyear,draftplansforrepairsandinvestmentsforthefollowingperiodarecompiled.Lastyearnewlocationsofindividualhousingconstruc-tionalongwithnewpublicwatermainswerebuiltinSpišská Nová Ves. The most important are: Červenýjarok, Modrý vrch II stage, Malé pole II stage, locationPanskýkruhinSmižany,locationKpivovaruinSpišskéPodhradieandfurthershortsectionsofthewatermainsthat were an investment by PVS, plc., municipalitiesorindividualinvestors. InSpišskéVlachy,areconstruc-tion of the most defect parts of the feed piping intotownwascarriedout.Failuresinthepipingsectionhadcausedoutagesinwatersuppliesforthewholetown.Othebasisofthenegativeexperienceduringthefloodperiodin2010andextremefrostin2012whentheca-pacityofwatersourcessank,necessarymeasuresweretaken on the water resource for the water treatmentplant Jakubany. Reinforcement of streambanks regu-larlydamagedbyheavydownpourswerecarriedoutonotherobjectsadministratedbyPVPS,plc.Popradaswell.Eventhoughthequalityofthecollectedrawwater isgettingworseowingtoclimaticchangesandinterven-tion innature,ourcompanymakeseffortswhenpro-ducing drinking water in order to supply best qualitydrinkingwatertoourbuyers.
production and distribution of
drinking water
selected operational dataNumberofwaterresources: 239
Capacityofwaterresources: 2,222.56l/s
Numberofcustomerssupplied: 305763
Lengthofwatermainsnetworkinkm(includingwater-servicepipes): 2,112
Numberofwatertreatmentplants: 23
Numberofwaterstoragereservoirs: 166
Numberofpumpingstations: 38
ANNUAL REPORT 2015 15
![Page 16: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/16.jpg)
fulfillment overview of key production indicators:Indicator in thousand m3 year 2015
Water Consumption Total 15,226
Subterranean Water Consumption 12,505
Surface Water Consumption 2,721
Industrial Water Total 100
Out of which: Subterranean 0
Surface 100
Water Produced within Company´s Own Facilities 15,126
Water Sold to Local Municipalities 165
Water Produced for Realisation 15,126
Water Invoiced Total 10,386
Out of which: Households 7,073
Other Customers 3,148
Village and Town municipalities 165
Non-invoiced Water 4,740
Water Treated 3,039
Water Pumped 9,139
ANNUAL REPORT 201516
![Page 17: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/17.jpg)
767writtenopinionsregardingtheassessmentoftechnicalconditionsforpropertyconnectiontothepublicwatermains,ordisconnectionofapropertyfromthepublicwatermainsandfor
establishingacustomer´sservicepipeorremovingacustomer´sservicepipe,
636writtenopinionsregardingtheassessmentoftechnicalconditionsforpropertyconnectiontothepublicsewerageorpropertydisconnectionfromthepublicsewerageandestablishingasewer
connectionorremovingasewerconnection,
603writtenopinionsregardingothercustomer´srequirements(networks,highvoltageadjustments,low voltage adjustments, garages, and other buildings not requiring connections to the civil
engineeringnetworks),
150writtenopinionstolargebuildings(extendingofpublicwatermainsnetwork,publicseweragenetwork,IBV(CivilInvestmentConstruction),reconstructionandrelocationofwaterworknetworks,
completionofwatermainsnetworkandseweragenetwork,territorialplans,shoppingcentres,sportsfacilities,etc.)
2,156the department
for technical and operational activities
received and processed
written opinions during the last year, out of which were:
number of opinions to project documentations
according to the individual centres:Operational centre Number of written opinionsPoprad 1,319SpišskáNováVes 553StaráĽubovňa 284PVPS, plc. TOTAL 2,156
ANNUAL REPORT 2015 17
![Page 18: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/18.jpg)
Decreasing the volume of non-invoiced water (as well as water loss) was carried out mainly by cyclical check-ups of the water mains network and the subsequent elimination of water leakage from water mains. Water losses that are the largest segment in non-invoiced water in volumetric terms occurred mainly in outdated steel and grey cast iron water pipes. The next segment in non-invoiced water is the company´s own consumption where the volumes are still significant as desludging and flushing water pipes has to be carried out more frequently because of decreased consumption of water and so it is necessary to secure standard quality water in the water mains pursuant to the effective legislation (namely concerning the indicator of iron).An increased number of breakdowns in water mains network occurs regularly in transient seasonal periods such as winter-spring and autumn – winter which is repeated because of the movement of soil (freezing and thawing). Mild winters contribute to the decrease of the number of breakdowns significantly. With the aim to lower the number of breakdowns we focused on the preparation and compiling of plans for reconstruction of the parts with the highest occurrence of breakdowns, updating of transfers of measurements to the control room and carrying out of monitoring of the critical parts.The group that is in charge of the localisation of breakdowns in water mains secured the detection as well as the surveying of water mains network related to investment activities of external buyers. The cyclical echoing in the planned water mains was also carried out.
water loss reduction
water meters
There are 45,230 invoicing water meters installed within the public network. On the basis of customers´complaints 22 water meters were demounted and sent for official testing. In two cases only were the complaints justified. 5,126 water meters were repaired in total.
ANNUAL REPORT 201518
![Page 19: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/19.jpg)
CentreRow Connection
TotalRunning Not-running Running Not-running
Poprad 275 255 88 71 689Stará Ľubovňa 126 62 170 95 453Spišská Nová Ves 325 58 329 67 779Water Total: 726 375 587 233 1,921
breakdowns in water mains network
ANNUAL REPORT 2015 19
![Page 20: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/20.jpg)
sewerage and waste water treatment plantsThis year the waste water treatment plants (WWTP) Kežmarok and Spišská Nová Ves were reconstructed. The reconstructions in the given areas will contribute to a reduction of the environmental load in the area and to an improvement of water quality parameters, mainly of the surface water.
The coordination of building work and work supplying was made difficult by the fact that the construction was carried out during the operation with the exception of operational breaks.The sewerage Hôrka, Podbanské was put in permanent operation.Last year we worked on the sewer overflow chamber Šišpľac Levoča because of a breakdown.The most important part of the operational activities of sewer and waste water treatment plants operation are trouble free wastewater discharge and wastewater draining, maintenance, cleaning of sewage pipes, removal of breakdowns in the sewer system and on waste water treatment plants, water treatment, management of raw material and waste that is produced during these activities. The impact on the environment is monitored, not only on the water in recipients in that the treated water is discharged but also the impact of the operation on the environment and the inhabitants in the built-up areas, and also the impact on the nature in the corridors of the sewage pipe networks. A considerable part of the operated area belongs to TANAP /Tatra National Park/. It is certainly much more difficult to manage areas like national parks and protected areas than other areas as they are controlled by a special regime and it is monitored by several institutions and watched by ordinary people as well whom the environment in that they live matters a lot. Our employees take part in all negotiations – at all stages of the investment construction, external repair, deal with requirements and complaints and give opinions on their justness. They contribute to better overall information and awareness among people they meet at work. We organize guided excursions at waste water treatment plants and visits to the areas with an expert commentary for those who are interested in them. We also cooperate with municipal authorities on the preparation and provision for construction plans.In the town of Gelnica a new waste water treatment plant Gelnica was put into operation. So the new construction „The Town of Gelnica – Completion“ was connected to the public sewer system.Wastewater was drained from 219,519 inhabitants and industrial businesses in the area of six districts. Wastewater was treated by 30 waste water treatment plants operated by PVPS, plc. Poprad.
ANNUAL REPORT 201520
![Page 21: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/21.jpg)
volumetric indicatorsyear 2015 in thousand m3
breakdowns in the sewer network
selected operating data
Selectedoperatingdata 30ks
NumberofProjectsEquivalenttotheNumberofInhabitants(EO) 346,301
NumberofActualEO-year 218,053
ProjectedCapacityofWastewaterTreatmentPlants 104,368m3/deň
ProjectedFlowQ24 1,208.14l/s
ActualFlowQ24peryear 1,041.05l/s
NumberofSewerNetworkConnections 27,097ks
LengthofSewerNetworkexcludingConnections 639.07km
NumberofBreakdownsintheSewerNetwork 119
Indicator Reality
WastewaterDrained-Total 33,278
WastewaterDrained-Invoiced 10,409
outofwhich:
Households 6,314
Otherproducersofwastewater 4,095
Includedinit:
RainfallWater 2,308
Outofwhich:households 868
OtherProducersofwastewater 1,440
Watertreated 32,779
Wateruntreated 499
Centre Sewerage Row
Poprad 69
StaráĽubovňa 26
SpišskáNováVes 24
SewerageTotal: 119
There were 8,161 tonnes of solid sludge disposed from the wastewater treatment plants.
ANNUAL REPORT 2015 21
![Page 22: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/22.jpg)
examination
qualityQuality of drinking and waste water is examined in regular intervals by a testing laboratory of the Department of Quality Inspection (SLÚKK). The Laboratory performs its activities pursuant to the Accreditation Decree of S-250, issued by the Slovak National Accreditation Service in Bratislava. In 2015 the testing laboratory showed again that it is able to carry out the tests unbiased and trustworthy, within the meaning of STN EN / ISO 17025:2005 and the Certificate of Accreditation. Laboratory activities include physical and chemical tests, microbiological and biological tests of underground, technological, drinking and waste waters as well as sludge, including sampling of water and sludge.
of drinking water and wastewater
ANNUAL REPORT 201522
![Page 23: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/23.jpg)
Waste Waters Laboratory carried out quality inspections focusing on wastewater and sludge from the mouths of particular technological stages in the process of waste-water treatment within our wastewater treatment plants as well as the inspections of the producers of industrial and sewage wastewater. The extent and the number of samples that were monitored are in concordance with the Public Notice No.: 269/2010 Coll. and related legal regula-
tions in force concerning wastewater. The observance of the regulated limits of the released wastewater into the recipients is monitored, in order to ensure that no harm to the environment is caused.The Laboratory processed the total number of 4,199 sam-ples last year. Out of which were: 3,780 wastewater and sludge samples taken from our wastewater treatment plants, 226 samples from untreated mouths, 178 samples from industrial producers and 15 wastewater samples from water treatment plants.
In the area of waste management, waste treatment was in concordance with laws and regulations in force and in the concordance with hazardous waste treatment permit. During the operation of objects, 15,850 tonnes of waste were produced, out of which was 1.8 tonnes of hazardous waste. Compared to the year 2014 it was by 2,282 tonnes less. Their disposal was carried out by our contracting partners. Annual reports on waste amount were sent to respective environmental authorities in due time on the basis of which charges were levied for the waste produced.
In its operations, the company has small and medium-sized sources of air pollution. In total 8.453 tonnes of pollutants were released into air from the small sources and 7.703 tonnes from the medium-sized ones. Reports on their amounts and NEIS forms were sent to respec-tive environmental authorities in due time as provided by law. On their basis our company was charged levies for releasing emissions into the atmosphere.
The Quality Supervision Department provided for the in-spection of the quality of water, water resources, fresh wa-ter treatment plants, group municipal water mains, water reservoirs and the quality of drinking water at the points of final consumption. Drinking water supplied to the public water mains by Pod-tatranská vodárenská prevádzková spoločnosť, plc. is clean and free of any impurities, its quality is monitored in systema-
tic intervals and is in accordance with the Decree of NV SR No.: 496/2010 Coll., which specifies the requirements for water intended for human consumption. Based on continu-ous monitoring of drinking water quality within the water mains, it is possible to state that the quality of drinking water meets the European standards as viewed from the physical, chemical, microbiological and biological aspects. Drinking water laboratory tested the quality of drinking water in almost 1,527 samples. The quality was compliant with the required standards in 96% of samples taken.
Water Reservoirs and Water Transmission Network
Overall Number of Samples/Number of Non-compliant Samples
Overall Number of Analyses/Number of Noncompliant Analyses
Microbiological and Biological Indicators 857 / 43 12,177 / 73
Physical and Chemical Indicators 670 / 22 6,428 / 27
drinking waterwater quality
wastewater
waste management
Year Amount of Other Waste (t) Amount of Hazardous Waste (t) Total (t)
2014 18,130 3,7 18,133.7
2015 15,850 1,8 15,851.8
ANNUAL REPORT 2015 23
![Page 24: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/24.jpg)
customers
ANNUAL REPORT 201524
![Page 25: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/25.jpg)
In 2015, the goal of our employees was again to providegoodqualityservicestoourcustomers.Inordertoofferper-sonalcontactinformationtoourcustomersthreecustomercentreswithcashregistersinPoprad,SpišskáNováVesandinStaráĽubovňawereavailable.Weprovidednon-stopser-vicesonacustomercarelineofourCallCentre-24hoursperdayand7daysaweek–aweanswered9,502customercalls.Almost900customersaskedforourservice„ElectronicInvoice“whichmeansthatthecustomerreceivestheinvoicetothee-mailgiventhedayfollowingtheissueiftheinvoice.Almost2,900electronicinvoiceshavebeensentsofar.Abackinterestofourcustomersinelectroniccommunica-tionenabledthemdistancesettlementofseveralrequests.Via„TextMessage“servicewewereabletoinformourcus-tomersaboutplannedoutagesandbreakdowns.Wesentfreetextmessagesto8,600pointsofsupply.
Weregistered1,920customersusingtheservice„MyCus-tomerAccount“.When concluding a contract the households can decidehowtopaywaterandsewerrates–theycanpayregularmonthly advanced payments via standing order or SIPOcollection.Allourcustomersstillhaveapossibilitytopayan invoiceincashdirectlyatourcashdesks,cashlessviaourPOSter-minal,viabanktransferandviapaymentsatCOOPJednotasupermarkets(UNIKASAservice).Observingqualitystandardswithinthemeaningof „Cus-tomer Services Commitments“ (commitments related toavailability, information and solidarity) is still the priorityforourcompany.Thewordingisavailableonourwebpageandinbrochuresinourcustomercentres
services for customers
customer service approach
At the beginning of the year a CCTV security camera system was installed in our customer centres in Poprad, Spišská Nová Ves and Stará Ľubovňa. Both customers and employees of
our company are now protected when paying at the cash desk in case of unexpected events.The change to a new way of mobile or „drive-by“ meter reading was the main contribution. The main aim of the implementation of the device was the continuous effort to improve the quality of services provided to our customers. They have also decreased the number of cus-tomers´ claims. The new devices call immediately our employees´ attention to a problem when reading a meter, for example when higher consumption occurs, it draws their atten-tion to an eventual breakdown. The device will enable us in future to read water meters
that have not been accessible for a long time - when telecounting will be introduced.We continue helping families in a difficult financial situation in order not to interrupt
drinking water supplies. Our effort is to provide at least a repayment plan to physi-cal and legal entities disregarding the fact if a wholesale customer or retail
customer is concerned. In the year 2015, 755 customers entered into a written repayment plan. This means that 94% of applications for a
repayment plan were met halfway by our company.
ANNUAL REPORT 2015 25
![Page 26: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/26.jpg)
Every year an external customers’ satisfaction rate survey is carried out. The main goal of the survey is to gather customer feedback which is important to find out the overall customer satisfaction rate and their requirements. In the survey, standard questions were used in order to compare the individual answers in time.The survey was executed via standardized telephone calls on a sample of randomly selected 500 customers within the whole range of the activities performed by PVPS, plc. as follows: 300 inhabitants from detached houses, 150 le-gal entities including self-employees, and 50 inhabitants of residential buildings. We polled our customers to find out if they were satisfied with water supplies, the speed
of breakdown elimination, the access to information, our employees´ professionalism, the quality of services provided, and customers´ preference of services offered by our company. On the basis of their answers we also asked what their requirements were regarding our new products and services.The overall customer satisfaction with our services reached the level of 90.30 %. The overall satisfaction decreased by 12 hundredth of a percent compared to the previous year and the overall dissatisfaction with the services sank by 1.16 % which is evaluated as positive. Our customers perceive our company more positively than negatively.
satisfaction rate survey
ANNUAL REPORT 201526
![Page 27: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/27.jpg)
price for drinking water production, distribution, supply and wastewater treatmentForthefirsthalfoftheyeartheRegulatoryAuthorityforNetworkIndustries(ÚRSO)setnewwaterandsewerratesforourcompany.TherateswithinthemeaningofthevalidpricingdecisionNo0089/2014/Vfrom21November2013remainedinforce.TheRegulatoryAuthorityforNetworkIndustries(ÚRSO)approvedbythepricingdecisionthefollowingmaximumrates:
By reasons of a significant change of economic parameters when draining and treating wastewater theRegulatoryAuthorityforNetworkIndustries(ÚRSO)adjustedthemaximumpricefordrainingandtreatingwastewater by public sewer from 1 July 2015 by means of a ruling No 0006/2015/V from 3 June 2016.Maximumpricesfordrinkingwaterproductionandsupplyaswellasfordistributionbypublicwatermainsremainedunchanged.
Itwaspossibletoapplythechangeinsewerratesfromthefirstmeterreadingoncarriedoutafterthechangeoftherates,whichmeansfrom1July2015.Bythereasonsmentionedaboveadditionalmeterreadingstartedtobecarriedoutwhichmeansthatallmetershadtobereadaccordingtothatsewerratesareinvoiced.During the operation of PVPS, plc. price development has been influenced by several factors, such as thedevelopmentofeconomicallyjustifiedcostsaswellasthedevelopmentofrealizeddrinkingwaterproduction,distributionandsupplybypublicwatermainsandwastewatertreatmentbypublicsewerintechnicalunits.
Rates valid for the period from 1 January to 30 June 2015 €/m3 VAT exclusive
Maximum price for drinking water production and supply by public water mains 1.0884
Maximum price for drinking water distribution by public water mains 0.6925
Maximum price for draining and treatment of wastewater by public sewer 1.0585
Rates valid for the period from 1 July 2015 €/m3 VAT exclusive
Maximum price for draining and treatment of wastewater by public sewer 1.0904
issued 84,373 water and sewer invoices sent 8,001 remainders registered more than 65 thousand personal, telephone, postal and electronic contacts with customers
755 repayment plans were entered
in the year 2015 the company:
ANNUAL REPORT 2015 27
![Page 28: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/28.jpg)
human resourcesAt the beginning of the year 2015 the physical headcount totalled 533. During the year the company employed 27 new members of staff (including external staff, such as employees after parental leave) and 37 employees of the company left. As of 31 December 2015 the physical headcount of employees was 523. The average calculated number of employees was 515.53 – which was by 4.47 employees less compared to the plan and by 2.08 employees less compared to the average calculated number of employees for the year 2014.
ANNUAL REPORT 201528
![Page 29: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/29.jpg)
structure of employment
Physical headcount of employees as of 31 /12/ 2014 533Growth in the number of employees: 27Out of which: Temporary contract /a definite period of time/ 20 Permanent contract /an indefinite period of time/ 2 External staff 5Decline in the number of staff: 37Out of which: § 60 of the labour code - /contracted/ 16 § 70 of the labour code - /temporary/ 1 § 63 of the labour code - /organizational reasons/ 0Other reasons (disability, deaths, ...) 1Going into the external staff database 4Leaving as a result of retirement 15
Physical headcount of employees as of 31 /12/ 2015 523Average recorded calculated number of staff 515,53
ANNUAL REPORT 2015 29
![Page 30: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/30.jpg)
Age Structure of Employees:
Qualification Structure of Employees:
Age Female Male Totalup to 20 0 2 2
20 - 24 2 7 725 - 29 6 13 1930 - 34 5 15 2035 - 39 12 38 5040 - 44 15 62 7745 - 49 18 71 8950 - 54 24 76 10055 - 59 16 90 106over 60 11 41 52Total 109 414 523Average Age 47.71 48.24 48.13
1315
2
38
7
6271769041
65
0
12
2
1518241611
upto20
20-24
25-29
30-34
35-39
40-44
45-49
50-54
55-59
over60
upto20
20-24
25-29
30-34
35-39
40-44
45-49
50-54
55-59
over60
Education Degree Female Male TotalElementary 5 15 20Secondary Vocational 11 222 233Secondary Vocational with Leaving Exam 52 142 194Higher Vocational 1 0 1 University Degree 40 35 75 Total 109 414 523
Elementary
SecondaryVocational
SecondaryVocationalwithLeavingExam
HigherVocational
UniversityDegree
142
15222
035
52
511
140
FEMALE
FEMALE
MALE
MALE
ANNUAL REPORT 201530
![Page 31: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/31.jpg)
The total costs incurred by the company for educational purposes amounted to the sum of 44,021.54 €. The average costs for educational trainings per employee amounted to the sum of 85.31 €. In total, 11,537 € were paid for compul-sory trainings (stipulated by legislative decrees), 4,114 € were paid for language courses and 28,370.54 € for further trai-nings, courses, seminaries etc. The total number of training courses organized and attended was 940 of the total length of 9,465 hours, out of which the number of hours dedicated to trainings regarding health and safety at work was 4,132.
The company concentrated mainly on the development of professional skills and competence in employees, increasing and extending their professional qualifications, knowledge and skills. The corporate staff attended compulsory trainings on scheduled dates stipulated by special regulations.An important part of the employment education of our staff members were regular training courses in the field of occu-pational health and safety at work and fire prevention which apart from the planned ones were attended by all our newly recruited employees.
Education of Employees
The Social Fund created by the company amounted to the sum of 86,255.95 € including the fund balance from the previous year (7,082.24 €) and the allocation of profit (17,592.40 €). It was drawn for various purposes, specifically as a contribution to catering of our employees (48,050.55 €), for recreation, sport and the regeneration of our employees (15,788.37 €)), for regeneration regarding major work and life anniversaries of our employees (12,090.54 €) and in the social area (3,868.00 €). The Social Fund Balance amounting to the sum of 6,458.49 € will be used in the year 2016.Within the frame of social expenses the company contri-buted for our employees additional pension fund schemes
totalling the sum 151,205.42 €, for catering of our emplo-yees (apart from the social fund) amounting to the sum of 241,662.64 €, for health care amounting to the sum of 28,113.68 €, for drinking regime 1,512.85 €, for temporary sick leave totalling to the sum of 20,615.37 € and for the company´s contribution within the frame of SEQUOIA Campaign totalling to the sum of 22,531.64 €.Severance money and retirement benefits were paid to-talling to the sum of 54,324.16 € out of which the seve-rance money was paid to employees whose employment, according to a medical opinion, ended because of a long-term loss of their ability to perform their work.
Social Area
79
108
120
216
Structure of Employees according to the duration of employment
upto5years
upto10years
upto20years
over20years
The intra-company network – the Intranet belongs to the fastest and the most effective communication tools among our employees. It helps to inform our employees immediately on current events, orders, requirements, or newly issued regulations.Within the Veolia group and in cooperation with the Stre- doslovenská vodárenská prevádzková spoločnosť (Water Operation Company of Central Slovakia) we continue issu-ing the magazine „Voda je život“ (Water is Life) for our em-ployees on a regular basis. The magazine comes out four
times a year. Via the electronic memo from the company IES Praha, offers for internal education are available for our employees. Information on innovative technologies from all over the world can be found in our electronic bimonthly magazine „Planéta Veolia“ (The Planet Veolia) that is sent from our centre in Paris. For our employees who have no access to the Internet, company noticeboards are available.Another regular means of communication between the company´s management and the subordinate employees are sessions and meetings.
Internal Communication
ANNUAL REPORT 2015 31
![Page 32: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/32.jpg)
The area of health and safety at work is as well as property protection is an inseparable part of all activities performed by our company.Adopting commitments and setting goals regarding de-creasing dangers and hazards in all company´s operations directly contributed to a safer work environment. One work accident was registered and investigated and measures were taken to prevent similar unwanted accidents in future. Last year no case of work-related illness was registered.Last year 300 alcohol screening tests were performed in or-der to check possible use of alcoholic drinks during working hours and all test results were negative. Further check-ups and inspections focused on observing health and safety rules and further regulations, work procedures and safe be-haviour at work. The duty of meeting the requirement of allotment, wear and use of respective PPE (personal protec-tive equipment) at work was examined. All concerned em-ployees took part in regular meetings regarding regular in-formation on health and safety regulations at work and fire prevention when it was necessary for the period of time. Last year, four inspections were carried out by the Labour Inspectorate of Prešov and Košice into the following opera-tions: administration building in Poprad, Wastewater Treat-ment Plant in Krompachy, Wastewater Treatment Plant in Poprad-Matejovce-Laoratories, and administration building in Spišská Nová Ves in order to investigate a work accident. No fine was imposed upon the company. The control car-ried out by the Public Health Authority with the registered seat in Poprad focused on risky workplaces of the company.In the department of fire prevention regular fire preven-tion controls of buildings, rooms and spaces were carried out on scheduled dates. Within the scope of prevention fire extinguishers, hydrants, fire protection valves, and further protection devices were examined. Also, regular revisions of electrical tools and selected technical equipment were carried out according to the schedule. Expert trainings of Fire Patrol at workplace and of the legal entity continued.The goal of the Department of health and Safety at Work and Fire Prevention for the following period is that all our employees can perform their duties in a safe environment free of any health hazard.
occupational health safetyand
ANNUAL REPORT 201532
![Page 33: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/33.jpg)
The annual Slovakia-wide competition of em-ployee skills in water sector belongs to impor-
tant events for employees. Last year the event was organized by Stredoslovenská vodárenská
prevádzková spoločnosť, a.s. (Water Opera-tion Company of Central Slovakia, plc.) Banská
Bystrica. This activity enables the employees to compare their technical skills among the col-
leagues, to follow the innovations in the techno-logical area and to exchange their experience in
the water sector.
Slovakia-wide employee skills competition in water sector
ANNUAL REPORT 2015 33
![Page 34: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/34.jpg)
Environmental education
and awareness
On the occasion of the World water Day the company provided their customers with several activities. In the Testing Laboratory of the De-
partment of Water Quality water analyses were carried out free of charge where water samples were tested for nitrates. The water samples were brou-ght by customers from their own sources. 297 people used the possibility – some of them have no possibility to get connected to the public water main and others who supposed that their drinking water might be contaminated by nitrates because of keeping livestock or by another agricultural activity.
On the basis of the samples analysed, the maximum nitrate limit, which is 50mg/l, was exceeded in 35 samples which presents 11.8%
of overall contamination. The highest nitrate concentration was 174.4 mg/l was found in a well in Spišské Vlachy. The overall
concentration of nitrates of water samples brought from Poprad was 4.8%, from Stará Ľubovňa and the sur-
roundings 15.8% and from Spišská Nová Ves and the surroundings it was
17.5%.
world water day
ANNUAL REPORT 201534
![Page 35: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/35.jpg)
In May the company announced „Vodný kalendár“ (Water Calendar) - the 9th year of the Painting Competition for Primary Schools in the Tatra region. The pupils had to paint the four seasons of the year on the topic WATER. A jury of experts assessed 112 works of art sent from 12 schools in the Tatra region.The winner was Primary School of Ing. Kožuch 11 in Spišská Nová Ves.
Educational projects for schools
In summer months we regularly organize a Photography Contest for our employees that focuses on an environmental topic. The main topic of the last year was „The World of Water“ in which 23 of our employees took part. Three winners were chosen.
Photography contest for employees
ANNUAL REPORT 2015 35
![Page 36: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/36.jpg)
The World Water Day is commemorated with our custom-ers in shopping and entertainment centres in Poprad and in spišská Nová Ves where we organize various presenta-tions of our company. On this occasion the representatives of our centres help people who are interested to answer
various questions on the topic WATER and for families with children various painting competitions, games and funny tests on the topic NATURE PROTECTION are available. In-formation sources for the visitors to our exhibition stands are company leaflets, brochures and bulletins.
We offer excursions into selected water company objects and wastewater treatment plants for school groups. Dur-ing the whole year, pupils and students have a possibility to visit different production processes of water company
premises upon agreement with our employees. Apart from the visit to the exteriors we inform them with the help of prepared presentations on various technologies and innovations of the company.
In the months of September – October Slovakia-wide media campaign under the name „Let us connect“ was in progress with the aim to encourage people to get con-nected to the sewerage network in which our company took part as well. The call for joining the campaign was realized on the basis of findings made by the Association
of Water Companies according to which Slovakia belongs to countries with low number of people connected to the sewerage network, despite the fact that in many munici-palities the sewerage network has already been built. Me-dia spots were broadcasted on RTVS, the radio Regina and they also occurred in print media on full page.
Corporate presence in shopping centres
Slovakia-wide campaign „Let us connect“
Excursions for schools
ANNUAL REPORT 201536
![Page 37: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/37.jpg)
As a socially conscious company we support various regional activities and events that help our region develop. We provide free water supplies in water tank trucks at various large social events (such as traditional annual Marian pilgrimage in Levoča, summer music festivals), material and non-material resources for organisation of various sports and cultural competitions (ice-hockey, basketball, fitness, sports flying, dance competitions, chess tournaments and various school and out-of-school activities).
Support of regional activities
ANNUAL REPORT 2015 37
![Page 38: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/38.jpg)
Thecompanymanagementtriestobuildacompanybuildupacompanywithservicesofhighlevel and quality regarding drinking water supplies and wastewater draining. At the sametime the company pays continuous attention to the environmental protection and placesemphasisonhealthandsafetyatworkofitsownaswellasofexternalemployees.ThecompanyhasimplementedtheIntegratedManagementSystem(IMS)thatconsistsofQualityManagementSystem(ISO9001),EnvironmentalManagementSystem(ISO14001),EnergyManagementSystem(ISO50001)andOccupationalHealthandSafetyManage-mentSystem(OHSAS18001).Connectingseveralmanagementsystemsintooneintegrat-edsystemisaveryeffectivewayofcreationofamanagementsystemthattakesseve-ralthingsintoconsideration:qualityofproductsandservices,environmentalapproach,healthandsafetyatworkaswellassavingenergy.From19thto20thOctober2015thefollowingauditstookplace:the6thsupervisoryauditpursuanttothe internationalstandardSTNENISO9001:2009,the4thsupervisoryau-ditpursuanttotheinternationalstandardSTNENOHSAS18001:2009andthe1stre-certificationauditpursuanttheinternationalstandardSTNENISO14001:2005.Apartfromtheaudits,thecertificationauditpursuanttheinternationalstandardSTNENISO50001:2012wascarriedoutfrom26thto27thNovember2015.TheauditswerecarriedoutbytheCertificationcompanyTÜVSÜDSlovakia,Ltd.Bratislava,groupmemberofTÜVSÜD,theworldleaderinprovidingcertificationserviceswithalong-termtradition.During the audit all activities and processes of the company were systemicallychecked,aswellasupholdingthegoalsintermsofquality,environmentalprotec-tion,energeticsandoccupationalhealthandsafety.Thesuccessfullycompletedauditconfirmedthefunctionalityoftheimplementedintegratedmanagementsystemanditwasalsoconfirmedthatallfoursystemsarekeptinlinewiththerequirementsoftherespectivestandards.Improvementprocessesstillhavenotfinished.Thecompanyhastocontinuetoworkonitselfandonitsemployees.Greatthanksandacknowledgementforeffortsgivenandforexcellentworkshallgotoallemployeeswhoparticipatedinreachingthesetgoals.
successful retention of ISO 9001, ISO 14001 and OHSAS 18001 certificates and introduction of ISO 50001
ANNUAL REPORT 201538
![Page 39: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/39.jpg)
innovationsFurther objects in Spišská Nová Ves were added to our dispatch management and monitoring system thus the monitoring of selected problem sections was secured. The change of the radio network in 11 knots for digital radio sta-tions of a new type continued which secured the stability of the network and the resistance against weather exposure.Through innovations in GIS (Geographic Information Sys-tem) and the Operational and Technical Information Sys-tem elements of GIS and of planned maintenance were interconnected. Planning for regularly repeated activities on water mains and sewer mains was introduced. Transport requisitions were interconnected with work orders. The sys-tem of work procedures, check-ups, revisions and service activities along with the integration to further individual program systems was improved.Innovations realized within the fleet amounted to the sum of 479,708.53 € in total.Purchased vehicles: TGM 4x4 – 2 special vehicles, 10 passen-ger vehicles, 2 utility vehicles, 1 trailer-mounted work plat-form, 4 monitoring equipments, 2 SECURE scales, 1 Radio-detection RD 8100 device and 3 pulse generators PWG 2000.
The installation of further monitoring devices in vehicles – GPS (Global Positioning system) – 37 pieces, enables us to monitor vehicles and to create vehicle log books which part-ly reduces the administrative workload. An interconnection of accounting programs, transport programs and the opera-tional and technical information system for the verification of GPS data as a control and integrating mechanism saves time of accounting and checking individual vehicle travels depending on work orders.From the energy audit that was carried out within the whole company requirements for reducing energy intensity resulted regarding some operations – for example the ex-change of pumps – at the pumping station Spišská Teplica and drill holes in Liptovská Teplička which was subsequently realized. An important goal of the monitored period was re-ducing the costs for electric energy at the operation Waste-water Treatment Plant Poprad-Matejovce through more ef-fective use of sludge gas for production of electric energy in the co-generating unit. Compared to the previous year the production of electric energy increased by 31,115 kWh, ex-pressed financially – 3,738 €.
ANNUAL REPORT 2015 39
![Page 40: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/40.jpg)
By means of its own staff the company carried out planned and non-planned repair and maintenance on water mains, sewer mains and other objects on the property leased from PVS, plc. Poprad, on its own property and the property operated on the basis of contracts with towns and municipalities.
In order to ensure continuous supplies of drinking water for the inhabitants and draining wastewater from towns and municipalities and wastewater treatment we had to remove breakdowns on water mains and sewer mains first place, repair technological and electrical equipment, clean and disinfect water storage reservoirs, exchange water meters, do painting work, repair fences, etc.
care for property, plant and equipment
of property, plant and equipmentrepairs
by company staff:
ANNUAL REPORT 201540
![Page 41: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/41.jpg)
52 surface hydrants and 46 line valves were replaced, 130 manhole covers were repaired,
water storage reservoir Kežmarok- interrupting – plaster repair, water storage reservoir Kežmarok- Slavkovský – plaster repair, water storage reservoir Svit- Podskalka, 400 m3 – plaster repair,
administration building Poprad – roof cover repair, cathodic protection station Letanovce – kiosk repair, water storage reservoir Nová Lubovňa – plaster and roof repair,
administration building Stará Ľubovňa – roof cover repair, water storage reservoir Majere – abutment wall repair, administration building at Wastewater Treatment Plant Levoča – roof cover repair,
water storage reservoir Smižianská Maša, 2 x 3,000 m3 – repair of the technological part of the armature chamber,
water storage reservoir Hranovnica, 2 x 400 m3 – repair of the technological part of the armature chamber,
water Treatment Plant Prakovce – fence repair, pumping station Spišská Stará Ves – fence repair.
planned repairs realised:
In total, 2,040 breakdowns were eliminated, out of which 1,921 on water mains and 119 on sewer mains.
investment projects Revenues for investment projects for PVS, plc. Poprad realized amounted to ........508,345 € Revenues for new water connections for PVS, plc. Poprad amounted to ....................103,876 € Revenues for new water connections for towns and municipalities amounted to ........46,807 € Revenues for water meters for PVS, plc. Poprad amounted to .................................................11,293 €
An essential part of the financial means was drawn for the repairs of water meters, water pumps, electric motors, vehicular and mechanization fleet, water storage reservoirs, water treatment plants, wastewater treatment plants, operational and administration buildings.
on property leased from PVS, plc. Poprad: ...................................................................................................622,585 € owned by PVPS, plc. Poprad: .............................................................................................................................190,296 € operated on the basis of contracts with towns and municipalities: .................................................17,653 €
Total ..................................................................................................................................................................................830,534 €
repairs by external staff:
Costs of repair of property, plant and equipment realised:
of property, plant and equipment
ANNUAL REPORT 2015 41
![Page 42: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/42.jpg)
ANNUAL REPORT 201542
![Page 43: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/43.jpg)
The main source of income are revenues for our own performance, mainly revenues for drinking water supplies and for draining and for the treatment of wastewater that create 95.5% of aggregate income. An increase in volume compared to the previous year is about 1% which interrupted a long-term trend in consumption decrease.In expenditures the most important item was the increase of the rent for renting tangible property from Podtatranská vodárenská spoločnosť by 230 thousand €. Investments in innovation of assets and consequently an increase in depreciation that enter in the calculation of the amount of rent participate in the increase.The company has leased the infrastructural assets (operative leasing) totalling to the sum at the value acquisition of 213,653,034 EUR. The term of lease is set for a definite period of time, for 30 years beginning from 21 August 2006.Furthermore, the company has also properties from municipalities and third parties in use that are operated by the company on the basis of contracts on operating and contracts on outsourcing.
On the basis of the fact that Veolia is a consolidated company, in 2015 it was granted a long-term loan amounting to 1,000,000 EUR and short-term loan amounting to 1,000,000 EUR.Financial statement was drawn up providing that the company will continuously carry on with its activity (going concern).Accounting methods and general accounting principles were consistently applied by the accounting unit. After 31 December 2015 no important circumstances occurred that could influence the financial, economic and capital situation of the water company Podtatranská vodárenská prevádzková spoločnosť, plc.. The company did not carry out any activities in the field of research and development. During the year 2015 the company did not acquire its own shares, interim certificates, business shares and shares, interim certificates and business shares of the mother accounting unit.
financial part The company made
an economic result - the profit after taxation amounting to 1,034,784 €.
ANNUAL REPORT 2015 43
![Page 44: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/44.jpg)
BALANCE SHEET as of 31 december 2015 (in €)
Line No.
Desig-nation ASSETS
Current accounting period Preceding accounting
periodBrutto Correction Netto
1 TOTALASSETSline02+line33+line74 21713380 14786872 6926508 6793454
2 A. Non-currentassetsl.03+l.11+l.21 16004106 14012963 1991143 1931675
3 A.I. Non-currentintangibleassets-total(l.04to10) 11381614 11370525 11089 4958
5 2. Software(013)-/073,091A/ 39465 28376 11089 4958
7 4. Goodwill(015)-/075,091A/ 11342149 11342149 0 0
11 A.II. Property,plantandequipment-total(l.12to20) 4619573 2642438 1977135 1922188
14 3.Separatemovableassetsandsetsofmovables(022)-/082,092A/
4586979 2625344 1961635 1714758
17 6.Otherproperty,plantandequipment(029,02X,032)-/089,08X,092A/
21232 17094 4138 12410
18 7.Aquisitionofproperty,plantandequipment(042)-/094/
11362 0 11362 195020
21 A.III. Non-currentfinancialassets-total(l.22to32) 2919 0 2919 4529
22 A.III.1.Sharesandownershipinterestsinaffiliatedaccoun-tingentities(061A,062A,063A)-/096A/
2919 0 2919 4529
33 B. Currentassetsl.34+l.41+l.53+l.66+l.71 5689425 773909 4915516 4838810
34 B.I. Inventory-total(l.35to40) 249121 2455 246666 246448
35 B.I.1. Rawmaterial(112,119,11X)-/191,19X/ 249121 2455 246666 246448
41 B.II. Non-currentreceivables-total(l.42+l.46to52) 177099 0 177099 123152
52 8. Deferredtaxasset(481A) 177099 0 177099 123152
53 B.III. Currentreceivables-total(line54+lines58to65) 4594830 771454 3823376 3346737
54 B.III.1. Tradereceivables-total(lines55to57) 4506640 771454 3735186 3253532
55 1.a.Tradereceivablesfromaffiliatedaccountingentities(311A,312A,313A,314A,315A,31XA)-/391A/
216003 0 216003 0
57 1.c.Othertradereceivables(311A,312A,313A,314A,315A,31XA)-/391A/
4290637 771454 3519183 3253532
60 4.Otherreceivablesfromaffiliatedaccountingentities(351A)-/391A/
301 0 301 0
63 7.Taxassetsandsubsidies(341,342,343,345,346,347)-/391A/
0 0 0 40943
65 9.Otherreceivables(335A,33XA,371A,374A,375A,378A)-/391A/
87889 0 87889 52262
71 B.V. Financialaccounts(l.72andl.73) 668375 0 668375 1122473
72 B.V.1. Cash(211,213,21X) 3541 0 3541 3620
73 2. Bankaccounts(221A,22X,+/-261) 664834 0 664834 1118853
74 C. Accruals/Defferals-total(l.75to78) 19849 0 19849 22969
75 C.1. Prepaidexpenses-long-term(381A,382A) 759 0 759 1031
76 2. Prepaidexpenses-short-term(381A,382A) 19090 0 19090 21938
FINANCIAL STATEMENTS OF ENTREPRENEURS IN DOUBLE
ANNUAL REPORT 201544
![Page 45: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/45.jpg)
Line No.
Desig-nation LIABILITIES AND EQUITY Current accounting
period grossPreceding
accounting period
79 Totalequityandliabilitiesline80+line101+line141 6926508 6793454
80 A. Equityl.81+l.85+l.86+87+90+93+97+100 1876632 2749202
81 A.I. Sharecapital-total(l.82to84) 33200 33200
82 A.I.1. Sharecapital(411or+/-491) 33200 33200
86 A.III. Othercapitalfunds(413) 821188 821188
87 A.IV. Legalreservefundsline88+line89 6640 6640
88 A.IV.1. Legalreservefundandnon-distributablefund(417A,418,421A,422) 6640 6640
93 A.VI. Differencesfromrevaluation-total(lines94to96) -19180 -17570
94 A.VI.1. Differencesfromrevaluationofassetsandliabilities(+/-414) -19180 -17570
97 A.VII. Netprofit/lossofpreviousyearsline98+line99 0 1026124
98 A.VII.1. Retainedearningsfrompreviousyears(428) 0 1026124
100 A.VIII.Netprofit/lossfortheaccountingperiodaftertax/+-/l.01-(l.81+l.85+l.86+l.87+l.90+l.93+l.97+l.101+l.141)
1034784 879620
101 B. Liabilitiesl.102+l.118+l.121+l.122+l.136+l.139+l.140 5048511 4043104
102 B.I. Non-currentliabilities-total(l.103+l.107to117) 1166295 1182321
108 Otherliabilitiestoaffiliatedaccountingentities(471A,47XA) 1000000 0
109 4.Otherliabilitieswithinparticipatinginterest,exceptforliabilitiestoaffiliatedaccountingentities(471A,47XA)
0 1000000
114 9. Liabilitiesralatedtosocialfund(472) 6458 7082
117 12. Deferredtaxliability(481A) 159837 175239
122 B.IV. Currentliabilities-total(l.123+l.127to135) 3208518 2030785
123 B.IV.1. Tradeliabilities-total(l.124to126) 1132022 1243356
124 1.a.Tradeliabilitiestoaffiliatedaccountingentities(321A,322A,324A,325A,326A,32XA,475A,476A,478A,47XA)
150422 0
126 1.c.Othertradeliabilities(321A,322A,324A,325A,326A,32XA,475A,476A,478A,47XA)
981600 1243356
127 2. Netvalueofcontract(316A) 2384 0
129 4.Otherliabilitieswithinparticipatinginterest,exceptforliabilitiestoaffiliatedaccountingentities(361A,36XA,471A,47XA)
1000393 0
131 6. Liabilitiestoemployees(331,333,33X,479A) 406711 356673
132 7. Liabilitiesrelatedtosocialsecurity(336A) 306172 246546
133 8. Taxliabilitiesandsubsidies(341,342,343,345,346,347,34X) 335216 180501
135 10. Otherliabilities(372A,379A,474A,475A,479A,47XA) 25620 3709
136 B.V. Short-termprovisionsl.137+l.138 673698 829998
137 B.V.1. Legalprovisions(323A,451A) 139290 635709
138 2. Otherprovisions(323A,32X,459A,45XA) 534408 194289
141 C. Accruals/defferals-total(l.142to145) 1365 1148
143 2. Accruedexpenses-short-term(383A) 1365 1148
ENTRY BOOKKEEPING AS OF 31 DECEMBER 2015
ANNUAL REPORT 2015 45
![Page 46: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/46.jpg)
Profit and Loss Statement as of 31 december 2015
Line No.
Desig-nation Text
Current accounting
period
Preceding accounting
period
1 * Netturnover(partofAccountClass6accordingtotheAct) 23384048 22582898
2 ** Operatingincome-total(lines03-09) 23482558 22582790
5 III. Revenuefromthesaleofservices(602,606) 23384048 22496269
7 V. Owngroupcapitalized(accountinggroup62) 40113 37567
8 VI. Revenuefromthesaleofnon-currentintangibleassets,property,plantandequipment,andrawmaterials(641,642)
9254 3028
9 IV. Otheroperatingincome(644,645,646,648,655,657) 49143 45926
10 ** Operatingexpenses-totalline11+line12+line13+line14+line15+line20+line21+line24+line25+line26
22106301 21433114
12 B. Consumedrawmaterials,energyconsumption,andconsumptionofothernon-inventorysupplies(501,502,503)
4245961 4284703
14 D. Services(accountgroup51) 9188698 8412720
15 E. Personnelexpenses-total(l.16to19) 7922454 7604923
16 E.1. Wagesandsalaries(521,522) 5395877 5255139
17 2. Remunerationofboardmembersofcompanyorcooperative(523) 43419 39004
18 3. Socialsecurityexpenses(524,525,526) 2047429 1967249
19 4. Socialexpenses(527,528) 435729 343531
20 F. Taxesandfees(accountgroup53) 221058 518551
21 G. Amortizationandvalueadjustmenttonon-currentintangibleassetsanddepreciationandvalueadjustmentstoproperty,plantandequipment(line22+l.23)
429323 405282
22 G.1. Amortizationofnon-currentintangibleassetsanddepreciationofproperty,plantandequipment(551)(551)
429323 405282
24 H. Carryingvalueofnon-currentassetssoldandrawmaterialssold(541,542) 97 2381
25 I. Valueadjustmentstoreceivables(+/-)(547) -16179 91508
26 J. Otheroperatingexpenses(543,544,545,546,548,549,555,557) 114889 113046
27 *** Profit/lossfromoperations(+/-)(line02-line10) 1376257 1149676
28 * Addedvalue(l.03+l.04+l.05+l.06+l.07)-(l.11+l.12+l.13+l.14) 9989502 9836413
29 ** Incomefromfinancialactivities-total(l.30+l.31+l.35+l.39+l.42+l.43+l.44) 471 108
39 XI. Interestincome(l.40+l.41) 471 107
40 XI.1. Interestincomefromaffiliatedaccountingentities(662A) 301 0
41 2. Otherinterestincome(662A) 170 107
42 XII. Exchangerategains(663) 0 1
45 ** Expensesrelatedtofinancialactivities-totall.46+l.47+l.48+l.49+l.52+l.53+l.54) 30000 10982
49 N. Interestexpense(l.50+l.51) 24274 4901
50 N.1. Interestexpensesrelatedtoaffiliatedaccountingentities(562A) 24274 0
51 N.1. Otherinterestexpenses(562A) 0 4901
52 O. Exchangeratelosses(563) 834 585
54 Q. Otherexpensesrelatedtofinancialactivities(568,569) 4892 5496
55 *** Profit/Lossfromfinancialactivities(+/-)(r.29-r.45) -29529 -10874
56 **** Profit/Lossfortheaccountingperiodbeforetax(+/-)(l.27+l.55) 1346728 1138802
57 R. Incometax(l.58+l.59) 311944 259182
58 R.1. Incometax-current(591,595) 381293 243056
59 2. Incometax-deferred(+/-)(592) -69349 16126
61 **** Profit/Lossfortheaccountingperiodaftertax(+/-)(l.56-l.57-l.60) 1034784 879620
ANNUAL REPORT 201546
![Page 47: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/47.jpg)
Cash Flow Statement as of 31 december 20152015 (€) 2014 (€)
Cash flow from operating activitiesOperatingCashFlow 1143820 2579860InterestsPaid -23664 -3747InterestsReceived 169 107IncomeTaxPaid -204969 -281500DividendsPaid -1888151 -2133337CashFlowpriortoItemsofExtraordinaryExtentorOccurrence -972795 161383RevenuesfromItemsofExtraordinaryExtentorOccurrence 0 0Net Cash Flow from Operating Activities -972 795 161 383
Cash Flow from Investment ActivitiesNon-CurrentAssetsPurchase -490402 -437370Non-CurrentAssetsSalesRevenues 9099 1892InvestmentPurchasing 0 0DividendsReceived 0 0Net Cash Flow from Investment Activities -481 303 -435 478
Cash Flow from Financial ActivitiesRevenuesfromShareCapitalIncrease 0 0RevenuesfromLoans 1000000 1000000Long-termliabilitiesInstallments 0 0ReceivedLoansInstallments 0 -763324Net Cash Flow from Financial Activities 1 000 000 236 676
Net(Decrease)IncreaseinCashandCashEquivalents -454097 -37419
CashandCashEquivalentsattheBeginningoftheYear 1122473 1159892
Cash and Cash Equivalents at the End of the Year 668 376 1 122 473
Cash flow from operating activitiesNet Profit (prior to deducing interest, tax and items of extraordinary extent and occurrence) 1 370 531 1 143 596
AlternationsofNon-MonetaryOperations:Amortizationofnon-currentintangibleassetsanddepreciationofproperty,plantandequipment 429323 405282ValueadjustmentstoAccountsReceivables -65942 91507ValueadjustmenttoInventory 0 0Valueadjustmenttoproperty,plantandequipment 0 0ValueadjustmenttoNon-CurrentFinancialAssets 0 0UnrealizedExchangeRateLosses 29 5UnrelizedExchangeRateGains 0 0Reserves -156299 161212Loss(Profit)fromNon-CurrentAssetsSale 0 -434RevenuesfromNon-CurrentFinancialAssets 0 0Differencebetweenacknowledgedcapitalcontributionvalueanditsaccountingvalue 0 0OtherNon-MonetaryOperations 2141 955957ProfitfromOperationpriortoWorkingCapitalChange 1579783 2757125
WorkingCapitalChangeDecrease(Increase)inReceivablesfromCommercialActivitiesandotherReceivables(includingAccruedAssets) -459624 -70670
Decrease(Increase)inInventories -218 27802Decrease(Increase)inLiabilities(includingaccruedLiabilities) 23879 -134397
Cash Flow from Operation 1 143 820 2 579 860
ANNUAL REPORT 2015 47
![Page 48: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/48.jpg)
Independent Auditor’s Report
ANNUAL REPORT 201548
![Page 49: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/49.jpg)
ANNUAL REPORT 2015 49
![Page 50: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/50.jpg)
Report by the Supervisory Board 2015
REPORT
by the SUPERVISORY BOARD OFPodtatranská vodárenská prevádzková spoločnosť, plc. POPRAD
regarding the Annual Financial Statement as of the Year 2015 and on the Corporate Annual Report as of the year 2015
The Financial Statement and the Corporate Annual Report were audited by the auditing company of KPMG Slovensko, limited liability company, License of SKAU No.: 96.
In the report to the shareholder from 29 March 2016, the auditor expressed his opinion on the Financial Statement to the Supervisory Board and to the Corporate Board of Directors
The Auditor declares in the report to the shareholder, the Supervisory Board and the Corporate Board of Directors that the Financial Statement faithfully reflects the actual corporate financial situation of the company as of 31 December 2015 and its result regarding Profit and Loss for the year ending on 31 December 2015 and is in compliance with the Slovak Law on Accounting.
In their meeting on June 27, 2016, the Supervisory Board examined the Current Financial Statement pursuant to the § 198 of the Commercial Code and the Article XII., Section 4 of the Book of Statutes.
Following the examination of the Financial Statement and as a follow-up to the Report of the auditor, the Supervisory Board concludes that the company keeps the Corporate accounting in full observance and concordance with the Law of Accounting and further related regulations and rules. By examining the formal and material validity and credibility of the Current Consolidated Financial Statement as of the year 2015 no shortcomings were found.
The company attained the total accounting profit of 1,034,783.78 EUR as of the year 2015.
CONCLUSION:The Supervisory Board recommends to the General Assembly of the PVPS, plc. to approve of the Annual Consolidated Financial Statement , the Corporate Annual Report as well as the proposed draft proposal for the profit distribution achieved in the year 2015.
In Poprad, 27 June 2016
Ing. Ján Mlynár Chairman of the Supervisory Board of PVPS, plc. Poprad
ANNUAL REPORT 201550
![Page 51: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/51.jpg)
• continuous improvement of the quality of water services provided• renovation and optimisation of operations and technological facilities of wastewater treatment plants in cooperation with PVS, plc.• improvement of electronic services for our customers• support of education and educational processes at Primary and Secondary Schools• implementation of new technologies in order to lower water loss permanently• securing activities in compliance with the requirements regarding health and environmental protection• cooperation with state organs in order to secure legislation observing
Intentions for the Year 2016
ANNUAL REPORT 2015 51
![Page 52: PVPS ANNUAL REPORTpvpsas.sk/wp-content/uploads/2016/07/annual_report_en_2015.pdf · The company has a well-established and functioning integrated management system (ISO 9001, ISO](https://reader035.vdocuments.net/reader035/viewer/2022071215/604566d3482fc56e4d7ac26c/html5/thumbnails/52.jpg)
Issuedby:PVPS,plc.(Poprad2016)
www.pvpsas.sk
Podtatranská vodárenská prevádzková spoločnosť, plc.Hraničná662/17,05889Poprad
Tel.:00421/052/7873115,e-mail:[email protected],www.pvpsas.sk
e-mail:[email protected]|fax:+421527729548
POPRADHraničná 662/17
058 89 Poprade- mail:[email protected]: +421 52 772 95 48
SPIŠSKÁ NOVÁ VESDuklianska 40
052 01 Spišská Nová Vese-mail: [email protected], [email protected]
Fax: +421 53 415 52 41
STARÁ ĽUBOVŇALevočská 34
064 01 Stará Ľubovňae-mail: [email protected], [email protected]
Fax: +421 52 426 54 40
Customer centers
Call centrum0850 111 800
PRINTED ON RECYCLED PAPER