June 20, 2013
1
PW/Engineering
2
Three Questions
• Why is the Eastern Shore Drive Drainage Area Experiencing Recurrent Flooding?
• What can be done about it?
• What is being done?– Comprehensively– On an Interim basis
3
Why is the Eastern Shore Drive Drainage Area Experiencing
Recurrent Flooding?
4
Recurrent Flooding & Sea Level Rise
• Storm water & flooding: A major citizen concern
• Flooding is increasing• Sea level is rising
5
Sea Level RiseInformation
• Sewell’s Point: + 0.18 in/yr • CBBT: + 0.24 in/yr • Rise last 50 years: ~ 1 ft • Projected rise next 50 years: 1 – 3 ft• Result:
Sea Level Rise
CoastalStorms+ =
Increased and Recurrent Flooding
in Many Areas
6
Ocean Park
Cape Henry Shores
Lynnhaven Colony
Back Bay
Eastern ParkKings Grant
Cape Story
Windsor Woods
Princess Anne Plaza
Thalia
Glenwood
Old Beach
Oceanfront
Sandbridge
Green RunOcean Lakes
730th Street
8Goodspeed Road
9Dockside Vicinity
10Bubba’s
11Eastern Shore Drive Neighborhoods
12
A Particularly Vulnerable Area
-High Tides -Storm Surge -Rainfall
Eastern Shore Drive Area
13
Close-up of Eastern Shore Drive Area
Flooding & Sea Level Rise
What can be done about it?
14
15
Recurrent Flooding Adaptation Strategies
• Management/Retreat– Prevent development in high risk areas– Discourage rebuilding in high risk areas
• Accommodation– Elevating buildings/Flood proofing homes– Evacuation routes/warning systems
• Protection Measures– Focus of Today’s Discussion
16
Recurrent Flooding & Sea Level RiseAdaptation Strategy: Protection Measures
• Engineering Flood Control Measures:– Complex– Costly– O&M Intensive– Limit to Effectiveness (LOS)
• LOS Exceedence = Major Flooding
What is being done?
17
18
Comprehensive Flood Control Measures
19
Comprehensive Flood Control Measures
Major CIP: 7-151 Eastern Shore Drive Drainage ImprovementProgrammed Funding: $53.13 MFinal Cost: TBDProject Development Study Underway
• Identify Improvements: Pump Stations, Outfalls, Flood Control Gates, Flood Walls
• Lowest Lying Areas May Be Problematic• Develop Implementation Plan (Phasing)• Results By End of This Year
20
• Some have suggested installing backflow preventers to keep tides out
Interim Flood Control Measures
Lynnhaven Colony – Cape Henry Ditch
21
Interim Flood Control Measures
22
Detailed analysis:• Determine where backflow prevention devices
will help reduce flooding from high tides• Determine where backflow prevention devices
will not increase flooding from rainfall• Determine type of backflow prevention device
appropriate for location (flexible check valve or automated sluice gate)
Interim Flood Control Measures
23
Interim Flood Control Measures
For Each Location Evaluated:• Determined tidal elevation at which flooding will
occur, even with backflow preventer in place• Determined elevations of streets and homes• Calculated available storage for rainfall in each
drainage basin• Hydraulically modeled numerous rainfall / tidal
elevation combinations to determine benefits and impacts of installing backflow prevention devices
24
Interim Flood Control Measures39 Locations Considered
25
Lynnhaven Colony - Tidally Adjacent Area
Interim Flood Control Measures
• Range of Effectiveness– Up to overtopping elevations of 3.3 to 4.7 Feet (NAVD88)
depending on location– Up to 4 to 6 inches of rainfall depending on location
• Cost: $244,000 (5 Locations- 4, 5, 8, 10, 11)• Houses Protected: 0• Garages Protected: 4• Linear Feet of Lynnhaven Drive Protected: 320 L.F.
26
Lynnhaven Colony - Tidally Adjacent AreaResults
Interim Flood Control Measures
Lynnhaven Colony Cape Henry Ditch
27
Interim Flood Control Measures
Lynnhaven Colony Cape Henry Ditch
28
• Range of effectiveness:– Up to Overtopping Elevation: 5.4 Feet (NAVD88)– Up to 1 inch of rainfall with tide gates closed
• Total Cost: $672,000 (2 Locations- 18 & 26)• Houses protected: 4• Garages protected: 9• Length of Cape Henry Drive protected: 150 L.F.
Results
Interim Flood Control Measures
Cape Henry Area
29
Interim Flood Control Measures
Cape Henry Area
30
Results• Range of Effectiveness
– Up to Overtopping Elevation: 5.2 Feet (NAVD88)– Up to 1 inch of rainfall with tide gate closed
• Cost: $290,000 (Location 39)• Houses Protected: 1• Garages Protected: 2• Linear Feet of Street Protected: 0 L.F.
Interim Flood Control Measures
31
• In eight locations backflow prevention devices can provide limited benefit by reducing the frequency of flooding from certain moderately high tides
• Backflow prevention devices cannot eliminate all flooding
• There has been at least three storm since 2009 for which the backflow preventers would have had absolutely no benefit:– Nor’Ida (November 2009) Elev. 6.9’– Irene (August 2011) Elev. 5.5’– Sandy (October 2013) Elev. 5.7’
Summary of Findings
All elevations are in NAVD 88 datum.
32
Sewell’s Point Tidal Surge InfoBenchmarks and Events MLLW (FT)
Category 4 ‐ (13‐19 Feet Surge at High Tide) 21.56Category 3 ‐ (9‐12 Feet Surge at High Tide) 14.56Category 2 ‐ (6‐8 Feet Surge at High Tide) 10.56
1933 Hurricane 8.02' Above MLLW 8.028.0 FT OCCURS ONCE EVERY 80 YEARS (EXTREME) 8.00Hurricane Isabel 9/18/2003 7.89' Above MLLW 7.89
November Nor'easter 11/12/2009 7.75' Above MLLW 7.75Category 1 ‐ (3‐5 Feet Surge at High Tide) 7.56
Hurricane Irene 8/27/2011 7.55 Above MLLW 7.55Ash Wednesday Storm 3/7/1962 7.22 ' Above MLLW 7.227.0 FT OCCURS ONCE EVERY 20 YEARS (SEVERE) 7.00Hurricane Sandy 10/29/2012 6.81' Above MLLW 6.81
Hurricane 1936 6.2' Above MLLW 6.72Thanksgiving Nor'easter 2006 6.63' Above MLLW 6.63
Twin Nor'easter #2 1998 6.58' Above MLLW 6.58Columbus Day Nor'easter 6.52' Above MLLW 6.52
Nor'easter 1956 6.12' Above MLLW 6.126.0 FT OCCURS ONCE EVERY 7 YEARS (MODERATE) 5.00
Twin Nor'easter 1998 6.04' Above MLLW 6.04Hurricane Floyd 1999 5.97' Above MLLW 5.97Hurricane Flossy 1956 5.92' Above MLLW 5.92Hurricane Donna 1960 5.92' Above MLLS 5.92
4.5 FT OCCURS 3 TIMES PER YEAR (MINOR) 4.502.56 OCCURS 3 TIMES PER YEAR 2.56
MEAN HIGH HIGH WATER‐MHW (Average all High Tides) 2.56MEAN SEA LEVEL 1.35
MEAN LOWER LOW WATER‐MLLW (Average all Low Tides) 0.00
Lowest Tide of Record 1/31/1996 ‐3.58
33
• Total Cost of Interim Improvements: $1.2 M• Benefit is some reduction in flooding frequency for:
– 5 house– 15 Garages– 570 L.F. of Street
• Comprehensive improvements are budgeted and initial phases could begin in 2016
• A decision on whether to fund the Interim Improvements is needed
Return On Investment
If Authorized
• Procure / Install Check Valves at 5 locations in the Lynnhaven Colony Tidally Adjacent Area (Fall 2013, $244,000)
• Detailed Engineering / Permitting / Construction for 1 Check Valve and 2 Sluice Gates in Cape Henry Ditch (1 gate at West Great Neck and 1 gate at First Landing Lane, Check Valve at Sunstates Court; Construct Fall 2014, $962,000)
34
Two Step Process
35
• Brief the City Management Leadership Team √• Brief the Bayfront Advisory Committee √ • Brief the District Council Member• Brief the City Council
Decision Process
QUESTIONS
36
FOLLOW UP NEXT DOOR
Report Located on VBGOV.COM under Public Works Stormwater http://www.vbgov.com/government/departments/public-works/storm-water/Pages/east-shore-dr-drainage-impvts.aspx