PYD-OUTDOOR Ενδοδαπέδια θέρμανση εξωτερικού χώρου.Το σύστημα θέρμανσης PYD-OUTDOOR είναι η λύση για χρήση σε εξωτερικούς χώρους για να παρέχουν την απαιτούμενη ενέργεια θέρμανσης.

TRANSCRIPT

  • 0000

    T H E R M O S Y S T E M E

    Outdoor areas panel heating

    PYD-OUTDOOR

    1

    2

    7

    4 35

    6

    System

    T H E R M O S Y S T E M E

    LeistungsberechnungAuslegetabellen bei R,B=0,01 m

    2K/W z.B. Fliese

    4

    Cosinessw i t h s a v i n g e f f e c t

    PYD OUTDOOR 0706-01 EN

    PYD-THERMOSYSTEMEmi-Heiztechnik GmbHDachlmoosweg 6D-83483 Bischofswiesen

    Tel. +49 (0)8652 9466-0Fax +49 (0)8652 9466-17

    [email protected]

    Heating power

    Construction

    Laying

  • Subject to change without notice www.PYD.de [email protected] Su

    T H E R M O S Y S T E M E

    Subject to change without notice www.PYD.de [email protected]

    PYD-VWR laying elbow pipe PYD-KB cable ties PYD-SR system pipe

    PYDOUTDOOR is the solution for outdoor areas in order to yield the necessary heating power.

    PYD-OUTDOOR guarantees the highest standard of quality and heating power with easy and fast installation in accordance with DIN EN1264

    We offer you the necessary security with a 10 year warranty for the system, ensured by an independent insurance rm.

    Measured activity values accordingto DIN 4726, production of all components in accordance to ISO 9001, DIN 4721, CE. Our suppliers testing institutes

    PYD-OUTDOORGeneral information, build-ups

    2

    Buildups1) Pavement2) Ondulatedly moulded distance struts3) Concrete4) PYD system pipe SR20 with PYD cable ties5) Grid of steel rods6) Spacer7) Moisture protection in accordance with DIN8) Evening/ blinding layer, possible insulating layer, soil below

    1) Floor covering (Cobble stone)2) Sand bedding3) PYD system pipe SR20 with PYD cable ties4) Grid of steel rods5) Spacer6) Blinding layer (gravel)7) Natural ground (soil)

    OUT-STR OUT-PFLPYD -Alu-Fubodenheizung

    mi-Heiztechnik GmbHDachlmoosweg 6D-83483 BischofswiesenTel. +49(0)8652/9466 -0 Fax -17www.PYD.de [email protected]

    Fa.: BV: Dat.: cn M=1:2

    BodenaufbauBauteilaktivierung

    1 Oberbewehrung2 wellenfrmig gebogene Distanzsttzen3 miTECK-SR Systemrohr 20 x2 mit miTECK-KB Kabelbinder4 Beton5 Unterbewehrung6 Flchenabstandshalter7 Feuchtigkeitssperre nach DIN8 Ausgleichs-/Sauberkeitsschicht evt. Wrmedmmung darunter Erdreich

    nderungen vorbehalten

    2

    7

    3

    1

    68

    4 5

    1

    2

    7

    435

    6

  • T H E R M O S Y S T E M E

    Subject to change without notice www.PYD.de [email protected]

    PYD-OUTDOORtable for installation, instructions for installation

    3

    table of material requirements for laying

    laying distance in cm 15 20

    meters of pipe/m2 6,3 4,7

    meters of clip rail /m2 13 10

    Instructions for installation

    1) Installation of the distance struts and reinforcement steel mesh

    2) Installation of PYD system pipe

    3) Connection to the heating circuit distributor

    4) Pressure test to controlthe leak tightness of the system

    PYD system pipes are installed on a reinforcement steel mesh onsite. PYD system pipes are af xed to the grid of steel rods every 50 cm by means of cable ties. Doing so, the sizes of the heating circuits as speci ed in the design are to be attended. Flow and return of every heating circuit are pushed through the laying angle pipes, cut ttingly, and connected to the PYD heating circuit distributor by means of the PYD adaptors. When the heating circuits have been installed, a pressure test to control the leak tightness of the system is performed. The testing pressure should be 6 bar and maintained until the addition of plaster or concrete has been completed. All parts of the system that are liable to frost have to mandatorily be lled with a frost protection solution. Yet, the frost protection solution should be added after the pressure test has been conducted

    Duration of assembly:

    In order to install the system in an area of 400 m, 2 tters and 1 helper will need approximately one day, in case the subground hasbeen prepared appropriately. This time speci cation includes rolling out the PYD system pipe, af xing the pipe by means of PYD cableties, and the connection of the pipe to the PYD heating circuit distributor.Setting up the PYD heating circuit distributor and distribution box is estimated to take about 30 minutes.

    PYD-OUTDOOR keeps areas free of snow and ice. Driveways, exits, access roads, ramps, loading zones, parking lots, outdoor circulation and movement areas, e.g. in front of hospitals, clinics, retirement homes, pedestrian areas, underground parking, and multi- story garages, just to mention some possible applications, involve an increased risk of accidents by involuntary glissades or the like in the cold winter months. The reduction of cost and the positive effect on the environment due to the reduction of personnel needed for maintenance and omission of the use of road salt are to be taken into account, as well.

    In tempering outdoor areas, the performance has to be calculated and adjusted individually, according to the desired or planned oor system. Please dont hesitate to contact us to obtain technical solutions

  • Subject to change without notice www.PYD.de [email protected] Su

    T H E R M O S Y S T E M EPYD-OUTDOOR

    Notice

    4