HEALTH s·ECTOR REFORM PROJECT PHASE 2 IBRD Loan 4760RO EIB Loan 22943 RO Project Management Unit APL2
Bank approval Date of the Procurement Plan : Original: April7, 2005 Date of GPN : March 31, 2005 Period covered by this Procurement Plan: January, 2007 ·December 31, 2013 Procurement Procedures for Community Participation in Procurement: Nona UPDATED PROCUREMENT PLAN : December 18, 2012
Ref No. CONTRACT DESCRIPTION
Component A • Mellmlty IUid Child lte.llh Cere
MCH1 Procurement of equlpmen_J for component mother and child MCH1.1 Hlah Lavel Neonatology Incubator (Package I) MCH1.2 Hloh Lavel Neonatology Eaulcrnent Package II) MCH1.3 Hlah Lavel Neonatoloov Eauicrnent Peckaae Ill MCH1.4 Basic Neonatology Equipment (Peckage IV) MCH1.5 Other Neonatology Equipment (PeckaQe V) MCHt .6 Standard Neonatology ICU Equipment PeckaQe V1 MCH1.7 General Anesthesia and ICU Equipment Package Vl!) MCH1.8 Gynecology • Surgery (Package VIII) MCH1.9 Sterilization (Package IX
MCH1.10 Ultrasound system (Packaae X MCH .1.11 lmaalstic E;_QI.Iipment (Packaae XI MCH1 .12 Laborat01Y Eauiprnent (Peckaae XII MCH1 .13 Fetal Diagnostic Equipment (Package XIII) MCHt.14 Neonatal Parenteral Nulrition Equipment PeckaQe XIV) MCH 1.15 Monitors • Package XV)
MCH2 TA lor design and development of an operational manual on the maternal & neonatal referral system
MCH3 Designs for civil works (Initially expertlee) for 22 units selected under criterill established by PSC and TWO (1at pilaR)
MCH3.1 Design lor Moldova region (Proiect Bucuresti) including amendment
MCH3.2 Design lor Dobrogea regiOn (Prolecl Bucuresti) InCluding amendment
MCH3.3 Design lor center of Moldova (SeJVcom)
MCH3.4 Design lor Ardeal region (Se!Vcom ) Including amendment
MCH4 TA on devetODina the quality assurance svstem lor MCH seJVices MCH5.1 Technical expertise lor Nord region
MCH5.2 Technical expertise lor South region
MCH6 Design for civil works 3 unlla - pilaR 2
MCH6.1 Design OG Plolesti hospital
MCH6.2 I Deslan lor Matemllv • Countv Emeraencv HosDital Bacau MCH6.3 I Deskin tor Clnical HosDital ··er. Panait Saltu" MCH7·8 Training management seJVice provider
MCH9 Civil works
MCH9/W/1 SBARCEA 01>-Gyn County Hospital Brasov
MCH9/WI2 "CUZA VODA" 01>-Gyn Clinical Hospllallasl
MCH9/W/3 BRAILA Qb.Gyn Hospital MCH9/W/4 SIBIU County Clinical Hospital
MCH9/WI5 CLW County CUnlcal Hospital MCH9/W16 BISTRITA County Hospital (MCH9/Wf6.BN
MIERCUREA CIUC County Hospital (MCH9/W/6-MG>_
MCH9/W" BOTOSANI 01>-Gyn Hospital (MCH9/W"·Bl)
RADAUTI Municipal Hospital (MCH9/W"·RD MCH9/W18 "SF lOAN CEL NOU" Suceava County Hospital MCH9/WI8·SV)
PIATRA NEAMT County Hospital (MCH9/W/6-PN
MCH9/WI9 BACAU County Hospital MCH9/W/10 CRAIOVA Emergency County Clinical Hospital
MCH9/W/11 PLOIESTI Qb.Gyn Hospital_ "SF lOAN" Children's Emeroencv Clinical Hospital Galati
MCH9/W/12 GIURGIU County Hospital MCH9/W/12·GRJ Emeroencv University Clinical Hosollal Bucharest (MCH9/W/12 ·SUUS SF PANTEUMON EmergenCY Clinical Hose. Such. MCH9/W/12·SFPB
MCH9/W/13 ONESTI MuniciDal HosDital MCH9/W/14 ORAOEA Cauntv Ctinical HosDital MCH9/W/15 TG MURES Emeraencv Countv Clinical HosDital
2% axes 0.10 and 0.70% MCH10 TA lor civH works site suD&JVision includina amendment no.1 MCH11 TA • MCH Health Worldorce Planning and Management Reform
MCH12 Procurement of eaulpment for comPOnent mother and child - Phaae II MCH12.1 LOT I : Neonatal EauiD!11ent
MCH12.2 LOT II : Gynecology • Surgery
MCH12.3 LOT Ill: Vacuum EauiiJment MCH12.4 LOT IV : Screening EQuipment lor new born
MCH12.5 LOT V : Gynecology eauil)menl
MCH12.6 LOT VI : Surglcallnstrumenta1or Gynecology (rebid ICB 15)
MCH12.7 LOT Vll : Eq lor Treatment and final elimination of hazardous biomedical and health -care waste
MCH13 TA • Elaboration of Bidding documents lor Civil worl<s
w a: :I t: c
~ l'i1 No. of ... LOTS 0 > a: 0
lil ... oC 0
G 15 G G G G
G G G G G G G G G
G G cs 1
cs 4
cs cs cs cs cs 1
cs 1
cs 1
cs 3 cs cs cs cs 1
cw 1 CW 1 CW 1 cw 1
cw 1
CW 1
cw cw 2
CW CW 2 CW cw 1
cw 1 CW 2 CW CW 3 CW cw cw 1
cw 1
cw 1
cs 1 cs 1
G 7
G G G G G
G 1
G
cs 1
Q 0 :c Iii :IE Bank
ffi Review
i!i Prlod a: Post :I 0 0 a: ...
ICB Prior
OCBS Prior
LCS Prior
LCS LCS LCS LCS
OCBS Prior
LCS Prior
LCS Prior
sss Prior sss sss sss
OCBS Prior
NCB Prior NCB Prior NCB Prior NCB Prior NCB Prior NCB Post
NCB Post
NCB Prior
NCB Prior
NCB Post
NCB Post
NCB Post NCB Prior NCB Post NCB Post NCB Post NCB Post NCB Post
NCB Post NCB Post
NCB Post
OCBS Prior OCBS Prior
ICB Prior
ICB Prior
co Prior
Revision 3: May 19, 2010 Revision 4: March 15, 2011
Revision 7: April 27, 2012 Revision 8: June 11,2012
ESTIMATED/ ACTUAL DATES
Bids Eval1111tlon
Report/ TORI REI/ Technlcel& ITOIBD
IFBI BDIITQ I Bid Opening/ Rllllflclal Contract Contract
REI Issue Propoeala COMMENTS Prepare& Eval1111tlon Signing Date Completion
Date submlsalon Submlsalon Report & Date
Date Award
Recommend aU on
12-Mar-ol 25-Jun-ol 6-Dec·07 Dec-08 Completed 14-Dec·07 Dec-08 Completed 21·Jan·08 Jan-09 ComPleted 14-Dec-07 Jun-09 Compleled
14-Dec-07 Jun-09 COmpleled 14-Dec.07 Dec·08 COmpleted 1·Mar·08 Mar·09 Completed
29-Feb-08 May-09 Completed 28·Mar·08 May-09 Completed 28·Mar·08 Mar-09 Completed 29-Feb-08 Feb-09 Completed
Re ·bid IC88 6·May-o8 May-o9 Completed
14-Dec.07 Dec-oe Completed Re·Bid ICB7
15-Feb-08 24-Apr·OB 04-Aug·08 17-Apr-09 2-Sep-09 Apr-10 Completed
26-8e!HJ7 Oct-13 Contract on-going
26-:Sep-07 Oct·13 Contract on-going 2-0ct·07 Oct-13 Contract on-going_ 2·0ct·07 Oct-13 Contract on-going_
15-Feb-08 24-Ailr·OB 07·Aua·08 15-Ailr·09 2·Sep.09 Jun·10 Com Dieted 26-Sep-()7 Feb-08 Completed 26-Sep-07 Feb-08 Completed
2·Jun-o9 SeP-13 Contract on:going_ 21·Ailr·09 Oct·13 Contract on·aoina 25-Mar-o9 Dec·10 Com Dieted
01·Apr·08 11·Apr·08 22-Sep-08 27·Apr·09 2·Sep.()9 Dec-10 Completed
17-May-09 2·Jun·09 29-Jui·09 1-Jun-10 9-Aug-10 Nov-13 Contract on-going 17·May·09 23-Jun·09 13-Aug-09 17-Mar-10 15-Apr-10 Mar-13 Contract on-going
17·May·09 18·Jun·09 17·Aug·09 15-Jun-10 5-Jul·11 Jul-13 Contract on-going
17·May·09 25-Jun-o9 18-Aug-09 1-Jun-10 9-Ju~ 10 Jul-13 Contract on-going
17·May-o9 16-Jun-09 14-Aug-o9 1-Jun-10 1()-Sep-10 Jan-13 Contract on-going
30-Jul-09 31 ·AUQ-o9 23-0ct· 09 15-Sep.11 23-Ju~12 Aug-13 Contract on-going 15-Aug-11 17·AUQ-11 B·Sep-11 22·Sep-11 Cancelled
30-Jul-09 3-Sep-09 19-0ct·09 12·Aug·11 18·NOV·11 Mar-13 Contract on-going
30-Jul-09 3-Sep-09 19-0ct·09 13-Jul·11 4-Aug-11 Jan·13 Contract on-going
15-Aug-11 17·AUQ·11 6-Sep-11 22-Sep-11 17·NOV·11 Jan·13 Contract on-going
15-AUQ·11 17·Aug·11 B·Sep-11 22-Sep-11 17·Nov·11 Jan-13 Contract on-going 25-May-11 4-Jun-11 11·Jul-11 25-Aug-11 4-0ct-1 1 Feb-13 Contract on-going 15-Jun-11 25-Jul-11 25-Aug-11 25-Sep-11 4-Nov· 11 Mar·13 Contracl on-going
1·Aua· 12 27·Aua· 12 27·Seo-12 15-Nov-12 28·NOV·12 Oct-13 Contract on-going_
1·Au0· 12 27·AU0·12 27-SeP-12 15-Nov·12 26-Nov·12 Apr-13 Contract on-going_
1·JUI·11 4-Jul-11 4-Aua· 11 5-SeP-11 16·NOV·11 Mar-13 Contract on-going_
1·JUI·11 4-Jul-11 4-Aua· 11 5-SeP-11 28·Feb-12 Aug-13 Contract on-going_
1·JUI·11 4-Jul-11 4-Aua· 11 5-SeP-11 14-Fet>-12 Jul· 13 Contract on-going_ 31-Jul-11 18·Jan·12 5-Mar· 12 25-Ailr-12 23-Ju~12 Jun-13 Contract on·aoina
15-Aua-11 15-Mar· 12 17·Ailr·12 17·Mav·12 23-Jul-12 SeP.13 Contract on-aolna 22·Jun·12 2..Ju~12 13-Aua-12 13-Seo-12 12.Qct·12 Oct·13 Contract on-QOing
11·Mar-09 23-Mar·09 24-Jun-10 8-Nov·10 30-Jun-11 Dec-13 Contract on oolna 14-Mar·OB 05-May-08 29-Sep-08 20-Ailr·09 Cancelled
26·Jan·11 22·Jun·11 Corn eted
18·Feb-11 18·Jul· 11 Com eted 15-Jul-09 1()-Sep-09 20-Mav· 10 14-Ailr·11 20-Jul-11 17·Dec· 11 Com; ted
19-Jul-11 16-Dec·11 Com!: ted
20-Jan-11 20-Jun-11 Com eted
11-Jun-12 27·Jun·12 1·Aug·12 13-Sep-12 11·Jan· 13 15-Mar-13 Re- bid ICB 15
(contract sianinal
15-Nov-10 13-May-11 Completed
18·Aug·08 01·NOV.08 01·Dec·08 19·Mar·09 Feb-13 Contract on-going
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
is "' Evaluation
f Iii Report/ :::E Bank TORIREU Technlcello
1:1 .... IFB/BQIITQ/ Bid Opening/ No. of ffi Review ITOIBD Ananclal Contract Conlnlct Rei No. CONTRACT DESCRIPTION REIIaaue Propoula COMMENTS ... LOTS :::E Prlort Prepare a. Evaluation Signing Date Completion 0 w Date submlsalon ... a: Post Submission Report a. Date a: :::) Date
0 0 Award
~ i Recommend II. atlon <C
0
MCH14 Neonatal and ICU monitors re-bid package YN ICB 2 G ICB Prior MCH14.1 LOT I • Neonatal and Cardia • respiratory monHor
G Prior 1-May-oa 19-Aug-08 24-0ct-oa II·Feb-09 28-Jul-09 Nov-09 re-bid ICB2
1 (completed)
MCH14.2 LOT II· ICU and post operatory Care units monitor for Adults ·OG medium performance G 1 Prior 1-May-08 19-Aug-08 24-0ct-08 II·Feb-09 6·Aug-Q9 Dec-09 re-bldiCB2 (completed)
MCH15 LabOratory Equipment re bid Package XIIICB 2 G 1 tCB Prior 1-Mav-09 17-Jun-09 17-Aua-09 14-0cl-10 26-Jan-11 Dec· II ComDieted MCH16 Local training programmes in Neonatology field TR 1 Post Completed MCH17 Technical Survey of the Emergency CUnical County Hospital Cralova Building cs 1 IC Post 24-Jul-12 16-0ct-12 31-0ct-12 15-Nov-12 15-Jan-13 15-Feb-13 Procedure on gotng MCH18 Reinforcement of the structure of the ·or. loan Auret SbArcea" Clinical Obstetrics and cw NCB Post
Cancelled Gynaecology Hospital Brasov 1
SUBTOTAL Component A
Component B • Enlergencv uMOM
EMS I Procurement of EMS communication svstem lncludina additional auantities DE/9 1 ICB Prior 28-Aug-07 Aug-10 Completed EMS2 Procurement of GPS Subsvstem and A VL server DE/9 1 ICB Prior 11-Sep-07 Dec-10 Completed EMS3 Consumabtes for communications G cancelled EMS4 Equipment for Emergency Room of tcU: G 12 tCB Prior 31-Mav-o& 14-Aua-06
EMS4.1 Package 1 • tnterhospital transportatioon G 13-Nov-QS Dec-Q7 Completed EMS4.2 Package 2· Monitoring defibrilation G 2Q-Nov-o6 Dec-07 Completed EMS4.3 Package 3 • Anatysers G 22-Nov-06 Dec-07 Completed EMS4.4 Package 4 • Immobilization G tt·Dec-06 Dec-07 Completed EMS4.5 Package 5 Ventilation and Spirometry G 14-Mar-07 Dec-07 Completed EMS4.6 Package 6 • Neonatology and patient heating device G 28-Nov-06 Dec-07 Completed EMS4.7 Package 7 • Radiology G 26-Feb-07 Dec-07 Completed EMS4.8 Package 8 • Ultrasonography G 2Q-Mar..Q7 Dec-07 Completed EMS4.9 Package 9 • Basic examinlatton/ investigation devices G IQ-Nov-06 Dec-07 Completed EMS4.10 Package 1 o • Endoscopy- Bronhoscopy G 2Q-Nov-06 Dec-07 Completed EMS4.11 Package 11 • Resuscitation and alrway management G 28-Nov-06 Dec-07 Completed EMS4.12 Package 12 • Volumetric perfusion devices G 7·NOV·06 Dec-07 Completed
EMSS Scale up monitoring capacity In ICU of 37 hospltala (Neonatal and ICU monltora ICB G 2 ICB Prior Completed EMS5.1 LOT Ill • ICU monHortng Svstem for adult and Dediatrie use G 1-May-oa 19-AI.Jg-08 24-0ct-08 15-Jan-10 23-Jul-10 Nov-10 Completed EMS5.2 LOTIV • ICU monHors G I ·May-08 1~-oa 24-0ct-08 11-Feb-09 9-Jun-09 Oct-09 Completed
EMS6 Eauio multi-trauma ODeratina theaters at uo to 8 realonal hosDitaiS G 1 ICB Prior Cancelled EMS7 Procurement of six manequtns for establishing 6 ultrasonography training centers for ER
G 1 DC Prior 5-May-08 21-May-08 4-Jul-08 15-Nov-oa 11·Dec-o8 Mar-09 Completed
EMS8 Improve the ventilation and monitoring capacity ole county/regional hospitals (addendum 1
G 2 DC Prior 1·Dec-o7 Feb-08 Completed contract package 5 and addendum 2 package 2) EMS9 Procurement of eQUipment for 193 small municipal and Nral hoallftela G 7 ICB Prior Completed
EMS9.1 lot I - lntra·hosDHal transportation G 17-Mar-08 26-May-oa 16..Jui·08 14-AuQ·08 23-Mar-09 Sep-09 Completed EMS9.2 LOT II • MonHortng. defibrillation and EKG G 17-Mar-oa 26-May-oa 16-Ju~08 21-Aug-09 15-0ct-09 Feb-10 omoteted EMS9.3 LOT Ill· lrnmobilzation G 17-Mar-oa 26-May-o& 16-Jul-08 14-Aua-oa 2&-Mar-09 Sep..Q9 Completed EMS9.4 LOT IV • Ventilation and SDYrornei<Y G 17-Mar-oa 26-May-oa 16-Jul-08 14-Aug-08 17-Nov-o& Apr-09 Completed EMS9.5 LOT V • Basic Investigation - examination devices G 17-Mar-oa 26-May-08 16-Jul-08 14-Aug-08 14-Nov-08 Apr-09 Completed EMS9.6 LOT VI - Resuscitation and airway management G 17-Mar-08 26-May-08 16-Jui·08 14-Aug-08 14-Apr-09 Oct-09 Completed EMS9.7 LOT VII - VolumetriC perfusion devices G 17-Mar-08 26-May-08 16-Jul-08 14-Aug-08 11-Dec-08 Apr-09 Completed EMS10 Implement a letemedlclne pilot for trauma/emergency cases In 1 county G 2 ICB Prior
EMS10.1 LOT I • Emergency Telemedlclne audio-video conference system G IQ-Mar-08 29-May-08 25-Jul-08 17-Aug-08 14-Nov-oa Jun-09 Completed EMS 10.2 LOT 11 -Entergency Tetentediclne data system G I Q-Mar-o& 29-May-oa 25-Jul-08 17-Aug-08 14-Nov-08 Jun-09 Completed EMS II !;q~~ipment for registration - telecommunication system G 1 ICB Prior to-Mar-oa 2-Jun-08 23-Jul-08 IQ-Aug-oa 5-Dec-o& Jun-09 Completed EMS12 EquJJ!ot>ent for Paging ayatem G 2 ICB Prior
EMS12.1 LOT I • Local paging Systems G 13-Mar-08 2-Jun-08 23-Jui·OB IQ-Aug-08 19-Nov-08 May-10 Completed EMS 12.2 LOT II • Reaional caaing Systems G 13-Mar-08 2-Jun-08 23-Juf·08 IQ-Aug-08 19-Nov-08 Jul-IO Completed
EMS13 Rehabilitation of emergency room CW
EMS13.1 Medical fluids Installations for for County Hoso Ta Jlu CW 1 s Post 21-Nov-07 Dec-07 Completed EMS 13.2 Medical fluids installations for County Hoso ALEXANDRIA CW 1 s Post 21-Nov-07 Dec-07 Completed EMS13.3 Medical fluids instalations for Child Hoso BOTOSANI CW 1 s Post 21-Nov-07 Sep-11 Completed EMS13.4 Medical fluids installations for Emerqency County Hosg TQ MURES cw 1 s Post 21-Nov-07 Cancelled EMS 13.5 Medcal fluids installations for County Hose BRAILA cw 1 s Post 21 -Nov-o7 Aug-08 Completed EMS 13.6 Medea! fluids installations for County HosD CALARASI cw 1 s Post 21·Nov-o7 Mav-08 Completed EMS13.7 MedlcaJ fluids Installations for County Hose CONSTANTA cw 1 s Post 21-Nov-07 Dec-10 completed EMS 13.8 MediCal fluids Installations for Child Hose PLOIESTI CW 1 s Post 21·NOV·07 Dec-08 Comcleted EMS 13.9 MediCal fluids Installations for County Emergency Hosp SLOBOZIA CW 1 s Post 21·NOV·07 ADr-09 Com Dieted
EMS 13.10 Medical fluids Installations lor County Entergency Hosp SLOBOZIA Phase 2 CW 1 s Post Cancelled EMS 13.11 Medical fluids instalations lor County Hasp SA TU MARE cw 1 s Post 21·Nov-o7 Cancelled EMS13.12 Medical fluids installations for County Hasp SA TU MARE PHASE 2 cw I s Post Cancelled EMS 13.13 Medical fluids installations lor County Hose VASLUI CW 1 s Post 21-Nov-07 Sep-(18 Completed EMS 13.14 Medical fluids installations for Pediatrieal Hosp SIBIU cw 1 s Post 21-Nov-07 Dec-07 Completed EMS 13.15 Civil worl<s for County Hosp BRAILA cw 1 s Post 21-Nov-07 Jun-08 Completed EMS 13.16 Civil worl<s for Pediatric Clinical Hosp SIBIU cw 1 s Post 21-Nov-07 Dec-07 Completed EMS 13.17 Civil worl<s for County Hosp GIURGIU CW 1 s Post 21-Nov-07 Apr-08 Completed EMS13.18 Civil worl<s lor PediatriC Hosp BAASOV cw 1 s Post 21-Nov-07 Dec-07 Completed EMS 13.19 Civil worl<s for Entergency County Hosp Tg MURES CW 1 s Post 21-Nov-07 Cancelled EMS13.20 Civil works for County Hosp_SUCEAVA CW 1 s Post 21-Nov-o7 Apr .OS Completed EMS13.21 Civil works for County Hosp_ TIMISOARA CW 1 s Post 21 -Nov-07 Dec-07 Completed EMS 13.22 Civil works for Emergency Cou"h'_ Hosp VASLUI cw 1 s Post 21-Nov-07 Sep-08 Completed EMS 13.23 Civil worl<s lor Pediatrical Hos_R_PLOIESTI cw 1 s Post 21-Nov-07 Dec-07 Completed EMS 13.24 Civil worl<s lor County Hose SATU MARE cw 1 s Post 21-Nov-07 Mar-08 Completed EMS 13.25 Civil worl<s for County Hose VALCEA cw 1 s Post 21-Nov-07 Dec-07 Completed EMS 13.26 Civil worl<s for Oradea children hosPital cw 1 s Post 21·NOV·07 Cancelled EMS13.27 Civil worl<s for Erneroencv County Hoso VASLUI cw 1 s Post 16..Ju~08 Dec-o& Completed
EMS14 Civil works lor ERU SMURO Tarau Mures hosDHal cw 1 NCB Prior 15-Feb-10 30-Jul-10 2Q-Aug-10 8-Nov-10 11-Jan-11 Jul-12 Completed EMS15 Desian Rehabilitation ol erneraencv room Ta. Mures ProDesianl cs 1 sss Prior 25-Feb-09 1&-Mar-o9 IQ-Apr-09 15-May-09 Jul-12 Completed EMS16 Consultant for multi-trauma rooms cs 1 IC Post Cancelled EMS17 Manual'Emergency medicine• G 1 s Post 22-0ec-08 Apr-09 Completed EMS18 Manual 'First-ald" G 1 s Post 01-Jun-09 11·AIJ9~·09 01 -Sep-_09 15-Sep-09 15-0ct-09 Dec-09 Completed EMS19 Dispatch traininQ TR 1 sss Prior Cancelled
Ref No.
EMS20 EMS21 EMS22 EMS23
EMS23.1 EMS23.2 EMS23.3
EMS23.4 EMS23.5 EMS23.6 EMS23.7 EMS23.8
EMS23.9 EMS23.10
EMS24
EMS24.1
EMS24.2 EMS24.3 EMS25
EMS25.1 EMS25.2 EMS25.3 EMS25.4 EMS25.5 EMS25.6 EMS26
EMS26.1 EMS26.2 EMS26.3 EMS27.1
EMS27.2
PHCt
PHC2 PHC3 PHC4
PHC5
PHC6.1 PHC6.2
PHC7
PHC8 PHC9
PCH10
NHA1 NHA2
PM1 PM2 PM3 PM4 PM5 PM6 PM7 PM8 PM9 PM10 PM11 PM12 PM13
PM14.1 PM14.2 PM14.3 PM14.4 PM15 PM16
CONTRACT DESCRIPTION
Training for 190 emeraencv hosDilals Establish a monitorinQ and evaluation framework for telemedicine pilot Ambulance for contaaious patients Equipment purchase tor Ambulance and SMURD Personnel Training Centers (ICB It)
Basic Cardio-pulmonary Simulator I.V. Simulator Basic cartio-pulmonary Simulator with Digital Evaluation System and Semi-automatic defibrillator simulator Intubation Simulator Accessories for Simulator Advanced Cardio-pulmonary Resuscitation Simulator Multifunctional Advanced Neo-natal Simulator (resuscitation-trauma) Multifunctional Advanced Adult Simulator- wireless (cable free) coordinated with remote control Multifunctional Advanced Adult static Simulator (resuscitation-trauma) Multifunctional Advanced Baby Simulator (resuscitation-trauma) Update the existing telemedlcine system for imaging data transmission and telemedlclne system extending from the other regions, with the connection between County Hospitals and Regional Center in that region -ICB 12
Lot 1: Upgrade and extension of the existing Emergency Telemedlcine Audio -Video Conference System (Including addendum)
Lot II:Extension of the Emeraencv Telemedlcine Data SVstem lncludlnQ addendum Lot Ill: EmerQencv Telemedcaf lmaQinQ Svstem Procurement of equipment for emergency rooms. Intensive care and cardiOIClQY units (UPU Tg. Mures Emergency County Hospital, ERs county hospitals}· ICB 10 Lot 1: lntrahospital transportation LOT II : MonltorinQ and ECG LOT Ill : Ventilation Equipment LOT IV : Resuscitation, airway management and Immobilization LOT V : Tomography equipment LOT VI : RadioiClQY EQUipment ICB 14 rebid
Weak- currents Installation equipment for TG. Mures emergency clinical county hospital
Surveillance and Control Systems Communication Equipment Network and Telephony Equipment Hospital bedS· Tg. Mures ER Infusion pumps, docking stations for syringe pumps and Hypo and hyper thermla system • Tg. Mures ER SUBTOTAL Component B
TA for assement of the addresabiHty of the subloans for famllity doctors from rural and small urban areasmonltoring and evaluation framework TA for developing a beneficiary map TA shorterrn for improving a rural strategy for primary healthcana Rehabilitation works for the Influenza vaocine production unit at the Cantacuzino Institute
Rehabilitation of the aseptic ampoule sealing and filling station at the Cantacuzino Institute
Uparade of the ampoule filling and sealing line to cGMP at the Cantacuzino Institute Uparade for vials filling and sealing Une at the Cantacuzino Institute Site Supervisor for the rehabilitation works (vaocin production unil and sealing and filling station at Cantacuzino Institute) Designs for the vaoclne production uparade at the Cantacuzino Institute Equipment for BSL3 at Cantacuzino Institute TA for BSL3 certification at Cantacuzino Institute
SUBTOTAL ComponentC
Component D- Naa-ltteallll Acc:oul* and Planning
TA for National Health Accounts TA for informal payments assessment SUBTOTAL Component D
Conlpolwll E • Projeclllanagement '·
Mobile phone
IT eaulpment for PMU E-mail Server Reaistration device Electric and electronic device Office Fumituna PMU omce furniture Iron catllnet Other equipment and vehicle for PMU (to be contracted} Audll services 2005 Audit services 2006 Audit services 2007 Audtt services 2008
Audit services 2009 Audit services 2010 Audit services 2011 Audtt services 2012 ·2013 Audit services (until dec 2013) Local monitoring- region 6, 7 (01 .02.07- 31.12.07) Local monitoring - region 1, 2 ( 01.02.07- 31 .12.07)
TR cs G G
G G G
G G G G G
G G G
G
G G G
G G G G G G G
G G G G G
cs
cs cs cw
cw
G G
cs cs G cs
cs cs
No. of LOTS
10
3
6
2
co co ICB ICB
ICB
ICB
s s s s s
co
co aces NCB
NCB
ICB ICB
sss sss NCB co
LCS co
oc 1 s oc 1 s oc 1 s oc 1 s oc 1 s oc 1 s oc 1 s OC Multiple S CS 1 LCS CS 1 LCS CS 1 LCS CS 1 LCS CS 1 LCS CS 1 LCS CS 1 LCS CS 1 LCS CS 1 LCS CS 3 IC CS 3 IC
Bank Review Priori Poet
Posl Post Prior Prior
Prior
Prior
Post Post Post Post Post
Post
Post Prior Post
Prior
Prior Prior
Prior
Prior Post Post
Prior Prior
Posl Post Post Post Post Post Post Post Prior Prior Prior Prior Prior Prior Prior Post Post Post Post
TOR/REII ITQ/BD
Prepare. Submlselon
15-Mar-11
28-Apr-11
28-Apr-11
28-Apr-11 28-Apr-11 15-Mar-11
01-Jun-09
31-Jan-11
27-Jun-11 27-Jun-11
31-Jan-11
IFB/ BDIITQ I Bid Opening/ REI Issue Proposala
Date aubmlselon Date
15-Apr-11 02-Jul-11
16-Jun-11 17-Aug-11
16-Jun-11 17-Aug-11
16-Jun-11 17-Aug-11 16-Jun-11 17-Aug-11 30-May-11 15-Jul-11
to-Feb-12 24-Feb-12 2D-Feb-12 05-Mar-12 27-Feb-12 14-Mar-12 24-May-12 07-Jun-12 24-May-12 07-Jun-12
15-Sep-09 28-0ct-10 28-Sep-11 08-Nov-11
23-Mar-11 11-May-11
2D-Jul-11 12-S'!Q-11 2D-Jul-11 12-SeP-11
1 8-Aug-08 23-0ct-06 12-Aug-09
28-Dec-09 15-Feb-10 15-Mar-10 21-Feb-11 21-Mar-11 13-Feb-12 2o-Mar-12 24-0ct-12 21-Nov-12 01-Aug-13 01-Sep-13
Evaluation Report/
Technical• Rnanclal
Evaluation Report.
Awanl Recommend
atlon
15-Aug-11
5-Nov-11
5-Nov-11 5-Nov-11
22-Jui-11 8-Aug-11 22-Jul-11 22-Jul-11 2-Sep-11 2D-Sep-11
6-Jun-12 15-Apr-12 15::Apr-12 19-Jun-12 7-Jun-12
15-Jun-11 16-Nov-11
1o-Jun-11
09-APr-12 09-APr-12
3o-Nov-09
07-May-10 15-APr-11 15-Apr-12 05-Jan-13 01-0ct-13
Con1nlc1 Con1nlc1 Signing Date Completion
Date
30-Nov-tt Dec-II 30-Nov-11 Mar-12 22-Nov-11 Dec-11
23-NOV-11 Mar-12 22-Nov-11 Feb-12 23-Nov-11 Dec-11 27-Sep-11 Dec-11 27-Sep-11 Dec-11
27-Sep-11 Dec-11 27-Sep-11 Oec-11
23-Dec-11 Sep-12
29-Dec-11 Sep-12 29-Dec-11 Sep-12
27-Sep-11 Jan-12 30-Sep-11 Dec-11 27-Sep-11 Dec-11 24-0ct-11 Dec-11 27-Sep-11 Mar-12 7-Nov-11 Jun-12
25-Jun-12 Jul-12 5-MaJ~-12 Jun-12 s-Ma1:12 Jun-12 1D-Jul-12 Sep-12 23-Jul-12 Sep-12
26-Sep-06 Dec-06
28-Mar-06 4-0ct-11 Feb-12
29-Dec-11 May-12
5-Aug-11 Oct-12
26-Jui-12 Mar-13 24-Jul-12 Mar-13
26-Sep-11 Oct-12
19-Apr-11 Oct-12
5-Feb-10 Sep-10
28-Feb-06 Apr-06 to-May-07 Jul-07 8-Jul-08 Oct-08
17-Jun-09 Aug-09
01-Jun-10 30-Jun-10 01-May-11 14-Jun-11 08-Jun-12 08-Jul-12 3o-Jan-13 15-Mar-13 15-0ct-13 15-Dec-13
Dec-11 Dec-11
COMMENTS
Cancelled Cancelled Cancelled
Completed Completed Completed
Completed Completed Completed Com leted Completed
Completed Completed
Completed
Completed Completed
Comlleled Com ted Com~ eted
Corn~ ated Com~ ated
Completed Completed Completed Completed Completed
Completed
Completed Completed
Completed
Contract on-aoina Contract on·QoinQ
Completed
Completed Cancelled Cancelled
Completed Cancelled
Completed Com leted Completed Completed Com~ eted Com~ eted Completed
Completed Completed Completed Completed Completed Completed Completed
Procedure on going
Completed Completed
iS :.: EvaluaUon z Iii Report/ Ill ::1 Bank TOR/REI/ Technical& ...
ffi IFBI BDIITQ I Bid Opening/ r:i No. of Revl- ITQ/BD Rnancllll Contract Contract Ref No. CONTRACT DESCRIPTION REI lsaue Proposals COMMENTS ... LOTS ill Prlod Prepare& EvaluaUon Signing Data Completion 0 Data submlsalon ... a: Poet SubmiUion Report • Date a: ::I Date 0 8 Award '-' Recommend Ill a: ~ ... aaon u
PM17 Local monitor1ng • region 4. 5 cs 3 IC Post Dec·tt Completed
PMt8 Local monitoring • region 3 and Bucuresti cs 3 IC Post Dec-tt Completed PMt9 Other consultants (PMU accountant) oc t IC Post tt-Jun· t2 t2-Jun-t2 27·Jun-t2 t3-Jul-t2 25-Jul-t2 t5-Dec-t3 Contract on-going PM20 Comunication Strategy cs t co Post t·Feb-08 29-Mar-08 9·Juf.<l8 Dec-08 Completed PM2t Public Information CampalQn cs t FBS Prior 24-Mar-09 6-Mav-09 9-Jul-09 22-Jul-09 Cancelled PM22 Information, Education and Communication Campaign on the Health Sector Reforms in cs t QCBS Prior 24-May-tO to-Jan-t1 7·Ju~t1 25-Aug-tt 9-Apr-t2 Sep-t2 Completed Romania
PM23 Legal TA for drafting health reform legiSlation cs t co Post Cancelled PM24 Legal assistance lor PMU (Including amendments) cs t co Post 23-Jun-08 t5-Dec-t2 On-going
PM25 Translation services (completed) cs 1 Post Completed
PM26 Translation services (second) cs t Post tt-Sep-07 3t-Dec-t3 On-going
PM27 Accounting soltware cs 1 Post Completed
PM28 TA for INTRASTAT cs t Post 24-Fet>-07 3t-Dec-t3 On-going
PM29 CIEL TA for accountability cs t Post t5-Dec-t2 On-going
PM30 Evaluation committee members cs Multiple IC Post t5-Dec- t2 Completed
PM3t Logistique services lor PMU oc Multiple s Post t5-Dec-t3
PM32 Training lor PMU stall (completed) TR 1 Prior Dec-11 Completed
PM33 Training for the PMU staff (to be completed) TR Multiple Prior t5-Dec-t3
PM34 Consumables, communication , supplies for PMU (completed) oc Multiple s Post Dec-11 Completed
PM34.t Consumables, communication , supplies lor PMU oc Multiple s Post t5-Dec-t3
PM35 Advertising_ services oc t s Post 26-Fel>-08 t5-Dec-t0 Completed
PM35.t Advertising services oc t s Post t8-Mar-tt t5-Dec-t2 Completed
PM35.2 Advertising services (EIB) oc 1 s Post t5-Dec-t3
PM36 PMU stall (completed) oc Multiple IC Prior Oct-t2 Completed
PM37 PMU stall (on-going) oc Multiple IC Prior t5-Dec-t3 On-going PM38 TA for Package of Health Services cs t sss Prior 7-NOV-t1 Dec-tt Completed PM39 TA for DPLJRBF/PiorR cs Multiple QCBS Prior Cancelled PM40 Multifunctional for PMU oc t s Post 2t-Apr-tt 3t·May-tt Ju~tt Completed PM41 Notebooks for PMU oc t s Post 2<>-Jul-tt Aug-tt Completed PM42 E-signatura PMU oc t s Post 4-Ju~tt Aug-t2 On-going PM43 TA lor HT A training cs t co Prior 24-Jul-12 t7-Aug-t2 30-0ct-t2 7-Nov-t2 15-Jan-13 t5-Mar-t3 Procedure on going PM44 TA for an Impact study of the new health law cs t co Prior t5-Jul·12 t7-0ct-t2 25-0ct-t2 tt-Jan-t3 t5-Jan-t3 t5-Mar-t3 Procedure on going