Q Street Bridge Replacement Project Update September 2012 Key Project Elements: Replaces the aging Q Street Bridge. Shortens the bridge by adding a fill section between Edward Babe Gomez Avenue & 27 th Street. Improves the grade between 27 th & 28 th Street. Adds a left turn lane on Q Street each way at 27 th Street. Widens sidewalk on north side of Q Street to accommodate bicycle traffic. Some utility relocations are required. Schedule: Public Open House Meeting o Thursday, October 25 th ,57pm at the Kroc Center A fall 2014 letting is currently planned with work beginning over the 20142015 winter (follows NDOR redecking of L Street Bridge). Anticipated end of construction: November 2015 Impacts: The Q Street Bridge between 26 th & 27 th Streets would be closed to vehicle and pedestrian traffic during construction for bridge removal and reconstruction. Short term intersection closures at 26 th Street and 27 th Street would be required to rebuild those intersections in phases. Improvements along Q Street would extend to 28 th Street. Edward Babe Gomez Avenue would remain open throughout construction (with possibly a few nighttime closures for girder erection). Contacts: Phil Rossbach – HDR Engineering Inc. (402) 3991065 [email protected] Harry Owen – Omaha Public Works Department (402) 4445923 [email protected]

Upload: hoangtram

Post on 06-Mar-2018

233 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Q Street Bridge Replacement PI Briefing · PDF fileQ Street Bridge Replacement Project Update ‐ September 2012 Key Project Elements: Replaces the aging Q Street Bridge

 Q Street Bridge Replacement 

Project Update ‐ September 2012  

Key Project Elements: 

Replaces the aging Q Street Bridge. 

Shortens the bridge by adding a fill section between Edward Babe Gomez Avenue & 27th 

Street. 

Improves the grade between 27th & 28th Street. 

Adds a left turn lane on Q Street each way at 27th Street. 

Widens sidewalk on north side of Q Street to accommodate bicycle traffic. 

Some utility relocations are required. 

Schedule: 

Public Open House Meeting 

o Thursday, October 25th, 5‐7pm at the Kroc Center 

A fall 2014 letting is currently planned with work beginning over the 2014‐2015 winter 

(follows NDOR redecking of L Street Bridge). 

Anticipated end of construction: November 2015 

Impacts: 

The Q Street Bridge between 26th & 27th Streets would be closed to vehicle and 

pedestrian traffic during construction for bridge removal and reconstruction. 

Short term intersection closures at 26th Street and 27th Street would be required to 

rebuild those intersections in phases. 

Improvements along Q Street would extend to 28th Street. 

Edward Babe Gomez Avenue would remain open throughout construction (with possibly 

a few nighttime closures for girder erection). 

Contacts: 

Phil Rossbach – HDR Engineering Inc.  (402) 399‐1065 [email protected] 

Harry Owen – Omaha Public Works Department (402) 444‐5923 

[email protected] 

Page 2: Q Street Bridge Replacement PI Briefing · PDF fileQ Street Bridge Replacement Project Update ‐ September 2012 Key Project Elements: Replaces the aging Q Street Bridge

Edward Babe Gomez Ave

S 26th St

Edward Babe Gomez Ave

Kennedy Freeway

StartProject

EndProject

UPRR

75

Q St

R St

S 25th St

S 28th St

S 27th StProject Location and Study Area"Q" Street Bridge Replacement from 26th to 27th StreetOmaha, NebraskaProject No. BR-5026(11)Control No. CN 22325

DATE

FIGURE June 2012

1

Z:\Projects\City_of_Omaha\162685_26th_Q_Prelim_NEPA\map_docs\mxd\Project_Location_and_Study_Area.mxd\june12\jcm

2000

200100

FeetScale

LegendProject LocationEnvironmental Study Area

Douglas County, Nebraska

Project Location

Page 3: Q Street Bridge Replacement PI Briefing · PDF fileQ Street Bridge Replacement Project Update ‐ September 2012 Key Project Elements: Replaces the aging Q Street Bridge

27592

S 30th St

L St

Q St

S 27th St

S 30th St

S 25th St

UPRR

S 33rd St

Designated Detour Route During Construction"Q" Street Bridge Replacement from 26th to 27th StreetOmaha, NebraskaProject No. BR-5026(11)Control No. CN 22325

DATE

FIGURE June 2012

2

Z:\Projects\City_of_Omaha\162685_26th_Q_Prelim_NEPA\map_docs\mxd\Detour_Map.mxd\june12\jcm

6000

600300

FeetScale

LegendProject LocationDesignated Detour RouteAlternate Detour RouteTemporary Traffic Signal for Detour

Douglas County, Nebraska

Project Location