q4 2013 presentation final

38

Upload: primeromining

Post on 08-May-2015

296 views

Category:

Investor Relations


2 download

TRANSCRIPT

Page 1: Q4 2013 presentation final
Page 2: Q4 2013 presentation final
Page 3: Q4 2013 presentation final
Page 4: Q4 2013 presentation final

o

o

o

o

o

o

o

o

o

Page 5: Q4 2013 presentation final

-

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

2012 2013

Page 6: Q4 2013 presentation final

100

120

140

160

180

200

2012 2013

Tho

usa

nd

s

Page 7: Q4 2013 presentation final
Page 8: Q4 2013 presentation final

o

o

o

o

Page 9: Q4 2013 presentation final

2012 2013 2014E 2015E 2016E

9

Page 10: Q4 2013 presentation final

o

o

o

o

Page 11: Q4 2013 presentation final
Page 12: Q4 2013 presentation final

Builds on Established Presence in Mexico San Dimas Mine

(AT DECEMBER 31, 2012, MINERAL RESOURCES INCLUDE MINERAL RESERVES)

Au Reserves (Moz) 0.66

Au M&I Resources (Moz) 0.78

Au Inferred Resources (Moz) 0.76

Ag Reserves (Moz) 39.4

Ag M&I Resources (Moz) 46.9

Ag Inferred Resources (Moz) 64.6

Ventanas Property (AT JANUARY 27 2009)

Ind. Resources (koz AuEq.) 34.0

Inferred Resources (koz AuEq.) 70.0

Cerro del Gallo (AT DECEMBER 31, 2012, MINERAL RESOURCES EXCLUDE MINERAL RESERVES)

Au Reserves (Moz) 0.71

Au M&I Resources (Moz) 0.92

Ag Reserves (Moz) 15.3

Ag M&I Resources (Moz) 20.6

Cu Reserves (M lbs) 56.4

Cu M&I Resources (M lbs) 103.4

Black Fox Mine

(AT DECEMBER 31, 2012, MINERAL RESOURCES INCLUDE MINERAL RESERVES)

Au Reserves (Moz) 0.77

Au M&I Resources (Moz) 0.96

Inferred Resources (Moz) 0.06

Grey Fox (AT JULY 2, 2013)

Au Indicated Resources (Moz) 0.51

Au Inferred Resources (Moz) 0.23

Page 13: Q4 2013 presentation final
Page 14: Q4 2013 presentation final
Page 15: Q4 2013 presentation final
Page 16: Q4 2013 presentation final
Page 17: Q4 2013 presentation final

o

o

o

o

Page 18: Q4 2013 presentation final
Page 19: Q4 2013 presentation final

Exploration and Development Upside o

o

o

o

Page 20: Q4 2013 presentation final

20

Page 21: Q4 2013 presentation final
Page 22: Q4 2013 presentation final
Page 23: Q4 2013 presentation final
Page 24: Q4 2013 presentation final
Page 25: Q4 2013 presentation final
Page 26: Q4 2013 presentation final

o

o

o

Page 27: Q4 2013 presentation final
Page 28: Q4 2013 presentation final

o

o

o

o

Recent Tax Ruling Created Positive Leverage to Silver

25%

75%

Silver Gold

Page 29: Q4 2013 presentation final

Favorable Horizon

Mineralization – Ore Bodies Extension of the Favorable Horizon

Potential

0 1 2

K I L O M E T E R S

SW NE 3,000 m.

2,000 m.

1,000 m.

3,000 m.

2,000 m.

1,000 m.

Source: San Dimas Geology Office

Intrusive

Faults

West Block 2014 EXPLORATION

San Antonio Mined 1987-2002

Central Block Mined 2002-Current

Tayoltita Block Mined 1975-Current

Arana Hanging Wall

Sinaloa Graben Mined 2012-Current

2014 EXPLORATION PROGRAM DRILLING FOR EXTENSIONS OF KNOWN VEINS

Page 30: Q4 2013 presentation final
Page 31: Q4 2013 presentation final
Page 32: Q4 2013 presentation final
Page 33: Q4 2013 presentation final
Page 34: Q4 2013 presentation final

o

o

o

o

o

o

oo

o

o

o

o

o

Page 35: Q4 2013 presentation final

o

o

|

o

o

o

o

o

o

o

o

o

o

o

o

o

o

o

o

o

Page 36: Q4 2013 presentation final
Page 37: Q4 2013 presentation final