  • 8/19/2019 QAP- LT Panel.pdf

    1/8

    S.No. Component /Operation

    CharacteristicsChecked

    Classification Method /Type of Check

    AcceptanceNorm

    Format ofRecord

    Agency

    1 2 3 4 5 6 7 8

    Page 1 of 8

    QUALITY ASSURANCE PLAN

    ITEM : SOLAR LT PANEL. 

    MATERIALINSPECTION

    1 Busbar Support SMC/DMC

    A)   Type OfSupport:SMC

    Major Visual As per ANElectricals

    Drgs

    ANElectricals

    AN Electricals

    B) Dimensions - do - Measurement - do - - do - - do -

    C) Surface Finish - do - Visual - do - - do - - do -

    2 BUSBAR A) Size & CrossSection:

    - do - Measurement Apprd. Drwgs&

    Specifications

    IS : 5082/1897

    ANElectricalsInspection

    Record

    AN Electricals

    3 Hardware

    Bolt / Nuts / PlainWasher / SpringWasher

    A) DimensionalConfirmity

    Major Measurement IS :1364/3063

    ANElectricalsInspection

    Record

    AN Electricals

    B) Plating : Zinc /Cd

    - do - - do - - do - - do - - do -

    4 Neoprene RubberGasket

    A) DimensionalConfirmity

    - do - - do - Internal Std. ANElectricalsInspection

    Record

    AN Electricals

    5 Conductor / Wire A) Verification ofCross Sectionmake, ColourCode , Grade etc.

    Major PhysicalVerification /Measurement

    - do - - do - - do -

  • 8/19/2019 QAP- LT Panel.pdf

    2/8

    S.No. Component /Operation

    CharacteristicsChecked

    Classification Method /Type of Check

    AcceptanceNorm

    Format ofRecord

    Agency

    1 2 3 4 5 6 7 8

    Page 2 of 8

    B) Thickness ofInsulation

    - do - PhysicalVerification /Measurement

    IS : 694 - do - - do -

    6 Air Ckt Breaker (ACB) A) Verification ofCurrent rating

    Major Visual Approved Drg - do - - do -

    B) Verification ofVoltage Grade

    - do - - do - - do - - do - - do -

    C) MountingArrangement &Dimensions

    - do - Measurement - do - - do - - do -

    D) Voltage Ratingof Closing Coil /

    Shunt / Trip /Under Voltage

    - do - Visual - do - - do - - do -

    E) Anti Pumping/ Trip FreeFeature

    - do - Electrical - do - - do - - do -

    7 Terminal for Power &Control

    A) Size / Currentrating

    Major Visual ApprovedDrg.

    ANElectricalsInspection

    Record

    AN Electrical

    B ) ConnectingArrangement

    - do - - do - - do - - do - - do -

    8 Protective Relays A) MountingDetail Settingrange Aux.Contact Pos.

    Major Physicalverification Approved Drg ANElectricalsInspectionRecord

    AN Electricals

    9 Air Break Contactors / Timers / Timeswitches

    A) MountingDetail &Mechanicaloperation

    Major Physicalverification

    Approved Drg/ IS : 2959

    ANElectricalsInspection

    Record

    AN Electricals

  • 8/19/2019 QAP- LT Panel.pdf

    3/8

    S.No. Component /Operation

    CharacteristicsChecked

    Classification Method /Type of Check

    AcceptanceNorm

    Format ofRecord

    Agency

    1 2 3 4 5 6 7 8

    Page 3 of 8

    B) Current Rating/ Make

    - do - - do - - do - - do - - do -

    C) No. OfContacts

    - do - - do - - do - - do - - do -

    10 Current Transformer A) MountingDetail &Dimensions

    Minor PhysicalVerification

    Approved Drg ANElectricalsInspectionRecord

    AN Electricals

    B) CT Ratio ,Class OfAccuracy

    Critical Documentverification

    - do - Manufacturer TC

    Manufacturer

    11 Indicating Lamps &IndicatingInstruments(Voltmeter,

    Ammeter, Frequency,KW, KWH, Meter etc.)

    A) MountingDetail &Dimensions

    Minor PhysicalVerification

    Approved Drg Manufacturer TC

    Manufacturer

    B) Accuracy Class Major Visual Approved drgIS : 1248IS : 2419

    - do - - do -

    C) Routine / Type Test

    Major Electrical Approved drgIS : 6875

    Manufacturer TC

    Manufacturer

    12 Control Switch A) Visual Minor Physicalverification

    Approved Drg ANElectricalsInspection

    Record

    AN Electricals

    B) Contact RatingAC / DC

    Major Visual - do - - do - - do -

    C) Operational Test

    - do - Functionaltest

    - do - - do - - do -

    13 Space Heater A) MountingDetail

    Minor Visual /Physicalinspection

    Approved Drg ANElectricalsInspectionRecord

    AN Electricals

  • 8/19/2019 QAP- LT Panel.pdf

    4/8

    S.No. Component /Operation

    CharacteristicsChecked

    Classification Method /Type of Check

    AcceptanceNorm

    Format ofRecord

    Agency

    1 2 3 4 5 6 7 8

    Page 4 of 8

    B) Verification ofVolt / WattRating

    Major Visual - do - - do - - do -

    14 MCB / MCCB A) Verification ofrating & Make

    Major Electrical Approved drg ANElectricalsInspection

    Record

    AN Electricals

    15 Push Button A) Verification ofRating & ContactArrangement

    Major Electrical Approved drg ANElectricalsInspectionRecord

    AN Electricals

    B) MountingArrangement

    - do - - do - - do - - do - - do -

    C) Operational /

    Functional

    - do - - do - - do - - do - - do -

    INPROCESSINSPECTION

    16 PANEL FABRICATION A) Visual checkfor weld,dressing,deburing,straightness &dimensionalcontrol

    Minor PhysicalVerification

    Internal Std. InternalInspection

    record

    AN Electricals

    B) Dimensions - do - Process (

    Physicalcheck beforeassembly)

    - do - - do - - do -

    C) LiftingFacilities

    - do - - do - - do - - do - - do -

    D) Cable Entry - do - - do - - do - - do - - do -

    E) Waviness - do - - do - - do - - do - - do -

  • 8/19/2019 QAP- LT Panel.pdf

    5/8

    S.No. Component /Operation

    CharacteristicsChecked

    Classification Method /Type of Check

    AcceptanceNorm

    Format ofRecord

    Agency

    1 2 3 4 5 6 7 8

    Page 5 of 8

    F) GasketArrangement

    - do - - do - - do - - do - - do -

    17 Panel Painting - Paint Thickness

    - do - Measurement - do - - do - - do -

    - Finish - do - Visual - do - - do - - do -

    18 Assembly A) Alignment ofPanel & Busbar

    Major Physicalverification

    IS : 101 InternalInspection

    record

    AN Electricals

    b) Check forBusbar Mounting

    1) Tightness ofBusbar Joints

    - do - Physical testby TorqueWrench

    Internal Std. - do - - do -

    2) BusbarMounting onInsulators

    - do - - do - - do - - do - - do -

    3) Busbar jointingArrangement &Overlapping

    - do - - do - - do - - do - - do -

    4) Busbarbending &Drilling

    - do - - do - - do - - do - - do -

    5) PhaseIdentification &

    Clearance

    Critical Physical - do - - do - - do -

    6) BusbarSleeving

    Minor Visual Check - do - - do - - do -

    C) Check for CTMounting

  • 8/19/2019 QAP- LT Panel.pdf

    6/8

    S.No. Component /Operation

    CharacteristicsChecked

    Classification Method /Type of Check

    AcceptanceNorm

    Format ofRecord

    Agency

    1 2 3 4 5 6 7 8

    Page 6 of 8

    1) Mounting &AdequateSupports of CT

    Major Physicalverification

    - do - - do - - do -

    2) Provision forShorting link onCT terminal

    - do - - do - - do - - do - - do -

    D) MechanicalInterlockingArrangement

    - do - Functionalcheck

    - do - - do - - do -

    F) Arrangement ofComponents & Terminations

    - do - PhysicalVerification

    - do - - do - - do -

    19 Wiring A) Proper Wire

    Clamping

    Minor Visual Internal Std Internal

    records

    AN Electricals

    B) Continuity &Ferruling as perwiring diagram

    - do - Visual / test - do - - do - - do -

    C) Propercrimping of lugs /connectionstightening atterminals &components

    - do - - do - - do - - do - - do -

    20 Final Inspection A) Verification of

    Component,Rating,Arrangement asper GA Drg make

    Major Physical

    Verification

    Approved Drg

    IS : 8625/ IS: 4237/ IS :

    2127

    Internal

    records

    AN Electricals

  • 8/19/2019 QAP- LT Panel.pdf

    7/8

    S.No. Component /Operation

    CharacteristicsChecked

    Classification Method /Type of Check

    AcceptanceNorm

    Format ofRecord

    Agency

    1 2 3 4 5 6 7 8

    Page 7 of 8

    C) Wiring Cubicle& Ckt. Functiontest , operation of

    indicatinginstrumentswiringcompleteness

    - do - - do - - do - - do - - do -

    D) Continuity test - do - Routine test - do - - do - - do -

    E) HV/Megger Test on bothPower / ControlCkt

    Critical - do - - do - - do - - do -

    F) PhaseIndication

    Major Visual Approved DrgIS : 8623 / IS

    : 4237 / IS :2127

    InternalRecords

    AN Electricals

    G ) Check forBusbar clearance, Tightness ofelectrical /mechanicalinterlock

    - do - Visual /Physicalverification oftorquewrench

    - do - - do - - do -

    H ) Degree ofprotection byinsertion of thin

    paper / light test

    - do - Test - do - - do - - do -

    I ) Final Painting

    1) Shade - do - Visual - do - - do - - do -

    2) Surface Finish Minor - do - - do - - do - - do -

    3) Thickness Major PhysicalVerification

    - do - - do - - do -

  • 8/19/2019 QAP- LT Panel.pdf

    8/8

    S.No. Component /Operation

    CharacteristicsChecked

    Classification Method /Type of Check

    AcceptanceNorm

    Format ofRecord

    Agency

    1 2 3 4 5 6 7 8

    Page 8 of 8

    1) Function Major Physicalverification

    InternalSpecs

    InspectionRecord

    AN Electricals

    2) HV / IR test - do - Routine test - do - - do - - do -