    QA/QC Inspection Checklist

    design coordinates, inc. CP No.: ______________________La Vie FlatsParkway Ave.Filivest Corporate CityAlabang,Muntilupa City

    ITEM / REQUIREMENT Conform.Non -

    Conform.NotAvail.

    NotApplic.

    Remarks / Corrective ActionsDueDate

    Open Close

    b.5.3 in accordance/approvedsubmittal

    B.6Correct spacing and installation ofbrackets, hangers, sway braces andsupports

    B.7 Approve insulation

    B.8 Joints:

    b.8.1. mechanical joint

    b.8.2 brazed

    b.8.3 threaded

    b.8.4 soldered

    B.9 Types:

    b.9.1. K

    b.9.2. L

    b.9.3. M

    b.9.4. DWV

    B.10 Correct pipe size

    B.11 Pipe labels

    B.12 Valve labels

    B.13 Valve flow marks on the direction ofthe flow

    B.14 Correct location of installed valve

    B.15Proper heat temperature for brazingand soldering

    B.16 Lead free flux and solder

    B.17 Installed rel ief valve

    B.18 Installed balancing valve

    B.19Die electric fitting in betweencopper and galvanized iron.

    B.20 Installed water hammer arrestor

    DCI-QIC rev. 00 Page 2 of 3

  • 8/14/2019 QA&QC D2020.15060-Pipes & Pipe Fittings EDITED

    3/4

    QA/QC Inspection Checklist

    design coordinates, inc. CP No.: ______________________La Vie FlatsParkway Ave.Filivest Corporate CityAlabang,Muntilupa City

    ITEM / REQUIREMENT Conform.Non -

    Conform.NotAvail.

    NotApplic.

    Remarks / Corrective ActionsDueDate

    Open Close

    B.21Well clean pipes and fittings prior toinstallation

    B.22 Flushing (cleaning)

    B.23 Disinfected

    C TESTING PROCEDURES:

    C.1 Calib ra ted instruments

    C.2 Joints exposed

    C.3 Caulking on joints

    C.4 With pressure drop

    C.5 Cracks on fittings

    C.6 Leakage

    C.7 Air pressure

    C.8 Hydrostatic p ressure

    a. initial pressure reading, _____psi

    b. final pressure reading, ____ psi

    General Notes, Comments and Recommendations:

    Inspected by : Noted by : Concurred by :

    ROY JOHN BORNILLA_____________________________________

    Construction Project Engineer / Architect

    ARCH. RODERICK DENNIS M. CALLUENG_____________________________________

    Construction Project Manager

    RONALD ANDY PUNSALAN__________________________________________

    Supplier

    Distribution:

    Supplier Customer / Developer DCI File

    DCI-QIC rev. 00 Page 3 of 3

  • 8/14/2019 QA&QC D2020.15060-Pipes & Pipe Fittings EDITED

    4/4

    QA/QC Inspection Checklist

    design coordinates, inc. CP No.: ______________________La Vie FlatsParkway Ave.Filivest Corporate CityAlabang,Muntilupa City

    ITEM / REQUIREMENT Conform.Non -

    Conform.NotAvail.

    NotApplic.

    Remarks / Corrective ActionsDueDate

    Open Close

    Note : A separate Non-Conformance & Corrective Action Report (DCI-NCR) should be prepared for each and every non-conforming item identified in this checklist.

    DCI-QIC rev. 00 Page 4 of 3