qatari gas transport company ltd. (nakilat) company presentation
TRANSCRIPT
![Page 1: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/1.jpg)
Copyright © 2010
Qatar Gas Transport Company Ltd.
September 2010
Qatar Gas Transport Company Ltd. (NAKILAT)
Company Presentation
IEEJ: Octorber 2010
![Page 2: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/2.jpg)
Agenda:
Importance of LNG to the State of Qatar; Overview of Nakilat; Facilities Development; Ship Repair & Conversion (Phases 1 and 2); Offshore Structures Fabrication & Maintenance (Phase 3); Small Ship Construction (Phase 4); Repair of small ships (Phase 5); Production of Small Luxury Yachts (Phase 6); Timeline.
IEEJ: Octorber 2010
![Page 3: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/3.jpg)
Qatar Gas Transport Company Ltd. (NAKILAT)Company Presentation
Importance of LNGto the State of Qatar
IEEJ: Octorber 2010
![Page 4: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/4.jpg)
0
10
20
30
40
50
60
70
80
Qatar Indonesia Algeria Malaysia Nigeria Australia Trinidad
2005 2008E 2010E
Qatar in the Context of Global LNG Markets
Becoming the Dominant Player in the Rapidly Growing LNG IndustryThe Importance of LNG to the State of Qatar
___________________________1. Source: Energy Information Administration, International Energy Outlook .
(MTA)
Qatar is One of the World’s Largest LNG Producers
On Track to be World’s Largest LNG Producer
IEEJ: Octorber 2010
![Page 5: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/5.jpg)
The Qatar LNG “Integrated Chain”The Qatar LNG Story
QP and partners to produce 77 MTA of LNG from the North Field
QP and partners to ship much of their LNG via ships they control under long-term charters
QP and partners have ownership interests in regasification terminals around the world
QP and partners sell LNG globally via long-term contracts with creditworthy offtakers
Upstream Shareholder Offtakers
Strong “Sponsorship” of the Entire Chain from the State of Qatar
MarketingDownstream / RegasMidstream / ShippingUpstream
Third-Party Offtakers
Nakilat and Other Shippers
IEEJ: Octorber 2010
![Page 6: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/6.jpg)
Shipping Infrastructure is the Lifeblood of “Qatari LNG Inc”
500 round-trip journeys annually, each round trip averaging over 15,000 km Over 7 million km p.a. Over 7 million km p.a.
totaltotal Over 150 world Over 150 world
tripstrips
Importance of Nakilat to State of Qatar
Construction / Development2005-2010
Existing Export Markets
77 mtpa of LNG 12 to 14 million tons of LPG
annually 750,000 barrels/day of
Condensate
Shipping critical to Qatar– Essential infrastructure– Global supply function
Optimal configuration vital– Small savings = big $’s
Qatari LNG (and Income) Integrated into Global Energy Grid via Ship Infrastructure
IEEJ: Octorber 2010
![Page 7: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/7.jpg)
Snapshot of Nakilat
LNG critical to Qatar Petroleum (QP) and State of Qatar (SOQ) RasGas and Qatargas ventures vital to QP and international oil company (IOC) partners Transportation integral to connecting gas reserves and infrastructure to market QGTC established to play a key role in shipping for Qatari LNG projects
Transportation Integral to Qatar’s Ability to Connect Massive Gas Reserves to MarketOverview of QGTC and Nakilat
NorthField
(~15%world’sprovedgas)
77 MTALNG
LNG sales
RasGas LNG
Qatargas LNG
Shippers includingNakilat Inc.
IEEJ: Octorber 2010
![Page 8: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/8.jpg)
Qatar Gas Transport Company Ltd. (NAKILAT)Company Presentation
Overview of Nakilat
IEEJ: Octorber 2010
![Page 9: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/9.jpg)
Public Float50%
Qatar Navigation
Co.15%
Qatar Shipping Co.
15%
Qatar Petroleum
5%
Other15%
Nakilat:Created to Own & Operate the Qatari LNG Fleet
Established in 2004 as part of the overall Qatari LNG strategy
Successful IPO in February 2005 Restricted to Qatari nationalsRestricted to Qatari nationals Provided avenue for citizens to participate directly in Provided avenue for citizens to participate directly in
Qatari LNG business through share purchaseQatari LNG business through share purchase
Nakilat Profile Nakilat Shareholder Base
Qatar Government Affiliates Doha Stock Exchange
Nakilat’s LNG Shipping Activities
Part QGTC Ownership 100% QGTC Ownership
29 LNG Carriers Partnered with international
shipping companies
25 LNG Carriers Charterers: QGII / QG3 /
QG4 / RG3
4 LPG Carriers 24 Tugs / Workboats
IEEJ: Octorber 2010
![Page 10: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/10.jpg)
Nakilat vision is “To be the world’s leading owner and operator of vessels for the transportation of LNG and associated products, and the provider of choice for ship repair and construction services, as measured by customer satisfaction; financial profitability and growth; operational efficiency; and high standards of safety, health and environment”.
Nakilat – Corporate Vision:
IEEJ: Octorber 2010
![Page 11: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/11.jpg)
To maximize shareholder value by:
Optimizing investment in our core businesses of transporting LNG and associated products, through stringent cost control, effective risk management and innovative financing.
Establishing “centres of excellence” for the repair and maintenance of very large LNG carriers and other vessels, and for the construction of small, high value ships, thereby providing further assets for the State of Qatar.
Providing fully integrated logistics support to vessels. Identifying and capturing synergies. Recruiting, developing and retaining the highest quality
personnel in the industry.
Nakilat – Mission Statement:
IEEJ: Octorber 2010
![Page 12: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/12.jpg)
9 LNG VesselsConventional (145,000 – 154,000 m3)
31 LNG VesselsQ-Flex (210,000 – 216,000 m3)
14 LNG VesselsQ-Max (263,000 – 266,000 m3)
Nakilat LNGC Fleet:
IEEJ: Octorber 2010
![Page 13: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/13.jpg)
Delivering the Program – State-of-the-Art Ships
Increased shipyard capacity Reduced Suez Canal fees/costs Reduced wind resistance
Propulsion separate from BOG Maximizes delivered cargoMaximizes delivered cargo
BOG converted to liquid
Diesel engines Thermal efficiency Twin screw configuration Superior fuel efficiency
Classification Society Approved Design Offers Material Operating AdvantagesOverview of QGTC and Nakilat
“Gaz Transport” Membrane Enhanced Reliquefaction System Advanced Propulsion Technology
Significant Savings on Transport Cost for Charterers
Key Technologies on the QGTC Fleet of Q-Flex and Q-Max Ships
Q-Flex / Q-Max Shipping Cost Advantaged Economies of Scale Realized Through Chain Reliquefaction prevents boil-off gas (BOG) loss
– Increases overall sales volume Transport cost savings ~30% Cost reduction on QGII, QG3, QG4, RGII/3
– Gross saving of ~$13 billion over 25 years
Lower per unit capital costs Higher per unit operating efficiency Faster loading / discharge rates Elimination of lost sales due to reliquefaction More efficient Diesel propulsion
IEEJ: Octorber 2010
![Page 14: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/14.jpg)
Other Nakilat Joint Ventures Companies
Nakilat Switzer Towage Contract in Ras Laffan (operating 24 vessels)
Nakilat Agency Company Agency services for all vessels calling in Ras Laffan
Nakilat-Keppel Offshore & Marine Operating the Ship Repair Yard in Ras Laffan
Nakilat Damen Shipyards Qatar Operating the Ship Construction Facility in Ras Laffan
Gulf LPG Operating 4 LPG Vessels
IEEJ: Octorber 2010
![Page 15: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/15.jpg)
Qatar Gas Transport Company Ltd. (NAKILAT)Company Presentation
Facilities Development
IEEJ: Octorber 2010
![Page 16: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/16.jpg)
Construction & Maintenance ofMarine & Offshore Structures:
Phase Activities / Facilities
Phase 1 Repair and conversion of very large ships (e.g. LNGCs, VLCCs)
Phase 2 Repair of medium-sized ships (e.g. 20,000 dwt to 80,000 dwt)
Phase 3 Fabrication and maintenance of offshore structures (and components for land-based petrochemical plant) (Feasibility Stage)
Phase 4 Construction of high-value small ships (< 120m LoA)
Phase 5 Repair of small ships (< 20,000 dwt) (Engineering Stage)
Phase 6 Production of FRP vessels (Engineering Stage)
Nakilat and QP have defined a six-phase strategy to develop facilities for the construction and maintenance of a wide range of marine and offshore structures:
IEEJ: Octorber 2010
![Page 17: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/17.jpg)
Overview of Strategy:
Ship repair (large & medium vessels) Conversions
Phases 1 & 2
Repair of small ships
Phase 5
Phase 3
Fabrication of Offshore Structures
Phase 4
Construction of small ships
Phase 6
Production of FRP vessels
IEEJ: Octorber 2010
![Page 18: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/18.jpg)
Phase 1 & 2
Phases 1 & 2: Repair of medium to large sized vessels (20,000 to 400,000 dwt)
Phase 4
Phase 4: Construction of high-value, specialist vessels (<120m LOA)
Phase 5
Phase 5: Repair of small vessels (<20,000 dwt)
Phase 6: Production of FRP vessels
Phase 6
Phase 3
Phase 3: Fabrication & maintenance of offshore structures
IEEJ: Octorber 2010
![Page 19: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/19.jpg)
Status on 22 August 2010
Shipyard Sites
IEEJ: Octorber 2010
![Page 20: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/20.jpg)
Aerial view of Phases 1 to 6 (22 August 2010)
Phase 3 Phases 1 & 2
Phase 4
Phase 5Phase 6
IEEJ: Octorber 2010
![Page 21: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/21.jpg)
Facilities Under Development:(December 2009)
IEEJ: Octorber 2010
![Page 22: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/22.jpg)
Qatar Gas Transport Company Ltd. (NAKILAT)Company Presentation
Phases 1 & 2Ship Repair Yard
IEEJ: Octorber 2010
![Page 23: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/23.jpg)
Phases 1 & 2:Repair + Conversion of Large / Medium Vessels
IEEJ: Octorber 2010
![Page 24: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/24.jpg)
Fabrication / Laydown
area
Phases 1&2:Ship Repair Yard
Subcontractors’Facilities
Ops Support
and Stores
M&E Facility
AmenitiesBlock
MainOffice
PipeShop
SteelShops
UtilityCompound
30t jib cranes
Quays / Piers
6 x 400m berths
Dry Dock 1 360m x 66m
Dry Dock 2 400m x 80m
Q-Max LNGC345m x 55m
500t Gantry Crane
(future)
Paint& BlastCells
Mobile Shelters
Floating Dock 2 220m x 38m
Floating Dock 1 405m x 64m
IEEJ: Octorber 2010
![Page 25: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/25.jpg)
Facilities Under Development:(December 2009)
IEEJ: Octorber 2010
![Page 26: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/26.jpg)
Facilities Under Development:(December 2009)
IEEJ: Octorber 2010
![Page 27: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/27.jpg)
Dock No. 1, Pump House & Dock No. 2:(September 2010)
IEEJ: Octorber 2010
![Page 28: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/28.jpg)
Stockyard and Steelworking Facilities:(September 2010)
IEEJ: Octorber 2010
![Page 29: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/29.jpg)
Treatment Line:(September 2010)
IEEJ: Octorber 2010
![Page 30: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/30.jpg)
Steelworking Facility:(December 2009)
IEEJ: Octorber 2010
![Page 31: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/31.jpg)
Steelworking Facility – Block Assembly:(May 2010)
IEEJ: Octorber 2010
![Page 32: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/32.jpg)
Pipeworking Facility:(September 2010)
IEEJ: Octorber 2010
![Page 33: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/33.jpg)
Workshop Offices:(September 2010)
IEEJ: Octorber 2010
![Page 34: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/34.jpg)
Mechanical & Electrical Facility:(June 2010)
IEEJ: Octorber 2010
![Page 35: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/35.jpg)
Warehouse Facilities:(September 2010)
IEEJ: Octorber 2010
![Page 36: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/36.jpg)
Main Amenities Block:(July 2010)
IEEJ: Octorber 2010
![Page 37: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/37.jpg)
Amenities Block ‘C’:(February 2010)
IEEJ: Octorber 2010
![Page 38: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/38.jpg)
Amenities Block ‘C’:(February 2010)
IEEJ: Octorber 2010
![Page 39: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/39.jpg)
Main Office Block:(September 2010)
IEEJ: Octorber 2010
![Page 40: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/40.jpg)
Qatar Gas Transport Company Ltd. (NAKILAT)Company Presentation
Phase 3Offshore Structures Fabrication
IEEJ: Octorber 2010
![Page 41: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/41.jpg)
Phase 3: Fabn & Maintenace of Offshore Structures
IEEJ: Octorber 2010
![Page 42: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/42.jpg)
Potential Products – Phase 3:
Class B Jack-up Drilling module
Integrated deck ~ 10,000t
Module for FPSO
IEEJ: Octorber 2010
![Page 43: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/43.jpg)
Qatar Gas Transport Company Ltd. (NAKILAT)Company Presentation
Phase 4Ship Construction – Small Vessels
IEEJ: Octorber 2010
![Page 44: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/44.jpg)
Phase 4: Construction of Small Ships
IEEJ: Octorber 2010
![Page 45: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/45.jpg)
Commercial Vessels:
Harbor tugs
Dredgers
Offshore Supply Vessels
Coastal Tankers
IEEJ: Octorber 2010
![Page 46: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/46.jpg)
Coastal Defence Vessels:
MCDV
Fast Patrol Boat
Offshore Patrol Vessel
Coastguard Vessel
IEEJ: Octorber 2010
![Page 47: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/47.jpg)
Custom Luxury Yachts:
49m
80m 95m
52m
IEEJ: Octorber 2010
![Page 48: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/48.jpg)
Fabrication / Laydown
area
Phase 4:Ship Construction Facility
SteelShops
UtilityCompound
30t jib cranes
Q-Max LNGC345m x 55m
Paint& BlastCells
Mobile Shelters
DepotWarehouse
Assembly Shop
Construction Hall
SuperyachtConstruction Hall (Future)
Load-out & Recovery
Barge140m x 35m
Outfitting Quay Outfitting Quay (Future)
IEEJ: Octorber 2010
![Page 49: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/49.jpg)
Construction Hall:270m long x 85m wide x 45m high
IEEJ: Octorber 2010
![Page 50: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/50.jpg)
19m Tug
70m OSV70m OSV
Construction Hall:
IEEJ: Octorber 2010
![Page 51: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/51.jpg)
Construction Hall and Assembly Shop:(December 2009)
IEEJ: Octorber 2010
![Page 52: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/52.jpg)
Construction Hall:(September 2010)
IEEJ: Octorber 2010
![Page 53: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/53.jpg)
Construction Hall:(September 2010)
IEEJ: Octorber 2010
![Page 54: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/54.jpg)
Depot Store:(June 2010)
IEEJ: Octorber 2010
![Page 55: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/55.jpg)
Assembly Shop:(September 2010)
IEEJ: Octorber 2010
![Page 56: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/56.jpg)
Qatar Gas Transport Company Ltd. (NAKILAT)Company Presentation
Phase 5Ship Repair – Small Vessels
IEEJ: Octorber 2010
![Page 57: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/57.jpg)
Phase 5: Repair of Small Ships
IEEJ: Octorber 2010
![Page 58: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/58.jpg)
Phase 5:Repair of Small Ships
Floating Dock 2 220m x 38m
Floating Dock 3(5,000 TLC)
Onshore SupportFacility
Floating Moorings
Floating Dock 1 405m x 64m
Tower Cranes
Onshore Repair Berths
TravelLift
TravelLift
Piers
Repair Quay
IEEJ: Octorber 2010
![Page 59: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/59.jpg)
Qatar Gas Transport Company Ltd. (NAKILAT)Company Presentation
Phase 6Production of Small Luxury Yachts
IEEJ: Octorber 2010
![Page 60: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/60.jpg)
Phase 6: Production small luxury yachts
IEEJ: Octorber 2010
![Page 61: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/61.jpg)
Phase 6: Production of small luxury yachts
IEEJ: Octorber 2010
![Page 62: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/62.jpg)
Floating Moorings
MouldShop
Stores & Outfit Manufacturing
Fit-out, Testing & Finishing
Breakwater
Phase 6: Production of small luxury yachts
IEEJ: Octorber 2010
![Page 63: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/63.jpg)
Qatar Gas Transport Company Ltd. (NAKILAT)Company Presentation
Timeline
IEEJ: Octorber 2010
![Page 64: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/64.jpg)
Timelines:
Phase Start of Operations(Current status)
Phases 1 and 2Repair of Medium / Large Ships
Q3 2010(Under construction)
Phase 3Offshore Structures Fabrication and Maintenance
TBD(Feasibility stage – on hold)
Phase 4Ship Construction
Q1 2010(Under construction)
Phase 5Repair of Small Ships
Q4 2011(Engineering stage)
Phase 6Production and Repair of FRP Vessels
Q2 2012(Partner selection)
IEEJ: Octorber 2010
![Page 65: Qatari Gas Transport Company Ltd. (NAKILAT) Company Presentation](https://reader031.vdocuments.net/reader031/viewer/2022013005/58a2f3d31a28ab722c8b9d71/html5/thumbnails/65.jpg)
World class service.World class service.
World class facilities World class facilities ……
Thank you.Thank you.