  • MethodStatement Client:BPJobNumber: 50860WREP058 DocumentNumber: QC124127

    QC124,Rev.:1,05/11/2012 Page1of12

    Title of Document: Minor PaintingWorksatPS05ThisdocumentisaControlledDocument.Anychangetothisdocumentmustbereviewedandapprovedpriortouseandissue.AnydocumentnotapprovedinthismannerwillbeUncontrolled.

    1 19/02/2014 R.Asgarov N.Dadashev ForapprovalRev. Rev.Date Prepared Checked Approved ReasonforIssue

  • MethodStatement Client:BPJobNumber: 50860WREP058 DocumentNumber: QC124127

    QC124,Rev.:1,05/11/2012 Page2of12

    TableofContents1. Scope.....................................................................................................................................................41.1. Purpose.........................................................................................................................................41.2. DefinitionofScope........................................................................................................................41.3. ScopeDetails.................................................................................................................................41.4. Location.........................................................................................................................................41.5. WONos.........................................................................................................................................41.6. Discipline.......................................................................................................................................4

    2. Documentation.....................................................................................................................................52.1. ReferenceDocuments...................................................................................................................52.2. Definitions&Abbreviations..........................................................................................................52.3. GoC................................................................................................................................................6

    3. HSE,SecurityandSocialAspects...........................................................................................................73.1. Induction.......................................................................................................................................73.2. PersonalProtectiveEquipment.....................................................................................................73.3. OperationPlantandEquipment...................................................................................................73.4. RiskAssessment............................................................................................................................83.5. ToolBoxTalks................................................................................................................................83.6. PermittoWork..............................................................................................................................83.7. EnvironmentalImpact...................................................................................................................83.8. NoiseandVibrationEmissions......................................................................................................83.9. EnvironmentalImpactAssessment...............................................................................................83.10. EnvironmentalAwarenessandTraining...................................................................................93.11. WasteManagement..................................................................................................................9

    4. Requirements......................................................................................................................................104.1. Personnel.....................................................................................................................................104.2. Equipment,Tools&Materials.....................................................................................................104.3. ImpactonOperationalProcesses...............................................................................................104.4. Isolations.....................................................................................................................................104.5. Responsibilities............................................................................................................................10

    5. Execution.............................................................................................................................................115.1. SummaryofWorkActivities........................................................................................................115.2. WorkActivities............................................................................................................................11

  • MethodStatement Client:BPJobNumber: 50860WREP058 DocumentNumber: QC124127

    QC124,Rev.:1,05/11/2012 Page3of12

    5.3. Reinstatement.............................................................................................................................12

  • MethodStatement Client:BPJobNumber: 50860WREP058 DocumentNumber: QC124127

    QC124,Rev.:1,05/11/2012 Page4of12

    1. ScopeThissectiondefinesdetailsofthescopeofworkthatsubjectmethodstatementwaspreparedfor.

    1.1. PurposeThepurposeofthismethodstatementistodefinethespecifictaskstobeperformedrelatingtoMinorPaintingWorksatPS05.Itisalsodescribesthequality,safety,health,environmental,socialandsecurityrequirements.

    1.2. DefinitionofScopeWOswereraisedforCorrosionCleaningontheOilyWaterSeparatorPumpCasing&FoundationandPigLauncherKickerByPassLine2"GlobeValveatPS05.

    1.3. ScopeDetailsWorksshallinclude,butnotbelimitedto:Cleaning&PaintingWorks

    1.4. LocationPS05

    1.5. WONos.3315095&3519714

    1.6. DisciplineMechanical

  • MethodStatement Client:BPJobNumber: 50860WREP058 DocumentNumber: QC124127

    QC124,Rev.:1,05/11/2012 Page5of12

    2. DocumentationThissectiondefinesallreferencedocumentation,definitions&abbreviations.

    2.1. ReferenceDocumentsDocumentNumber: DocumentDescription:AZSPUHSSEDOC004043 AzerbaijanExportPipelinesWasteManagementProcedureAZSPUHSSEDOC001975 ProcedureforSiteVisitNotificationInterseal670HSAluminiumPartA MSDSInterseal670HSPartB MSDSIntergard475HSMIOLightGreyPartA MSDSIntergard475HSPartB MSDSInterthane990OffWhitePartA MSDSInterthane990LightGreyPartA MSDSInterthane990PartB MSDSCleanerGTA822 MSDSThinnerGTA007 MSDSThinnerGTA220 MSDSThinnerGTA713 MSDSIntergard475HS TDSInterseal670HS TDSInterthane990 TDSN/A CalibrationCertificateforElcometer319DewPointMeterN/A CalibrationCertificateforDFTGaugeMQSQPI011 MQSITPN/A CertificationofApplicatorN/A CertificationofInspectorGP0660 GroupPractice forPaintingofMetalSurfacesIPPCCAT114 ManufacturerMethodStatementIPPCCAT115 ManufacturerQualityControlPlan

    2.2. Definitions&AbbreviationsDefinition/Abbreviation: Description:ASAP AssoonaspossibleCOMPANY ClientofMQSLLCCONTRACTOR MQSLLCGoC GuidanceonCertificationDocumentationHSE Health,SafetyandEnvironmentalMS MethodStatementN/A NotapplicableNos. NumbersPPE PersonalProtectiveEquipmentPTW PermittoWorkQTY QuantityTBT ToolBoxTalksWO WorkOrderinBPMAXIMOSystem

  • MethodStatement Client:BPJobNumber: 50860WREP058 DocumentNumber: QC124127

    QC124,Rev.:1,05/11/2012 Page6of12

    2.3. GoCFollowingGoCdocumentationshallbefilledbyexecutorofsubjectMethodStatement:N/A

  • MethodStatement Client:BPJobNumber: 50860WREP058 DocumentNumber: QC124127

    QC124,Rev.:1,05/11/2012 Page7of12

    3. HSE,SecurityandSocialAspectsThissectioncoversgenericHSE,SecurityandSocialAspects.

    3.1. InductionPrior to startwork all personnelmust attend the specifiedHSE induction course, conducted by theCOMPANYAreaAuthority.AllemployeesalsoshallsignthesheetsofacknowledgementwithcorporateHealthandSafetyPolicy. Induction logbookshallbeproperly implementedandmaintained.PersonnelwhohavenotpassedtheProjectInductionCourseshallundertakenowork.

    3.2. PersonalProtectiveEquipmentAllpersonnelinvolvedinworkactivitiesshallcomplywiththeprojectPPEstandards.TheminimumPPErequirementsonsiteduringworkactivitiesshallbe:

    SafetyBootswithmetaltoeprotectors SafetyHardHat AppropriateEyeProtection Coveralls Gloves HearingProtection(whereapplicable)

    Additional PPE identified by the risk assessment shall also be implemented. Personnel shall takereasonable care about personal protective equipment issued by contractor. PPE logbook shall beimplemented andmaintained toensure all respectivepersonnel is issuedwith standardPPE set anddefectiveordamagedPPE isreplacedwithappropriateone.AnyviolationofPPEstandards,misuseofcorporateissuePPEorequipmentwillbethesubjectfordisciplinaryaction.HandmadeorpersonalPPEwillnotbeacceptablebyCONTRACTOR.

    3.3. OperationPlantandEquipmentThecrewsupervisorshallinspectallequipmentfordamageand/ordeficienciespriortothestartofworkondailybasisandappropriatesurveillanceshallbeimplementedandmaintainedonequipmenttocheckifithassustainedfromanydamageduringthecourseofexploitation.Defectiveitems,thataffectthesafeoperationofthepieceofequipment,shallbeimmediatelyremovedfromserviceuntilrepairedorreplaced.OtherdeficienciesshallberectifiedonASAPbasis.CrewsupervisorsshallcompletedailyaPlant&EquipmentChecklistfortheitemofplanttheyoperateand shall report all deficiencies to the site supervisors who are in charge of rectification from anydeficiencies.TheTechnicaldepartmentshalldocumentanyrectificationworkperformed.Allpersonnelshall exercise care when performing their duties with the contrast movement of vehicle plant andpersonnel within the work area. The Crew supervisors and workmen shall take special care whenworkingandmovingnearorunderoverheadservicesandburiedexistingservices.

  • MethodStatement Client:BPJobNumber: 50860WREP058 DocumentNumber: QC124127

    QC124,Rev.:1,05/11/2012 Page8of12

    3.4. RiskAssessmentSuitable and sufficient risk assessment shall be implemented by CONTRACTOR, which shall coveractivitiesofcontractorspersonnelaswellasvisitors,clientspersonnel.Refertothespecifictaskriskassessmentfordetailsoftheassociatedhazardsandmitigationmeasurestobeimplemented.Prior to thecommencementofworks the riskassessment shallbe reviewedbyHSEDepartmentandOperations(AreaAuthority)inconjunctionwithConstructiondepartmenttoensurethatalltherisksareaddressed and the required controlmeasures are in place, and followed during operations. Lessonslearnedpracticemustbeimplemented.

    3.5. ToolBoxTalksPrior to the commencementofworks theCrew supervisor,with support from theHSEOfficer, shallconduct a prestart toolbox talkwith all of the crew present. The crew supervisor shall explain themethod ofworks focusing on the hazards, risks and themitigationmeasures that shall be taken asdetailed intheRiskAssessment.AllTBTsshallbedocumentedand filedaccordingly.Registrationshalltakeplace inworkplace instructionandtraining logbook.ThecustodianofallTBTdocumentationshallbethecrewsupervisor.

    3.6. PermittoWorkAPTWshallbeobtainedinaccordancewiththerequirementsofPermittoworkProceduredescribedincorporate occupational health and safety manual, prior to performing the following operations oractivities.Thesiteandcrewsupervisorshallexplainthemethodsinvolved,focusingonthehazardsandrisks involved the activity, and the mitigation measures that shall applied as detailed in the RiskAssessmentincluding.

    3.7. EnvironmentalImpactPrior to commencing work all personnel shall have been inducted by the CONTRACTORS HSEDepartmentinaccordancewiththerequirementsoftheProject.PersonnelwhohavenotattendedtheProjectInductionCoursesshallundertakenowork.TheHSEDepartmentshallensurethatalltherisksareaddressedandthecontrolmeasuresareinplace.

    3.8. NoiseandVibrationEmissionsAllequipmentshallbemaintainedinefficientstatetominimizenoiseandvibrationemissions.Potentialsourceofnoiseshallbeidentifiedandcontrolmeasuresimplementedasfarasitreasonablypracticable.Regularnoiseemissionsmonitoringshallbecarriedoutbytrainedpersonnel.Incasenoisemonitoring iscarriedoutbyCOPMANYpersonnelonregularbasisandCONTRACTORnotlikelytoexceedregularsitenoiseemissions,thensubjectsectionisnotapplicable.

    3.9. EnvironmentalImpactAssessmentSignificant environmental impacts resulted from scope of work performed by CONTRACTOR shalladequately addressed with consistent control and monitoring measures implemented. Wherenecessary, an Environmental impact assessment shall be carried out by competent environmentalengineer.

  • MethodStatement Client:BPJobNumber: 50860WREP058 DocumentNumber: QC124127

    QC124,Rev.:1,05/11/2012 Page9of12

    3.10. EnvironmentalAwarenessandTrainingPrior to commencement of any work general environmental awareness programs will be run byCOMPANY forCONTRACTORpersonnel.CONTRACTORwillensurethat itspersonnelact inaccordancewithinstructionandtrainingprovidedbyCOMPANY.

    3.11. WasteManagementFollowupAzerbaijanExportPipelinesWasteManagementProcedure(AZSPUHSSEDOC004043).

  • MethodStatement Client:BPJobNumber: 50860WREP058 DocumentNumber: QC124127

    QC124,Rev.:1,05/11/2012 Page10of12

    4. RequirementsThis section describes personnel, tools, equipment etc. requirements. It also describes impacts onoperationalprocess,requiredisolationsandresponsibilitiesofclient.

    4.1. PersonnelTrade QTY Duration

    SiteSupervisor/PerformingAuthority 1 8 daysPainter 1 8days

    CoatingInspector 1 8days4.2. Equipment,Tools&Materials

    Thefollowingtoolsandequipmentarerequiredtoperformtheworkscopeasminimum:Description QTY Duration

    PickupVehicle 1 8daysFittersHandToolsSet 1 8daysElcometer319Standard 1 8 days

    Elcometer124 1 8days4.3. ImpactonOperationalProcesses

    N/A.4.4. Isolations

    AnyIsolationrequiredduetocleaning&coating.4.5. Responsibilities

    OndefaultCOMPANY is responsible forprovisionofanything thatCONTRACTORnotprovidingasperthismethodstatement.Thisistoinclude,butnotlimitedtothefollowing:

    Scaffoldsupport COMPANYInspectortofollowITP ProvideBlisterBlaster(andairsupplyaswell) Removalofanyinsulationbeforeworkstarts(ifapplicable) Accesstoworklocation Scaffolding Anyisolationsrequired Liftingauthority Sign and approve Work Acceptance Certificate(s), Mobilization Sheet(s) and Weekly Charge

    Sheet.MQSisresponsibletoexecutethescopeasperthismethodstatement.

  • MethodStatement Client:BPJobNumber: 50860WREP058 DocumentNumber: QC124127

    QC124,Rev.:1,05/11/2012 Page11of12

    5. ExecutionThissectiondefinesworkactivitiesimplementation.

    5.1. SummaryofWorkActivitiesCleaningCoating

    5.2. WorkActivitiesAllworkactivitiesarebasedon10hoursworkingday.Traveltimerequiredfor:Mobilization1dayDemobilization1dayTaskNo. TaskSteps

    TaskDuration

    5.2.1 OnarrivalatsitecontactthesiterepresentativeBPandidentityallMQSpersonnelinvolvedinworkactivities 2ndday

    5.2.2 Thesupervisorwillrequestapermittowork 2ndday5.2.3 EnsureallpersonnelinvolvedinworkactivitiestakepartinBPriskassessmentpriortoworkcommencing 3

    rdday5.2.4 Carryouttoolbox,ensurethatpersonnelareclearlyunderstandSOWandtheirownresponsibilities 3

    rdday5.2.5 Checkallequipmentisinplacepriortoworkcommencement 3rdday5.2.6 Transferallequipmentandmaterials towork location taking carenot toobstructanyemergencyescaperoutes,orcauseanyobstructionordisruptiontooperations 3

    rdday5.2.7 Erectsignsandbarriersatworklocation 3rdday5.2.8 Cleanallrequiredareasfromanydebrisandcontaminationtoachievelevelofcleannessrequiredbyproductdatasheet. 3

    rdday

    5.2.9Checkambientconditionsandrepeatevery4hours(minimumapplicationtemp.5deg.C),shelflifeofproductsselectedbasedonGP0660system.Ifacceptable,proceedtonextsection.

    3rdday5.2.10 CarryoutsurfacepreparationtoSt3usingbristleblaster. 3rdday5.2.11 Spotrepairareasandnoncoatedareasneedstobemaskedoff.CarryoutstripeprimingwithInterseal670HSusingbrush. 3

    rdday

    5.2.12ApplyInterseal670HSasaprimerusingbrushesandrollerstoachieve125micronsDFT(typically100125micronscanbeachieved).*durationidentifiedisbestcasescenarioandcanvarydependingonachievedDFTandtemperatureduringdryingofproducts.

    3rdday*

    5.2.13 CarryoutchecksofDFTasperSSPCPA2aftereachcoat. 4thday5.2.14 Overcoatasperproductdatasheet,cleansurfaceandcarryoutstripecoatingwithIntergard475HSusingbrushesandrollers. 4

    thday

    5.2.15ApplyfirstlayerofIntergard475HS,asanintermediatecoatusingbrushesandrollerstoachieve125micronsDFT(typically5075micronscanbeachieved).*durationidentifiedisbestcasescenarioandcanvarydependingonachievedDFTandtemperatureduringdryingofproducts.

    4th5thdays*

  • MethodStatement Client:BPJobNumber: 50860WREP058 DocumentNumber: QC124127

    QC124,Rev.:1,05/11/2012 Page12of12

    5.2.16 Overcoatasperproductdatasheet,cleansurfaceandcarry outstripecoatingwithInterthane990offwhiteandlightgreyusingbrushesandrollers. 6thday

    5.2.17ApplyfirstlayerofInterthane 990lightgreyonOilyWaterSepatorPumpcasing&Foundation,andoffwhiteonPigLauncherKickerByPassLine2"GlobeValveusingbrushesandrollerstoachieve50micronsDFT(typically3050micronscanbeachieved).*durationidentifiedisbestcasescenarioandcanvarydependingonachievedDFTandtemperatureduringdryingofproducts.

    6thday*

    5.2.18 Ifanyrepairsrequired,carrythemoutasperGP0660(betweenapplicationsofeachcoat). 7thday

    5.2.19 Onceallworkhasbeensatisfactorilycompletedworkpackcompletioncertificatewillbeofferedforsigningoff. 7thday

    SummaryofWorkActivatesdurationinclusiveofmobilizationanddemobilization8days5.3. Reinstatement

    Ensureworkareaisleftcleanandtidyandalderbiesremovedfromsiteanddisposedofinthecorrectlocation.Removeallplantandequipmentfromsiteandcloseoutpermittowork.Uponcompletionensureallrelevantdocumentationandtimesheetsaresignedandapprovedbyclient.