QCS Section 1 Part 14 Temporary Works and Equipment Page 1 14. TEMPORARY WORKS AND EQUIPMENT ...................................................2 14.1 GENERAL ......................................................................................................2 14.1.1 Scope 2 14.2 TEMPORARY WORKS ..................................................................................2 14.2.1 General 2 14.3 TEMPORARY EQUIPMENT...........................................................................2 14.3.1 General 2

Upload: rotsapnayrb

Post on 04-Oct-2015

213 views

Category:

Documents


0 download

DESCRIPTION

qcs 2007 0114

TRANSCRIPT

  • QCS Section 1 Part 14 Temporary Works and Equipment Page 1

    14. TEMPORARY WORKS AND EQUIPMENT ...................................................2

    14.1 GENERAL ......................................................................................................2

    14.1.1 Scope 2

    14.2 TEMPORARY WORKS ..................................................................................2

    14.2.1 General 2

    14.3 TEMPORARY EQUIPMENT...........................................................................2

    14.3.1 General 2

  • QCS Section 1 Part 14 Temporary Works and Equipment Page 2

    14. TEMPORARY WORKS AND EQUIPMENT

    14.1 GENERAL

    14.1.1 Scope

    1 This Part specifies the requirements for temporary works required in connection withconstruction of the Works and temporary plant and equipment required in connection withaiding the construction of the Works. It does not include overpumping activities in respectof sewers and drains.

    14.2 TEMPORARY WORKS

    14.2.1 General

    1 Everything used for and in connection with the temporary works shall be fit for the purpose,in serviceable condition and in compliance with any relevant standard.

    2 The Contractor shall design his temporary works to be of adequate strength and stability.

    3 The Contractor shall submit details of any temporary works proposed to the Engineer forreview before commencing the work. Such details shall include, but not be limited todesign calculations and drawings. The submission to the Engineer of any such details shallnot relieve the Contractor of his responsibility for sufficiency of the temporary works or ofhis other duties and responsibilities under the Contract.

    4 The Contractor is responsible for ensuring that temporary works are not in any waydetrimental to existing structures in any way. Particular care shall be taken with scaffoldingto avoid staining or mechanical damage to finishings.

    5 The Contractor shall make safe and reinstate all areas affected by temporary works.

    14.3 TEMPORARY EQUIPMENT

    14.3.1 General

    1 The Contractor shall provide and maintain in good condition on the Site all plant, tools andvehicles necessary for the proper and safe execution of the Works.

    2 Temporary equipment shall be fit for the purpose for which it is to be used.

    3 Temporary equipment shall only be operated by personnel who are trained and qualified.

    END OF PART

    14. TEMPORARY WORKS AND EQUIPMENT14.1 GENERAL14.1.1 Scope14.2 TEMPORARY WORKS14.2.1 General14.3 TEMPORARY EQUIPMENT14.3.1 General