ProCME Group presentationGroup

Having the spanish ACS Group as a shareholder, presently one of the largest in the world and a global reference in the construction and services sector, ProCME Group comprises companies developing activity in the scope of high-tech engineering.

ProCME Group companies are involved in the development of key-sectors of the economy, namely infrastructures and energy, decisive for the social and economic development of the countries in which they operate.

Each company within the Group, with full Portuguese management, benefits from the competences of each of the other Group companies.

This complementary relationship supported by a set of effective synergies is, in itself, one of the success factors of ProCME Group.

Page 3: Quadríptico ProCME livro en 2016.cdr

ProCME Group presentationGroup

Having the spanish ACS Group as a shareholder, presently one of the largest in the world and a global reference in the construction and services sector, ProCME Group comprises companies developing activity in the scope of high-tech engineering.

ProCME Group companies are involved in the development of key-sectors of the economy, namely infrastructures and energy, decisive for the social and economic development of the countries in which they operate.

Each company within the Group, with full Portuguese management, benefits from the competences of each of the other Group companies.

This complementary relationship supported by a set of effective synergies is, in itself, one of the success factors of ProCME Group.

Page 4: Quadríptico ProCME livro en 2016.cdr
Page 5: Quadríptico ProCME livro en 2016.cdr
Page 6: Quadríptico ProCME livro en 2016.cdr

Group companies develop their activity in the areas of energy -

eletricity and gas -, telecommunications, water, hvac and building

services, environmental projects, information systems and industry.

CME, S.A. is the main Group company.

With a significant presence in practically every sector of activity, it came

to be the Group's starting point, allowing for the creation of companies

meant to occupy market slots complementary to its own.

From amongst those companies the following stand out:

. Tecneira Group, with the purpose of promoting and building electrical

energy power plants from renewable sources.

. ProRESI, with the purpose of processing and eliminating non-

dangerous industrial waste in landfill facilities, with the Economic

Activity Class (CAE) 90020, defined as «collection and processing of

miscellaneous waste.

In the african market the Group is presently

developing projects in Angola, Cape Verde and

Mozambique, countries with strong growth

perspectives.

In Angola, CME Angola has been participating,

associated with local companies, in business

proposals in the areas of electricity, energy, water

and telecommunications.

The company is set upon the goal of growing in the

areas of electricity and water, in which the PIP -

Public Interest Projects - are the most important.

In Cape Verde, within a set of contracts celebrated

with the Ministery of Tourism, Industry and Energy,

CME Cabo Verde has built a number of

infrastructures composed by 60 kV lines and

distribution networks in MV and LV, in the Island of

Santiago.

Inovantis, in Mozambique, has the purpose of

developing the Group's core activities in which it

has important know–how.

In the Industrial Services business area ProCME

Group is one of the world leaders in the

construction of:

Renewable energy installations, either

thermosolar, photovoltaic or wind power;

. Electrical energy, namely combined cycle and

hydraulic;

. Oil related assets, such as refineries and platforms

. Gas related assets, such as gas liquefaction, re-

gasification, and gas storage.

Page 7: Quadríptico ProCME livro en 2016.cdr

Group companies develop their activity in the areas of energy -

eletricity and gas -, telecommunications, water, hvac and building

services, environmental projects, information systems and industry.

CME, S.A. is the main Group company.

With a significant presence in practically every sector of activity, it came

to be the Group's starting point, allowing for the creation of companies

meant to occupy market slots complementary to its own.

From amongst those companies the following stand out:

. Tecneira Group, with the purpose of promoting and building electrical

energy power plants from renewable sources.

. ProRESI, with the purpose of processing and eliminating non-

dangerous industrial waste in landfill facilities, with the Economic

Activity Class (CAE) 90020, defined as «collection and processing of

miscellaneous waste.

In the african market the Group is presently

developing projects in Angola, Cape Verde and

Mozambique, countries with strong growth

perspectives.

In Angola, CME Angola has been participating,

associated with local companies, in business

proposals in the areas of electricity, energy, water

and telecommunications.

The company is set upon the goal of growing in the

areas of electricity and water, in which the PIP -

Public Interest Projects - are the most important.

In Cape Verde, within a set of contracts celebrated

with the Ministery of Tourism, Industry and Energy,

CME Cabo Verde has built a number of

infrastructures composed by 60 kV lines and

distribution networks in MV and LV, in the Island of

Santiago.

Inovantis, in Mozambique, has the purpose of

developing the Group's core activities in which it

has important know–how.

In the Industrial Services business area ProCME

Group is one of the world leaders in the

construction of:

Renewable energy installations, either

thermosolar, photovoltaic or wind power;

. Electrical energy, namely combined cycle and

hydraulic;

. Oil related assets, such as refineries and platforms

. Gas related assets, such as gas liquefaction, re-

gasification, and gas storage.

Page 8: Quadríptico ProCME livro en 2016.cdr

Some reference projects abroad, ongoing or completed

Brazil

Angola (through the Group's branches in Angola)

HV lines in Oviedo (Spain)

Construction of thermosolar plant Andasol1 (Granada - Spain)

Substations and HV lines in Libya

Refurbishment and enlargement of a Polyethylene plant in Kuwait

220 kV Cables and connections in Iceland

220kV undeground connections in San Diego and Albany (USA)

VHT line insulator washing through the use of helicopter in Spain, Greece and Egypt

Other countries

Rehabilitation and expansion of the public lighting system in urban Luanda (Angola)

Rehabilitation of hydraulic facilities at Kunge, 30 kV line and MV, LV and IP construction in Camacupa (Angola)

LV and MV distribution network refurbishment with transformer substations assembly in Luanda (Angola)

Electrical installation and systems adaptation of voting facilities for the September 5th, 2008 election process (Angola)

Underground LV & MV network malfunction and failure detection and repair in Luanda (Angola)

Contract for the construction of infra-structures on phase 1 of the Kora Housing (15ha) - Kuito - project

Contract for the maintenance of optic fiber - LAD-SOY

Revamping and modernisation of Cazenga 220/60/15 kV electrical substation

Rehabilitation of Luena township LV / MV networks

Contract for the construction of infra-structures on phase 2 of the Kora Housing A+B - Kuito - project

Increase of the thermal energy production capacity in Luanda

Overhead and Underground Distribution Network - from substation output to customer home. Jacarépagua / Bangu cell -

600.000 consumers.

Rocinha Special Project, normalisation of electrical connections and Overhead and Underground LV / MV Distribution Network

construction. Installation of 28.8 km of Overhead Low Voltage with multiplex cable and wooden poles. 9kM, 17.4 kM of IP

network, 2.3 kM of overhead and underground Medium Voltage network, installation on 73 transformers and normalisation of

23.450 consumers.

500 kV and 900 km High Voltage line between the villages of Itumbiara and Cuiabá (Brazil).

Construction of 5 substations in Goiás and Mato Grosso states (Brazil).

500 kV and 324 km High Voltage line between Tucuruí and Vila do Conde (Brazil).

Construction of 2 substations in Pará state - Brazil.

500kV and 308km High Voltage line between Jaguara - Estreito - Riberao Preto - Poços de Caldas and Engineering / Systems in

Jaguará, Estrito, Poços de Caldas and Riberao Preto substations (Brazil).

500kV High Voltage line between Sao Simao - Marimbondo - Riberao Preto and Engineering / Systems in all substations

(Brazil).

Project, construction and operation, for a period of 30 years, of the Transmissao de Energia project in southeast Pará, northern

Brazil.

Page 9: Quadríptico ProCME livro en 2016.cdr

Some reference projects abroad, ongoing or completed

Brazil

Angola (through the Group's branches in Angola)

HV lines in Oviedo (Spain)

Construction of thermosolar plant Andasol1 (Granada - Spain)

Substations and HV lines in Libya

Refurbishment and enlargement of a Polyethylene plant in Kuwait

220 kV Cables and connections in Iceland

220kV undeground connections in San Diego and Albany (USA)

VHT line insulator washing through the use of helicopter in Spain, Greece and Egypt

Other countries

Rehabilitation and expansion of the public lighting system in urban Luanda (Angola)

Rehabilitation of hydraulic facilities at Kunge, 30 kV line and MV, LV and IP construction in Camacupa (Angola)

LV and MV distribution network refurbishment with transformer substations assembly in Luanda (Angola)

Electrical installation and systems adaptation of voting facilities for the September 5th, 2008 election process (Angola)

Underground LV & MV network malfunction and failure detection and repair in Luanda (Angola)

Contract for the construction of infra-structures on phase 1 of the Kora Housing (15ha) - Kuito - project

Contract for the maintenance of optic fiber - LAD-SOY

Revamping and modernisation of Cazenga 220/60/15 kV electrical substation

Rehabilitation of Luena township LV / MV networks

Contract for the construction of infra-structures on phase 2 of the Kora Housing A+B - Kuito - project

Increase of the thermal energy production capacity in Luanda

Overhead and Underground Distribution Network - from substation output to customer home. Jacarépagua / Bangu cell -

600.000 consumers.

Rocinha Special Project, normalisation of electrical connections and Overhead and Underground LV / MV Distribution Network

construction. Installation of 28.8 km of Overhead Low Voltage with multiplex cable and wooden poles. 9kM, 17.4 kM of IP

network, 2.3 kM of overhead and underground Medium Voltage network, installation on 73 transformers and normalisation of

23.450 consumers.

500 kV and 900 km High Voltage line between the villages of Itumbiara and Cuiabá (Brazil).

Construction of 5 substations in Goiás and Mato Grosso states (Brazil).

500 kV and 324 km High Voltage line between Tucuruí and Vila do Conde (Brazil).

Construction of 2 substations in Pará state - Brazil.

500kV and 308km High Voltage line between Jaguara - Estreito - Riberao Preto - Poços de Caldas and Engineering / Systems in

Jaguará, Estrito, Poços de Caldas and Riberao Preto substations (Brazil).

500kV High Voltage line between Sao Simao - Marimbondo - Riberao Preto and Engineering / Systems in all substations

(Brazil).

Project, construction and operation, for a period of 30 years, of the Transmissao de Energia project in southeast Pará, northern

Brazil.

Page 10: Quadríptico ProCME livro en 2016.cdr

PROCME MANAGEMENT INDICATORS

ProCME Economic and Financial Indicators (kEuro - Year 2016)

ProCME Turnover by Business Area

CORPORATE STRATEGY

MissionTo Create Value for shareholders, to satisfy Customers and the staff and to contribute to the country’s economic and

social balance.

VisionTo Lead the Engineegring market in the scopes of design, construction and operation of installations and infrastructures.

ValuesOur values bind our strategy and are always present in the way we act, defining Who We Are.

We assume as a corporate commitment the satisfaction of the needs of everybody who interacts with us, basing our

corporate strategy on 3 pillars: sustained growth, profitability and social and environmental responsibility.

Leadership is a consequence of our customer-oriented

actions, in a relationship based on trust and the constant

search for innovative solutions.

The patterns of professionalism of our staff reflect the

commitment to a service of excellence for our

customers, with their satisfaction and business

profitability always on our minds.

In ProCME Group we scrupulously observe Human

Rights and Public Freedom included in the Universal

Declaration of Human Rights, as well as all international

instruments referenced in the Group's policy.

The relationships we establish with our stakeholders and

our staff's performance are bound by transparency and

integrity conduct.

Leadership Respect

Profe

ssio

nalism

Integrity

Net Result

Total Net Assets

Cash Resources

Financial Autonomy

Solvency

Endebtedness

Equity Capital Profitability

Turnover

ProCME

EBIT

9%

28%

35%

5%

5%

18%

2015

WATER & GAS

TELECOMMUNICATIONS

ELECTRICITY

INSTALLATIONS &MAINTENANCE

SPECIAL PROJECTS

RENEWABLE ENERGY

7%

22%

38%4%

9%

20%

2016WATER & GAS

TELECOMMUNICATIONS

ELECTRICITY

INSTALLATIONS &MAINTENANCE

SPECIAL PROJECTS

RENEWABLE ENERGY

190.607

9.054

348.306

45.434

60.433

13,0%

15,0%

87,0%

19,9%

Page 11: Quadríptico ProCME livro en 2016.cdr

PROCME MANAGEMENT INDICATORS

ProCME Economic and Financial Indicators (kEuro - Year 2016)

ProCME Turnover by Business Area

CORPORATE STRATEGY

MissionTo Create Value for shareholders, to satisfy Customers and the staff and to contribute to the country’s economic and

social balance.

VisionTo Lead the Engineegring market in the scopes of design, construction and operation of installations and infrastructures.

ValuesOur values bind our strategy and are always present in the way we act, defining Who We Are.

We assume as a corporate commitment the satisfaction of the needs of everybody who interacts with us, basing our

corporate strategy on 3 pillars: sustained growth, profitability and social and environmental responsibility.

Leadership is a consequence of our customer-oriented

actions, in a relationship based on trust and the constant

search for innovative solutions.

The patterns of professionalism of our staff reflect the

commitment to a service of excellence for our

customers, with their satisfaction and business

profitability always on our minds.

In ProCME Group we scrupulously observe Human

Rights and Public Freedom included in the Universal

Declaration of Human Rights, as well as all international

instruments referenced in the Group's policy.

The relationships we establish with our stakeholders and

our staff's performance are bound by transparency and

integrity conduct.

Leadership Respect

Profe

ssio

nalism

Integrity

Net Result

Total Net Assets

Cash Resources

Financial Autonomy

Solvency

Endebtedness

Equity Capital Profitability

Turnover

ProCME

EBIT

9%

28%

35%

5%

5%

18%

2015

WATER & GAS

TELECOMMUNICATIONS

ELECTRICITY

INSTALLATIONS &MAINTENANCE

SPECIAL PROJECTS

RENEWABLE ENERGY

7%

22%

38%4%

9%

20%

2016WATER & GAS

TELECOMMUNICATIONS

ELECTRICITY

INSTALLATIONS &MAINTENANCE

SPECIAL PROJECTS

RENEWABLE ENERGY

190.607

9.054

348.306

45.434

60.433

13,0%

15,0%

87,0%

19,9%

Page 12: Quadríptico ProCME livro en 2016.cdr

CORPORATE STRATEGY

TECHNICAL CAPABILITY CULTURE OF SERVICE

ENTERPRENEURSHIP

. Rigorous and efficient management

. Focus on sustained growth

. Search for attractive investment opportunities

. Design and development of innovative services

. Customer-oriented performance

. Integrated solutions

. Flexibility and adaptability. Engineering

. Procurement

. Construction

. Operation

. Maintenance

THE COMPETITIVE EDGE

COMMITMENT WITH SUSTAINABILITY

"In ProCME Group, we want to contribute towards a more cohesive and balanced society, based upon the principles

of sustainability. Thus, we assume as commitments:

. the quality of our service, through the anticipation and satisfaction of our client's needs and expectations;

. t he quality of life of our staff and of those who interact with us, through the respect for their rights and the

prevention of work accidents and professional diseases;

. t he preservation of the Environment, through the rational use of natural resources, the prevention of pollution

and the conservation of Biodiversity;

. the sustainable growth of all the companies within the Group, through innovation and continuous

improvement of our processes and technology.

ProCME Group's Integrated Policy

September 2008

Social Economic

Environmental

Commitmentwith

Quality of Life

Commitmentwith

Quality of Service

Commitmentwith

Sustainable Growth

(Innovation)

Commitmentwith

the Protectionof the

Environment

Page 13: Quadríptico ProCME livro en 2016.cdr

CORPORATE STRATEGY

TECHNICAL CAPABILITY CULTURE OF SERVICE

ENTERPRENEURSHIP

. Rigorous and efficient management

. Focus on sustained growth

. Search for attractive investment opportunities

. Design and development of innovative services

. Customer-oriented performance

. Integrated solutions

. Flexibility and adaptability. Engineering

. Procurement

. Construction

. Operation

. Maintenance

THE COMPETITIVE EDGE

COMMITMENT WITH SUSTAINABILITY

"In ProCME Group, we want to contribute towards a more cohesive and balanced society, based upon the principles

of sustainability. Thus, we assume as commitments:

. the quality of our service, through the anticipation and satisfaction of our client's needs and expectations;

. t he quality of life of our staff and of those who interact with us, through the respect for their rights and the

prevention of work accidents and professional diseases;

. t he preservation of the Environment, through the rational use of natural resources, the prevention of pollution

and the conservation of Biodiversity;

. the sustainable growth of all the companies within the Group, through innovation and continuous

improvement of our processes and technology.

ProCME Group's Integrated Policy

September 2008

Social Economic

Environmental

Commitmentwith

Quality of Life

Commitmentwith

Quality of Service

Commitmentwith

Sustainable Growth

(Innovation)

Commitmentwith

the Protectionof the

Environment

Page 14: Quadríptico ProCME livro en 2016.cdr

ACTIVITIES

Energy Production, Transmission and Distribution

ProCME Group provides its customers with the best integrated high quality solutions.

engineering procurement construction operation maintenance

We add value

Page 15: Quadríptico ProCME livro en 2016.cdr

ACTIVITIES

Energy Production, Transmission and Distribution

ProCME Group provides its customers with the best integrated high quality solutions.

engineering procurement construction operation maintenance

We add value

Page 16: Quadríptico ProCME livro en 2016.cdr

Important completed or ongoing projects

. Engineering, supply and construction of the 42 MW Cogeneration

Power Plant for Artelia / Artenius at Sines Portugal)

. Engineering, supply and construction of the 2 x 42 MW Cogeneration

Power Plant of Sines Refinery Plant for GALP (Portugal)

. Engineering, supply and assembly of the Dessulphurisation Installation

for the 4x330 MW Coal Power Plant for EDP at Sines (Portugal)

. Engineering, supply and construction of the 2x430 MW Combined

Cycle Power Plant for EDP at Lares - Figueira da Foz (Portugal)

. Engineering, supply, construction, operation and maintenance of the

2X 25 MW Electrical Power Plant at Cazenga for the Ministery of Energy

in Luanda (Angola)

. Engineering, supply and construction of the 1X 30 MW Cogeneration

Power Plant for Portucel-Viana at Viana do Castelo (Portugal)

. Assembly of the Biomass Boiler for Portucel-Viana at Viana do Castelo

(Portugal)

. Revamping of the S. Jorge Thermo-Electrical Power Plant, with the

installation of two generators XI & XII, in Azores (Portugal)

. Alqueva II - Security and general purpose facilities of the Alqueva II

Hydraulic Power Plant (Portugal)

. Thermal Plants for the Barlavento Algarvio District Hospital (Algarve -

Portugal) for Teixeira Duarte

. Electrical Power Plant from fermentation gas in the Seixal landfill

(Portugal)

Power Generation

Customer SiteEnding Date

ARTELIA, S.A.ARTLAND PTA CHEMICAL PLANTNovember 2011

Cogeneration

Design and Construction, on a "turnkey" basis, of a

42MW Cogeneration Plant, based on one gas turbine ,

one heat recovery steam generator including fresh-air

and post firing system, and an auxiliary boiler. HV

electrical installation , including substation 60/11 ,5 kV,

MV and LV electrical installation, DCS,, , Gas Grid, incl. RM

S, Biogas Grid, Civil Works, electrical and mechanical

interconnections and ancillary services.

Modelo: General Electric - Frame 68 DLE Power: 42 MW

Main Technical Data:

Gas Turbine

HRSG

Auxiliary Boiler

Auxiliary Systems:

Model: STEINProduction: 101 bar, 135 t/h saturatedFuel: Natural gas (supplementary firing)

Model: STEINProduction: 90 t/h, 101 bar saturated

. Equipment and gas ducting including bypass and final stacks, by pass diverter damper and fresh air fans and sealing fans

. Compressed air plant

. Fire protection system

. Natural gas system, including HP, MP and LP piping and RMS and biogas system

. Piping (HP and LP steam, feed water, condensates and purges, demineralized water, industrial water and potable water,

compressed air, fire fighting water, waste water) and thermal insulation

. Metallic structures, including supports, pipe-racks, ladders, platforms, walkways and protection structures

. Electrification: 150/11 kV substation, 1* 11/6.9 kV power transformer , 1 * 6.6/0.42kV power transformer; MV and LV system, incl.

MCC's, LV distribution panel

. Command and control protection systems, including electrical system and DCS

. Civil Works

Scope of supply: Basic and detailed engineering, procurement, supply, construction, commissioning, tests, start up

and warranty follow up.

Project Price: 38 M€

Project description:

Page 17: Quadríptico ProCME livro en 2016.cdr

Important completed or ongoing projects

. Engineering, supply and construction of the 42 MW Cogeneration

Power Plant for Artelia / Artenius at Sines Portugal)

. Engineering, supply and construction of the 2 x 42 MW Cogeneration

Power Plant of Sines Refinery Plant for GALP (Portugal)

. Engineering, supply and assembly of the Dessulphurisation Installation

for the 4x330 MW Coal Power Plant for EDP at Sines (Portugal)

. Engineering, supply and construction of the 2x430 MW Combined

Cycle Power Plant for EDP at Lares - Figueira da Foz (Portugal)

. Engineering, supply, construction, operation and maintenance of the

2X 25 MW Electrical Power Plant at Cazenga for the Ministery of Energy

in Luanda (Angola)

. Engineering, supply and construction of the 1X 30 MW Cogeneration

Power Plant for Portucel-Viana at Viana do Castelo (Portugal)

. Assembly of the Biomass Boiler for Portucel-Viana at Viana do Castelo

(Portugal)

. Revamping of the S. Jorge Thermo-Electrical Power Plant, with the

installation of two generators XI & XII, in Azores (Portugal)

. Alqueva II - Security and general purpose facilities of the Alqueva II

Hydraulic Power Plant (Portugal)

. Thermal Plants for the Barlavento Algarvio District Hospital (Algarve -

Portugal) for Teixeira Duarte

. Electrical Power Plant from fermentation gas in the Seixal landfill

(Portugal)

Power Generation

Customer SiteEnding Date

ARTELIA, S.A.ARTLAND PTA CHEMICAL PLANTNovember 2011

Cogeneration

Design and Construction, on a "turnkey" basis, of a

42MW Cogeneration Plant, based on one gas turbine ,

one heat recovery steam generator including fresh-air

and post firing system, and an auxiliary boiler. HV

electrical installation , including substation 60/11 ,5 kV,

MV and LV electrical installation, DCS,, , Gas Grid, incl. RM

S, Biogas Grid, Civil Works, electrical and mechanical

interconnections and ancillary services.

Modelo: General Electric - Frame 68 DLE Power: 42 MW

Main Technical Data:

Gas Turbine

HRSG

Auxiliary Boiler

Auxiliary Systems:

Model: STEINProduction: 101 bar, 135 t/h saturatedFuel: Natural gas (supplementary firing)

Model: STEINProduction: 90 t/h, 101 bar saturated

. Equipment and gas ducting including bypass and final stacks, by pass diverter damper and fresh air fans and sealing fans

. Compressed air plant

. Fire protection system

. Natural gas system, including HP, MP and LP piping and RMS and biogas system

. Piping (HP and LP steam, feed water, condensates and purges, demineralized water, industrial water and potable water,

compressed air, fire fighting water, waste water) and thermal insulation

. Metallic structures, including supports, pipe-racks, ladders, platforms, walkways and protection structures

. Electrification: 150/11 kV substation, 1* 11/6.9 kV power transformer , 1 * 6.6/0.42kV power transformer; MV and LV system, incl.

MCC's, LV distribution panel

. Command and control protection systems, including electrical system and DCS

. Civil Works

Scope of supply: Basic and detailed engineering, procurement, supply, construction, commissioning, tests, start up

and warranty follow up.

Project Price: 38 M€

Project description:

Page 18: Quadríptico ProCME livro en 2016.cdr

Power Generation

CustomerSiteEnding Date

Sinecogeração, S.A.Galp Energia, Sines Refinery October 2009

Cogeneration

Design and Construction, on a "turnkey" basis, of a 84MW Cogeneration

Plant, based on 2 groups of gas turbines, 2 heat recovery steam

generators (boilers) including fresh-air system and post firing, HV

electrical installation , including substation 150/60/11.5 kV, MV and LV

electrical installation, Command and Control System, Civil Works, Gas

Grid, incl. RM S, Fuel Gas Grid, including MS, mechanical

interconnections and ancillary services , and maintenance services to

turbo generators for a period of 15 years.

Model: General Electric - Frame 6B DLEPower: 2 x 42MW

Main Technical Data:

Gas Turbine

HRSG

Auxiliary Systems:

Model: Foster Wheeler lberiaProduction: 83 bar, 523 ºC, 2 x 125 UhNatural gas & refinery gas for post-combustion

. Equipment and gas ducting including bypass and final stacks, bypass diverter damper, fresh air and sealing fans

. Compressed air plant

. Fire protection system

. Natural gas system, including HP, MP and LP piping and RMS

. Refinery gas system, including RMS and piping

. Piping (HP and LP steam, water feed, condensing and purging systems, demineralized water, industrial and fresh water,

compressed air, fire fighting water, waste water and thermal insulation

. Metallic structures, including supports, pipe -racks, ladders, platforms, walkways and protection structures

. Electrification: Substation 150/60/11,5 kV incl. 2 * 63 MVA power transformers & 1 * 70 MVA power transformer

. MV system, including 3 & 11,5 kV panels and 2 * 5 MVA power transformers; LV system, incl. MCC's, LV distribution panel and

1,5MVA power transformer

. Command and control protection system, including electrical system and DCS

. Civil Works

Scope of supply: Basic and detailed engineering, procurement, supply, construction, commissioning, tests, start up and

warranty follow up.

Project Price: 62,9 M€ + 21 M€ (turbo generator maintenance contract)

Project description:

Power Generation

CustomerSiteEnding Date

EDA, S.A. Electricidade dos AçoresSão Miguel, Azores2002

Thermal Power Plant

Upgrading of the Caldeirão Thermal Power Plant, including supply

and installation of 2 Diesel Engines of 17 MW each, burning heavy

fuel oil, and all auxiliary equipment. Revamping of the automation

and control system for the plant.

CME has participated in a Consortium together with Wartsila

Finland OY (generator suppliers), Etermar and Gerco (civilworks).

Manufacturer: WartsilaNominal power: 2 x 17 MWFuel: Heavy fuel oil

Main Technical Data:

Reciprocating Engine

Auxiliary Equipment (CME's responsibility):

. Fuel oil treatment plant (storage tanks, preamps, separator, metering and distribution lines)

. Lube oil plant (new and used storage tank and distribution network)

. Treatment plant heavy and oiled effluents (tank, skimmers, sludge network)

. Compressed air plant at 30 and 7 bar (compressors, tanks, filters and dryers and distribution lines)

. Filtering and calcium removers (mesh filters and carbon activated filters, pneumatic network)

. lncineration plant for oil residues (incineration, tanks, separator and skimmer)

. Exhaust gas heat recovery system (2 boilers for total steam production and auxiliary equipment, including steam distribution)

. Chemical dosage and sampling systems (analysers, dosing, pumps, chemical products tanks).

CME Scope of Supply: Detailed engineering, procurement, supply (except WSD engine & generators), construction,

commissioning, tests, start up and warranty follow up.

Project Price: 27,76 M€ (CME: 4,04 M€)

Project description:

Page 19: Quadríptico ProCME livro en 2016.cdr

Power Generation

CustomerSiteEnding Date

Sinecogeração, S.A.Galp Energia, Sines Refinery October 2009

Cogeneration

Design and Construction, on a "turnkey" basis, of a 84MW Cogeneration

Plant, based on 2 groups of gas turbines, 2 heat recovery steam

generators (boilers) including fresh-air system and post firing, HV

electrical installation , including substation 150/60/11.5 kV, MV and LV

electrical installation, Command and Control System, Civil Works, Gas

Grid, incl. RM S, Fuel Gas Grid, including MS, mechanical

interconnections and ancillary services , and maintenance services to

turbo generators for a period of 15 years.

Model: General Electric - Frame 6B DLEPower: 2 x 42MW

Main Technical Data:

Gas Turbine

HRSG

Auxiliary Systems:

Model: Foster Wheeler lberiaProduction: 83 bar, 523 ºC, 2 x 125 UhNatural gas & refinery gas for post-combustion

. Equipment and gas ducting including bypass and final stacks, bypass diverter damper, fresh air and sealing fans

. Compressed air plant

. Fire protection system

. Natural gas system, including HP, MP and LP piping and RMS

. Refinery gas system, including RMS and piping

. Piping (HP and LP steam, water feed, condensing and purging systems, demineralized water, industrial and fresh water,

compressed air, fire fighting water, waste water and thermal insulation

. Metallic structures, including supports, pipe -racks, ladders, platforms, walkways and protection structures

. Electrification: Substation 150/60/11,5 kV incl. 2 * 63 MVA power transformers & 1 * 70 MVA power transformer

. MV system, including 3 & 11,5 kV panels and 2 * 5 MVA power transformers; LV system, incl. MCC's, LV distribution panel and

1,5MVA power transformer

. Command and control protection system, including electrical system and DCS

. Civil Works

Scope of supply: Basic and detailed engineering, procurement, supply, construction, commissioning, tests, start up and

warranty follow up.

Project Price: 62,9 M€ + 21 M€ (turbo generator maintenance contract)

Project description:

Power Generation

CustomerSiteEnding Date

EDA, S.A. Electricidade dos AçoresSão Miguel, Azores2002

Thermal Power Plant

Upgrading of the Caldeirão Thermal Power Plant, including supply

and installation of 2 Diesel Engines of 17 MW each, burning heavy

fuel oil, and all auxiliary equipment. Revamping of the automation

and control system for the plant.

CME has participated in a Consortium together with Wartsila

Finland OY (generator suppliers), Etermar and Gerco (civilworks).

Manufacturer: WartsilaNominal power: 2 x 17 MWFuel: Heavy fuel oil

Main Technical Data:

Reciprocating Engine

Auxiliary Equipment (CME's responsibility):

. Fuel oil treatment plant (storage tanks, preamps, separator, metering and distribution lines)

. Lube oil plant (new and used storage tank and distribution network)

. Treatment plant heavy and oiled effluents (tank, skimmers, sludge network)

. Compressed air plant at 30 and 7 bar (compressors, tanks, filters and dryers and distribution lines)

. Filtering and calcium removers (mesh filters and carbon activated filters, pneumatic network)

. lncineration plant for oil residues (incineration, tanks, separator and skimmer)

. Exhaust gas heat recovery system (2 boilers for total steam production and auxiliary equipment, including steam distribution)

. Chemical dosage and sampling systems (analysers, dosing, pumps, chemical products tanks).

CME Scope of Supply: Detailed engineering, procurement, supply (except WSD engine & generators), construction,

commissioning, tests, start up and warranty follow up.

Project Price: 27,76 M€ (CME: 4,04 M€)

Project description:

Page 20: Quadríptico ProCME livro en 2016.cdr

Power Generation

Portucel Viana Energia, S.A.Deocriste, Viana do Castelo(ongoing)

Cogeneration

Engineering, procurement and construction, on a "turnkey" basis, of the

"Balance of Plant" of the new cogeneration plant for the pulp & paper

mill of Viana do Castelo, based on a 32 MW gas turbine (supplied by

third party), heat recovery steam generator with a production capacity

of steam at 2 pressure levels, electrification in HV, MV and LV, control

and supe rvision system, civil works, natural gas works including GRMS,

mechanical interconnections and auxiliaries.

Manufacturer: Foster Wheeler lberiaProduction: 62 barg,430 ºC,48,6 t/h;4,5 barg, 166ºC, 7,8t/hFuel: Natural gas for post-combustionFresh-Air system included

Main Technical Data:

Steam Generator

CME participation:

. Mechanical erection of boiler and all auxiliaries

. Piping (steam, water, make-up water, steam condensers, demineralized water, waste water)

. Natural gas system, including supply and erection of GRMS

. Compressed air system, incl. compressed air station detection and fire-fighting system

. Electrical installation, incl.:

. Power Transformer 15/60 kW,40 MVA

. High Voltage Electrification

. Medium Voltage Electrification, incl. auxiliary services power transformer

. Low Voltage Electrification

. Control and Supervision System

. Civil Works

Scope of Supply: Basic & detailed engineering (electricity & control), procurement, supply, construction, commissioning, start up

and warranty follow up.

Project Price: 7,6 M€ (FWI: 50,5% CME: 49,5%)

Project description:

CustomerSiteEnding Date

Power Generation

CustomerSiteEnding Date

Transgás, S.A.Transgás main building, Bucelas, Lisboa2000

Trigeneration

Engineering, procurement and construction, on a

"turnkey" basis, of a combined heat cooling and power

plant for the Transgas main offices and dispatch building

at Bucelas.

Manufacturer model: Caterpillar G3512LENominal Power: 765kWFuel: Natural Gas

Main Technical Data:

Reciprocating Engine

Auxiliary Equipment

-. Cooling Tower

. Air Coolers

. Heat Exchanger, latest model

. Pump groups

. Control and automation system

. Substation and LV and MV electrification

Scope of Supply: "Turn-Key" installation

Project Price: 0,802 M€

Equipment: Fire tube boilerFluid: Superheated water at 125°C Thermal Power: 1000 kW

Equipment: Brli Absorption Chiller, simple eject, YorkFluid: 91 m3/h, cold water at 6°CThermal Power: 517 kW

Heat Recovery

Cooling

Project description:

Page 21: Quadríptico ProCME livro en 2016.cdr

Power Generation

Portucel Viana Energia, S.A.Deocriste, Viana do Castelo(ongoing)

Cogeneration

Engineering, procurement and construction, on a "turnkey" basis, of the

"Balance of Plant" of the new cogeneration plant for the pulp & paper

mill of Viana do Castelo, based on a 32 MW gas turbine (supplied by

third party), heat recovery steam generator with a production capacity

of steam at 2 pressure levels, electrification in HV, MV and LV, control

and supe rvision system, civil works, natural gas works including GRMS,

mechanical interconnections and auxiliaries.

Manufacturer: Foster Wheeler lberiaProduction: 62 barg,430 ºC,48,6 t/h;4,5 barg, 166ºC, 7,8t/hFuel: Natural gas for post-combustionFresh-Air system included

Main Technical Data:

Steam Generator

CME participation:

. Mechanical erection of boiler and all auxiliaries

. Piping (steam, water, make-up water, steam condensers, demineralized water, waste water)

. Natural gas system, including supply and erection of GRMS

. Compressed air system, incl. compressed air station detection and fire-fighting system

. Electrical installation, incl.:

. Power Transformer 15/60 kW,40 MVA

. High Voltage Electrification

. Medium Voltage Electrification, incl. auxiliary services power transformer

. Low Voltage Electrification

. Control and Supervision System

. Civil Works

Scope of Supply: Basic & detailed engineering (electricity & control), procurement, supply, construction, commissioning, start up

and warranty follow up.

Project Price: 7,6 M€ (FWI: 50,5% CME: 49,5%)

Project description:

CustomerSiteEnding Date

Power Generation

CustomerSiteEnding Date

Transgás, S.A.Transgás main building, Bucelas, Lisboa2000

Trigeneration

Engineering, procurement and construction, on a

"turnkey" basis, of a combined heat cooling and power

plant for the Transgas main offices and dispatch building

at Bucelas.

Manufacturer model: Caterpillar G3512LENominal Power: 765kWFuel: Natural Gas

Main Technical Data:

Reciprocating Engine

Auxiliary Equipment

-. Cooling Tower

. Air Coolers

. Heat Exchanger, latest model

. Pump groups

. Control and automation system

. Substation and LV and MV electrification

Scope of Supply: "Turn-Key" installation

Project Price: 0,802 M€

Equipment: Fire tube boilerFluid: Superheated water at 125°C Thermal Power: 1000 kW

Equipment: Brli Absorption Chiller, simple eject, YorkFluid: 91 m3/h, cold water at 6°CThermal Power: 517 kW

Heat Recovery

Cooling

Project description:

Page 22: Quadríptico ProCME livro en 2016.cdr

Transmission

. Undergound network project;

. Charts / GIS;

. Records;

. Civil Works / Ground works/ Horizontal drilling;

. Electromechanical construction – Cables;

. Underground network maintenance - Malfunction Detection and

repair 60kV;

. Underground network refurbishment;

. Terminals and connection boxes.

Underground Transmission Networks - 220, 150 and 60 kV

Project, Construction and Maintenance.

Project and construction, study and elaboration of base and execution projects, installation, commissioning and startup of

underground networks, emphasising the following points:

. Substation project;

. Metallic structure project and calculation;

. Chart and map;

. Topography;

. Civil works – Outer platform;

. Civil works – Command buildings;

. Civil works – Technical buildings;

. Electromechanical works – Earth grid networks;

. Electromechanical works – Metallic structure assembly;

. Electromechanical works – HV/MV/LV equipment

installation;

. Line & Pole project and calculation;

. Charts & Maps;

. Topography;

. Records;

. Land owners;

UHV Overhead Transmission Lines - 400, 220 and 150 kV - Project,

Construction and Maintenance.

Study and elaboration of base and execution projects, erection, commissioning and startup of new UHV lines and/or up rating

(recapaciting and remodelling) of existing UHV lines, emphasising the following points:

Substations - 400, 220, 150 and 60 kV

Project, construction and maintenance.

Project and construction, study and elaboration of base and execution projects, erection, commissioning and startup of new

substations and/or remodelling/enlargement of existing substations, with emphasis on the following points:

. Electromechanical works – Rigid and flexible buffers ;

. Electromechanical works – HV/MV/LV connections;

. Electrical works – HV/MV/LV cable installation;

. Electrical works – Command, control and protection

systems installation;

. Electrical works – AC/DC Auxiliary systems installation;

. Substation recap and refurbishment;

. Turnkey Substation construction.

. Civil Works;

. Electromechanical construction – Poles;

. Electromechanical construction – Cables;

. Foundation, Poles, Cables and Accessories maintenance;

. Line refurbishment;

. Turnkey construction.

Transmission

Page 23: Quadríptico ProCME livro en 2016.cdr

Transmission

. Undergound network project;

. Charts / GIS;

. Records;

. Civil Works / Ground works/ Horizontal drilling;

. Electromechanical construction – Cables;

. Underground network maintenance - Malfunction Detection and

repair 60kV;

. Underground network refurbishment;

. Terminals and connection boxes.

Underground Transmission Networks - 220, 150 and 60 kV

Project, Construction and Maintenance.

Project and construction, study and elaboration of base and execution projects, installation, commissioning and startup of

underground networks, emphasising the following points:

. Substation project;

. Metallic structure project and calculation;

. Chart and map;

. Topography;

. Civil works – Outer platform;

. Civil works – Command buildings;

. Civil works – Technical buildings;

. Electromechanical works – Earth grid networks;

. Electromechanical works – Metallic structure assembly;

. Electromechanical works – HV/MV/LV equipment

installation;

. Line & Pole project and calculation;

. Charts & Maps;

. Topography;

. Records;

. Land owners;

UHV Overhead Transmission Lines - 400, 220 and 150 kV - Project,

Construction and Maintenance.

Study and elaboration of base and execution projects, erection, commissioning and startup of new UHV lines and/or up rating

(recapaciting and remodelling) of existing UHV lines, emphasising the following points:

Substations - 400, 220, 150 and 60 kV

Project, construction and maintenance.

Project and construction, study and elaboration of base and execution projects, erection, commissioning and startup of new

substations and/or remodelling/enlargement of existing substations, with emphasis on the following points:

. Electromechanical works – Rigid and flexible buffers ;

. Electromechanical works – HV/MV/LV connections;

. Electrical works – HV/MV/LV cable installation;

. Electrical works – Command, control and protection

systems installation;

. Electrical works – AC/DC Auxiliary systems installation;

. Substation recap and refurbishment;

. Turnkey Substation construction.

. Civil Works;

. Electromechanical construction – Poles;

. Electromechanical construction – Cables;

. Foundation, Poles, Cables and Accessories maintenance;

. Line refurbishment;

. Turnkey construction.

Transmission

Page 24: Quadríptico ProCME livro en 2016.cdr

Live Line

. Recap and refurbishment of 220 and 150 kV lines;

. Insulator cleaning by means of demineralised water;

. Insulator cleaning by means of organic particles;

. Live Line works;

. Live Line insulator chain replacement;

. Live Line buffer installation / replacement;

. Live Line marking spheres installation / replacement.

Live Line Technology - 400, 220, 150, 60, 30, 15, 10, 6 and 0,4kV

Execution of live line works in: overhead transmission and distribution lines; substations; distribution networks, with the use of

specific procedures in all parts of the installations and with highly trained and qualified staff. All works are subject to specific

studies for the evaluation of execution possibilities.

Some of the important aspects are as follows:

Distribution

. network project;

. radialization networks;

. underground cable testing and diagnostic;

. insulator cleaning - lines;

. insulator cleaning - substations;

. insulator chain replacement;

. rigid insulator replacement;

. disconnecting switch conservation;

. disconnecting switch replacement;

. OCR, IAR, DAR, etc assembly;

. branch connection;

HV/MV/LV Distribution

. arc installation / replacement;

. line replacement;

. anti-nesting device installation;

. pole replacement.

. insulator replacement;

. cable installation / replacement;

. service failure repair.

. construction / conservation / maintenance of

LV/MV/HV/VHV installations in Portugal.

. live line works

. Transformer Substation project;

. Transformer Substation refurbishment;

. Hotspot detection;

. Anomaly detection;

. Transformer substation cleaning and maintenance;

. Transformer substation total conservation;

. Component replacement;

. Earth connection improvement.

Cleaning and Maintenance of Transformer Substations

Execution of all inspection and diagnostic works

(verifications, tests and measurements) in all substation

parts. Elaboration of inspection protocols, indicating the

kind of intervention needed according to the anomalies

observed. Preventive and corrective maintenance

planning.

Page 25: Quadríptico ProCME livro en 2016.cdr

Live Line

. Recap and refurbishment of 220 and 150 kV lines;

. Insulator cleaning by means of demineralised water;

. Insulator cleaning by means of organic particles;

. Live Line works;

. Live Line insulator chain replacement;

. Live Line buffer installation / replacement;

. Live Line marking spheres installation / replacement.

Live Line Technology - 400, 220, 150, 60, 30, 15, 10, 6 and 0,4kV

Execution of live line works in: overhead transmission and distribution lines; substations; distribution networks, with the use of

specific procedures in all parts of the installations and with highly trained and qualified staff. All works are subject to specific

studies for the evaluation of execution possibilities.

Some of the important aspects are as follows:

Distribution

. network project;

. radialization networks;

. underground cable testing and diagnostic;

. insulator cleaning - lines;

. insulator cleaning - substations;

. insulator chain replacement;

. rigid insulator replacement;

. disconnecting switch conservation;

. disconnecting switch replacement;

. OCR, IAR, DAR, etc assembly;

. branch connection;

HV/MV/LV Distribution

. arc installation / replacement;

. line replacement;

. anti-nesting device installation;

. pole replacement.

. insulator replacement;

. cable installation / replacement;

. service failure repair.

. construction / conservation / maintenance of

LV/MV/HV/VHV installations in Portugal.

. live line works

. Transformer Substation project;

. Transformer Substation refurbishment;

. Hotspot detection;

. Anomaly detection;

. Transformer substation cleaning and maintenance;

. Transformer substation total conservation;

. Component replacement;

. Earth connection improvement.

Cleaning and Maintenance of Transformer Substations

Execution of all inspection and diagnostic works

(verifications, tests and measurements) in all substation

parts. Elaboration of inspection protocols, indicating the

kind of intervention needed according to the anomalies

observed. Preventive and corrective maintenance

planning.

Page 26: Quadríptico ProCME livro en 2016.cdr

Global References to Completed Works

. UHV Line Construction

2.500 km

. UHV Underground Line Construction

288 km

. HV Line Construction

2.000 km

. UHV Line Recap/Refurbishment

2.800 km

. UHV Substation Construction

180

. HV Substation Construction

230

. UHV Substation Recap/Refurbishment

245

. HV Substation Recap/Refurbishment

420

. UHV Live Line Interventions

20.000

Renewable Energy

TECNEIRA - The Forefront of Renewable Energy

Tecneira Group is the brand of ProCME Group for the

renewable energy sector. It is dedicated to the

exploitation of renewable natural resources for energy

production and its marketing.

The Group's activity is the promotion, licensing,

construction and operation of power generation

projects from renewable energy sources.

In addition to Tecneira, established in 2000, the Group

has corporate vehicle companies associated with each

production center, established with the aim of exploring

the energy sales business.

Page 27: Quadríptico ProCME livro en 2016.cdr

Global References to Completed Works

. UHV Line Construction

2.500 km

. UHV Underground Line Construction

288 km

. HV Line Construction

2.000 km

. UHV Line Recap/Refurbishment

2.800 km

. UHV Substation Construction

180

. HV Substation Construction

230

. UHV Substation Recap/Refurbishment

245

. HV Substation Recap/Refurbishment

420

. UHV Live Line Interventions

20.000

Renewable Energy

TECNEIRA - The Forefront of Renewable Energy

Tecneira Group is the brand of ProCME Group for the

renewable energy sector. It is dedicated to the

exploitation of renewable natural resources for energy

production and its marketing.

The Group's activity is the promotion, licensing,

construction and operation of power generation

projects from renewable energy sources.

In addition to Tecneira, established in 2000, the Group

has corporate vehicle companies associated with each

production center, established with the aim of exploring

the energy sales business.

Page 28: Quadríptico ProCME livro en 2016.cdr

The optimisation of power source consumption is nowadays one of the

main concerns of the tertiary and industrial sectors of the developed

world.

Aware of this reality, CME has provided its Energy Services sector with

the capability to find specific power supply solutions.

In the scope of the power production, CME has developed financial

packages offering incentives to the installation of cogeneration units in

which it participates as an investor or co-investor.

In the scope of this activity, we highlight the following kinds of services:

. Audits of energy efficiency;

. Technical and economic feasibility studies;

. Management and centralised operation of cogeneration units;

. Cogeneration units;

. Thermal and combined cycle plants;

. Biomass plants;

. Fermentation gas electrical plants from waste water and landfill

sites;

. Natural gas compression plants.

Designing specific energy solutions

Energy Services Gas Pipelines

Tailor-made solutions for any project

Endowed with highly qualified personnel and technical

means, CME was consortium leader and responsible for

the coordination of the consortium companies, along

with the Technical Office, Quality and Environmental

Management, with a high level of requirements in

coordination and intensive use of specific equipment, in

the construction of the gas pipeline between Sines and

Setúbal.

This infrastructure, both essential and strategic to the

national energy system, allows for the interconnecting

of the Sines Natural Gas Terminal with the national gas

duct network as well as the Underground Natural Gas

Storage at Carriço, in Pombal.

Page 29: Quadríptico ProCME livro en 2016.cdr

The optimisation of power source consumption is nowadays one of the

main concerns of the tertiary and industrial sectors of the developed

world.

Aware of this reality, CME has provided its Energy Services sector with

the capability to find specific power supply solutions.

In the scope of the power production, CME has developed financial

packages offering incentives to the installation of cogeneration units in

which it participates as an investor or co-investor.

In the scope of this activity, we highlight the following kinds of services:

. Audits of energy efficiency;

. Technical and economic feasibility studies;

. Management and centralised operation of cogeneration units;

. Cogeneration units;

. Thermal and combined cycle plants;

. Biomass plants;

. Fermentation gas electrical plants from waste water and landfill

sites;

. Natural gas compression plants.

Designing specific energy solutions

Energy Services Gas Pipelines

Tailor-made solutions for any project

Endowed with highly qualified personnel and technical

means, CME was consortium leader and responsible for

the coordination of the consortium companies, along

with the Technical Office, Quality and Environmental

Management, with a high level of requirements in

coordination and intensive use of specific equipment, in

the construction of the gas pipeline between Sines and

Setúbal.

This infrastructure, both essential and strategic to the

national energy system, allows for the interconnecting

of the Sines Natural Gas Terminal with the national gas

duct network as well as the Underground Natural Gas

Storage at Carriço, in Pombal.

Page 30: Quadríptico ProCME livro en 2016.cdr

Gas

CME has major clients in all the Portuguese gas distribution companies

as well as Transgás. In Brazil, CME is one of the main service suppliers of

the CEG in Rio de Janeiro.

CME provides its clients with a wide range of services which cover all

the spectrum of this activity.

. Network project and installation;

. Turnkey projects;

. Consumer sales and installations;

. Total gas distribution to urban and industrial centres;

. Pipeline construction;

. Construction of primary and secondary networks;

. Domestic, industrial and tertiary installation construction;

. GRMS;

. Gas exchange;

. Facilities and equipment conversion;

. Construction of caverns to store natural gas;

. LNG gas distribution units.

At the service of gas distribution companies and their customers

Telecommunications

In this area of activity, with an annual turnover of over 30

million Euros, CME has established partnerships with a

huge selection of telecommunication operators,

technology manufacturers and utilities, regarding

implementation, maintenance and infrastructure

operations, along with telecommunication systems.

The profitability of the operators is intimately connected

to the dimension of the customer, average invoicing,

infrastructures and system implementation and

operation costs, along with engagement costs,

installation, fidelity and customer post-sale assistance.

Regarding this reality and expecting to supply its

customers with a vast range of services and solutions in

every area of business, CME has set multidisciplinary

teams adjusted to the needs of every client, aiming at

understanding and offering in an integrated form, the

best services at the best prices, in the following

activities:

. Conception and project;

. Construction and recast;

. Supplying of Equipment and materials;

. Installation, configuration and testing;

. System Integration;

. Preventive and corrective maintenance;

. Operation and Supervision;

. Commercial Services;

. Logistics Provisioning, Stocks Management,

Transportation and Distribution;

. Turn-key projects management.

A serious presence in all the areas of telecommunications

. Fixed Networks STF, ISP, STD, FWA, Triple Play,

PLC

. Mobile Networks GSM, GPRS, CDMA, iMODE,

UMTS, WI-FI, TRUNKING, TETRA

. Cable TV Networks (RDC/TVC)

. Corporative Networks

. Communication Systems associated with Utilities’

Infrastructures

Business Areas

Products and Services

. Auxiliary Infrastructures

. Sites, POP's, Access Points, Call Centres, Stores,

Offices, Warehouses

. Cable Networks

. Telecommunications Engineering Services

. Networking

. Voice, Data and Video - wired and wireless

. Commercial Services

Page 31: Quadríptico ProCME livro en 2016.cdr

Gas

CME has major clients in all the Portuguese gas distribution companies

as well as Transgás. In Brazil, CME is one of the main service suppliers of

the CEG in Rio de Janeiro.

CME provides its clients with a wide range of services which cover all

the spectrum of this activity.

. Network project and installation;

. Turnkey projects;

. Consumer sales and installations;

. Total gas distribution to urban and industrial centres;

. Pipeline construction;

. Construction of primary and secondary networks;

. Domestic, industrial and tertiary installation construction;

. GRMS;

. Gas exchange;

. Facilities and equipment conversion;

. Construction of caverns to store natural gas;

. LNG gas distribution units.

At the service of gas distribution companies and their customers

Telecommunications

In this area of activity, with an annual turnover of over 30

million Euros, CME has established partnerships with a

huge selection of telecommunication operators,

technology manufacturers and utilities, regarding

implementation, maintenance and infrastructure

operations, along with telecommunication systems.

The profitability of the operators is intimately connected

to the dimension of the customer, average invoicing,

infrastructures and system implementation and

operation costs, along with engagement costs,

installation, fidelity and customer post-sale assistance.

Regarding this reality and expecting to supply its

customers with a vast range of services and solutions in

every area of business, CME has set multidisciplinary

teams adjusted to the needs of every client, aiming at

understanding and offering in an integrated form, the

best services at the best prices, in the following

activities:

. Conception and project;

. Construction and recast;

. Supplying of Equipment and materials;

. Installation, configuration and testing;

. System Integration;

. Preventive and corrective maintenance;

. Operation and Supervision;

. Commercial Services;

. Logistics Provisioning, Stocks Management,

Transportation and Distribution;

. Turn-key projects management.

A serious presence in all the areas of telecommunications

. Fixed Networks STF, ISP, STD, FWA, Triple Play,

PLC

. Mobile Networks GSM, GPRS, CDMA, iMODE,

UMTS, WI-FI, TRUNKING, TETRA

. Cable TV Networks (RDC/TVC)

. Corporative Networks

. Communication Systems associated with Utilities’

Infrastructures

Business Areas

Products and Services

. Auxiliary Infrastructures

. Sites, POP's, Access Points, Call Centres, Stores,

Offices, Warehouses

. Cable Networks

. Telecommunications Engineering Services

. Networking

. Voice, Data and Video - wired and wireless

. Commercial Services

Page 32: Quadríptico ProCME livro en 2016.cdr

Geographic Information Systems

The information technologies at the disposal of substructure operation

Today, the quality of the public operational

management of utilities depends on the accuracy and

credibility of the information included in the portfolios.

Aware of this reality and aiming at providing its clients

with a wide range of solutions in all its activities, CME

has created the Geographic Information Systems (GIS)

activity.

With the most sophisticated equipment and counting

on a highly qualified team, the company has the

capacity to design, install and launch into service, on a

turnkey basis, any kind of geographical information

system.

In the scope of this activity, CME operates in the

following areas:

. Information systems service implementation;

. Definition of data patterns;

. Validation and conversion of infrastructures

records;

. Configuration of computer equipment;

. Geo-reference of elements;

. Integration of information in computing Systems;

. Cartography validation.

UAV - Unmanned Aerial Vehicle

Innovation on safety

UAV ENGINEERING . WE GO HIGHER

Services

Monitoring Airlines, pipelines, wind turbines,

photovoltaic plants, among others, maintaining safety

distances, especially in areas of limited access.

Features

. Image Capture

. Video Capture

. Collection of thermographic images and

videos

. Presentation of detailed technical reports of

engineering and safety

Applications

Monitoring and Inspection

. visual inspection of MV, HV and UHV

overhead lines

. inspection of supporting frames, moorings,

etc.

. inspections of MV and HV overhead lines

protection lanes - thicket

. thermography - Reports

. wind turbine monitoring

. visual and thermographic inspections to

photovoltaic parks - hotspot Identification

. building art work inspection - bridges and

viaducts

. railway infrastructure - catenary

. refinery inspection

GeoEngineering

. aerial images

. aerophotogrammetric coverage

. orthophotomaps

. cartography

. volume calculations

. thermal analysis of crops

. digital terrain model

. As-Builts

Specialized services

. line of sight study for Telecom sites

. site surveys - structural and safety

. LIDAR

An experienced team with high capacity in the

analysis of the assets to inspect / monitor.

Page 33: Quadríptico ProCME livro en 2016.cdr

Geographic Information Systems

The information technologies at the disposal of substructure operation

Today, the quality of the public operational

management of utilities depends on the accuracy and

credibility of the information included in the portfolios.

Aware of this reality and aiming at providing its clients

with a wide range of solutions in all its activities, CME

has created the Geographic Information Systems (GIS)

activity.

With the most sophisticated equipment and counting

on a highly qualified team, the company has the

capacity to design, install and launch into service, on a

turnkey basis, any kind of geographical information

system.

In the scope of this activity, CME operates in the

following areas:

. Information systems service implementation;

. Definition of data patterns;

. Validation and conversion of infrastructures

records;

. Configuration of computer equipment;

. Geo-reference of elements;

. Integration of information in computing Systems;

. Cartography validation.

UAV - Unmanned Aerial Vehicle

Innovation on safety

UAV ENGINEERING . WE GO HIGHER

Services

Monitoring Airlines, pipelines, wind turbines,

photovoltaic plants, among others, maintaining safety

distances, especially in areas of limited access.

Features

. Image Capture

. Video Capture

. Collection of thermographic images and

videos

. Presentation of detailed technical reports of

engineering and safety

Applications

Monitoring and Inspection

. visual inspection of MV, HV and UHV

overhead lines

. inspection of supporting frames, moorings,

etc.

. inspections of MV and HV overhead lines

protection lanes - thicket

. thermography - Reports

. wind turbine monitoring

. visual and thermographic inspections to

photovoltaic parks - hotspot Identification

. building art work inspection - bridges and

viaducts

. railway infrastructure - catenary

. refinery inspection

GeoEngineering

. aerial images

. aerophotogrammetric coverage

. orthophotomaps

. cartography

. volume calculations

. thermal analysis of crops

. digital terrain model

. As-Builts

Specialized services

. line of sight study for Telecom sites

. site surveys - structural and safety

. LIDAR

An experienced team with high capacity in the

analysis of the assets to inspect / monitor.

Page 34: Quadríptico ProCME livro en 2016.cdr

Water and Sanitation

A wide range of services

In the scope of this activity, CME offers a wide range of services. Among

them, we point out:

. Construction and maintenance of water feeder pipes;

. Construction and maintenance of water Networks;

. Distribution network refurbishment;

. Water treatment facilities;

. Household assistance;

. Telemanagement systems installation;

. Detection and repair of leakages.

CME has the human, technical and financial capabilities to take

complete charge of the design and construction of Water Treatment

and Sanitation Facilities, on a turnkey basis, along with energy systems

based on organic or inorganic waste materials.

. Water treatment facilities;

. Biologic based wastewater treatment facilities;

. Wastewater treatment facilities;

. Domestic, industrial & rain drainage networks;

. Cogeneration for biogas.

. Fresh and salt water networks, fire fighting, ballast water,

acetylene, oxygen and compressed air networks;

Water Treatment Plants

Environmental Projects

CME is one of the few companies with the capacity to

fully implement multi disciplinary projects with high

incorporation of technology and an environmentally

responsible attitude.

Construction and environmental management in very

diverse areas such as:

. Soil decontamination project and work;

. Building and substructure construction and

maintenance;

. Environmental management systems

implementation in CME’s intervention areas;

. Water and waste water treatment environmental

systems project conception, construction,

implementation and management, with or without

self financing;

. New technology search and implementation,

namely in bio-mass, construction residue and

building demolition.

Responsible planning & design, incorporating a high level oftechnology and environmental awareness.

Page 35: Quadríptico ProCME livro en 2016.cdr

Water and Sanitation

A wide range of services

In the scope of this activity, CME offers a wide range of services. Among

them, we point out:

. Construction and maintenance of water feeder pipes;

. Construction and maintenance of water Networks;

. Distribution network refurbishment;

. Water treatment facilities;

. Household assistance;

. Telemanagement systems installation;

. Detection and repair of leakages.

CME has the human, technical and financial capabilities to take

complete charge of the design and construction of Water Treatment

and Sanitation Facilities, on a turnkey basis, along with energy systems

based on organic or inorganic waste materials.

. Water treatment facilities;

. Biologic based wastewater treatment facilities;

. Wastewater treatment facilities;

. Domestic, industrial & rain drainage networks;

. Cogeneration for biogas.

. Fresh and salt water networks, fire fighting, ballast water,

acetylene, oxygen and compressed air networks;

Water Treatment Plants

Environmental Projects

CME is one of the few companies with the capacity to

fully implement multi disciplinary projects with high

incorporation of technology and an environmentally

responsible attitude.

Construction and environmental management in very

diverse areas such as:

. Soil decontamination project and work;

. Building and substructure construction and

maintenance;

. Environmental management systems

implementation in CME’s intervention areas;

. Water and waste water treatment environmental

systems project conception, construction,

implementation and management, with or without

self financing;

. New technology search and implementation,

namely in bio-mass, construction residue and

building demolition.

Responsible planning & design, incorporating a high level oftechnology and environmental awareness.

Page 36: Quadríptico ProCME livro en 2016.cdr

Industrial Installations

Experience and rigour

In the last few years, our industry and maintenance activities registered

an important growth, as a result of the work developed by the team

responsible for its management. CME is able to provide its clients with

the following services:

. Design and execution of active security installations;

. Instrumentation;

. Installation of electromechanical equipment;

. Design and construction of electrical installations;

. Systems installation and maintenance;

. Design and construction of communications installations.

Carriço Underground Gas Storage

This project, attributed by Transgás – Sociedade Portuguesa de Gás

Natural, to a Consortium formed by CME/KBB/KOCH/BPC, comprised

two phases: the construction of caves in saline formations (rock salt),

located at a depth of about 1.000m, with a total capacity of over

250.000 cubic meters and, afterwards, the construction of a Natural Gas

Compression Plant. CME’s participation consisted on conceptual and

detail engineering of special installations, equipment supply and

assembly, the supervision and commissioning, throughout the

guarantee period, of all Low Voltage and High Voltage aboveground

electrical installations, security and surveillance systems, pipeline

construction and assembly and main fluids network components

(water, gas and nitrogen).

Desulphurisation in the Thermal Power Plant at Sines

A large project in the field of environmental requalification of thermal

power plants, the desulphurisation unit in the Sines thermal power

plant, with an installed capacity well over 1200 MW, allows the

processing of exhaust gases originating in coal combustion. It’s a

turnkey project, with a CME/Hitachi/Cobra consortium.

Industrial Maintenance

Integrated competence

Operating in the B2B Portuguese market, ProCME Group

companies guarantee its customers, through pro-active

and need anticipation positioning, equipment,

installation and production systems operativity.

With a highly qualified team, with large innovative

capabilities, we perform in the following areas:

. Facilities maintenance - Operation, conduction,

organization and global maintenance of equipment

and facilities;

. Facilities management - Management and global

technical services in facilities, equipment and

Infrastructures;

. Civil Works and Rehabilitation Works;

. Maintenance, management, coordination and

organisation (outsourcing);

. Management of maintenance contracts:

. Preventive, programmed or conditioned

maintenance;

. Permanent prevention to insure corrective

maintenance 24 hours per day, 365 days a year;

. Facilities technical conduction;

. Management of third part contracts with the

Customer;

. Equipment repair in workshop;

. Facilities rehabilitation;

. Project Engineering.

. Installation and equipment rehabilitation within the

scope of general maintenance policies.

Page 37: Quadríptico ProCME livro en 2016.cdr

Industrial Installations

Experience and rigour

In the last few years, our industry and maintenance activities registered

an important growth, as a result of the work developed by the team

responsible for its management. CME is able to provide its clients with

the following services:

. Design and execution of active security installations;

. Instrumentation;

. Installation of electromechanical equipment;

. Design and construction of electrical installations;

. Systems installation and maintenance;

. Design and construction of communications installations.

Carriço Underground Gas Storage

This project, attributed by Transgás – Sociedade Portuguesa de Gás

Natural, to a Consortium formed by CME/KBB/KOCH/BPC, comprised

two phases: the construction of caves in saline formations (rock salt),

located at a depth of about 1.000m, with a total capacity of over

250.000 cubic meters and, afterwards, the construction of a Natural Gas

Compression Plant. CME’s participation consisted on conceptual and

detail engineering of special installations, equipment supply and

assembly, the supervision and commissioning, throughout the

guarantee period, of all Low Voltage and High Voltage aboveground

electrical installations, security and surveillance systems, pipeline

construction and assembly and main fluids network components

(water, gas and nitrogen).

Desulphurisation in the Thermal Power Plant at Sines

A large project in the field of environmental requalification of thermal

power plants, the desulphurisation unit in the Sines thermal power

plant, with an installed capacity well over 1200 MW, allows the

processing of exhaust gases originating in coal combustion. It’s a

turnkey project, with a CME/Hitachi/Cobra consortium.

Industrial Maintenance

Integrated competence

Operating in the B2B Portuguese market, ProCME Group

companies guarantee its customers, through pro-active

and need anticipation positioning, equipment,

installation and production systems operativity.

With a highly qualified team, with large innovative

capabilities, we perform in the following areas:

. Facilities maintenance - Operation, conduction,

organization and global maintenance of equipment

and facilities;

. Facilities management - Management and global

technical services in facilities, equipment and

Infrastructures;

. Civil Works and Rehabilitation Works;

. Maintenance, management, coordination and

organisation (outsourcing);

. Management of maintenance contracts:

. Preventive, programmed or conditioned

maintenance;

. Permanent prevention to insure corrective

maintenance 24 hours per day, 365 days a year;

. Facilities technical conduction;

. Management of third part contracts with the

Customer;

. Equipment repair in workshop;

. Facilities rehabilitation;

. Project Engineering.

. Installation and equipment rehabilitation within the

scope of general maintenance policies.

Page 38: Quadríptico ProCME livro en 2016.cdr

HVAC and Building Services

This CME activity began in 1996, including specialised services in

heating, ventilation and air conditioning (HVAC), cold and hot water

networks, fire fighting systems, residual water and domestic pluvial

networks and also the so-called special installations like labs and

compressed air and steam networks.

The launch of this service has enabled CME to fill a gap in its portfolio of

services and attract new business through the provision of this service

in conjunction with related activities.

Multidisciplinary capacity

Contacts

Associated Companies

Tecneira / effect

Rua Rui Teles Palhinha, 4

Leião

2748-278 Porto Salvo

Portugal

Tel.: (+351) 21 423 37 70

Fax: (+351) 21 423 37 89

CME África / CME Angola

Polo Industrial de Viana,

Km20 – Armazéns 3 e 4

Município de Viana

Luanda – Angola

Tel. (+244) 222 719 162

CME Sucursal en España, S.A.

José Abascal, 56

28003 Madrid

España

Tel.: (+34) 91 576 39 99

Fax: (+34) 91 319 15 62

CME Cabo Verde

- Sociedade Unipessoal, S.A.

Edifício Lua Nova, 1º. Esq.

Achada de Sto. António

Cidade da Praia

Cabo Verde

Tel.: (+238) 2601604

Fax: (+238) 2625151

CME Perú, S.A.

Calle Luís Carranza

2235 Lima

Perú

Tel.: (+51) 1 336 9000/336 7968

UAV Engineering

Rua Rui Teles Palhinha, 4

Leião

2748-278 Porto Salvo

Portugal

Tel.: (+351) 21 423 31 00

Fax: (+351) 21 423 31 99

Inovantis, S.A.

Av. Agostinho Neto, n. 326

Maputo Business Center

Maputo

Moçambique

Tel. (+258) 214 98318 / (+258) 214 98319

OPTIC 1 Powerlines (PTY) Ltd

60 Amelia Lane

Lanseria Corporate Estate

Ext 46 - Lanseria, 9999

Republic of South Africa

Tel. (+27) 087 805 5743/4

Fax (+27) 086 558 1809

ProCME - Gestão Global de Projectos, S.A.

CME - Construção e Manutenção Electromecânica, S.A.

Rua Rui Teles Palhinha, 4 - Leião

2740-278 Porto Salvo

Portugal

Tel.: (+351) 21 423 31 00

Fax: (+351) 21 423 31 99

[email protected] www.procme.pt

Head-Offices

RESTEL

34, Rue de L´Erier – 73 290 La Motte

Servolex

France

Tél: (+33) 04 80 47 02 87

Page 39: Quadríptico ProCME livro en 2016.cdr

HVAC and Building Services

This CME activity began in 1996, including specialised services in

heating, ventilation and air conditioning (HVAC), cold and hot water

networks, fire fighting systems, residual water and domestic pluvial

networks and also the so-called special installations like labs and

compressed air and steam networks.

The launch of this service has enabled CME to fill a gap in its portfolio of

services and attract new business through the provision of this service

in conjunction with related activities.

Multidisciplinary capacity

Contacts

Associated Companies

Tecneira / effect

Rua Rui Teles Palhinha, 4

Leião

2748-278 Porto Salvo

Portugal

Tel.: (+351) 21 423 37 70

Fax: (+351) 21 423 37 89

CME África / CME Angola

Polo Industrial de Viana,

Km20 – Armazéns 3 e 4

Município de Viana

Luanda – Angola

Tel. (+244) 222 719 162

CME Sucursal en España, S.A.

José Abascal, 56

28003 Madrid

España

Tel.: (+34) 91 576 39 99

Fax: (+34) 91 319 15 62

CME Cabo Verde

- Sociedade Unipessoal, S.A.

Edifício Lua Nova, 1º. Esq.

Achada de Sto. António

Cidade da Praia

Cabo Verde

Tel.: (+238) 2601604

Fax: (+238) 2625151

CME Perú, S.A.

Calle Luís Carranza

2235 Lima

Perú

Tel.: (+51) 1 336 9000/336 7968

UAV Engineering

Rua Rui Teles Palhinha, 4

Leião

2748-278 Porto Salvo

Portugal

Tel.: (+351) 21 423 31 00

Fax: (+351) 21 423 31 99

Inovantis, S.A.

Av. Agostinho Neto, n. 326

Maputo Business Center

Maputo

Moçambique

Tel. (+258) 214 98318 / (+258) 214 98319

OPTIC 1 Powerlines (PTY) Ltd

60 Amelia Lane

Lanseria Corporate Estate

Ext 46 - Lanseria, 9999

Republic of South Africa

Tel. (+27) 087 805 5743/4

Fax (+27) 086 558 1809

ProCME - Gestão Global de Projectos, S.A.

CME - Construção e Manutenção Electromecânica, S.A.

Rua Rui Teles Palhinha, 4 - Leião

2740-278 Porto Salvo

Portugal

Tel.: (+351) 21 423 31 00

Fax: (+351) 21 423 31 99

[email protected] www.procme.pt

Head-Offices

RESTEL

34, Rue de L´Erier – 73 290 La Motte

Servolex

France

Tél: (+33) 04 80 47 02 87

Page 40: Quadríptico ProCME livro en 2016.cdr

Electricity - Transmission & Distribution

Renewable Energy

Energy Services

Gas - Transport & Distribution

Environment, Water & Sanitation

Installations

Industrial Maintenance

Integrated Substructures

Telecommunications

Geographic Information Systems (GIS)

HVAC & Building Services

UAV - Unmanned Aerial Vehicle

www.procme.pt

we plan we build we manage