QUARTERLY REPORT April-June 2006 QUARTERLY REPORT April – June 2006 Done by the Management Contractor The 15-th of July 2006 _______________ Patrick LORIN

Upload: vuonghanh

Post on 30-May-2018

291 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

QUARTERLY REPORT

April – June 2006

Done by the Management Contractor The 15-th of July 2006

_______________ Patrick LORIN

Page 2: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

2

TABLE OF CONTENTS

1. OPERATIONS .................................................................................................................. 4

1.1 COMMERCIAL ............................................................................................................... 5

1. QUARTERLY ACTIVITIES ............................................................................................................................. 6

2. PLANNING OF THE NEXT QUARTER .......................................................................................................... 8

DIAGRAMS 1-6 ................................................................................................................................................... 8

BILLING AND COLLECTION TABLE-1 .......................................................................................................... 12

COLLECTION OF AWS CJSC FOR APRIL-JUNE 2006 TABLE -2, DIAGRAM-7 ........................................ 13

NUMBER OF WATER METERS INSTALLED BY AWS CJSC ON DATE 01.07. 2006 - TABLE 3 ............ 14

1.2 W O R K S .................................................................................................................... 15

BULK FLOW METERS PROGRAM ................................................................................................................. 16

FILTERS INSTALLATION PROGRAM ............................................................................................................ 16

CHLORINATION PROGRAM ......................................................................................................................... 17

WORKS ON THE NETWORK .......................................................................................................................... 18

PROJECTS ....................................................................................................................................................... 19

REHABILITATION OF ASSET BUILDINGS .................................................................................................... 21

SUMMARY TABLE OF BULK FLOW-METER INSTALLATION AND HANDOVER (AS OF 01.07.2006)

TABLE-4 ............................................................................................................................................................ 22

1.3 TECHNICAL ................................................................................................................. 24

TECHNICAL INVESTIGATIONS .................................................................................................................... 25

ASSETS DIVISION ......................................................................................................................................... 26

WATER QUALITY CONTROL .......................................................................................................................... 26

POTABLE WATER INVESTIGATION IN I QUARTER, 2006 – TABLE 5 ....................................................... 27

NATURE PROTECTION .................................................................................................................................. 29

ENVIRONMENTAL UTILIZATION & PROTECTION FEES BY THE REGIONS AND SECTORS TABLE-6 . 29

CONTAMINANTS VOLUME THREW TO WATER BASIN TABLE-7 ............................................................ 31

MAPPING .......................................................................................................................................................... 32

1.4 OPERATION & MAINTENANCE ................................................................................. 33

OPERATION & MAINTENANCE WORKS .................................................................................................... 34

OPERATION & MAINTENANCE OF WATER TRANSMISSION AND DISTRIBUTION SYSTEMS TABLE-

8, DIAGRAM-8,9 .............................................................................................................................................. 36

MAINTENANCE OF WESTWATER COLLECTION SYSTEMS TABLE-9 .................................................... 37

Page 3: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

3

DIAGRAMS-10,11 ............................................................................................................................................. 38

NETWORK ANALYSING TABLE - 10 ........................................................................................................... 39

DIAGRAMS – 12,13 ......................................................................................................................................... 40

DIAGRAMS - 14,15 .......................................................................................................................................... 41

WATER PRODUCTION & LOSSES TABLE-11 .............................................................................................. 42

DIAGRAMS – 16,17 .......................................................................................................................................... 45

WATER DELIVERED THROUGH PUMPING AND CORRESPONDING ELECTICITY CONSUMPTION ...... 46

TABLE- 12 ......................................................................................................................................................... 46

DIAGRAMS – 18,19 .......................................................................................................................................... 47

PROGRESS OF THE WATER METERS EQUIPMENT INSTALLATION BY THE AWS CJSC IN ITS

MAINTENANCE AREA TABLE- 13, DIAGRAM 20 ......................................................................................... 48

DISINFECTANT RECORDS IN II QUARTER 2006 TABLE- 14 .................................................................. 49

ELECTRICITY CONSUMPTION & EXPENSES TABLE-15,16 ..................................................................... 51

ELECTRICITY CONSUMPTION & EXPENSES IN PERIOD OF 13 LAST MONTHS DIAGRAM - 21 ......... 51

2. FINANCE & ACCOUNT ................................................................................................. 52

SUBSIDY TABLE-17 ........................................................................................................................................ 53

CONCERNING INCOMES AND EXPENSES OF AWS CJSC IN II QUARTER, 2006 TABLE-18 ............... 54

3. HUMAN RESOURCES ................................................................................................... 55

ACTIVITIES PERFORMED BY HUMAN RESOURCES DEPARTMENT DURING II QUARTER 2006 ......... 56

INFORMATION CONCERNING AWSC PERSONNEL DIAGRAM – 23 ......................................................... 56

TRAINING AND DEVELOPMENT .................................................................................................................. 57

4. PUBLIC RELATION ....................................................................................................... 59

ON ACTIVITIES IMPLEMENTED BY THE PUBLIC RELATIONS DEPARTMENT ........................................ 60

5. WB PROCUREMENT ..................................................................................................... 64

PROCUREMENT MANAGEMENT AND PROGRESS REPORT APRIL-JUNE 2006 ..................................... 65

6. LEGAL & INSURANCE .................................................................................................. 66

BRIEF DESCRIPTION OF ACTIVITIES AND RESULTS OF LEGAL AND INSURANCE DIVISION IN THE 67

SECOND QUARTER OF 2006 ......................................................................................................................... 67

7. INDICATORS ................................................................................................................. 68

INDICATORS RECAPITULATION – TABLE 20, (INDICATORS 1-25) .......................................................... 70

Page 4: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

4

1. OPERATIONS

Page 5: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

5

1.1 COMMERCIAL

Page 6: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

6

1. QUARTERLY ACTIVITIES

ORGANIZATION

Organizational Structure

At present the introduction of Head Office Commercial

Department has been completed and the Department operates in

compliance with its structure.

Procedures Manual

Upon reviewing and taking into account the comments, in May 2006 the procedures manual was

finalized, the responsible persons approved and put into operation the final version of the manual.

From July 15, 2006 it is planned to start training of IT Department employees of Head

Office(about 20 days) after which starting mid August the specialists of Head Office will conduct

similar trainings in the regional branches.

Contractual agreements with Banks and Post Offices

Starting May 2006 cash collection is fully controlled by banks and HayPost offices. Manual

collection by controllers is prohibited. New agreement was signed with “Ardshininvestbank” for

water supply and discharge services, water meters and for other collections. The agreements with

“Armsavingsbank” and HayPost were revised.

IT EQUIPMENT AND SOFTWARE

Software Upgrade

Currently new VAT rules is applied in the company and monthly reports are being prepared for

VAT payment.

Internet access and Web site

Web Site design works are completed. Upon entry of information the last recapitulated version will

be submitted to the management. DSL connection will be installed in the AWSC internal IT

Network and each of the users will have access to internet with @armwater.am email address.

Access to Internet will be ensured from August 2006.

From August 1, 2006 it is planned to introduce in the Company’s Head Office the antivirus

licensed package (Symantic) for 1 server and 25 computers (users).

Page 7: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

7

MANAGEMENT CHART – ANALYSIS OF DATA

Revenue Collection

In the 2nd

quarter of 2006 AMD 563.5 million was collected. As compared with previous period an

increase tendency is noticed (AMD 34.8 million more than in the 1st quarter), though the company

is still far from its objectives. Actions are being carried out to increase revenue collections due to

massive disconnections and communication campaign starting from March, 2006.

In June 2006, 91.645 customers paid their invoices (as compared with 68.122 in June 2005). During

June 2006, 100% of payments were made through banks and HayPost offices, (as compared with

28.4 % of June 2005).

Revenue / Sales Ratio

Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a target of

98%: we are collecting for these customers (around 50% of the total number of active customers)

part of the last year uncollected amounts in addition to the current invoices. Even from the first

sight it is clear that the increase of collection level is directly proportional to the installation of

water meters. At present the water meters installation procedure is progressing slowly the main

reason of which is the delay in acquiring of water meters.

Sales Analysis

With increasing of number of customers with meters we can note a decrease of average

consumption for residential customers with meters as compared to last year same period, except for

the sectors where the time supply schedule was increased.. In order to improve the quality of

billing, and reaching realistic and accurate figure, we have fixed the target to 0 residential

customers with diameter of pipe method of calculation for 2006.

The application of the RA Decree N2250-Ü dd 22.12.2005 in the company, though very slowly, is

almost completed (even under conditions of water meters absence).

Commercial Department of the company makes visits to the sectors by choice directed at

adjustment of formed revenue. It is planned to make an inventory of the customers which is a vital

issue. A pilot project shall be implemented in the nearest future in one of the sector by means of

the company after which in the whole company by external financing.

SPECIFIC ACTIONS

Inspections

As part of the monitoring of Commercial activities, as well as on the request of branch managers,

customer surveys were conducted in various sectors during the quarter. The following sectors were

visited:

In the South Region: Kapan, Meghri

In the Center-West Region: Masis

In the North-West Region: Hrazdan, Aparan,

In the North-East Region: Alaverdi, Stepanavan, Tashir.

Page 8: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

8

There is an improvement of the situations encountered: there is less and less unsealed connections,

readings are more coherent with the existing data in the application. In case of detecting violations,

situations are immediately corrected, but still there is a room for improvement.

Despite evident changes there are still problems in the company connected with billing.

Struggle against illegal connections becomes a daily problem and has a continuous character.

Connected with irrigation season the struggle becomes more complicated and work consuming.

In the areas not having irrigation system, potable water is used for irrigation purposes.

Legal Actions

A verdict was delivered concerning “Armentel” of Jermuk and AMD 2108.6 thousand was charged.

2. PLANNING OF THE NEXT QUARTER

Completion of training in regard to Commercial policy and procedures

Customers inventory recording

Checking by choice

Please, see below a diagrams concerning the quarterly activity.

DIAGRAMS 1-6

Page 9: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

9

DIAGRAM 1

Revenue Collection - Distribution of Payments by Type

125

38

313229

80

3

194184

144

173

5

150

121

147

195187182

197

178

153

179

85

0

50

100

150

200

250

Jan.0

5

Dec.

05

Jan.0

6

Feb.0

6

Mar

.06

Apr

.06

May

.06

Jun.0

6

Jul.0

6

Aug.0

6

Sep.0

6

Oct

.06

Nov

.06

Dec.

06

Mil

lio

ns A

MD

Cash Bank & Post Total

DIAGRAM 2

Number of Payments

85,507

91,645

85,646

89,53889,525

83,337

79,841

52,997

40,000

50,000

60,000

70,000

80,000

90,000

100,000

Ja

n.0

5

De

c.0

5

Ja

n.0

6

Fe

b.0

6

Ma

r.0

6

Ap

r.0

6

Ma

y.0

6

Ju

n.0

6

Ju

l.0

6

Au

g.0

6

Se

p.0

6

Oct.

06

No

v.0

6

De

c.0

6

Nu

mb

er

of

Pa

ym

en

ts

Number of Customers receiving services : around 170.000

Page 10: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

10

DIAGRAM 3

Bil l ing & Revenue Collection

(Collection n, Billing n-1)

311324

347360 359

336

312 303

153179

85

178197 182 187

195

0

50

100

150

200

250

300

350

400

Jan.05 Dec.05 Jan.06 Feb.06 Mar.06 Apr.06 May.06 Jun.06 Jul.06 Aug.06 Sep.06 Oct.06 Nov.06 Dec.06

Millio

ns A

MD

Billing Revenue Collection

DIAGRAM 4

Billing, collection and ratio %

for customers with water meters

778

638504

374

249

124

1,242

72

517

800

11147

1,211

239

385

656

90%

98%

96%

103% 102% 103%103%

65%

0

200

400

600

800

1,000

1,200

1,400

Jan.05 Dec.05 Jan.06 Feb.06 Mar.06 Apr.06 May.06 Jun.06 Jul.06 Aug.06 Sep.06 Oct.06

Millio

ns A

MD

50%

60%

70%

80%

90%

100%

110%

120%

130%

Billing Revenue Collection Ratio

Page 11: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

11

DIAGRAM 5

2,135

1,593

3,268

1,599

4,624

1,834 1,945

1,092

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

Millio

ns A

MD

2003 2004 2005 As at 06/2006

Cummulative Billing & Collection

Billing Revenue Collection

DIAGRAM 6

Juridical Persons Revenue Collection Follow-up

397,663

85,14574,668

86,347

151,503

102.5%

98.6%

86.2%

90.7%93.4% 92.1%

103.3%

109.8%

103.1%

93.2%

105.0%

99.3%96.3%

104.6%

91.2%

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

AWSC North West North East Center West South

60%

70%

80%

90%

100%

110%

120%

130%

140%

Juridical Persons Cumulative Billing Budget Ratio Other Economic Ratio Global Ratio

Page 12: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

12

BILLING AND COLLECTION TABLE-1 mln AMD

# Month

2004* 2005 2006

Total

Collection

Total

Collection

Including The% of

expenses done

in branches in

compliance

with collection

Total

Collection

Including The% of

expenses

done in

branches in

compliance

with

collection

Transferred

to AWSC

Used in

branches

Transferred

to AWSC

Used in

branches

1 January 99 85 60 25 29% 153 151 2 1%

2 February 97 115 93 22 19% 178 175 3 2%

3 March 146 121 120 1 1% 198 195 3 1%

4 April 130 129 128 1 1% 182 180 2 1%

5 May 128 134 132 2 2% 187 185 2 1%

6 June 172 169 168 1 1% 195 193 2 1%

7 July 154 169 168 1 0%

8 August 150 184 182 2 1%

9 September 141 185 182 3 2%

10 October 126 178 173 6 3%

11 November 116 184 182 2 1%

12 December 141 179 177 2 1%

Total 1 600 1 834 1 765 69 4% 1 092 1 078 14 1%

Notes* The data of “Vanadzor”, ”Shirak”, “Armavir” and “Yeghvard” branches are not included in this table.

Page 13: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

13

COLLECTION OF AWS CJSC FOR APRIL-JUNE 2006 TABLE -2, DIAGRAM-7 1000 AMD

# SECTORS TOTAL BILLING TOTAL COLLECTION % 1 2 3 4 5

1 Abovyan 67 080 47 246 70.4%

2 Charentsavan 28 904 21 005 72.7%

3 Hrazdan 83 646 25 013 29.9%

4 Ashtarak 50 096 26 261 52.4%

5 Artik 43 083 28 866 67.0%

TOTAL NORTH-WEST REGION 272 809 148 391 54.4%

6 Sevan 13 293 10 735 80.8%

7 Dilijan 13 769 9 962 72.3%

8 Ijevan 24 836 19 346 77.9%

9 Gavar 69 673 27 103 38.9%

10 Alaverdi 39 356 16 237 41.3%

11 Spitak 33 291 26 116 78.4%

TOTAL NORTH-EAST REGION 194 219 109 500 56.4%

12 Masis 68 142 38 602 56.6%

13 Artashat 54 997 30 052 54.6%

14 Vedi 51 232 36 864 72.0%

15 Echmiadzin 79 419 57 366 72.2%

TOTAL CENTER-WEST REGION 253 789 162 884 64.2%

16 Eghegnadzor 19 417 17 048 87.8%

17 Sisyan 36 331 28 371 78.1%

18 Goris 46 367 19 460 42.0%

19 Kapan 102 691 77 863 75.8%

TOTAL SOUTH REGION 204 807 142 741 69.7%

TOTAL 925 624 563 516 60.9%

54%

56%

64%

70%61%

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

Nor th Wes t Region Nor th Eas t Region Center Region South Region Total

Page 14: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

14

NUMBER OF WATER METERS INSTALLED BY AWS CJSC on date 01.07. 2006 - TABLE 3

Units

# REGIONS & SECTORS Total count of

Water meters

Including

TOTAL

installed in

II quarter Residential

customers

Juridical

persons

1 2 3 4 5 6

1 Abovyan 18 912 18 487 425 214

2 Charentsavan 7 758 7 521 237 187

3 Hrazdan 8 523 8 110 413 600

4 Ashtarak 7 151 6 909 242 168

5 Artik 4 889 4 642 247 138

TOTAL NORTH-WEST REGION 47 233 45 669 1 564 1 307

6 Sevan 6 118 5 880 238 122

7 Dilijan 2 504 2 415 89 20

8 Ijevan 6 063 5 837 226 214

9 Gavar 5 409 5 133 276 199

10 Alaverdi 8 048 7 879 169 301

11 Spitak 9 147 8 842 305 253

TOTAL NORTH-EAST REGION 37 289 35 986 1 303 1 109

12 Artashat 9 761 9 487 274 362

13 Masis 5 957 5 654 303 100

14 Vedi 8 369 8 181 188 318

15 Echmiadzin 14 402 13 980 422 489

TOTAL CENTER-REGION 38 489 37 302 1 187 1 269

16 Sisyan 4 666 4 446 220 39

17 Eghegnadzor 5 613 5 233 380 141

18 Goris 4 544 4 389 155 60

19 Kapan 12 478 11 949 529 554

TOTAL SOUTH REGION 27 301 26 017 1 284 794

TOTAL 150 312 144 974 5 338 4 479

Page 15: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

15

1.2 W O R K S

Page 16: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

16

BULK FLOW METERS PROGRAM

PIU CONTRACT

The program, seriously delayed by the winter and by a late rainy season until end of April, is now on

the last run for completion, finally.

* The package 1 ( SYUNIK -VAYOTS DZOR ) has been completed recently .

* The package 2 ( KOTAYK-GEGHARKUNIK-TAVUSH ) is still under process.

* The package 3 ( LORI - SHIRAK ) is almost ready to be completed.

* The package 4 ( ARMAVIR - ARAGATSOTN ) is still under process.

* The package 5 ( ARARAT ) is almost completed, few installation remaining.

See attached revised table for understand the actual situation of the handover process (Table-7, page 22).

The number of broken turbines on mechanical flow meters has increased a lot since the end of 2005

due to the lack of filters. The total approximate number of broken turbines has reached the level of 73

at the end of June.

The mixing of the indicators on electro-magnetic flow meters is still in process of re-installation on the

correct locations. Those who have been re-located are giving now accurate information on the real

flow.

FILTERS INSTALLATION PROGRAM

USAID - CONTRACT

* The installation of filters on package 1 has been fully completed.

* Installation still on process for the other packages but almost ready to be completed (end of July

maximum).

* Several control visits have been organized with USAID on the sites to check the conformity of the

installation with the design. The general remark concern the external coating that has to be replaced in

most of the locations due to none or bad application.

* The civil works for extension of chambers, due to insertion of filters are still on process in some

locations but almost completed.

* One more time, the deadline fixed with the Constructors at the meeting of March 31-th with USAID,

has not been hold. BULK FLOW METERS

RIGHT INSTALLATION OF FILTERS AND FLOW METERS

Page 17: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

17

CHLORINATION PROGRAM

AWSC SELF FINANCING

* AWSC has completed a series of 80 "packs" for twin bottles as presented in the first quarterly report.

* These new packs are ready to be used on site as soon as the civil works of the chlorination rooms

will be completed.

* 20 points are now ready to receive the new equipments and two are already installed in Tashir and

Sisyan.

* The remaining 20 points are under process of checking and evaluation and the works already started

for some and scheduled for the rest on July and August.

* In parallel of this program AWSC has re-started the rehabilitation of the bottles and containers and

has proceeded to the technical control of 40 bottles and 8 containers but will finish this technical visit

as soon as the totality of the 120 bottles and 13 containers will have transited back to the factory for

re-filling (end of August or September for the last remaining bottles).

* Since July and until September AWSC will have implemented on its own means the 40 new

chlorination equipments in the four Regions and will be able from there to check and follow the good

level of CL injected on each point with the expected possibility to better the quantity and the schedule

of CL delivered on site.

* The training of the CL operators will complete the process until obtaining a fully controlled process

with an effective traceability of the events permitting to react quickly with the appropriate measures.

PACKS FOR BOTTLES

Top of new “packs” for bottles.

Sets of new “packs” ready for use.

Bottom of new “packs” for

bottles.

Page 18: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

18

REMARK* Each pack is identified with reference number.

Each bottle is identified with reference number.

Each bottle should be have the technical control with certificate.

The exact weight of Chl contained in a pack is given by AWSC digital

dynamometer at each delivery on site.

A transportation form for each delivery have signed by the factory, the crane

driver and the operator of Chl on each delivery point with the exact weight of

Chl supplied.

The reverse operation is done when the empty bottles are returned to factory

and we can know every residual quantity of Chl if its happen.

WORKS ON THE NETWORK

During the second quarter of 2006 the total quantity of replaced pipes has been 8 800m. The main

quantity has been done with PE pipes due to the fact that the choices have been done on the worst

portions of lines. The use of PE is right where the length of the line or the section is compatible with

the length of the repair. As much as possible the choice of PE will be done when a complete line can

be replaced after one two or three successive repairs. Other punctual repairs continue to be done using

steel pipes.

The progress of the replacement of the old unusable systems will be done in accordance with the

actual self financing capacity of the Company, mainly based on the level of the collection for the

second half of the year.

One of the essential objectives of AWSC is to go on with all works permitting the increase of the

water delivery through all possible gravity option at first and by regulation and adjustment of pumped

water in all other systems.

* ALAVERDI - AKORI by-pass on SARAHART main delivery pipe DN 300mm: since several years one

huge portion of the mountain in Akori sector is sliding down creating interruption of gas pipeline and

irrigation pipeline. The water pipeline until today could resist to the soil strength but was repaired

several times and recently, after winter, an extreme tension was applied on the pipe which is ready to

break at any moment. AWSC made decision to anticipate this critical eventuality of a main breakage

stopping water in all Sarahart district during a long period for reconstruction. The pipe will be laid

superficially above the ground by using a translation system on concrete beams. The new steel pipe

will be DN 273mm on 220m length.

* Pilot project in ARTASHAT

AWSC decided to rehabilitate the ring pipes (240m of 57mm, 30m of 89mm) in the basement of 4

buildings in view to evaluate the impact on the distribution and on the collection. Immediately after

this renovation the water could reach the 5th

floor. An economic analysis will be produced after the

establishment of real data based on the indices of the 30 main flow-meters given by the Municipality.

The result of this analysis will be interesting by giving a good base for next actions.

Page 19: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

19

* A capital repair has been done on GARNI supply line between the captage and the chlorination due to

a big breakage on the DN 600mm cast iron damaging a little later a second pipe DN 500mm. The lines

are now operational after 24h of half production for Artashat area.

GARNI

DN 600 breakage

DN 600+500 breakage

* Civil works repairs on one of the ABOVYAN reservoirs. Preparation works done by AWSC but

process still on the way due to the administrative delays of the tender process.

PROJECTS

INTERNAL DESIGN

* MARTUNI gravity project ( 2,5 km DN 500mm ) has been given for construction, by tender, to local

Constructor and will be implemented very soon under AWSC supervision.

* The second and final step of GISHSAR additional captage ( 25 l/s), has been completed, the PE pipe

has been put underground and backfilled. The seasonal variations of these captages seem to be directly

connected to a brave raining regime giving short return in the quantity of available water.

* ARGEL semi-gravity project has been submitted to tender and will be implemented soon.

* SEVAN boreholes project started on May 28-th and the drilled depth reached on June 30-th was:

- 77 m for BH 1

- 88 m for BH 2

The static water level was reach at about - 72m of depth.

Page 20: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

20

SEVAN BOREHOLES

Borehole #1 in Ltchashen village

Borehole #2

* DZEKENGET new captages for gravity delivered to Sevan have just been implemented and should be

realized in July with the hope to give an additional 40 l/s. This additional quantity will reach the town

very partially if the resolution of the technical and mainly commercial losses is not implemented

immediately on the Sevan's lake shore where the situation is confused.

* ALAVERDI - AGARAK supplying pipe from captage to Areghi chlorination point has been inspected in

detail and a profile established. According to the resultant hydraulic gradient for all distance on 8 km,

the possibility to built a by-pass for using an existing DN 600mm on the last 1,5 km of the line could

facilitate the transit and increase the actual flow from 95 l/s up to 150 l/s. In this case, the totality of

the flow ( 320 l/s ) from Loriberd captage will be used for Alaverdi-Noyemberyan line with a new

regulation. This job is under implementation.

* ALAVERDI - SARAHART district local replacement of distribution network in the frame of leaking

lines for buildings combined with restructuring of the main line DN 500mm between Alaverdi and

Noyemberyan. This re-construction consist in main repairs, removal of illegal connections, installation

of diverse working gate valves, removal of strangulated portions on DN 500mm by giving full size to

the line from Alaverdi to Noyemberyan.

* HRAZDAN DN 500mm by-pass in Andranik Avenue will reduce a big permanent leakage (15 l/s) by

laying a DN 500mm on 200m.

* CHF has delayed the starting of KAPAN-SISYAN-APARAN rehabilitation projects for administrative

questions. But the starting should be end of July for KAPAN, the others following a little after.

* In South region the following projects are under implementation or started:

- GETAP ; SHATIN ; GORIS AVANGAR ; JERMUK FOR WATER.

- JERMUK FOR SEWERAGE.

* Ararat sewerage new connection DN 400mm on 250m of length was laid in May to solve the

sanitary aspects and huge blockages downstream the military camp and buildings area.

Page 21: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

21

CIVIL WORKS

* All regions have prepared the supports for the fences designed according to scheduled priorities.

AWSC is ready to install the totality of the 6 500m of new fence with its own means. This job should

be completed before winter. Unfortunately the total distance needed is largely above this scheduled

quantity and numerous areas including many capatages will not have sanitary fences.

* In the South region a permanent activity for cleaning, small repairs, rehabilitation has been

implemented by the Regional Director in many sites like captages, reservoirs, pumping stations etc.,

giving a better image of the installations and participating to preventive and curative maintenance.

REHABILITATION OF ASSET BUILDINGS

* The civil works implemented for the rehabilitation of the building under WB financing are complied

for the Head Office and almost finished in Abovyan including additional works. Still ongoing in

Artashat, but completion scheduled for middle of August. Sisyan has been completed since May.

Page 22: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT April-June 2006

22

SUMMARY TABLE OF BULK FLOW-METER INSTALLATION AND HANDOVER (as of 01.07.2006) TABLE-4

PA

CK

AG

E

RE

GIO

N

Qu

an

tity

of

flow

-met

ers TECHNICAL STATE OF FLOW-METER POINTS

Rea

dy f

or

Han

dover

Rem

oved

by s

ecto

r or

by l

oca

l co

mm

un

ity

Not installed

Tota

l

Not

Inst

all

ed a

nd

Dis

man

tled

Tota

l

for

Han

dover

(4+

10)

Flo

w-m

eter

s

work

ing, w

ith

min

or

def

ects

Flo

w-m

eter

s n

ot

work

ing, an

d/o

r w

ith

con

stru

ctio

n a

nd

inst

all

ati

on

def

ects

Flo

w-m

eter

(or

turb

ine)

bro

ken

Inst

all

ati

on

of

flow

-

met

er p

oin

ts i

n

pro

cess

Du

e to

sec

tor'

s

ob

ject

ion

to t

he

dia

met

er c

hose

n

du

e to

imp

oss

ibil

ity t

o

emp

ty t

he

pip

elin

e

up

on

AW

SC

's

pro

posa

l

wit

hin

con

tract

def

ined

per

iod

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PACKAGE 1 VAYOTS DZOR 17 8 1 1 9 2 6

SYUNIK 44 18 4 1 4 9 27 3 14

Total 61 26 4 1 5 10 36 5 20

PACKAGE 2

KOTAYK 51 9 4 21 25 34 14 3

GEGHARKUNIK 52 21 1 16 17 38 9 5

TAVUSH 30 10 2 2 12 15 3

Total 133 40 3 16 4 21 44 84 38 11

PACKAGE 3 LORI 87 50 7 7 57 25 4 1

SHIRAK 63 13 19 10 5 34 47 12 3 1

Total 150 63 19 10 7 5 41 104 37 7 2

PACKAGE 4 ARMAVIR 113 43 12 1 6 19 62 46 4 1

ARAGATSOTN 53 25 1 2 3 28 14 11

Total 166 68 13 1 8 22 90 60 15 1

PACKAGE 5 ARARAT 129 87 8 8 95 14 20

TOTAL 639 284 39 27 6 27 26 125 409 154 73 3

Page 23: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT April-June 2006

23

1.Flow-meters are accepted by

AWSC; the flow-meter equipment

not installed are to be handed over

to the Company

Total points accepted: 409 points, including: 39 removed and 86 not

installed

2.Flow-meters will be accepted

after eliminating small defects

3.Flow-meters will be accepted

after correcting construction faults

and /or/ restarting /testing/ the

flow-meters

154 points

4.Out-of-order flow-meters must

be repaired or replaced

73 flow-

meters

5. Flow-meters will be accepted after the completion of works

3 points

Page 24: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT April-June 2006

24

1.3 TECHNICAL

Page 25: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT April-June 2006

25

THE FUNCTIONS OF THE TECHNICAL DEPARTMENT FOR II QUARTER 2006 INCLUDED:

TECHNICAL INVESTIGATIONS

1. On site studies of the water supply and wastewater

systems of Eghegnadzor, Goris, Tashir, Stepanavan

cities included in II and III tender packages of the works

being implemented in expenses of the World Bank

means. As a result, projection of the parts of the water

supply and wastewater systems to be repaired and

reconstructed on the cadastre maps of the settlements.

2. Development of the technical reference for II and III packages of the programs being

implemented in expenses of the World Bank means.

3. Preparation of bidding packages for each branch for the works being implemented by the

contract DW/SW-04/005 “Protection of sanitary zones of the water supply systems” signed

with “ArmWaterDesign Institute” CJSC.

4. Development of draft technical references for improvement of water supply and wastewater

systems of Artashat, Kapan, Hrazdan, which should be implemented in expenses of the

USAID finances.

5. Development of a suggestion for improvement of water supply systems of Norashen,

Geghadir, Gandzak, Koghb, Bjni communities, which should be included in the programs for

the State budget for 2007.

6. Presentation of a suggestion to the SCWE concerning acceptance of repair works carried out

in AWSC CJSC by means of the State budget and the decrees of the Government by the

“Water Sector Development and Improvements PIU” SI in 2004.

7. On site study for improvement of water supply and wastewater in Meghri city, mapping of

the operating system of the city and presentation of a suggestion.

8. Development of a suggestion and cost estimate for reconstruction of the water supply

systems of Surenavan, Armash, Eraskh villages.

9. Study of the new track for the main from Lchashen borehole to Sevan DSR, preparation of

the layouts and grade profiles for the selected tracks, development of cost estimates for two

options.

10. Development of a draft design for the buildings of the AWSC and development of cost

estimates for two selected options.

11. Development of a grade profile for Martuni-Tsakkar main and implementation of a hydraulic

calculation.

12. Study of Lori Berd- Agarak water supply systems and development of a grade profile of the

main including hydraulic calculation.

13. Development of a program for improvement of the sewerage collectors, internal networks

and WWTP of Vardenis, Martuni, Gavar, Sevan, Hrazdan and Echmiadzin.

14. Execution of on-going assignments and letters.

Page 26: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT April-June 2006

26

ASSETS DIVISION

In compliance with the RA Government decrees preliminary

works have been carried out to transfer irrigation systems

property to the Water Users Unions for free use. The property

has been transferred to the “State Committee of Water

Economy Staff” State Enterprise. Preparation of documents for including the privatized property in the composition of assets of

regional branches and for making relevant accounting transactions in order to submit

clarifications to the RA Ministry of Finance and Economy.

Preparation of the “Methodological Manual” for registering property rights of water systems of

the “AWSC” CJSC regional branches.

Transfer of documents on fixed assets (subject to alienation) belonging to the “AWSC” CJSC to

the “WSC” CJSC.

Carry out works directed at transfer of property from “Irrigation” CJSC to the “AWSC” CJSC

for free operation connected with “Eghegnadzor” sector of the “South” regional branch.

Works are being implemented for labeling the property of the company and preparation of the

lists on labeled property.

Fulfillment of current assignments and tasks.

WATER QUALITY CONTROL

As compared with the previous checking (November, December, 2005) improvement trends have

been recorded in respect to the above mentioned works, especially in Charentsavan, Stepanavan,

Vedi, Eghegnadzor and Meghri sectors.

The works have been started to implement on compulsory washing and disinfection of water supply

systems, including daily regulating reservoirs.

The results of potable water and wastewater examinations of many years have been summarized and

presented in “EKVATEK- 2006” conference held in Moscow from May 30 - June 2.

Water quality control laboratories of the company have examined

about 4.48 thous. samples during the II Quarter (see the table # 5 ).

According to the microbiological indicators, the deviations made

7 %.

Exercise control over the procedure of potable water disinfection

in the North-East, Central-West and South regional branches, over

the procedure of water quality analysis, as well as the existence of

registers and the order of their filling.

Page 27: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

27

POTABLE WATER INVESTIGATION IN QUARTER II, 2006 – TABLE 5

# SECTORS

NAME

NUMBER OF SAMPLES TAKEN AND FAILED

REGARDING CHLORINE RESIDUAL RELEVANT TO WATER MICROBIOLOGY

in entrance of

distribution network in distribution network

Requirement PLACE OF

WATER

INTAKE

in distribution network

total does't correspond

to norms

town village town village

total failed total failed town village total does't correspond

to norms total

does't correspond

to norms

NORTH-WEST

1 Abovyan 400 28 - - 22 - 183 42 10 314 0 60 45

2 Hrazdan 126 - 105 0 - - 312 18 14 373 14 26 0

3 Charentsavan - - - - - - 183 48 - - - - -

4 Ashtarak - - 152 27 - - 243 78 12 203 17 93 35

5 Artik 155 15 1 167 7 214 74 246 198 4 515 0 204 29

TOTAL 681 43 1 424 34 236 74 1 167 384 40 1 405 31 383 109

NORTH-EAST

1 Sevan 60 11 72 10 - - 186 60 18 242 9 12 0

2 Gavar 1 510 60 441 0 4 0 405 66 120 317 17 36 1

3 Ijevan 550 10 186 25 18 6 147 26 - - - - -

4 Dilijan 510 0 40 2 - - 90 - 12 18 0 - -

5 Alaverdi 154 18 179 15 59 4 108 132 33 117 14 19 3

6 Spitak 234 51 130 49 4 1 156 72 3 93 32 - -

TOTAL 3 018 150 1 048 101 85 11 1 092 336 186 787 72 67 4

CENTER-WEST

1 Artashat 17 0 243 3 45 0 936 300 16 119 5 252 6

2 Echmiadzin 207 58 282 35 160 36 528 222 38 360 16 160 17

3 Masis 102 10 184 32 50 14 45 84 - - - - -

4 Vedi 61 0 502 0 49 - 36 75 - - - - -

TOTAL 378 68 1211 70 304 50 1 545 681 54 479 21 412 23

Page 28: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

28

# SECTORS

NAME

NUMBER OF SAMPLES TAKEN AND FAILED

REGARDING CHLORINE RESIDUAL RELEVANT TO WATER MICROBIOLOGY

in entrance of

distribution network in distribution network

Requirement PLACE OF

WATER

INTAKE

in distribution network

total does't correspond

to norms

town village town village

total failed total failed town village total does't correspond

to norms total

does't correspond

to norms

SOUTH

1 Sisyan 126 0 177 0 29 0 45 12 - 44 3 6 1

2 Goris 308 8 299 19 8 2 270 36 - 119 6 6 0

3 Kapan 299 11 1 956 113 22 0 1 029 6 18 650 41 14 3

4 Eghegnadzor 362 0 234 0 76 0 105 18 14 78 0 30 0

TOTAL 1 095 19 2 666 132 135 2 1449 72 32 891 50 56 4

TOTAL 5 172 280 6 349 337 760 137 5 253 1 473 312 3 562 174 918 140

REMARK * 1. The calculation of demand has been done according to the bacteriological analysis schedule, which is approved by the branches and agreed upon with the State Hygienic and

Anti-epidemic inspectorates.

Page 29: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

29

NATURE PROTECTION

The nature protection and natural resources usage

reports (calculations) presented by the Branches of the

Company in the II Quarterly Report for 2006 have

been revised and registered in the Nature protection

Department of RA Nature Protection Ministry.

The calculated natural resources usage fee is about 6.1

mln. AMD, nature protection fee – 5.1 mln. AMD,

about 0.99 mln. AMD was accumulated by ratio “3”

(see the table #6).

The volume of hazardous substances discharged into the water basins was BOD – 125.6 t,

suspended substances – 110.8, ammonium – 3.1 t, (see the table #7).

ENVIRONMENTAL UTILIZATION & PROTECTION FEES BY THE REGIONS AND SECTORS TABLE-6

REGIONS,

SECTORS

REGISTERED

ENVIRONMENTAL UTILIZATION FEES

(thous AMD)

REGISTERED

ENVIRONMENTAL PROTECTION FEES

(thous AMD

SURFACE (river)

WATER

GRAVITY

WATER TOTAL

WITH RATIO

“1”

WITH RATIO

“3” TOTAL

NORTH-WEST

Abovyan - 511.7 511.7 - - -

Hrazdan 10.7 440.5 451.2 390.6 - 390.6

Charentsavan - 277.8 277.8 - - -

Ashtarak - 320.0 320.0 259.5 - 259.5

Artik - 144.4 144.4 94.4 172.2 266.6

TOTAL 10.7 1 694.4 1 705.1 744..5 172.2 916.7

NORTH-EAST

Sevan - 311.8 311.8 175.7 - 175.7

Gavar - 557.1 557.1 394.2 - 394.2

Ijevan 18.2 143.7 161.9 271.3 - 271.3

Dilijan 35.4 5.9 41.3 123.7 - 123.7

Alaverdi - 355.7 355.7 213.4 - 213.4

Spitak - 356.8 356.8 324.1 - 324.1

TOTAL 53.6 1 731.0 1 784.6 1 502.4 - 1 502.4

Page 30: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

30

REGIONS,

SECTORS

REGISTERED

ENVIRONMENTAL UTILIZATION FEES

(thous AMD)

REGISTERED

ENVIRONMENTAL PROTECTION FEES

(thous AMD

SURFACE (river)

WATER

GRAVITY

WATER TOTAL

WITH RATIO

“1”

WITH RATIO

“3” TOTAL

CENTER-WEST

Artashat - 346.8 346.8 200.9 274.3 475.2

Echmiadzin - 459.5 459.5 447.4 156.2 603.6

Masis - 192.2 192.2 261.1 - 261.1

Vedi - 206.1 206.1 254.1 3.3 257.4

TOTAL - 1 204.6 1 204.6 1 163.5 433.8 1 597.3

SOUTH

Sisyan - 303.6 303.6 128.3 10.5 138.8

Goris - 378.8 378.8 113.3 258.2 371.5

Kapan - 274.9 274.9 379.3 86.7 466.0

Eghegnadzor - 481.0 481.0 123.9 26.5 150.4

TOTAL - 1438.3 1438.3 744.8 381.9 1126.7

MAIN TOTAL 64.3 6 068.3 6 132.6 4 155.2 987.9 5 143.1

Page 31: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

31

CONTAMINANTS VOLUME THREW TO WATER BASIN TABLE-7

SECTORS /

SUBSECTORS

NAME

TON / QUARTER

BOD5 RELATED SUBSTANCES AMMONIUM

IN FACT PMO IN FACT PMO IN FACT PMO

Hrazdan 12.45 12.77 6.08 25.75 0.490 1.02

Tsakhkadzor 0.95 0.47 0.25 0.94 0.020 0.09

Ashtarak 4.56 6.15 4.21 12.62 0.070 0.62

Aparan 1.07 2.58 0.87 5.28 0.010 0.15

Talin 1.53 1.45 1.44 2.23 0.010 0.09

Artik 4.11 1.49 4.51 3.05 0.160 0.25

Ashotsk 0.25 0.39 0.23 0.61 0.003 0.01

Sevan 2.00 5.85 0.98 11.79 0.080 1.09

Gavar 3.10 6.78 2.70 13.67 0.040 0.45

Martuni 1.80 3.23 0.90 6.51 0.070 0.26

Vardenis 2.70 3.37 2.10 6.80 0.060 0.27

Tchambarak 0.30 1.80 0.20 2.77 0.005 0.11

Ijevan 4.60 5.03 4.40 10.32 0.100 0.64

Berd 0.70 2.45 0.60 5.03 0.006 0.13

Dilijan 3.40 4.16 3.20 8.52 0.070 0.39

Alaverdi 4.30 5.41 4.00 11.10 0.080 0.58

Noyemberyan 0.20 1.94 0.10 2.98 0.002 0.12

Spitak 0.06 3.96 2.60 8.11 0.040 0.32

Stepanavan 2.70 4.16 2.60 8.39 0.090 0.58

Tashir 0.40 2.82 0.20 5.64 0.006 0.17

Artashat 11.72 6.75 10.34 13.84 0.170 0.67

Echmiadzin 17.90 15.07 17.3 30.90 0.300 1.25

Masis 7.63 8.71 6.38 17.85 0.240 1.22

Vedi 2.42 2.82 2.42 5.78 0.080 0.33

Ararat 5.75 5.69 5.11 11.67 0.100 0.66

Sisyan 4.55 4.36 4.80 8.80 0.070 0.29

Goris 8.10 3.75 8.83 7.69 0.220 0.68

Kapan 11.66 10.09 8.74 20.35 0.390 1.68

Meghri 0.44 1.21 0.49 2.48 0.010 0.12

Agarak 1.33 1.38 1.49 2.83 0.040 0.14

Eghegnadzor 1.01 1.98 0.95 4.05 0.003 0.22

Vayk 0.87 1.60 0.81 3.28 0.020 0.13

Jermuk 1.07 0.59 1.01 1.18 0.001 0.03

TOTAL 125.63 140.26 110.84 282.81 3.056 14.76

REMARK * Exceeding of PMO (Permitted Maximum Outlet) is conditioned by the absent of

WCS (Waste water Cleaning Stations), OBR- Oxygen Biological Requirement.

The actual volumes of detrimental substances discharged into the waters will be

clarified upon making examination of the wastewaters in the laboratories being

set up in four regional branches.

Page 32: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

32

MAPPING

Training was held on AutoCAD & MapInfo for 5 specialists of North-East, North-West, Center-West

and South regions for digitizing water and sewerage networks for cities and villages of Armenia.

For this purpose, maps were exported from AutoCAD to MapInfo, processed, printed and

sent to the mentioned regions.

SOUTH : Sisian, Meghri, Agarak, Eghegnadzor, Goris, Jermuk, Vayk, Kapan, Shatin ,Uyts Ashotavan,

Khot, Harjis, Shinuhayr.

NORTH-EAST: Sevan, Dilijan, Ijevan, Gavar, Alaverdi, Martuni, Vardenis, Chkalovka, Lchashen,

Karmir, Noratus, Akhtala, Tumanyan, Aygehat, Arevatsag.

NORTH-WEST: Abovyan, Ashtarak, Hrazdan, Byureghavan, Alapars, Ohanavan, Sasunik

CENTER-WEST: Echmiadzin, Tsakhkunk, Hovtamej, Arevshat, Artimet, Haytagh.

During the training trainees digitized and completed water and sewerage networks of Lchashen

and Tsakhkunk villages and Byureghavan and Sisian cities.

Pilot Project of Ashtarak have been completed (see picture 1).

Have been processed and printed the following maps:

Langazat, Langazat_topo, Tsakhkadzor, Ashtarak, Charentsavan, Ararat, Armavir, Vedi, Tavush,

Echmiadzin, Hrazdan, Martuni, Gavar, Vardenis, Sevan, Dilijan, Ayntap, Alapars, Jermuk, Sasunik,

Ohanavan, Artashat, Artashat_topo, Kapan

Were created and printed maps of 4 mentioned regions, one of them is presenting at the picture 2.

picture 1 picture 2

Page 33: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

33

1.4 OPERATION & MAINTENANCE

Page 34: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

34

OPERATION & MAINTENANCE WORKS

1. PRODUCED WATER QUANTITIES, WATER QUANTITIES DELIVERED TO THE INTERNAL

NETWORK, POTABLE WATER LOSSES.

Produced water quantities constituted 23 811.0 + 16 420.0 =40 231.0 thousand cubic meter which is

by 6% more than it was envisaged by the company’s budget (in the budget it was planned

21 769.0 + 16 090.0=37 859.0 thousand cubic meter). The main reason is that the water quantities

supplied by gravity have been increased. In the 2

nd quarter potable water losses constituted 82%. Such a low growth is conditioned mainly by

the increase of gravity supply and parallel to it less amount of potable water supplied to the consumers

(in the first quarter potable water losses constituted 81%), though this indicator is less than it was

envisaged by the company’s budget (84%) .

2. ELIMINATION OF BREAKDOWNS, CAPITAL REPAIRING OF THE SYSTEMS AND RENOVATION.

WATER SUPPLY SYSTEMS

As compared with the 1st quarter, in the 2

nd quarter the volumes of these works have been increased by

15 %. The works directed at elimination of breakdowns became more effective, e.g in two regional

branches of the company all the breakdowns were removed. If this tendency goes on and the two

other regional branches work in similar way, we can tell that in the water supply systems the activities

directed at renovation and breakdown elimination works are satisfactory and potable water losses

caused by poor technical conditions of the system is minimized.

Staring from the first quarter of current year we focused our attention on termination of water supply

and disconnection of illegal connections of the customers not paying versus water supply and

wastewater services. This is an important factor for operation procedures playing great role for the

issues relating to water losses.

As a result of aforementioned works fulfillment, water supply schedules have been increased in

average by one our (from 8.8 hours up to 9.8 hours) mainly in urban settlements (in Alaverdi-by 2

hours, in Ijevan-by 6.74 hours, in Stepanavan-by 3 hours, in Ahtarak-by 2 hours, in Artashat- by 1

hour, in Echmiatsin- by 2.7 hours, Eghegnadzor- by 4 hours).

WASTEWATER SYSTEMS

The length of cleaned sewers has been abruptly increased constituting 55.74 km against 8.29 km of

the 1st quarter. But this is not sufficient and in order to clean more sewers the working hours of special

emergency machines should be added. Such an increase is also noticed in other works connected with

wastewater systems due to which satisfactory operation of these systems in ensured.

Page 35: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

35

3. POTABLE WATER DISINFECTION

In the 2nd

quarter potable water disinfection works, but for exceptional cases, were completely

fulfilled. In this quarter 11131 kg of liquid chlorine and 3 880 kg of powder chlorine were used by

which 32,0 million cubic meter of potable water was disinfected. Disinfection equipment of chlorine

stations being in poor condition are being gradually replaced.

4. PREVENTIVE MEASURES

Today the delay of these works is connected with the lack of employees to implement such works.

Currently the details of these activities are being clarified and we shall try starting their

implementation from August of this year.

Page 36: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

36

OPERATION & MAINTENANCE OF WATER TRANSMISSION AND DISTRIBUTION SYSTEMS TABLE-8, DIAGRAM-8,9

N

NAME OF

REGIONAL

BRANCH

NETWORK PARTLY

REPAIRED

NETWORK LINEAR

REPAIRED

ARMATURE

REPAIRED

WA

TE

R T

RA

NS

MIS

SIO

N A

ND

DIS

TR

IBU

TIO

N S

YS

TE

MS

INS

PE

CT

ION

NUMBER OF

DISCONNECTED

IN NETWORK

NUMBER OF BREAK-

DOWNS

BR

EA

K-D

OW

NS

N

OT

RE

PA

IRE

D

NUMBER OF LIQUIDATED BREAK-DOWNS

MAIN TOTAL

WA

TE

R T

RA

NS

MIS

SO

N

SY

ST

EM

WA

TE

R D

IST

RIB

UT

ION

SY

ST

EM

AR

MA

TU

RE

TO

TA

L

WATER

TRANSMISSION

SYSTEM

WATER DISTRIBUTION

SYSTEM ARMATURE TOTAL

ILLEGALL NOT PAID

pc

Ma

teri

al

cost

(th

ou

s. A

MD)

To

tal

(th

ou

san

d

AM

D)

pc

Ma

teri

al

cost

(th

ou

s. A

MD)

To

tal

(th

ou

san

d

AM

D)

pc

Ma

teri

al

cost

(th

ou

s. A

MD)

To

tal

(th

ou

san

d

AM

D)

km

To

tal

(th

ou

san

d

AM

D)

pc

To

tal

(th

ou

san

d

AM

D)

pc

To

tal

(th

ou

san

d

AM

D)

pc pc pc pc pc pc

Ma

teri

al

cost

(th

ou

s. A

MD)

To

tal

(th

ou

san

d

AM

D)

pc

Ma

teri

al

cost

(th

ou

s. A

MD)

To

tal

(th

ou

san

d

AM

D)

pc

Ma

teri

al

cost

(th

ou

s. A

MD)

To

tal

(th

ou

san

d

AM

D)

pc

Ma

teri

al

cost

(th

ou

s. A

MD)

To

tal

(th

ou

san

d

AM

D)

Material

cost

Total

cost

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

1 NORTH

EAST 17 133 200 22 1930 2630 8 92 205 187 196 258 181 115 80 120 782 40 942 162 95 563 1528 657 2246 5753 28 415 682 780 3224 7963 5378 11455

2 NORTH

WEST 7 92 147 53 2678 3446 93 459 516 11 10 65 131 3 12 29 107 9 145 0 29 76 483 107 755 2203 9 56 132 145 887 2818 4115 7080

3 CENTER

WEST 173 1870 2681 132 4171 5599 4 68 76 221 137 47 42 12 5 54 651 24 729 233 41 1188 1522 446 8362 10909 9 63 119 496 9612 12550 15721 21089

4 SOUTH 3 10 31 69 1882 2882 1 74 79 34 11 178 199 95 9 86 158 27 271 0 86 425 1312 158 629 1738 27 504 687 271 1558 3737 3525 6947

5 TOTAL 200 2 104 3 060 276 10 661 14 557 106 693 876 452 353 548 552 225 106 289 1 698 100 2 087 395 251 2 251 4 845 1 368 11 992 20 602 73 1 038 1 620 1 692 15 281 27 067 28 739 46 571

CUMULATIVE 306 2 888 4 272 368 19 169 25 714 126 1 274 1 640 873 1 003 548 552 225 106 581 3 856 332 4 769 1 349 467 5 642 11 182 2 724 20 053 34 956 229 2 412 3 678 3 420 28 107 49 816 51 571 83 103

REMARK* The information is presented in base of operative data.

NUMBER OF REPAIRED BREAK-DOWNS, ARMATURE AND WATER TRANSMISSION END DISTRIBUTION SYSTEMS

0

500

1000

1500

2000

2500

SOUTH 463 111 112 121 344

CENTER WEST 516 218 366 221 805

NORTH WEST 157 161 76 61 298

NORTH EAST 810 245 295 287 827

I Quart April May June II Quart

NUMBER OF DISCONNECTED CONNECTING PIPES

0

100

200

300

400

500

600

700

800

900

Nu

mb

er

ILLEGALLY 258 65 47 178 548

NOT PAID 115 3 12 95 225

TOTAL 373 68 59 273 773

NORTH EAST NORTH WEST CENTER WEST SOUTH TOTAL

Page 37: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

37

MAINTENANCE OF WESTWATER COLLECTION SYSTEMS TABLE-9

# REGIONS

MAINS CLEARED

INCLUDING

MAIN REPAIRED MANHOLES

REPAIRED

INSPECTION

OF

WESTEWATER

COLLECTION

SYSTEMS

REMOVAL OF

OBSTRUCTIONS TOTAL

>3

00

mm

<3

00

mm

km

Ma

teria

l co

st

(th

ou

san

d A

MD

)

To

tal

exp

ense

s

(th

ou

san

d A

MD

)

km km pc

Ma

teria

l co

st

(th

ou

san

d A

MD

)

To

tal

exp

ense

s

(th

ou

san

d A

MD

)

pc

Ma

teria

l co

st

(th

ou

san

d A

MD

)

To

tal

exp

ense

s

(th

ou

san

d A

MD

)

km

To

tal

exp

ense

s

(th

ou

san

d A

MD

)

pc

Ma

teria

l co

st

(th

ou

san

d A

MD

)

To

tal

exp

ense

s

(th

ou

san

d A

MD

)

To

tal

oth

er

exp

ense

s

To

tal

ex

pen

ses

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

1 NORTH-EAST 17.4 63 582 6.6 10.8 8 205 358 7 96 154 68 218 829 329 2 055 694 3 366

2 NORTH-WEST 1.2 0 63 0 1.2 12 398 546 29 2 019 2 141 0 0 474 0 1 487 2 417 4 236

3 CENTER-WEST 27.1 0 249 18.3 8.8 3 190 203 54 1 522 1 558 53 90 289 7 541 1 719 2 640

4 SOUTH 4.8 45 765 2.02 2.8 28 1 067 1 339 25 347 464 0 0 294 64 570 1 522 3 139

5 TOTAL 50.7 108 1 658 26.92 23.54 51 1 860 2 445 115 3 984 4 317 120 308 1 886 400 4 654 6 352 13 382

CUMULATIVE 58.7 432 2 757 28.3 30.4 106 3 147 4 675 275 5 050 5 904 225 497 3 628 400 8 935 9 029 23 011

Page 38: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

38

DIAGRAMS-10,11

MAINS CLEARED

0

5

10

15

20

25

30

KM

NORTH EAST 2.14 0.85 7.6 9 17.5

NORTH WEST 2.21 0 0.1 1.1 1.2

CENTER WEST 2.6 0 0.5 26.6 27.1

SOUTH 1.34 1.7 1.5 1.72 4.97

I Quart April May June II Quart

NUMBER OF REMOVAL OF OBSTRUCTIONS, MAINS AND MANHOLES REPAIRED

0

100

200

300

400

500

600

700

800

900

NORTH EAST 537 247 239 358 844

NORTH WEST 467 169 200 146 515

CENTER WEST 513 93 143 110 346

SOUTH 440 164 117 66 347

I Quart April May June II Quart

Page 39: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

39

NETWORK ANALYSING TABLE - 10

# REGIONS

WATER TRANSMISSION AND DISTRIBUTION SYSTEMS WASTEWATER COLLECTION SYSTEM

Water

Transmission

System

(km)

Water

Distribution

System

(km)

Total

(km)

Water

Losses

m3/day km

Break-downs

piece/km

Collectors

km

Wastewater

System

km

Total

km

Number of

Obstructions

piece/ km

Cleaned

Network

%

1 2 3 4 5 6 7 8 9 10 11 12

1 NORTH-EAST 841 1 515 2 356 41 0.10 131 513 645 0.4 0.9

2 NORTH-WEST 567 689 1 256 88 0.04 132 555 687 0.2 0.1

3 CENTER-WEST 634 1 034 1 669 62 0.10 46 176 222 0.6 4.1

4 SOUTH 611 433 1 045 51 0.10 46 314 360 0.3 0.3

TOTAL 2 654 3 671 6 324 60 0,1 356 1 558 1 914 0,4 1.3

Page 40: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

40

DIAGRAMS – 12,13

NUMBER OF OBSTRUCTION (PIECE/KM)

0

0.2

0.4

0.6

0.8

1

NORTH-EAST 0.26 0.3 0.4 0.6 0.4

NORTH-WEST 0.2 0.2 0.3 0.2 0.2

CENTER-WEST 0.8 0.7 0.3 0.5 0.6

SOUTH 0.4 0.4 0.6 0.2 0.3

Average 1

quartApril May June

Average I1

quart

NUMBER OF BREAK-DOWNS (PIECE/KM)

0

0.05

0.1

0.15

0.2

0.25

NORTH-EAST 0.1 0.1 0.2 0.1 0.1

NORTH-WEST 0.1 0.1 0.04 0.03 0.04

CENTER-WEST 0.2 0.2 0.2 0.1 0.1

SOUTH 0.2 0.1 0.1 0.1 0.1

Average 1

quartApril May June

Average I1

quart

Page 41: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

41

DIAGRAMS - 14,15

CLEANED NETWORK / % /

0

2

4

6

8

10

12

NORTH-EAST 0.3 0.2 1.2 1.4 0.9

NORTH-WEST 0.05 0.04 0.01 0.2 0.1

CENTER-WEST 0.2 0.1 0.4 12 4.1

SOUTH 0.2 0.1 0.2 0.5 0.3

Average 1

quartApril May June

Average I1

quart

WATER LOSSES-M3/DAY*KM

0

20

40

60

80

100

NORTH-EAST 35 34 43 46 41

NORTH-WEST 93 93 82 89 88

CENTER-WEST 65 69 61 62 62

SOUTH 47 47 49 57 51

Average 1

quartApril May June

Average I1

quart

Page 42: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

42

WATER PRODUCTION & LOSSES TABLE-11

#

SE

CT

OR

S

SU

BS

EC

TO

RS

Name of Source

(pumping station)

WATER PRODUCTION

/thousand m3/

WATER DELIVERED

/thousand m3/ UN-ACCOUTED FOR WATER

April May June II

Quart April May June

II

Quart

April May June II Quart

tho

us.

m3

wa

ter

loss

es%

tho

us

m3

wa

ter

loss

es%

tho

us.

m3

wa

ter

loss

es%

tho

us.

m3

wa

ter

loss

es%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

NORTH-WEST REGION

1 Abovyan

Abovyan

Makravan - 4 p/s 634 687 684 2005

137 133 139 409 577 81 631 83 618 82 1826 82 Bujakan s. 16 17 16 49

Dzoragbyur p/s 36 32 35 103

Akunq p/s 28 29 22 79

Total 714 765 757 2236 137 133 139 409 577 81 631 83 618 82 1826 82

Byuregavan Nurnus s. 90 93 90 273 22 34 28 83 68 75 60 64 63 69 190 70

Total 90 93 90 273 22 34 28 83 68 75 60 64 63 69 190 70

Total 804 858 847 2 509 159 167 166 493 645 80 691 81 681 80 2 017 80

2

Charen

cavan Charencavan

Solak p/s 14 17 63 94

74 73 75 222 302 80 310 81 303 80 915 80

Alapars p/s 93 82 79 253

Makravan-4 -

Abovyan main 117 121 104 341

Gyumush p/s 120 135 102 357

Fantan b-h 7 8 8 23

Gyumush -2 p/s 24 22 24 69

Total 375 383 379 1 137 74 73 75 222 302 80 310 81 303 80 915 80

3 Hrazdan

Tsaghkadzor

Makravan p/s 36 27 75 138

12 11 21 44 32 73 33 75 90 81 155 78 Tegenis s. 8 17 19 44

Ulashik WCS 0 0 17 17

Total 44 44 111 199 12 11 21 44 32 73 33 75 90 81 155 78

Hrazdan

Makravan-4 -

Abovyan main 104 107 181 392

202 190 191 582 719 78 729 79 871 82 2319 80 Solak p/s 7 7 7 21

Makravan p/s 810 804 874 2488

Total 921 918 1062 2901 202 190 191 582 719 78 729 79 871 82 2319 80

Total 965 962 1 173 3 101 214 201 212 627 751 78 761 79 961 82 2 474 80

4 Artik

Artik Mantash

reservoir 648 670 648 1966 80 53 61 194 568 88 617 92 587 91 1772 90

Total 648 670 648 1966 80 53 61 194 568 88 617 92 587 91 1772 90

Talin

Zovasar s. 24 21 21 66

32 34 37 102 25 44 16 32 16 30 57 36

Jinj Akner s.

Maralik p/s 0 0 0 0

Kentagbyur s., N

809 s. 33 29 32 93

Total 57 50 53 159 32 34 37 102 25 44 16 32 16 30 57 36

Ashotsk

Dagdzutner s. 39 32 32 103

12 16 15 43 74 86 58 79 58 79 189 82

Sari s. 3 2 2 7

Ghazanchi s. 14 15 14 42

Lusagbyur s. 7 5 5 16

Zuygaghbyur s. 7 6 6 20

Gazanchi s. 8 6 6 19

Dzragacneri s. 0 0 0 0

Bavra b-h 9 8 9 25

Total 86 73 73 232 12 16 15 43 74 86 58 79 58 79 189 82

Total 791 793 774 2 357 124 102 113 339 667 84 690 87 661 85 2 018 86

5 Ashtarak Ashtarak

Karbi b-h 72 90 84 246

107 106 112 325 558 84 654 86 644 85 1856 85

Artak p/s 87 98 92 277

Artashavan s. 55 105 105 265

Sagmusavan s. 105 105 105 315

Wosketas s. 7 8 7 22

Bazmagbyur b-h 32 22 57 111

Kazaravan b-h 42 67 37 147

Bazmagbyur s. 265 265 268 798

Page 43: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

43

#

SE

CT

OR

S

SU

BS

EC

TO

RS

Name of Source

(pumping station)

WATER PRODUCTION

/thousand m3/

WATER DELIVERED

/thousand m3/ UN-ACCOUTED FOR WATER

April May June II

Quart April May June

II

Quart

April May June II Quart

tho

us.

m3

wa

ter

loss

es%

tho

us

m3

wa

ter

loss

es%

tho

us.

m3

wa

ter

loss

es%

tho

us.

m3

wa

ter

loss

es%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Kazaravan s

Total 665 760 756 2181 107 106 112 325 558 84 654 86 644 85 1856 85

Aparan

Ortachit s. 34 34 34 102

32 31 30 93 104 77 85 73 87 75 276 75 Geghagzor s.

Eznak p/s 53 33 33 119

Jami p/s 48 49 51 148

Total 136 116 117 369 32 31 30 93 104 77 85 73 87 75 276 75

Total 801 876 873 2 550 139 137 142 418 663 83 738 84 731 84 2 132 84

MAIN

TOTAL 3 737 3 871 4 045 11 653 710 680 708 2 098 3 027 81 3 192 82 3 337 82 9 555 82

NORTH-EAST REGION

1 Sevan Sevan

Dzknget s. 0 0 11 11 30 32 34 96 568 95 677 95 727 95 1971 95

Hatsarat p/s 598 709 750 2057

Total 598 709 761 2068 30 32 34 96 568 95 677 95 727 95 1971 95

2 Dilijan Dilijan

Golovino WCS 22 22 24 68

33 33 35 101 57 64 57 63 63 64 177 64

Florovi Balka

WCS 25 25 27 77

Bldan WCS 24 24 29 77

Shamakhyan s. 16 16 15 47

Jiliut Tala s. 3 3 3 9

Total 90 90 98 278 33 33 35 101 57 64 57 63 63 64 177 64

3 Ijevan

Ijevan

Qarqarut s. 54 94 91 239

42 41 47 130 172 80 375 90 316 87 863 87

Spitak dzur s. 49 80 78 207

Getahovit s. 39 153 122 313

Anapat s. 31 40 26 97

Khozmarag s. 16 21 21 58

Getapnya p/s 6 6 5 17

Dzr i dzor s. 8 11 10 29

Gmbet s. 5 5 5 16

Azatamut s. 5 5 5 16

Total 214 416 363 992 42 41 47 130 172 80 375 90 316 87 863 87

Berd Berd WTP 60 90 88 238

14 17 21 52 51 79 78 82 72 78 202 80 Chatakh s. 5 5 5 15

Total 65 95 93 253 14 17 21 52 51 79 78 82 72 78 202 80

Chambarak Kushchinski s. 15 15 15 45

6 6 6 17 24 81 24 80 24 81 73 81 Taqa s. 15 15 15 45

Total 30 30 30 90 6 6 6 17 24 81 24 80 24 81 73 81

Total 309 541 486 1336 61 64 73 199 247 80 477 88 413 85 1137 85

4 Gavar

Vartenis

Akunq s. 88 84 90 262

47 53 48 149 127 73 115 68 126 72 367 71 St. Vardan s. 22 22 21 65

Akner s. 42 40 42 124

Shat Jreq s. 22 22 21 65

Total 174 168 174 516 47 53 48 149 127 73 115 68 126 72 367 71

Martuni

Tsakqari w/s 35 30 44 109

27 39 42 109 102 79 82 68 94 69 278 72 Tsakqari s. 32 32 32 96

Hopoy var s. 62 60 60 182

Total 129 122 136 387 27 39 42 109 102 79 82 68 94 69 278 72

Gavar

Kaler p/s

427 368 501 1297

84 86 86 255 415 83 343 80 496 85 1254 83

Hatsarat p/s

Khacher p/s

Sarukhan p/s 48 46 57 151

Gandzak b-h 23 15 23 62

Total 499 430 581 1510 84 86 86 255 415 83 343 80 496 85 1254 83

Total 802 719 891 2412 158 179 176 513 644 80 540 75 716 80 1899 79

5 Alaverdi Noyemberyan

Berdavan b-h 14 5 9 28

13 20 17 49 71 85 66 77 62 79 199 80 Ayrumi p/s 64 63 64 191

Gij sari s. 5 17 5 27

Page 44: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

44

#

SE

CT

OR

S

SU

BS

EC

TO

RS

Name of Source

(pumping station)

WATER PRODUCTION

/thousand m3/

WATER DELIVERED

/thousand m3/ UN-ACCOUTED FOR WATER

April May June II

Quart April May June

II

Quart

April May June II Quart

tho

us.

m3

wa

ter

loss

es%

tho

us

m3

wa

ter

loss

es%

tho

us.

m3

wa

ter

loss

es%

tho

us.

m3

wa

ter

loss

es%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Spitakashen s. 1 1 1 2

Total 84 86 79 248 13 20 17 49 71 85 66 77 62 79 199 80

Alaverdi Lori berd s, 648 670 648 1966

93 84 76 252 763 89 801 91 780 91 2343 90 Agarak s. 207 214 207 629

Total 855 884 855 2595 93 84 76 252 763 89 801 91 780 91 2343 90

Total 939 970 934 2843 105 103 92 301 834 89 867 89 842 90 2542 89

6 Spitak

Spitak

Chakhkali s. 25 27 26 78

26 33 27 85 56 69 55 62 60 69 170 67

Drashen b-h 22 24 22 68

Nalband b-h 20 21 22 63

Ghazanchi s, 4 4 4 12

Spitak b-h 10 12 13 35

Total 81 88 87 256 26 33 27 85 56 69 55 62 60 69 170 67

Stepanavan

Gyulidar s, 31 27 31 89

36 36 37 109 339 90 343 91 329 90 1011 90 Getavan p/s 111 111 101 323

Novoseltsovo s, 233 241 233 708

Total 375 379 366 1120 36 36 37 109 339 90 343 91 329 90 1011 90

Tashir

Aksyutin p/s 57 57 106 220

33 39 40 112 108 77 102 72 148 79 359 76 Sevaberd s. 48 48 46 142

Bazumi s. 37 37 36 109

Total 141 141 188 471 33 39 40 112 108 77 102 72 148 79 359 76

Total 598 608 641 1 846 95 108 104 306 503 84 500 82 537 84 1 540 83

MAIN

TOTAL 3 335 3 637 3 811 10 782 482 520 514 1 516 2 853 86 3 117 86 3 297 87 9 267 86

CENTER-WEST REGION

1 Masis

Masis c. Araratyan 1,2 p/s 426 466 439 1331 54 59 61 174 371 87 407 87 379 86 1157 87

Total 426 466 439 1331 54 59 61 174 371 87 407 87 379 86 1157 87

Masis v. Araratyan 1,2 p/s 638 699 659 1996 87 88 84 259 551 86 612 87 574 87 1737 87

Total 638 699 659 1996 87 88 84 259 551 86 612 87 574 87 1737 87

Total 1064 1166 1098 3327 141 146 145 433 923 87 1019 87 953 87 2895 87

2

Echmia

tsin Echmiadzin

Gor. bak b-h 0 0 0 0

199 202 185 585 777 80 747 79 770 81 2293 80

Ghazaravani b-h 99 83 65 247

Bazmagbyur 3 s. 855 857 852 2564

Ghazaravani s.

Artameti p/s 0 0 5 5

Hushakerti p/s 6 0 9 15

Kozdasheni p/s 15 8 24 47

Total 975 948 955 2878 199 202 185 585 777 80 747 79 770 81 2293 80

3 Artashat Artashat

Artashati b-h 241 255 248 744 169 188 195 552 1042 86 1039 85 1027 84 3108 85

Garni s. 970 972 974 2916

Total 1211 1227 1222 3660 169 188 195 552 1042 86 1039 85 1027 84 3108 85

4 Vedi

Vedi Garni s. 163 162 162 487

83 106 102 290 254 75 230 69 235 70 719 71 Dzermanis s. 174 174 174 522

Total 337 336 336 1009 83 106 102 290 254 75 230 69 235 70 719 71

Ararat Garni s. 167 166 164 497 45 47 46 138 122 73 119 72 118 72 359 72

Total 167 166 164 497 45 47 46 138 122 73 119 72 118 72 359 72

Total 504 502 500 1 506 128 152 147 428 376 75 350 70 353 71 1 078 72

MAIN

TOTAL 3 754 3 843 3 775 11 371 637 688 672 1 997 3 117 830 3 155 82 3 103 82 9 374 82

SOUTH REGION

1 Eghegn

adzor

Eghegnadzor

Sarnagbyur s. 77 77 78 232 15 15 15 45 62 80 62 81 63 81 187 81

Qarasun s. 90 90 91 271 19 19 13 51 71 79 71 79 78 86 220 81

Vostan s. 86 87 87 260 18 18 12 48 69 80 68 79 75 86 212 82

Total 253 254 256 763 51 52 40 143 201 80 202 80 216 84 619 81

Vayk Bazmagbyur s. 56 60 71 187 24 23 24 71 33 58 37 62 46 65 116 62

Total 56 60 71 187 24 23 24 71 33 58 37 62 46 65 116 62

Jermuk Dzrasar s. 74 78 76 228 15 16 21 52 59 80 62 80 55 72 176 77

Page 45: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

45

#

SE

CT

OR

S

SU

BS

EC

TO

RS

Name of Source

(pumping station)

WATER PRODUCTION

/thousand m3/

WATER DELIVERED

/thousand m3/ UN-ACCOUTED FOR WATER

April May June II

Quart April May June

II

Quart

April May June II Quart

tho

us.

m3

wa

ter

loss

es%

tho

us

m3

wa

ter

loss

es%

tho

us.

m3

wa

ter

loss

es%

tho

us.

m3

wa

ter

loss

es%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Total 74 78 76 228 15 16 21 52 59 80 62 80 55 72 176 77

Total 383 392 403 1177 90 90 86 266 293 77 302 77 317 79 911 77

2 Sisyan Sisyan

Shaqe s. 173 196 230 600 44 50 52 146 129 74 146 75 178 77 454 76

Mukhutyan s. 5 6 7 19 1 1 2 4 4 79 5 77 5 75 14 77

Zor - zor s. 2 2 2 6 0 0 0 1 1 81 2 85 2 88 5 85

Total 180 204 240 625 46 51 54 151 134 75 153 75 186 77 473 76

3 Goris Goris

Akner s. 96 97 97 289 34 38 27 98 62 65 59 61 70 72 191 66

Mukhutyan s. 253 255 255 763 78 90 61 229 175 69 165 65 194 76 534 70

Total 348 352 352 1052 112 128 88 328 237 68 224 64 264 75 725 69

4 Kapan

Kapan

Geghi s, 128 202 207 537 19 25 26 71 109 85 177 87 181 87 466 87

Surin kap s. 52 53 55 160 10 13 8 31 42 81 40 75 47 85 129 80

Geghi WCS 531 522 536 1589 92 121 76 288 439 83 402 77 460 86 1301 82

Chanakhchi WCS 148 174 179 501 30 39 22 92 118 80 135 77 157 88 410 82

Vachagan WCS 4 4 4 13 1 2 1 4 3 71 2 58 3 74 8 68

Total 864 956 980 2800 153 201 133 486 711 82 755 79 847 86 2314 83

Megri

Agarak b-h 59 59 96 214 43 46 47 136 15 26 13 22 49 51 78 36

Agarak WCS 121 131 136 388 36 42 43 121 85 70 88 68 93 68 267 69

Setenc s. 15 15 16 45 5 5 5 15 10 66 10 70 10 67 31 67

Megri WCS 40 40 42 123 12 10 11 33 29 71 30 75 31 73 90 73

Total 235 245 290 770 96 103 107 305 139 59 142 58 183 63 465 60

Total 1 099 1 201 1 270 3 570 249 303 240 792 850 77 898 75 1 030 81 2 779 78

Total 2 010 2 149 2 265 6 424 496 573 468 1 536 1 514 75 1 577 73 1 797 79 4 888 76

GRAND

TOTAL 12 835 13 501 13 895 40 231 2 324 2 460 2 363 7 147 10 511 82 11 040 82 11 533 83 33 084 82

REMARK* The information is presented in base of operative data.

Because of absence of metering, it was not possible to separate water losses.

DIAGRAMS – 16,17

WATER LOSSES

70

72

74

76

78

80

82

84

86

I Quart April May June II Quart

Plan

Carry out

%

WATER PRODUCTION

0

10000

20000

30000

40000

50000

mln

m3

Gravity 21797.5 21964 7603 8083 8125 23811 21769

Delivered through pumps 17582.5 16095 5232 5418 5770 16420 16090

Total 39380 38059 12835 13501 13895 40231 37859

Carry out I Quart. Plan I Quart. April May June Carry out II Quart. Plan II Quart.

Page 46: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

46

WATER DELIVERED THROUGH PUMPING AND CORRESPONDING ELECTICITY CONSUMPTION

TABLE- 12

N SUBSECTORS

WATER

DELIVERED

THROUGH

PUMPING

thousand

m3/II quarter

ELECTRICITY

CONSUMPTION

KWH/m3

ELECTRICITY

CONSUMPTION

thous.KWH/

II quarter

CUMULATIVE

during 2006

ELECTRICITY

thousand KWH

WATER

thousand m3

1 2 3 4 5 6 7

1 Ashtarak 696 1.3 895 1 774 1 654

2 Aparan 267 0.7 179 371 505

3 Artashat 743 0.3 237 461 1 445

4 Echmiadzin 399 0.4 152 269 580

5 Gavar 1 510 0.7 1 039 2 076 2 998

6 Sevan 2 057 0.8 1 616 3 392 3 927

7 Tashir 168 0.0 0 0 348

8 Stepanavan 323 0.7 238 544 725

9 Noyemberyan 219 1.3 293 646 436

10 Spitak 35 0.6 19 38 68

11 Abovyan 2 921 0.2 564 1 246 6 038

12 Charentsavan 817 1.6 1 321 2 623 1 609

13

Hrazdan and

Tsakhkadzor 2 626 0.7 1 909 4 627 6 167

14 Martuni 109 0.6 68 148 236

15 Meghri 239 0.8 198 404 493

16 Sisyan 20 0.9 18 31 34

17 Ijevan 17 0.7 12 30 42

18 Masis 3 328 0.5 1 676 3 422 6 792

19 Ashotsk 87 0.5 43 127 233

20 Byuregavan 8 3.1 25 55 17

TOTAL

16 588 0.63 10 503 22 283 34 347

Page 47: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

47

DIAGRAMS – 18,19

ELECTRICAL CONSUMPTION KWH/m3

0.6

0.62

0.64

0.66

0.68

Energy 0.66 0.64 0.62 0.64 0.63

I Quart April May June II Quart

WATER DELIVERED THROUGH PUMPING AND CORRESPONDING ELECTICITY CONSUMPTION

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

Water 17759 5289 5475 5876 16640

Energy 11776 3372 3392 3739 10503

I Quart April May June II Quart

Page 48: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

48

PROGRESS OF THE WATER METERS EQUIPMENT INSTALLATION BY THE AWS CJSC IN ITS MAINTENANCE AREA TABLE- 13, DIAGRAM 20

N SECTORS

NAME

WATER METERS REQUIRED & INSTALLED

BULK WATER

METERS

IN ENTRANCE

OF APARTMENT

BUILDINGS

INDIVIDUAL

APARTMENT

OF BUILDING

PRIVATE HOUSES BUDGET

ORGANIZATIONS

OTHER

ORGANIZATIONS TOTAL INCLUDING

req

uir

emen

ts

met

ers

inst

all

ed

req

uir

emen

ts

met

ers

inst

all

ed

req

uir

emen

ts

met

ers

inst

all

ed

req

uir

emen

ts

met

ers

inst

all

ed

req

uir

emen

ts

met

ers

inst

all

ed

req

uir

emen

ts

met

ers

inst

all

ed

req

uir

emen

ts

met

ers

inst

all

ed

Inst

all

ed i

n

rep

ort

ing

mo

nth

In

sta

lled

in

rep

ort

ing

qu

art

No

t in

wo

rkin

g

con

dit

ion

number number number number number number number number number number number number number number number number number

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

NORTH EAST

1 Gavar 33 1 120 28 1 761 1 598 14 466 3 535 66 83 22 193 16 468 5 438 75 199 28

2 Sevan 17 5 134 31 1 195 3 960 2 438 1 920 30 30 15 208 3 830 6 154 24 122 12

3 Dilijan 9 0 97 1 1 017 942 2 769 1 473 14 26 9 63 3 915 2 505 - 20 20 16

4 Ijevan 14 0 177 0 1 970 3 021 1 949 2 816 23 59 0 167 4 133 6 063 64 214 3

5 Spitak 56 0 148 7 0 2 667 5 166 6 175 0 86 - 10 219 5 360 9 154 147 253 34

6 Alaverdi 40 0 246 0 1 896 4 577 3 102 3 302 36 60 0 109 5 320 8 048 83 301 24

Total 169 6 922 67 7 839 16 765 29 891 19 221 168 344 36 959 39 025 37 362 373 1 109 117

NORTH WEST

1 Abovyan 20 7 308 34 0 16 346 1 622 2 141 8 48 0 377 1 959 18 953 82 214 27

2 Charentsavan 14 0 178 18 0 6 318 7 754 1 203 15 41 61 196 8 022 7 776 94 187 11

3 Hrazdan 13 0 339 0 8 135 6 710 4 085 1 400 37 73 58 340 12 668 8 523 218 600 3

4 Ashtarak 40 0 209 0 1 949 2 870 4 393 4 039 47 55 35 187 6 674 7 151 24 168 0

5 Artik 76 0 257 0 3 033 2 324 10 560 2 318 68 72 24 175 14 019 4 889 49 138 14

Total 163 7 1291 52 13 117 34 568 28 415 11 101 176 289 178 1 275 43 341 47 292 467 1 307 55

CENTER WEST

1 Artashat 79 0 123 0 7 679 2 402 19 613 7 085 108 50 63 224 27 665 9 761 115 362 78

2 Vedi 28 0 159 0 0 3 454 8 091 4 727 28 46 0 142 8 307 8 369 96 318 84

3 Echmiatsin 113 0 247 0 1 852 7 087 18 327 6 893 72 50 0 372 20 612 14 402 128 489 69

4 Masis 39 0 69 0 1 717 2 269 6 238 3 385 35 44 0 259 8 098 5 957 - 15 100 39

Total 259 0 598 0 11 248 15 212 52 269 22 090 278 190 63 997 64 682 38 489 324 1 269 270

SOUTH

1 Goris 14 0 154 0 1 241 1 853 1 978 2 536 6 52 0 103 3 393 4 544 57 60 0

2 Eghegnadzor 17 0 124 1 1 193 3 441 1 965 1 774 20 72 0 308 3 320 5 596 17 123 18

3 Sisian 14 0 97 0 0 3 102 1 554 1 344 14 57 34 163 1 713 4 666 20 39 0

4 Kapan 16 0 339 1 3 793 10 395 2 052 1 554 21 88 0 441 6 221 12 479 260 554 1

Total 61 0 714 2 6 227 18 791 7 550 7 208 61 269 34 1 015 14 646 27 285 354 776 19

MAIN TOTAL 652 13 3 525 121 38 431 85 336 118 125 59 620 683 1 092 310 4 246 161 694 150 428 1 518 4 461 461

NUMBER OF WATER METERS INSTALLED IN REPORTING QUARTER

0

200

400

600

800

1000

1200

1400

1600

1800

North East 850 402 334 373 1109

North West 1408 368 472 467 1307

Center West 708 449 496 324 1269

South 1570 284 138 354 776

I Quart April May June II Quart

REMARK* 1. The report figures were presented by the sectors in base of collection and should be correct.

2. Because some customers have use more than one water line (connection point) in the flats, houses, budget and other organizations, the numbers of used water meters was

calculated with the coefficient q=1,2

Page 49: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

49

DISINFECTANT RECORDS IN II QUARTER 2006 TABLE- 14

N SECTORS AND

SUBSECTORS

BALANCE in the beginning

of II quarter RECEIVED USED

BALANCE

in the end of II quarter

DISINFECTED WATER

VOLUME USED CUMULATIVE

GAS

CHLORINE

(kg)

POWDER

CHLORINE

(kg)

GAS

CHLORINE

(kg)

POWDER

CHLORINE

(kg)

GAS

CHLORINE

(kg)

POWDER

CHLORINE

(kg)

GAS

CHLORINE

(kg)

POWDER

CHLORINE

(kg)

II quarter

thous. m3

Сumulative

thous. m3

GAS CHLORINE

(kg)

POWDER

CHLORINE

(kg)

1 2 3 4 5 6 7 8 9 10 11 12 13 14

NORTH-EAST

1 Sevan 0 40 0 45 0 60 0 25 30 60 0 100

2 Gavar 798 32 1 200 90 1 742 69 255 53 3 504 6 133 3 045 77

3 Martuni 74 0 50 450 99 355 25 95 333 528 153 435

4 Vardenis 164 0 50 135 183 135 31 0 442 668 279 175

5 Dilijan 0 0 350 180 189 90 161 90 178 563 364 210

6 Ijevan 0 0 0 1 620 0 855 0 765 852 1 274 0 1 095

7 Chambarak 0 10 0 135 0 94 0 52 80 165 0 203

8 Berd 92 0 250 45 311 5 31 41 238 445 649 5

9 Alaverdi 168 0 0 450 0 260 168 190 260 1 294 350 350

10 Nojemberyan 0 20 0 450 0 241 0 229 217 409 0 487

11 Spitak 0 0 0 495 0 257 0 238 213 472 0 507

12 Stepanavan 98 23 100 90 146 51 52 63 302 1 966 348 68

13 Tashir 330 0 0 90 220 17 110 73 306 833 640 17

TOTAL 1 722 125 2 000 4 275 2 890 2 487 833 1 912 6 955 14 811 5 828 3 729

NORTH-WAST

1 Abovyan 460 0 2 700 0 2 468 0 692 0 2 805 5 517 4 468 0

2 Bjureghavan 47 0 100 0 54 0 94 0 284 555 133 0

3 Hrazdan 200 120 3 050 45 1 750 125 1 500 0 2 627 6 171 3 050 125

4 Tsaghkadzor 0 0 100 85 50 85 50 0 41 41 50 85

5 Charentsavan 285 26 450 225 537 26 198 225 793 1491 995 62

6 Ashtarak 780 0 850 445 780 185 850 260 437 4 528 2 830 401

Page 50: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

50

N SECTORS AND

SUBSECTORS

BALANCE in the beginning

of II quarter RECEIVED USED

BALANCE

in the end of II quarter

DISINFECTED WATER

VOLUME USED CUMULATIVE

GAS

CHLORINE

(kg)

POWDER

CHLORINE

(kg)

GAS

CHLORINE

(kg)

POWDER

CHLORINE

(kg)

GAS

CHLORINE

(kg)

POWDER

CHLORINE

(kg)

GAS

CHLORINE

(kg)

POWDER

CHLORINE

(kg)

II quarter

thous. m3

Сumulative

thous. m3

GAS CHLORINE

(kg)

POWDER

CHLORINE

(kg)

1 2 3 4 5 6 7 8 9 10 11 12 13 14

7 Aparan 230 0 100 155 260 90 70 65 135 287 450 120

8 Artik 1 023 132 1 000 43 1 282 90 741 85 1 648 2 662 1 986 90

9 Ashotsk 0 30 0 210 0 205 0 35 137 227 0 295

10 Talin 0 7 0 197 0 116 0 88 126 253 0 215

TOTAL 3 025 315 8 350 1 405 7 181 922 4 195 758 9 033 21 731 13 962 1 393

CENTER-WEST

1 Artashat 320 41 4450 43 3 720 77 1 050 7 3 901 7 842 6 600 232

2 Echmiatsin 0 100 4420 180 2 405 267 2 015 13 2 836 2 836 2 405 347

3 Masis 584 113 2 800 0 2 004 113 1 380 0 3 611 7 075 4 655 182

4 Vedi 0 100 300 115 295 195 5 20 522 1 052 405 295

TOTAL 904 354 11 970 338 8 424 652 4 450 040 10 870 18 805 14 065 1 056

SOUTH

1 Egheghnadzor 150 0 300 110 317 10 133 100 550 701 317 83

2 Vayk 68 0 150 50 108 0 110 50 204 314 140 7

3 Jermuk 0 248 0 0 0 0 0 198 210 351 0 22

4 Sisian 80 16 150 60 200 40 30 36 435 782 320 65

5 Goris 661 106 0 45 452 0 209 151 807 1 559 746 30

6 Kapan 1 536 89 4 500 450 4 995 248 1 041 292 2 800 5 138 8 246 266

7 Meghri 300 0 0 600 170 257 130 343 452 956 320 407

TOTAL 2 795 459 5 100 1 315 6 242 555 1 653 1 169 5 458 9 799 10 089 879

GRAND TOTAL 8 447 1 253 27 420 7 333 24 736 4 616 11 131 3 880 32 006 65 145 43 943 7 057

REMARK* The report is completed in base of operative data.

Page 51: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

51

ELECTRICITY CONSUMPTION & EXPENSES TABLE-15,16

Electricity consumption and correspondingly payment indicators are better than it

was planned in the budget. Electricity consumption constituted 11.814 thousand

kwt/hour or AMD 221.245 million. The budget planned 12.404 thousand

kwt/hour or AMD 234.875, which means that 13. 590.0 thousand kwt/hour or

AMD 13.630 was saved.

In March 85.2

As compared with the 1st quarter of 2005, in the 1

st quarter of 2006 the electricity saving constituted

5203.0 thousand kwt/hour or AMD 96.7 million which was reached mainly due to reduction of working

hours of the pumping aggregates of “Araratyan 1/2”, “Makravan 2”, “Makravan 3” and “Hatsarat”

pumping stations.

ELECTRICITY CONSUMPTION & EXPENSES IN PERIOD OF 13 LAST MONTHS DIAGRAM - 21

20,000

40,000

60,000

80,000

100,000

120,000

Jan

uary

Feb

ruary

Marc

h

Ap

ril

May

Jun

e

July

Au

gu

st

Sep

tem

ber

Octo

ber

No

vem

ber

Decem

ber

1000 A

MD

0

1000

2000

3000

4000

5000

6000

7000

1000 K

WH

KWH 2006

Cost 2005

Cost 2006

KWH 2005

MONTH

Please, see attached tables # 15,16

Page 52: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

52

2. FINANCE & ACCOUNT

Page 53: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

53

SUBSIDY TABLE-17

Subsidy FROM RA GOVERNMENT

MONTH 2006 RECEIVED AMOUNT COMMENTS

January 300,0

187.4 electricity consumption payment

10.8 social security payment

76.7 salary

11.1 water meters

11.9 income tax

2.1 payment for regulation of public services

February 100,0

94.0 electricity consumption payment

6.0 social security payment

March 100,0

85.1 electricity consumption payment

14.9 social security payment

April 120.0

80.970 electricity consumption payment 20.639 VAT

8.391 Income tax

2.0 other tax

May 120.0

72.7 electricity consumption payment 17.4 VAT

24.0 social security payment 5.9 salary

June 80.0

70.9 electricity consumption payment 9.1 social security payment

TOTAL AMOUNT 820,0

Page 54: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

54

INFORMATION

CONCERNING INCOMES AND EXPENSES OF AWS CJSC IN II QUARTER, 2006 TABLE-18

N

Branch

name

Sums

received

from

branches

Subsidy Total

income

Current

expenses Net salary

CENTRALIZED PAYMENTS

Total Total

expenses Electricity Social

insurance

fund

Taxes Covering

of credit

Other

payments

1 2 3 4 5 6 7 8 9 10 11 12 13 14

North–West Region

1 Abovyan

Total 138 696.2 2 7026.3 65 357.3 11 0784.6 11 0784.6 20 3168.2

Center–West Region

1 Artashat

Total 148 604.4 24 910.1 54 099.5 45 564.7 45 564.7 154 582.8

North–East Region

1 Sevan

Total 89 981.7 27 374.4 67 943.5 59 264.9 59 264.9 124 574.3

South Region

1 Sisyan

Total 112 688.9 25 705.4 49 944.1 6 982.8 6 982.8 82 632.3

Head Office

Total 30 268.0 22 974.0 2 170.1 2 170.1 55 412.1

MAIN TOTAL 489 971.2 320 000 809 971.2 135 284.2 260 318.4 224 767.1 70 605.9 58 728.7 24 000 87 376.2 465 477.9 879 080.5

Remark* Is including the total amount received from operation of water supply, sewerage and water metering.

See, please, also attached Diagram-22

Page 55: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

55

3. HUMAN RESOURCES

Page 56: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

56

ACTIVITIES PERFORMED BY HUMAN RESOURCES DEPARTMENT DURING II QUARTER 2006

During the II quarter the works with the Labor State Inspectorate has been

regulated, particularly the calculations presented in the report according to the

locations of regional branches of the company, etc.

The quarterly and monthly reports being submitted to the statistics service have been put on a

digital basis – the data is presented according to the database developed by the statistics service.

During the quarter works concerning accounting of “ArCa” cards of the employees were carried

out.

Around 60 children of the employees are having rest also this year in “Gugark” camp in Lori marz.

The children are provided with uniform and caps with the logo of the company.

The number of the employees of the company has been controlled and analysis has been done.

INFORMATION CONCERNING AWSC PERSONNEL DIAGRAM – 23

Information concerning AWS CJSC Personnel

18281823

1848

1900

1943

1901

1760

1780

1800

1820

1840

1860

1880

1900

1920

1940

1960

January (01.02.06) February (01.03.06) March

(03.04.06)

April

(01.05.06)

May

(01.06.06)

June

(01.07.06)

Months

Nu

mb

er

of

Em

plo

ye

es

Page 57: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

57

TRAINING AND DEVELOPMENT

The training and development works for the welders are carried out by the Trainings division

through visits to all the regional branches, sectors and sub-sectors. The instruction, training and

development of the above mentioned specialists is carried out together with the Safety Techniques

department. The program included theoretical and practice parts. The actual knowledge of the

welders has been checked, materials concerning welding and safety has been provided and practical

works for electro-welding and electro cutting have been done, the mistakes have been corrected.

At the moment the visits to “South”, “Center-West” and “North-West” branches are over.

A free of charge training on “WORD”, “EXCEL” has been done by USAID. Our 2 employees

participated to the program together with other water supply and wastewater companies.

Training on “AutoCAD” and “MapInfo” programs have been organized and carried out by the

Trainings division. The head of the mapping department of the head office V.Aghababyan was

involved as a trainer.

During the training the participants has prepared digital maps and drawings of the sectors and

objects of the company.

In the future the mapping works in the company will be done according to the new requirements of

the scientific technical progress.

Summarizing the works carried out by the center in 2006, we come to the following:

#

NAME OF PROGRAM

NUMBER OF

PARTICIPATED

PERSONS

NAME OF TRAINER TIME OF

TRAINING

1 WELDERS TRAINING 21 S. Alaverdyan

K. Iskandaryan

24.05.06-

27.06.06

2 WORD, EXCEL COMPUTER PROGRAMS TRAINING

2

USAID

1.04.06-

1.05.06

3

AutoCAD COMPUTER PROGRAM TRAINING

6 V. Aghababyan 10.05.06-

23.06.06

The deviations of the Trainings plan of the company are connected with the fact that the works for

installation of new chlorinators are unfinished and the procurement process for new laboratory

equipment is not finished.

The expenses for the trainings of the middle level management and the trainers of the training

center should be done from the World Bank funds and the applications are already presented to the

procurement department.

Page 58: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

58

A tender for the repair works of the Training center is announced.

TRAINING FOR WELDERS

VAYK. Practice works

SISYAN. Implemented cutting and welding works.

AutoCAD & MapInfo Training

Page 59: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

59

4. PUBLIC RELATION

Page 60: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

60

ON ACTIVITIES IMPLEMENTED BY THE PUBLIC RELATIONS DEPARTMENT

(April - June)

On May 17, 2006, the Director General of the Company held a consultation in “South” RB of the

company.

During the meeting has been discussed the results of the company activity for April 2006, as well as

institutional questions.

The result of the company activity for May 2006, has been discussed in the meeting held in “North-

West” RB on June 20. Mr A. Andreasyan, the Chairman of State Committee of Water Economy of

Regional Management has participated in the meeting.

During the quarter, different programs has been broadcasted by the Armenian Television

Companies and different articles published in the newspapers related to the water supply and waste

water main issues and conditions of the towns and villages, which are in the competence of the

company.

The newspapres of “Hayastani Hanrapetutiun”, “Aravot”, “Hajots Ashkharh”, “Pakagitz”,

“Iravunk”, “Haykakan jamanak”, “168 jam”, “Aib... Fe”, have presented the current conditions of

the water supply and wastewater structures and networks, improvement measures, projects,

existence and installation of the water meters, collection of the payments of Kapan, Artik, Abovian,

Hrazdan, Sevan, Yeghegnadzor, Vaik, Meghri, Agarak, Jermuk towns, Ararat and Armavir regions.

The water supply main issues of Echmiatzin, Sevan (Gagarin) towns, Aragatzotn, Ararat and

Armavir regions has been broadcasted by the “H-1”, “H-2”, “Shant”, “Kentron” Armenian

Television Companies.

The Directorate of the Company, Directors of RB’s and the RA Public Services Regulatory

Commission has been informed about the publications.

During the quarter was published the first number of Informational Bulletin (“Trust”). The later has

been delivered to all Regional Branches, interesting parties and persons.

In April-June, by “H-2” Armenian TV was broadcasted the announcement about the collection

payments, which are suggested to implement through “Haypost’ and Bank’s branches. The

announcement has been prepared by the Directorate of the Company and addressed to the

subscribers.

Page 61: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

ANNUAL REPORT

2005

During the quarter has been organized visits of the Director General of the company with the

experts of World Bank, “Water Sector Development and Institutional Improvements PIU” SI’

specialists to different regions. Has been studied the effectiveness of the works and anticipated

programs (Hrazdan, Sevan, Artashat, Ararat, Echmiadzin).

CLARIFICATION AND DISCUSSION OF BASE TASKS IN CENTER-WEST REGION

WITH THE REPRESENTATIVES OF WB AND PIU

During the quarter AWSC has received 396 letters, including assignments, letters from SCWE

(104), as well as 23 announcements, from which 4 has from SCWE.

There are studied, discussed in details by the departments of the company, answered 145 letters and

10 announcements.

AWSC, in accordance with the established procedure, has presented the technical and economical

reports (monthly, quarterly, yearly) to the checking organizations.

Page 62: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

62

VISITES TO VAYOTS DZOR AND SYUNIK MARZES WITH THE REPRESENTATIVES OF LOCAL

SELF-GOVERNING BODIES DIRECTED TO IMPROVEMENT WATER SUPPLY SYSTEM FOR

CLARYFYING AND CELECTING DESIGN VERSIONS

VAYK. Area of “Her-Her” sources.

VAYK. Additional water outlet from “Her-Her”

sources.

EGHEGNADZOR: Meeting in the area of main

facilities of “40 springs”.

AGARAK. Pumping station of city.

Collaboration works has been implemented with the specialists of the RA Public Services

Regulatory Commission and the State Economic Competition Protection Commission (especially,

was approved Decrees, Rules related to the activity of the company).

The copy of the Decree of the RA Public Services Regulatory Commission N 60A, dated on April

19, 2006 and the model forms of the registration books for the quality parameters of the services,

provided by AWSC and the model forms for the information being presented to the PSRC, as well

as in connection with this, the Order of the Company General Director N 35, dated 06.05.06, has

been addressed to the Directors of the Company Head Office and RB Directors for execution.

Page 63: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

63

The Decree of the State Economic Competition Protection Commission of RA N 59-A, dated on

June 7, 2006, “About the results of survey of “Potable Water” goods markets and considering

AWSC as having a leading position” has been addressed to the Directors of the Company Head

Office and RB Directors and assigned to take into management and into account, according to the

RA Legislation.

The copy of the Decree of the Public Services Regulatory Commission of RA N 113A, dated on

June 21, 2006, on “Extension of the “AWS” Closed Joint-Stock Company license for using water

system” has been addressed to the Directors of the Company Head Office and RB Directors for

information notice.

Page 64: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

64

5. WB PROCUREMENT

Page 65: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

65

SAUR S. A. – AWS SCJC

MUNICIPAL WATER AND WASTEWATER PROJECT

PROCUREMENT MANAGEMENT AND PROGRESS REPORT April-June 2006

During reporting period the have been carried out the following WB

procurement:

PART B – AWSC INVESTMENTS

B1.3 – Audit of AWSC – The selection of Audit has been done by CMU and contract has been signed.

B2 – Redundancy Plan – The Redundancy Plan has been executed.

B3.3 – Rehabilitation of Training Center – Bidding Documents have been prepared and the tender has

been announced.

B4.1 – Laboratory Equipment – The Bids have been evaluated.

B6.1 – Water Meters – The Technical Specifications and Biding Documents have been approved and

the tender has been announced.

B8.1 – Tires – The Technical Specifications and Biding Documents have been prepared and approved

by CMB. The tender has been announced and evaluated.

B8.2 – Spare Parts – The Technical Specifications and Biding Documents have been prepared and

approved by CMB. The tender has been announced and evaluated.

B8.3 – Oil – The tender has been announced and evaluated. The contract has been signed and

implemented.

B8.4 – Fuel – The tender has been announced and evaluated. The contract has been signed and

implemented.

PART C 1 – IMMEDIATE INVESTMENT PROGRAM

C1.1 – Pipes, Pipe Fittings, Water Meters and Pumps – The bids have been evaluated. The contracts

have been signed.

C1.2 – Sevan, Package 1, Drilling of Boreholes – The bids have been evaluated and the contract have

been signed.

C1.2 – Sevan, Package 2, Internal Network – The bids have been evaluated and the contract have

been signed.

C1.2 – Dilijan, Package 1, Frolov WTS – New tender has been announced and evaluated.

C1.2 – Dilijan, Package 2, Golovino WTS – New tender has been announced and evaluated.

PART C 2 – INVESTMENT IN AWSC BRANCHES

C2.1 – Water Treatment Equipment – The bids have been evaluated and the contract has been signed.

C2.1 – Pumps – The bids have been evaluated.

C2.1 – Materials for Reservoirs – The quotations have been evaluated.

C2.4 – Design, Package 1 – The Proposals received and evaluated. The contract has been signed.

C2.4 – Design, Package 2 – The RFP has been sent to WB for approval.

C2.4 – Design, Package 3 – The RFP has been sent to WB for approval

See also attached TABLE-19

Page 66: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

66

:

6. LEGAL & INSURANCE

Page 67: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

67

BRIEF DESCRIPTION OF ACTIVITIES AND RESULTS OF LEGAL AND INSURANCE DIVISION IN THE

SECOND QUARTER OF 2006

The number of cases entered into the court is 244 with total amount of

AMD 11 938 000.

As a result of different legal actions AMD 4 560 000 have been

received.

During the whole period of its activities the “AWSC” CJSC first time insured 32 vehicles and

machineries belonging to the company. Two insurance certificates have been signed according to which

the vehicles and machineries stated therein are insured against natural calamities, accidents as well as

material losses caused to the third person.

For the next year it is planed to enlarge the list of insured property as well as the types of insured risks.

Page 68: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

68

7. INDICATORS

Page 69: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

69

As requested by the contract, the Contract Manager shall monitor 25 indicators

(3 aren’t used) on individual branch and Company level. These indicators will give a

possibility to check on the improvement of the AWSC.

REMARK*

Some indicators presented in this report for previous months differ a little from the indicators

presented earlier because the mechanism of interrelated (linked) files calculation has been adjusted.

Page 70: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

70

INDICATORS RECAPITULATION – Table 20, (INDICATORS 1-25)

№ INDICATORS UNIT BASE

YEARS

Average

2005

June

2005

June

2006

Variation between

June 2005 &

June 2006

1 2 3 4 5 6 7 8

1 Weighted average number of daily hours of

drinking water service

hours/

day 6.04 7.39 6.98 9.78 40.0%

2 % of individual subscribers billed on the basis of

metered consumption % 40.24 53.6 46.0 68.0 47.9%

3 Weighted average water bacteriological safety

compliance % 93.8 93.8 95.1 93.7 -1.4%

4 Company working ratio % 194.9 175.8 193.7 138.0 -28.8%

5 % of cities with minimal daily hours of services % 68.05 74.1 75.2 80.0 6.4%

6 % of block apartment buildings with individual or

common block meter % 38.6 56.3 45.5 59.4 30.5%

7 % of block apartment buildings under contractual

agreement with the company %

8 Revenue collected on domestic subscribers per

registered inhabitant

Drams/

month 166 181 189 245 29.6%

9 Collection ratio (excluding budget organizations) % 47.9 36.2 31.6 62.6 98.1%

10 % of subscriber with more than 4 months debt % 79.5 75.1 72.8 77.0 5.8%

11 Average domestic metered consumption per

metered registered inhabitant

Liters/

cap/day 81 71 68 83 21.3%

12 Average price of m3 metered and billed to

domestic subscribers

Drams/

m3 100.41 126.8 140.0 140.0 0.0%

13 Growth of the total collected revenue (excluding

budget organization) from base year % 114 568 16.2 21.8 48.7 123.5%

14

Ratio of water volume billed on the basis of

metering to the total metered and normative billed

volume

% 25.0 26.0 22.4 50.0 123.4%

15 Average daily production per equivalent

registered inhabitant at water catchments levels

Liters/

cap/day 668 759 761 757 -0.5%

16 Average daily supply to distribution reservoir per

equivalent registered inhabitant

Liters/

cap/day

17 Ratio of metered final consumption (m3) to water

production at water catchments levels % 6.8 6.4 6.0 8.5 41.8%

18 Working ratio for branches with gravity systems % 111.4 121.0 173.2 92.7 -46.5%

19 Working ratio for branches with pumping stations

or treatment plants % 223.3 196.8 177.2 154 -12.9%

20 Electricity cost as % of revenue collected in

systems with pumping or treatment plants % 72.6 63.1 49.0 39 -19.5%

21 Amount of chlorine effectively used per

equivalent inhabitant per year g/cap/year

22 Total staff per 1000 individual subscribers u 9.45 8.34 7.94 7.09 -10.7%

23 Staff and assignment contractors total costs as %

of collected revenue % 70.2 68.9 67.3 62.4 -7.3%

24 Electricity consumption kwh/m3 0.43 0.38 0.34 0.30 -12.7%

25 % of water disinfected % 60.9 67.8 88.2 75.1 -14.8%

Page 71: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

71

INDICATOR 1

WEIGHTED AVERAGE NUMBER OF DAILY HOURS OF DRINKING WATER SERVICE FROM

BEGINNING 2006

سñï ³ÙëÇÝ çñ³Ù³ï³Ï³ñ³ñÙ³Ý ÙÇçÇÝ ï¨áÕáõÃÛáõÝÁ ûñí³ ÁÝóóùáõÙ

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Base Year Average 2005 March 06

سñï 06

June 06

ÐáõÝÇë 06

months

³ÙÇëÝ»ñ

Nu

mb

er

of

ho

urs

of

wa

ter

su

pp

lies

æñ

³Ù

³ï

³Ï

³ñ

³ñ

Ù³

Ý Å

³Ù

Ȗ

Ç ï

¨á

Õá

õÃÛá

õÝÁ

AWSC/ ÐæÎÀ

North-East Region/ ÐÛáõëÇë-²ñ¨»Éù î³ñ³Í³ßñç³Ý

North-West Region/ÐÛáõëÇë-²ñ¨Ùáõïù î³ñ³Í³ßñç³Ý

Center-West Region/λÝïñáÝ-²ñ¨Ùáõïùî³ñ³Í³ßñç³Ý

South Region/ гñ³í î³ñ³Í³ßñç³Ý

INDICATOR 2

% OF INDIVIDUAL SUBSCRIBERS BILLED ON THE BASIS OF METRED CONSUMPTION

æñ³ã³÷»ñáí áõÝ»óáÕ µ³Å³Ýáñ¹Ý»ñÇ %-Á

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

December 05

¸»Ïï»Ùµ»ñ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06Months

²ÙÇëÝ»ñ

%

AWSC/ ÐæÎ

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center West RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

South Regionгñ³í³ÛÇÝï³ñ³Í³ßñç³Ý

Page 72: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

72

INDICATOR 3

"% of implemented analyses in compliance with bacteriological safety

æñÇ áñ³ÏÇ Ñ³Ù³å³ï³ë˳ÝáõÃÛáõÝÁ ÑÇ·Ç»ÝÇÏ ëï³Ý¹³ñïÝ»ñÇÝ

85.00%

86.00%

87.00%

88.00%

89.00%

90.00%

91.00%

92.00%

93.00%

94.00%

95.00%

96.00%

97.00%

98.00%

99.00%

100.00%

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06Months

%

AWSC/ÐæÎ

North East Region/ÐÛáõëÇë ³ñ¨»ÉÛ³Ý Ù³ëݳ×ÛáõÕ

North West Region/ÐÛáõëÇë ³ñ¨ÙïÛ³Ý Ù³ëݳ×ÛáõÕ

Center West Region/λÝïñáÝ ³ñ¨ÙïÛ³Ý Ù³ëݳ×ÛáõÕ

South Region/гñ³í³ÛÇÝ Ù³ëݳ×ÛáõÕ

Linear (AWSC/ÐæÎ)

INDICATOR 4

COMPANY WORKING RATIO

ÀÝÏ»ñáõÃÛ³Ý ³ß˳ï³ÝùÇ ³ñ¹Ûáõݳí»ïáõÃÛáõÝÁ

40.0%

60.0%

80.0%

100.0%

120.0%

140.0%

160.0%

180.0%

200.0%

220.0%

240.0%

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06Months

²ÙÇëÝ»ñ

%

AWSC/ ÐæÎ

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center West RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

South Regionгñ³í³ÛÇÝï³ñ³Í³ßñç³Ý

Linear (AWSC/ ÐæÎ)

Page 73: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

73

INDICATOR 5

% OF CITIES WITH MINIMAL DAILY HOURS OF SERVICE FROM THE BEGINNING OF 2006

Üí³½³·áõÛÝ çñ³Ù³ï³Ï³ñ³ñÙ³Ý Å³Ù»ñáí ëå³ë³ñÏíáÕ µÝ³Ï³í³Ûñ»ñÇ % 2006Ã. ëϽµÇó

0%

20%

40%

60%

80%

100%

120%

Base Year Average 06 March 06

سñï 06

June 06

ÐáõÝÇë 06Months

²ÙÇëÝ»ñ

%

AWSC/ ÐæÎ

South Regionгñ³í³ÛÇÝ ï³ñ³Í³ßñç³Ý

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center East RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

INDICATOR 6

% OF BLOCK APARTMENT BUILDINGS WITH INDIVIDUAL OR COMMON BLOC METERS

²Ýѳï³Ï³Ý ϳ٠ÁݹѳÝáõñ çñ³ã³÷ áõÝ»óáÕ µ³½Ù³µÝ³Ï³ñ³Ý ß»Ýù»ñÇ µ³Å³Ýáñ¹Ý»ñÇ

ïáÏáëÁ

15%

25%

35%

45%

55%

65%

75%

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

December 05

¸»Ïï»Ùµ»ñ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06Month

%

AWSC/ ÐæÎ

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center West RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

South Regionгñ³í³ÛÇÝï³ñ³Í³ßñç³Ý

Page 74: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

74

INDICATOR 8

REVENUE COLLECTED ON DOMESTIC SUBSCRIBERS PER REGISTERED INHABITANT

´Ý³ÏÇã µ³Å³Ýáñ¹Ý»ñÇó ³Ùë³Ï³Ý ѳí³ù³·ñáõÙÁ Áëï ·ñ³Ýóí³Í µÝ³ÏãÇ

100

150

200

250

300

350

400

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06Months

²ÙÇëÝ»ñ

Dra

ms/c

ap

/mo

nth

¸ñ

³Ù

/³Ý

Ó/³

ÙÇ

ë

AWSC/ ÐæÎ

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center West RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

South Regionгñ³í³ÛÇÝï³ñ³Í³ßñç³Ý

INDICATOR 9

COLLECTION RATIO (EXCLUDING BUDGET ORGANISATIONS)

гí³ù³•ñÙ³Ý ³ñ¹Ûáõݳí»ïáõÃÛ³Ý ïáÏáëÁ

(µ³ó³éáõÃÛ³Ùµ µÛáõç»ï³ÛÇÝ Ï³½Ù³Ï»ñåáõÃÛáõÝÝ»ñÇ)

20%

30%

40%

50%

60%

70%

80%

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06Months

²ÙÇëÝ»ñ

% O

F C

OL

LE

CT

ION

RE

VE

NU

·³

ÝÓ

í³

Í »

ϳ

Ùï

Ç %

AWSC/ ÐæÎ

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center West RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

South Regionгñ³í³ÛÇÝï³ñ³Í³ßñç³Ý

Page 75: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

75

INDICATOR 10

% OF SUBSCRIBERS WITH 4 MONTHS DEBT OR MORE THAN 4 MONTHS

²í»ÉÇ, ù³Ý 4 ³Ùëí³ å³ñïù áõÝ»óáÕ µ³Å³Ýáñ¹Ý»ñÇ ïáÏáëÁ

70%

72%

74%

76%

78%

80%

82%

84%

86%

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06Month

²ÙÇëÝ»ñ

%

AWSC/ ÐæÎ

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center West RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

South Regionгñ³í³ÛÇÝï³ñ³Í³ßñç³Ý

INDICATOR 11

AVERAGE DOMESTIC METERED CONSUMPTION PER METERED REGISTRED INHABITANT

ØÇçÇÝ ëå³éáõÙÁ ßÝãÇ Ñ³ßíáí` çñ³ã³÷ áõÝ»óáÕ µÝ³ÏÇã-µ³Å³Ýáñ¹Ý»ñÇ Ñ³Ù³ñ

50

60

70

80

90

100

110

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06Months

²ÙÇëÝ»ñ

Lit

ers

/cap

/day

ÈÇ

ïñ

/³Ý

Ó/û

ñ

AWSC/ ÐæÎ

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center West RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

South Regionгñ³í³ÛÇÝï³ñ³Í³ßñç³Ý

Page 76: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

76

INDICATOR 12

PRICE OF M3 METERED AND BILLED TO DOMESTIC SUBSCRIBERS

ê³Ï³·ÇÝÁ çñ³ã³÷ áõÝ»óáÕ µÝ³ÏÇã-µ³Å³Ýáñ¹Ý»ñÇ Ñ³Ù³ñ

75.30

96.38

8.38

20.29

83.68

116.67

0.00

20.00

40.00

60.00

80.00

100.00

120.00

140.00

1/4/2004 to 30/4/2005 1/5/2005 to 30/6/2006

Period

Àݹ³óÏ

Dra

ms/

m3

¸ñ

³Ù

/ Ë

áñ

.Ù.

Water/æáõñ

Sewerage/ÎáÛáõÕÇ

Total/ Àݹ³Ù»ÝÁ

INDICATOR 13

Avera

ge 0

5 ØÇç

ÇÝÁ

05

Mar

ch 0

6 س

ñï 0

6

June

06

ÐáõÝÇ

ë 06

AWSC/ ÐæÎ0%

10%

20%

30%

40%

50%

60%

70%

% O

F C

OL

LE

CT

ION

RE

VE

NU

г

í³

ù³

·ñ

áõÙ

ó ë

ï³

óí

³Í

»Ï

³Ù

ïÇ

%

Month

²ÙÇëÝ»ñ

GROWTH OF TOTAL COLLECTED REVENUE FROM BASE YEAR (EXCLUDING BUDGET

ORGANISATIONS)

ÀݹѳÝáõñ ѳí³ù³•ñÙ³Ý ³×Á (µ³ó³éáõÃÛ³Ùµ µÛáõç»ï³ÛÇÝ Ï³½Ù-ñÇ) µ³½³ÛÇÝ ï³ñí³ Ñ³Ù»Ù³ï

AWSC/ ÐæÎ

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center West RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

South Regionгñ³í³ÛÇÝï³ñ³Í³ßñç³Ý

Page 77: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

77

INDICATOR 14

Ratio of water volume billed on the basis of metering to the total metered and normative billed volume

æñ³ã³÷ áõÝ»óáÕ µ³Å³Ýáñ¹Ý»ñÇÝ ïñíáÕ çñ³ù³Ý³ÏÇ ïáÏáëÁ µ³Å³Ýáñ¹Ý»ñÇÝ ïñí³Í ÁݹѳÝáõñ

çñ³ù³Ý³ÏÇ Ýϳïٳٵ

20%

25%

30%

35%

40%

45%

50%

55%

60%

65%

70%

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06

Month

²ÙÇë

%

AWSC/ ÐæÎ

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center West RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

South Regionгñ³í³ÛÇÝï³ñ³Í³ßñç³Ý

INDICATOR 15

AVERAGE DAILY PRODUCTION PER EQUIVALENT REGISTRED INHABITANT/

úñ³Ï³Ý ³ñï³¹ñí³Í ÙÇçÇÝ çñ³ù³Ý³ÏÁ Ù»Ï ßÝãÇ Ñ³ßíáí

500

600

700

800

900

1 000

1 100

Base year / ÐÇÙÝ³Ï³Ý ï³ñÇÝ Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06Months

²ÙÇë

lite

rs /cap

/day

ÉÇï

ñ/³

ÝÓ

/ûñ

AWSC/ ÐæÎ

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center West RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

South Regionгñ³í³ÛÇÝï³ñ³Í³ßñç³Ý

Page 78: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

78

INDICATOR 17

RATIO OF METERED FINAL CONSUMPTION M3 TO WATER PRODUCED

æñ³ã³÷ áõÝ»óáÕ µ³Å³Ýáñ¹Ý»ñÇ ÏáÕÙÇó ëå³éí³Í çñÇ Í³í³ÉÇ ïáÏáëÁ ` ³ñï³¹ñí³Í çñÇ

ÁݹѳÝáõñ ͳí³ÉÇ Ñ³Ù»Ù³ï

4%

5%

6%

7%

8%

9%

10%

11%

12%

13%

14%

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06Months

²ÙÇë

%

AWSC/ÐæÎ

North East Region/ÐÛáõëÇë ³ñ¨»ÉÛ³Ý Ù³ëݳ×ÛáõÕ

North West Region/ÐÛáõëÇë ³ñ¨ÙïÛ³Ý Ù³ëݳ×ÛáõÕ

Center West Region/λÝïñáÝ ³ñ¨ÙïÛ³Ý Ù³ëݳ×ÛáõÕ

South Region/гñ³í³ÛÇÝ Ù³ëݳ×ÛáõÕ

INDICATOR 18

WORKING RATIO FOR THE BRANCHES WITH GRAVITY SYSTEMS

ÆÝùݳÑáë ѳٳϳñ· áõÝ»óáÕ Ù³ëݳ×ÛáõÕ»ñÇ ³ß˳ï³ÝùÇ ³ñ¹Ûáõݳí»ïáõÃÛ³Ý ïáÏáëÁ

40.0%

60.0%

80.0%

100.0%

120.0%

140.0%

160.0%

Base year / ÐÇÙÝ³Ï³Ý ï³ñÇÝ Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06

Months

²ÙÇëÝ»ñ

%

AWSC/ ÐæÎ

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center West RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

South Regionгñ³í³ÛÇÝï³ñ³Í³ßñç³Ý

Page 79: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

79

INDICATOR 19

COMPANY WORKING RATIO FOR BRANCHES WITH PUMPING STATIONS OR WATER

TREATMENT PLANTS

äáÙå³Ï³Û³ÝÝ»ñáí ϳ٠ٳùñÙ³Ý Ï³Û³ÝÝ»ñáí ³ß˳ïáÕ Ù³ëݳ×ÛáõÕ»ñÇ ³ß˳ï³ÝùÇ

³ñ¹Ûáõݳí»ïáõÃÛ³Ý ïáÏáëÁ

0.0%

50.0%

100.0%

150.0%

200.0%

250.0%

300.0%

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06

Months

²ÙÇëÝ»ñ

%

AWSC/ ÐæÎ

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center West RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

South Regionгñ³í³ÛÇÝï³ñ³Í³ßñç³Ý

INDICATOR 20

ELECTRICITY COST AS % OF REVENUE COLLECTED IN SYSTEMS WITH PUMPING OR TREATMENT

PLANTS

äáÙå³Ï³Û³ÝÝ»ñÇ ¨ Ù³ùñÙ³Ý Ï³Û³ÝÝ»ñÇ Í³Ëë³Í ¿É»Ïïñ³¿Ý»ñ·Ç³ÛÇ ³ñÅ»ùÇ ïáÏáëÁ ÀÝÏ»ñáõÃÛ³Ý

ÁݹѳÝáõñ ѳí³ù³·ñÙ³Ý Ýϳïٳٵ

0%

20%

40%

60%

80%

100%

120%

140%

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06

Month

²ÙÇë

% O

F C

OLLE

CT

ION

US

ED

FO

R E

LE

CT

RIC

ITY

EX

PE

NS

IES

г

í³

ù³

·ñÙ³

Ý %

û·

ï³

·áñÍí

³Í ¿

É»Ïï

ñ³

¿Ý»ñ·

dz

ÛÇ

ͳ

Ëë»ñÇ í

׳

ñÙ³

Ý Ñ

³Ù³

ñ

AWSC/ÐæÎ

North East Region/ÐÛáõëÇë³ñ¨»ÉÛ³Ý Ù³ëݳ×ÛáõÕ

North West Region/ÐÛáõëÇë³ñ¨ÙïÛ³Ý Ù³ëݳ×ÛáõÕ

Center West Region/λÝïñáݳñ¨Ùáõïù Ù³ëݳ×ÛáõÕ

South Region/гñ³í³ÛÇÝÙ³ëݳ×ÛáõÕ

Page 80: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

80

INDICATOR 22

TOTAL STAFF FOR 1000 INDIVIDUAL SUBSCRIBERS

1 000 µ³Å³Ýáñ¹ÇÝ µ³ÅÇÝ ÁÝÏÝáÕ ³ß˳ïáÕÝ»ñÇ ù³Ý³ÏÁ

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

Base year /

ÐÇÙÝ³Ï³Ý ï³ñÇÝ

Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06Month

²ÙÇë

Sta

ff p

er

10

00

In

div

idu

al S

ub

scri

be

rs

²ßË

³ï

³Ï

³½

Ù ³

Ù»

Ý 1

00

0 ³

ÝÑ

³ï

µ³

ų

Ýá

ñ¹

Ç Ñ

³Ù

³ñ

AWSC/ÐæÎ

North East Region/ÐÛáõëÇë³ñ¨»ÉÛ³Ý Ù³ëݳ×ÛáõÕ

North West Region/ÐÛáõëÇë³ñ¨ÙïÛ³Ý Ù³ëݳ×ÛáõÕ

Center WestRegion/λÝïñáݳñ¨Ùáõïù Ù³ëݳ×ÛáõÕ

South Region/гñ³í³ÛÇÝÙ³ëݳ×ÛáõÕ

INDICATOR 23

STAFF AND ASSIGNMENT CONTRACTOR TOTAL COST AS % OF COLLECTED REVENUE

²ÝÓݳϳ½ÙÇ å³Ñå³ÝÙ³Ý ÁݹѳÝáõñ ͳËëÇ ïáÏáëÁ ѳí³ù³·ñÙ³Ý Ýϳïٳٵ

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

100.0%

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06Months

²ÙÇë

% o

f co

llectio

n r

eve

nu

e

г

í³

ù³

·ñ

í³

Í »

ϳ

Ùï

Ç %

AWSC/ÐæÎ

North East Region/ÐÛáõëÇë³ñ¨»ÉÛ³Ý Ù³ëݳ×ÛáõÕ

North West Region/ÐÛáõëÇë³ñ¨ÙïÛ³Ý Ù³ëݳ×ÛáõÕ

Center West Region/λÝïñáݳñ¨ÙïÛ³Ý Ù³ëݳ×ÛáõÕ

South Region/гñ³íÙ³ëݳ×ÛáõÕ

Page 81: QUARTERLY REPORT June 2006 - armwater.am · INDICATORS RECAPITULATION ... Cumulative data shows a revenue / sales ratio for customers with meters of 102.9% for a ... but still there

QUARTERLY REPORT

April-June 2006

81

INDICATOR 24

ELECTRICITY CONSUMPTION IN Kwh

/m3 / ¾É»Ïïñ³¿Ý»ñ·Ç³ÛÇ ï»ë³Ï³ñ³ñ ëå³éáõÙÁ

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

Base year / ÐÇÙÝ³Ï³Ý ï³ñÇÝ Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06

Months

KW

/m3

AWSC/ÐæÎ

North East Region/ÐÛáõëÇë ³ñ¨»ÉÛ³Ý Ù³ëݳ×ÛáõÕ

North West Region/ÐÛáõëÇë ³ñ¨ÙïÛ³Ý Ù³ëݳ×ÛáõÕ

Center West Region/λÝïñáÝ ³ñ¨ÙïÛ³Ý Ù³ëݳ×ÛáõÕ

South Region/гñ³í³ÛÇÝ Ù³ëݳ×ÛáõÕ

INDICATOR 25

PERCENTAGE OF WATER DISINFECTED

²Ëï³Ñ³ÝíáÕ çñÇ %

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

100.0%

Base year / ÐÇÙݳϳÝ

ï³ñÇÝ

Average 05

ØÇçÇÝÁ 05

March 06

سñï 06

June 06

ÐáõÝÇë 06Months

²ÙÇëÝ»ñ

%

AWSC/ ÐæÎ

North East RegionÐÛáõëÇë ³ñ¨»ÉÛ³Ý ï³ñ³Í³ßñç³Ý

North West RegionÐÛáõëÇë ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

Center West RegionλÝïñáÝ ³ñ¨ÙïÛ³Ý ï³ñ³Í³ßñç³Ý

South Regionгñ³í³ÛÇÝï³ñ³Í³ßñç³Ý