Questionnaire AD-plant Page 1 of 3 Questionnaire AD-plant 1. Contact details Name of the customer: Address of the customer: Contact person: Telephone number: E-Mail address: Project Reference: Date: 2. General project information Location of the project - Country: - City/street: - Area available Does the permission of the AD-plant already exist? How will the financing of the AD-plant be arranged? Kolberger Str.13 D-24589 Nortorf Tel. +49/4392 91 77-0 Fax +49/4392 58 64 e-mail: [email protected] www.farmatic.com

Upload: taufany99

Post on 17-Dec-2015

5 views

Category:

Documents


1 download

DESCRIPTION

Questionnaire Biogas Plant

TRANSCRIPT

  • Questionnaire AD-plant Page 1 of 3

    Questionnaire AD-plant

    1. Contact details

    Name of the customer: Address of the customer: Contact person: Telephone number: E-Mail address: Project Reference: Date:

    2. General project information

    Location of the project

    - Country: - City/street: - Area available

    Does the permission of the AD-plant already exist?

    How will the financing of the AD-plant be arranged?

    Kolberger Str.13 D-24589 Nortorf Tel. +49/4392 91 77-0 Fax +49/4392 58 64 e-mail: [email protected] www.farmatic.com

  • Questionnaire AD-Plant Page 2 of 3

    3. Description of input materials

    Type of input Yearly mass [t/a]

    DS content1

    [%] DS/VS-

    content2 [%]

    Annual deviation of

    input

    Delivery of substrate3

    Impurities4 Ntotal [mg/l] or [mg/kg]

    NH4-N [mg/l] or [mg/kg]

    A Min. Max.

    B Min. Max.

    C Min. Max.

    D Min. Max.

    E Min. Max.

    F Min. Max.

    G Min. Max.

    H Min. Max.

    I Min. Max.

    1 Dry solid matter or dry solid content

    2 Volatile solids (residue of ignition, ash)

    3 E.g by tank, container or pipeline

    4 Medicine, disinfectants, packaging, sand etc.

  • Questionnaire AD-Plant page 3 of 3

    4. Application of digestate

    What happens with the digestate? Is a separation or any further treatment required?

    Do you need a digestate storage tank? Are there any legal requirements for the volume or storage time? For how many months should the storage tank be dimensioned?

    5. Infrastructure

    Which infrastructure is available on site (fresh water, sewer connection, telephone and electricity)?

    Are there any buildings or constructions existing on site? Please describe!

    6. Economic efficiency

    - Buying price for electricity: - Feed-in price for electricity: