quick frames
TRANSCRIPT
![Page 1: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/1.jpg)
![Page 2: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/2.jpg)
![Page 3: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/3.jpg)
![Page 4: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/4.jpg)
Waiting for location & sizing Wrong locations & wrong size Re-work Difficult installations (welding/fire) Forgotten frames (roof drains, etc.) Expensive and takes too long Roof frames are a pain in the ___!
ROOF FRAME FRUSTRATIONS
![Page 5: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/5.jpg)
QUICKFRAMES HISTORY
Family of Inventors
2001: Jay Soyko creates a frame due to accident
2004: US Patent
2011: Soyko Industries LLC
2012: Reaches over 2,500 frames sold!
2013: Becoming the Industry Standard
Jay Soyko & Friends
![Page 6: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/6.jpg)
WHAT IS A QUICKFRAME?
Bolt-on Patented Adjustable Pre-engineered Roof Opening
Frame
![Page 7: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/7.jpg)
RUT’S Sky lights Roof drains Exhaust fans Anything that
needs sub-desk support
APPLICATIONS
![Page 8: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/8.jpg)
Commercial buildings Pre-engineered buildings New construction Tenant improvement Panelized wood roof system
PROJECT TYPES
![Page 9: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/9.jpg)
Lower cost = lower bids & more savings Eliminates the need for detailing Avoids risk of fire in the roof or below Faster install time by 4.5 times Adjusts to site conditions Increased productivity – after the deck Reduce project delays No welding = no inspections & no skilled labor
BENEFITS
![Page 10: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/10.jpg)
Laboratory tested and approved for use by◦ Phoenix National Laboratories◦ Caruso Turley Scott Structural Engineers
Engineering for nearly everywhere in US◦ CTS will provide specific engineering as needed
When specific engineering is required, QuickFrames will provide for order over three frames
PRE-ENGINEERED
![Page 11: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/11.jpg)
12 ga Frame x 48” 6’ – 6040 lbs. 8’ – 2760 lbs. 10’ – 2060 lbs.
16 ga Frame x 48” 6’ – 1588 lbs. 8’ – 740 lbs. 10’ – 200 lbs.
WEIGHT LIMITATIONS
*Weights based on equally distributed loading. Seismic Load Category B – Snow Load 20 PSF – Dead/Live Load 10 PSF/ 20 PSF
(roof structure bearing on frame) Wind Load 90 mph, exposure C For Areas with code design greater than what our engineering states CTS can
provide site specific design.
![Page 12: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/12.jpg)
4’ 35” 51"-60" 13” <48> 12” = total 25”
5’ 40” 61"-70" 20” <60> 10” = total 30”
6’ 45” 71"-80" 27” <72> 8” = total 35”
8’ 60” 81"-110" 36” <96> 14” = total 50”
10’ 75” 111"-135" 45” <120> 15” = total 60”
15” 15"-20" 5”
20” 21"-30" 10”
25” 31"-40" 15”
30” 41"-50" 20”
35” 51"-60" 25”
40” 61"-70" 30”
45” 71"-80" 35”
60” 81"-110" 50”
75” 111"-135" 60”
Cross Rail Chart
Joist Rail Size Opening Size Adjustability
ADJUSTABILITY
![Page 13: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/13.jpg)
SIMPLE ORDERING
![Page 14: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/14.jpg)
500 Frames per Truckload
SHIPPING
![Page 15: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/15.jpg)
SHIPPING JUST A FEW?
![Page 16: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/16.jpg)
The only tool required is a ¾” wrench
We recommend a cordless impact driver
Typical install takes roughly 20-30 mins
INSTALLATION
![Page 17: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/17.jpg)
Do you know the cost of a average welded roof frame?
$500 - $1,500 depending on region QuickFrames is between $195 -$325 Skylights $130 - $185 No special inspections No welding / TI Pick-up the same day
COST BENEFITS
![Page 18: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/18.jpg)
CASE STUDY – FIRST SOLAR
![Page 19: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/19.jpg)
Wrong Orientation◦ 376 Skylights
Missed Frames◦ 80 Rood Drains/RTU’s
Wrong Locations◦ 20+
Cost Savings in Excess of
$675,000
THE PROBLEM(S)
![Page 20: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/20.jpg)
Mark Fultz VP of OperationsAble Steel Fabricators
“On our recent project of a 1.3 million square foot warehouse, utilizing QuickFrames allowed us to exceed the initial schedule by 4 weeks. When you’re talking minutes as opposed to hours to install a frame that has adjustment capabilities if there is a problem, [it] was an easy decision for us. We will never go back to the old way.”
TESTIMONIALS
![Page 21: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/21.jpg)
Nikki Wood, Project EstimatorBell Steel
“The entire process with QuickFrames was smooth and easy. I called them and they immediately were on top of handling my order. They personally came to our location to get the information on what we needed, took the time to confirm the details were accurate, and got it ordered. The project went quickly and QuickFrames was able to accommodate everything we asked for, even up to last minute changes. By using QuickFrames, a ton of my shop time was freed up, and the end result looks great. The frames blend into the roof seamlessly and if I need to move them, I can do so in a snap. I will choose QuickFrames every time over traditional frames.”
TESTIMONIALS
![Page 22: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/22.jpg)
Website DWG Files Full Engineering Report Submittals Installation Videos Written Spec
TOOLS FOR CONTRACTORS
![Page 23: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/23.jpg)
EVOLUTION OF THE ROOF FRAME
![Page 24: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/24.jpg)
PICTURE TRIVIA
![Page 25: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/25.jpg)
![Page 26: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/26.jpg)
![Page 27: Quick Frames](https://reader031.vdocuments.net/reader031/viewer/2022032003/55c73648bb61eb6b348b471f/html5/thumbnails/27.jpg)
THANKS!