PCE-based Computation Procedure To Compute Shortest Constrained P2MP Inter-domain Traffic Engineering Label Switched Paths draft-zhao-pce-pcep-inter-domain-p2mp-procedures-02.txt. Quintin Zhao, Huawei Technology Zafar Ali, Cisco Systems Tarek Saad, Cisco Systems - PowerPoint PPT PresentationTRANSCRIPT
PCE-based Computation Procedure To Compute Shortest Constrained P2MP Inter-domain Traffic Engineering Label Switched Paths
draft-zhao-pce-pcep-inter-domain-p2mp-procedures-02.txt
Quintin Zhao, Huawei TechnologyZafar Ali, Cisco Systems
Tarek Saad, Cisco SystemsFabien Verhaeghe, Thales Communication
Daniel King, Old Dog ConsultingKenji Kumaki, KDDIDavid Amzallag, BT
76th IETF Hiroshima
History• This work describes extensions to the PCE communication
Protocol (PCEP) to handle requests and responses for the computation of inter-domain paths for P2MP TE LSPs.
• Two solutions presented at the IETF74 meeting– draft-ali-pce-brpc-p2mp-ext-00– draft-zhao-pce-pcep-inter-domain-p2mp-00
• Co-chairs requested authors of both drafts communicate to determine if both drafts need to move forward independently, or might be merged
• draft-zhao-pce-pcep-inter-domain-p2mp-procedures-02 is a merged version of both initial drafts
76th IETF Hiroshima
Requirements• Allow a a P2MP TE LSP to meet specific OFs (SPT, MCT)• The Sub-tree within each domain should also be optimized
subject to the OFs• Computing each sub-tree is independent of the domain
sequences• End-to-end Path has to be remerge free• Maintain internal domain confidentiality• Grafting and pruning of multicast destinations in a domain
should have minimal or no impact on the tree in other domains• Limits the number of entry and exit points to a domain• A number of additional requirements are also specified in [
RFC5376] and RFC4461
Mechanisms Available
• Per Domain– Suited for simply-connected domains and where the
preferred points of interconnection are known• Extended BRPC
– Reuses existing techniques and suitable for multi-domain environments with few interconnection points
• Core Tree– Uses BRPC for its initial phase and utilizes additional
techniques to support multi-domain environments with many interconnection points and allows for tree reoptimization
Extended BRPC• BRPC is extended so that VSPT also includes Shortest Paths
(SPs) from:– Destination (leaf) to all exit BNs in the destination domain– From all entry-BNs to all exit-BNs at every transit domain– Can optimize by excluding entry-BNs and their sub-trees– Forms a virtual graph G(V,E), V={root, BNs, and destinations} and E={aggregate
links, inter-domain links}– Runs a suitable spanning tree (ST) heuristic to compute the tree when VSPTs
for all destinations are back
• By clustering requests of destinations, belonging to the same destination domain, performance could be improved
Extended BRPC
BN19C
S
DBN23
BN22 BN21
BN13BN5BN1
BN9
BN7
BN6 BN12BN4BN2
I
BN10
BN11
BF
E
D2
D4
D3
BN24
D1
H
D5
BN26BN20
PCE4
PCE3
PCE1 PCE5PCE6
PCE7
BN16
J
BN15
BN17
PCE2
BN18G
D6
2 Phased approach• Phase 1: PCE (1) collects XVSPTs for each of
the P2MP destinations• Phase 2: using the aggregated tree, PCE(1),
computes the P2MP tree6
BN19 BN24
D1
H
BN26BN20
PCE4
PCE(4) computes path XVSPT(4)
7
Extended BRPC – Phase 1, step 1
BN19C
DBN23
D2
BN24
D1
H
BN26BN20
PCE4
PCE3
BN16
BN17
BN18
PCE(3) computes path XVSPT(3) using XVSPT(4)
BN20, BN26 not considered
BN22 BN21
BN13BN5
8
Extended BRPC Phase 1, step 2
BN19C
DBN23
D2
BN24
D1
H
BN26BN20
PCE4
PCE3
BN16
BN17
BN18
PCE(2) computes path XVSPT(2) using XVSPT(3)
BN20, BN26 not considered
BN22 BN21
BN13BN5BN1
PCE1
BN16
BN15
PCE2
G
9
Extended BRPCPhase 1, step 3
BN19C
DBN23
D2
BN24
D1
H
BN26BN20
PCE4
PCE3
BN16
BN17
BN18
10
PCE(1) composes the aggregate P2MP tree from information collected
BN20, BN26 not considered
BN22 BN21
BN13BN5
BN16
BN15
PCE2
G
S
PCE1
BN1
10
Extended BRPCPhase 1, step 4
BN19C
S
D
BN22 BN21
BN13BN5BN1
BN9
BN7
BN6 BN12BN4BN2
I
BN10
BN11
BF
E
D2
D4
D3
BN24
D1
D5
PCE1
BN16
BN15
BN18G
D6
11
• PCE(1) completes the aggregate P2MP tree from information collected in XVSPTs for destinations D1,.. D5
• PCE(1) runs a P2MP Tree computation based on the aggregated tree
• PCE(1) replies with P2MP tree to PCC(S) 11
Extended BRPC Phase 2
Core Tree
• A Core Tree is a path tree with Boundary Nodes (BNs) from each domain corresponding to the PCE topology which satisfies the following conditions:• The root of the core tree is the ingress LSR in the root domain• The leaf of the core tree is the entry node in the leaf domain• The transit and branch node are from the entry and exit nodes from
the transit and branch domains• A Sub-Tree is a path tree within a domain with all of its root node, transit
node and leaf node from the same domain• The sub-tree within each domain is optimized subject to the OF• The Computing each sub-tree is independent of the domain
sequences• The grafting and pruning of multicast destinations in a domain has no
impact on other domains and no impact on the core-tree
76th IETF Hiroshima
Core TreeTwo phased approach
76th IETF Hiroshima
Domain1
Domain2
Domain3
Domain4
Domain5
Domain6
Core TreePhase 1: Build the core tree
76th IETF Hiroshima
PCE2
PCE1
PCE3
PCE4
PCE5
PCE6
T
U
A
EMP
RQ
W
X
ZD1
D2
• P2MP LSP Core Tree Building for the Boundary Nodes (BNs)
• Based on BRPC procedure, builds a VSPT which has the egress as the root and the ingress as the leaf
• The source PCE builds all possible Core Trees based on the VSPT computed from previous step and find out the optimal Core-Tree based on the OF
Core TreePhase 2: Graft destinations
76th IETF Hiroshima
PCE2
PCE1
PCE3
PCE4
PCE5
PCE6
T
U
A
EMP
RQ
W
X
ZD1
D2
• Grafting destinations or the sub-trees in each domain to the P2MP LSP Core Tree computed from phase1
Summary & Next Steps
• Both mechanisms were presented at iPOP 2009 (Tokyo) and MPLS 2009 (Washington)
• A lot of common ground exists between both mechanisms• Lots of work and analysis ahead. We would appreciate
feedback on both solutions from the WG• We will continue to review requirements and select the
technique that best meets the requirements • Authors would like the draft to become a WG document