[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008). The Large Hadron Collider Contents: 1. The machine II. The beam III. The interaction regions IV. First LHC beam. III. First LHC beam. Contents: Injection test 1 Injection test II Injection test III - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

The Large Hadron ColliderContents:

1. The machineII. The beam

III. The interaction regionsIV. First LHC beam

[R. Alemany][CERN AB/OP]

[Engineer In Charge of LHC]Lectures at NIKHEF (12.12.2008)

Page 2: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

III. First LHC beamContents:I. Injection test 1II. Injection test IIIII.Injection test IIIIV.10th September

Page 3: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.1. Injection Test 1

8 to 10.08.2008

Page 4: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.I. Injection Test 1 Achieved

Synchronization SPS – LHC Beam 1 injected IP2 Through to collimators in IP3 first shot Trajectory correction Kick-response measurements Off-energy measurements (dispersion) Explored the aperture First beam induced quench

Discovered Aperture restriction in the injection line

Traced to misaligned vacuum pump Optics problem IP3

Polarity convention QTL

Page 5: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.II. Injection Test 2

22-24.08.2008

Page 6: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.II. Injection Test 2 Achieved

Beam 2 injected IP8 Through to collimators in IP7 first shot Trajectory correction Kick-response measurements Off-energy measurements (dispersion) Explored the aperture Beam 1 injected IP2 Through to collimators in IP3 Aperture in injection region OK Polarity correction confirmed Interleaved injection

Discovered Optics problem at the end of the TI8 line

Page 7: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

I.I. Basic layout of the machine: quadrupole corrector magnets

LHC TDR

Fo

Do

MSCB

MCBM (dipole):Nominal main field strength = 2.93 TInominal = 55 A, 1.9 K, L=78.5 cm, ~143 kg

MSM (sextupole):Nominal main field strength = 4430 T/m2

Inominal = 550 A, 1.9 K, L=45.5 cm, ~83 kg

ChromaticityOrbit

Explore a range of particle angles (=kick strength) with one corrector dipole, then go to the next one

Page 8: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.II. Injection Test 2Beam 1 injected IP2Through to collimators in IP3Aperture in injection region OKPolarity correction confirmedInterleaved injection

DiscoveredOptics problem at the end of the

TI8 line

Page 9: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.III. Injection Test 3

5 – 7.09.2008

Page 10: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.III. Injection Test 3 Achieved

Beam 2 injected IP8 Threaded to dump in IP6 Steered then inject and dump Beam 1 injected IP2 Threaded through to coll in IP5

Discovered Optics problem in IP7

Polarity convention on Q6 Optics problem in IP4

Polarity convention

Page 11: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September

10.09.2008

Page 12: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of SeptemberAchieved

Beam 1 injected IP2Threaded around the machine in 1hTrajectory steering gave 2 or 3 turns

Beam 2 injected IP8Threaded around the machine in 1h30Trajectory steering gave 2 or 3 turnsQ and Q’ trims gave a few hundred turns

Page 13: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of SeptemberBeam 1 – First turn

trajectory

Each point is a BPM (Beam Position Measurement)

49 mm apertureARC BPMs

Betatron oscillation

Page 14: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September Beam 1 on TDI screen – 1st and 2nd

turns

ALIC

E

Page 15: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September Beam 2 – First turn

trajectory

Horizontal position (mm)

Vertical position (mm)

Page 16: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September Beam 2 – first turn dispersion

measurement

ppsDx x

)(

RF

Page 17: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September Beam 2: Longitudinal Bunch Profile

~ 200 turns

Page 18: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September Beam 2 closed orbit

Page 19: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September Beam 2 beta measurement

QF

QD

Page 20: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September Beam 2 beta measurement

Reminder from BH lectures

Page 21: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September Beam 2 integer tunes

Qx = 64

Qy = 59

Page 22: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September Beam 2 tunes

Qx = .279Qy = .310

BPM pos FFT tune

Page 23: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September Beam 2 fast BCT (Beam Current Transformer)

FBCT

Inte

nsity

~ 3 109

Page 24: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September Beam dilution on dump block

~ 8 m

concrete shielding

Beam Dump Block (graphite)

Page 25: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September Beam 2 captured – mountain range

display

Now RF ON

Bunch length

Turn

num

ber

Page 26: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September Fast start 10, 11 and 12

All done in 3 days Made possible by

Meticulous preparation Magnetic model data Sophisticated settings generation Dry runs Injection tests

Powerful control system (LSA) Powerful instrumentation working very quickly Logging a multitude of parameters

Allowed early look at several machine parameters systematic check of orbit system

Page 27: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

IV.IV. 10th of September