r' approved for release: c05032174 top seer!...mission arrival. mission production describes in...

71
r' 1 . L r . I 'O=l r • I L. r L L l L r' L r " I L r ...... I i.,... Approved for Release: 2018/06/25 C05032174 NATIONAL SECURITY INFORMATION Unauthorized Disclosure Subject to Criminal Sanctions Sensitive TOP SEeR!.T HtJU\bUI'l BIF_ooaB-GH-04259-I.-75.,. / This document contains __ 7_2 __ pages and appendixes ____ pages Copy ;Z if 40 copies " BRIDGEHEAD WARNING NOTICE Intelligence Sources and Methods Involved CLASSIFIED by IYIEM£N 1 EXEMPT FROM GENERAL DEClASSIFICATION SCHEDULE OF EXECUTIVE ORDER 11652 EXEMPT/ON CATEGORY 2. DEClASSIFY on: IMPOSSIBLE TO DETERMINE GAMBIT TOP SECRET HEXAGON .,.1- "Handle Ilia BYEMAN Con t rOil System On I y '- _-_._- ____ c_·_"_'_"'_"_"_" __ lL-"_-_" _". for Release: 2018/06/25 C05032174 r-

Upload: others

Post on 25-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r' 1 . ~

L r . I 'O=l

r •

I L.

r L

L

l

L r' L

r " I L

r ......

I i.,...

Approved for Release: 2018/06/25 C05032174

NATIONAL SECURITY INFORMATION

Unauthorized Disclosure Subject to Criminal Sanctions

·m~ Sensitive

TOP SEeR!.T HtJU\bUI'l BIF_ooaB-GH-04259-I.-75.,. {)~I /

This document contains __ 7_2 __ pages

and appendixes ____ pages

Copy ;Z if ~f 40 copies

" BRIDGEHEAD

WARNING NOTICE

Intelligence Sources and Methods Involved CLASSIFIED by IYIEM£N 1 EXEMPT FROM GENERAL DEClASSIFICATION SCHEDULE OF EXECUTIVE ORDER 11652 EXEMPT/ON CATEGORY 2. DEClASSIFY on: IMPOSSIBLE TO DETERMINE

GAMBIT TOP SECRET HEXAGON

.,.1-

"Handle Ilia BYEMAN Con t rOil System On I y

'-_-_._-____ c_·_"_'_"'_"_"_" __ lL-"_-_" _". _··_~,_-_··Approved for Release: 2018/06/25 C05032174 r-

Page 2: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r-L

[

r-I

L

I I L...

[

[

[

[

l [ ... -L [

[ r ' I I L-..

r .

L '-,-, -

INTRODUCTION

SECTION I

SECTION II

SECTION III -

SECTION IV

SECTION V

Approved for Release: 2018/06/25 C05032174 GAMBIT

TOP SECRET ~GON

TABLE OF CONTENTS

FACILITIES

Describes the physical location and size of the Primary NRP Processing Center and identifies work areas within the complex.

MISSION PREPARATION

Discusses tasks that are accomplished to establish readiness prior to mission arrival.

MISSION PRODUCTION

Describes in chronological order the typical workflow of a satellite mission payload through processing and reproduc-tion.

PRODUCTION CAPABILITIES

Describes production performance capa-bility in terms of quantities of pro-duct delivered, timelines, etc.

MAJOR ITEMS OF EQUIPMENT

Provides a brief description tif major items of ground handling equipment used in the processing center.

GAMBIT TOP SECRET HEXAGON

-3- -

--- -,- ,.,. - - -~ 1 -. , .... - Approved for Release: 2018/06/25 C05032174 1_

BIF-008B-GH-042S9-1-7S-

Page 4

Page 6

Page 13

Page 20

Page 56

Page 60

Handle via BVENAN Control System Only

/

Page 3: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP' SEeRET HEXAGON BI F-008B-GH-042S9-1-7S-

PROGRAM RESPONSIBILITIES

INTRODUCTION

EKC - BRIDGEHEAD

Develop and operate the primary NRP (TS) Film Processing and Reproduction Center.

Equip,. install and assist-operate NRP (TS) Field Film Processing and Reproduction Facilities.

Provide technical and logistic photographic support to all NRP (TS) program elements.

Conduct a R&D program, under a CCB, to:

Improve the practices, techniques, processes, and equipments concerned with exposure analysis and prediction; and the processing, reproduction, evaluation and analysis of photographic imagery.

Establish and maintain NRP (TS) sensitometric reference standards.

PROGRAM OPERATION

Under the administrative, contractual and·security aegis of CIA-OSP.

Under the budgetary and operational control of DNRO (S).

Performs the following mission-related tasks:

Receives and downloads all space mission film recovery hardware.

Chemically processes all mission original B&W and Color photographic acquisition films.

~its, composites, and titles augmented data on such films.

- Performs image and exposure analysis, and

Performs image reproduction services, delivering finished photographic duplicate copies (including special enlarge­ments) in accordance with the quantity, quality .and time­line requirements of the COMIREX.

GAMBIT TO,. SECRET H~ON

-4-

Approved for Release: 2018/06/25 C05032174

Handle vi a BYEMAN Control System Only

J J J

I J

i --i

I J

I ~

J

J

J 1

--'

J 1 !

--i

, ,

J

J

Page 4: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

[

[

[

[ r--

L r L

[

[

[

[

[

[

[

[

[

[

[

[

l

Approved for Release: 2018/06/25 C05032174 GAMBIT

lOP' S!CRET HEXAGON

Coordinates the development of

B/F-008B-GH-04259-I-75-

- Specifications for and methodology of manufacturing test and flight film supply loads for all NRP (TS) programs; maintains orderly manufacturing and logistics flow to depots and satellite load requirements.

Operates a Film Evaluation And Test Laboratory (FEAT).

GAMBIT TOP SECRET HEXAGON

-5- -

T • • . . " - Approved for Release: 2018/06/25 C05032174 I"

Handle via BYEMAN Control System Onl y

Page 5: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP' SECRET HEXAGON 8/ F-008B-GH-042S9-1-7S-

SECTION I

FACILITI ES

The Bridgehead Processing Facility is located in Rochester, New York at the Hawkeye Plant of the Eastman Kodak ·Co., Kodak Apparatus 'Division. (Fi gures 1 & 2).

The Facility houses the processing and reproduction operation as well as the R&D and engineering functions.

Bridgehead currently consists of:

1st Floor - Bldgs. 3-7-12-13 (Figure 3) 2nd Floor - Bldgs. 1-2-3-10-11-12 (Figure 4) 3rd Floor - Bldgs. 1-2-3-6-10-11 (Figure 5) 4th Floor - Bldgs. l-2-3-6~10-11 (Figure 6) 5th Floor Bldgs. 1-6-10-11 (Figure 7)

The facil;ty is protected by a Security Perimeter with access only through a Guard Post on the 4th Floor of Bldg. 6. Movement within the facility is handled by 3 stairtowers and 3 elevators which are secured at the perimeter boundaries.

The floor plans (Figure 3-7) show the locations of the major items of equipment and work areas assigned to the processing and reproduction operations.

In addition, a small portion (approx. 9000 sq. ft.) of the Lincoln Plant Facility, located approximately 4 miles S.W. of Bridgehead, is used for Color Processi ng. It is expected thi s porti on wi 11 be moved to Bridgehead during FY-76.

GAMBIT TOP SECRET HEXAGON

.,.6-

Approved for Release: 2018/06/25 C05032174

Handl e vi a BY EM AN Control System Onl y

J i

.J

1

J I

.J

I

-.l

I .J

J i

J

J 1

-.l

I -.J

J

Page 6: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

- -----

,­I

L _

r /.~

;? l _ /'

r ,

r ,

r J L

r I ,

r I I c

r

r r I

r ! l

I l

r I l

/

III :> c III >

<:

--.-

II

-

.

Approved for Release: 2018/06/25 C05032174 GAMBIT

TOP 'SECRET ~GON, BI F-OOBB-GH-04259-I-75-

.-_ .. -

Figure 1 - Hawkeye Plant

--.

-- --

5

River ._-"-- - - ._ ..

-

12A

I 10

-51 Paul Slreel

Fiqure 2 HAWKEYE PLANT

Eastman Kodak ~ompany Kodak Apparatus Division

12

11 11A

6

GAMBIT

TOP SECRET H~ON

-7 -

3

--.

. -- ---

-clr-' \

8

7 i---

9

1

J-jJ - I-

2

Handle via BYEMAN Control System Onl y

.. ~ ______________ Approved for Release: 2018/06/25 C05032174

Page 7: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

J­,/

o

o

o

u

BLDG 10 o

o

o

j--l 1

1

I 1 1

1 I L __ J

~

Approved for Release: 2018/06/25 C05032174

GAMBIT

a

D

BLDG II

n

o

[]

TO,.· 5~CR~T HEXAGON 81 F-008B-GH-042S9-I-7S-

Color Chem Mix

ffluent Tanker h-...6..-~:::::::::::C:::i

Equip. -.

BLDG 81 BLDG 3A BLDG 13

~~-LrD BLDG /3 n

a t BLDG 2

o

D

o

a

BLDG 6

BLDG I

1st FLOOR

Fiqure 3

GAMBIT

TOP SECRET HEXAGON

-8-

Approved for Release: 2018/06/25 C05032174

Handle via BYEMAN Control System Only

Page 8: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

[,

[

[

[

[

[

[

1-.....

l [,

Dalton Processor

[ Support Equip.

[ Silver Recovery

[

[

[

[ r"

L

L l

"

~ \!) c

en

Approved for Release: 2018/06/25 C05032174 GAMBIT

o 0 0 o

o 0 0

0

I D

I I 0

I

a

TOP SECRET HEXAGON

BlDG 12

o o 0

::: ~ 0 oJ III " \!)

0 -! c:Q

IlDG 1

2nd FLOOR

Fi qure 4

GAMBIT

TOP SECRET ~ON -9-

_ L'--~ __ ~-- -Approved for Release: 2018/06/25 C05032174

j ~

8/F-008B-GH-042S9-I-7S-

Processor

D 1_

, Handl e vi a BY EM AN Control System Only

Page 9: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Dalton

Approved for Release: 2018/06/25 C05032174

o 0 o 0 0 0

GAMBIT TOP SECRET HEXAGON

BLDG 12

o 0 o o o 0

Monitor

a Dupe Inspection

0 Mission Analysis

Area

I<) \!) a .J CIl

<\I \!) CI .... CI!

BLOe» (, Primary Breakdown

BLDG 1

3rd FLOOR

F;qure 5

GAMBIT TOP SECRET HEXAGON

-10-

D

____ Approved for Release: 2018/06/25 C05032174

BIF-OOBB-GH-042S9-1-1s-

a

0

D

" b

C

Handle via BYEMAN Control System Onl y

,

J

I '-'

J 1

J 1

J

J 1

--'

, I

--'

1 I

---1

, I

--'

J

J

J

Page 10: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

[

c [

[

I L

[

[

[

[

[

[

[

[

[

[

[

[

Approved for Release: 2018/06/25 C05032174 lIJ-\1VID.L 1

TOfl .5~CI~T MEXAGON

BLDG 12 uv 0 0 p ~-. -0 u==cr--u

0 0 0 0 1° o 0 m ro-':,O

I

--- -- -0

IE Sensitometer' __ ~~~~~=+:l~

Quality Control Area

Yardleigh . Support EQuip.

Dundee ______ ~~~~ Processor

Guard Postlol.. __ ~>

BLDG 6

Commo Center

0

0

Film Storage

.4th FLOOR Feat Lab.

Fiqure 6

GAMBIT

TOP SECAET.H~ON -11-

., ... __ .~_Approved for Release: 2018/06/25 C05032174 •.

BIF-OOBB-GH-04259-1-75-

a

Handle via BYEMAN Con tro 1 Sys tem On 1 y

Page 11: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT

TOP SECRET HEXAGON BI F-OOBB-GH-04259-1-75-

BLDG 12

o 0

o 0

Spricous -~~~-4-W ...-...... -1 ..--.-..-C~hemical Storage Processor

Chemical -=---lQo.

Mix ~ 0 Ib 0 ~ 0

Yardleigh _~~o~~~ Pr.ocessors

ROOF BL :3

General Offices

5th FLOOR

Figure 7

GAMBIT

TOP SECRET HEXAGON

-12 -

ROOF BLDG 2

\

Handle via BYEMAN Control System Only

Approved for Release: 2018/06/25 C05032174_.

J J J

1 I

-..-J

1 .J

1 I

..J

J J J

1 I

.J

J

1 J

J

I --'

I I

--J

Page 12: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r

r"'

I

r r-"'

I I , L.

r L

, l

[

l.

l. [.

I L

Approved for Release: 2018/06/25 C05032174

GAMBIT TOfl SECRET ~GON

SECTION II

MISSION PREPARATION

BIF-008B-GH-042S9-1-7S-

Prior to the arrival of a Gambit or Hexagon mission recovery vehicle, readiness certification of hardware, systems and materiel'is essential to expedient handling of the mission film. This readiness certification has three major components:

1 .. Procurement and Certification of Expendables

2. Dupl icating Films

3. Processing Chemistry

PROCUREMENT AND CERTiFICATION OF EXPENDABLES

Expendables required for a typical mission include duplicating fil.ms, processing chemistries and shipping materiels which are ordered, received and stored in sufficient quantity for all the production operations re­quire.d for a given recovery vehicle.

DUPLICATING FILMS

The film used for preparing mission duplicates is manufactured in splice-free rolls 9-1/2 inches wide by 1000 ft. long for Gambit missions and 6.6 inches wide by 1400 ft. long for Hexagon missions. Duplicating films are segregated by emulsion type; width and photographic (sensito­metric) response. ~ch batch is sampled and pre-tested in the Production cycle in order to thoroughly analyze its sensitometric and photographic properties. Films are then stored under cold room conditions awaiting use.

, GAMBIT TO,. SECRET HEXAGON

-13-

Handle via BYEMAN Control System Only

.~ _____________ ~Approved for Release: 2018/06/25 C05032174=============="""

Page 13: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174 , GAMBIT

10' SECREl HEXAGON 81 F-008B-GH-042S9-1-7S-, -

PROCESSING CHEMISTRY

A typical Hexagon mission requires 34,000 lbs. of powder chemicals and a typical Gambit mission requires 17,000 lbs. of powder chemicals. The liquid and viscous processing solutions are mixed in the Chemical Mix Room (Figure 8)-from which they are piped to the various processors in Bridgehead. Chemistry is mixed in sufficient quantity to fill all storage tanks before the mission arrives and as the solutions are ex­pended during Production operations, additional mixes are made.

All processing solutions are certified for use before being com­mitted to a processor. This certification includes laboratory chemical analysis (Figure 9) and photographic performance analysis performed on simulation sensitometric test processors, such as the Dundee (Figure 10).

Figure 8- Chemical Mix Room

GAMBIT

TOP SECRET H~ON -14-

Handle via BYEMAN Control System Only

I '

1

_______________ Approved for Release: 2018/06/25 C0503217 4,===========~_=

Page 14: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

. -

I i '-

r-' I

r

r l _

,...., I L.

[

Approved for Release: 2018/06/25 C05032174

GAMBIT lOP SECRET HEXAGON

Figure 9 - Chemical Laboratory

Figure 10 - Dundee Processor

GAMBIT TOP SECRET HEXAGON

. --15-

BIF-008B-GH-04259-1-75-

Handl e vi a BY EM AN Control System Only

1===================,Approved for Release: 2018/06/25 C05032174 ___________ _

Page 15: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174 GAMBIT .

TOP' SECRET ~GON

PHOTOGRAPHIC QUALITY CONTROL MATERIALS

BIF-008B-GH-04259-1-75-

There are two main types of photographic quality control materials required for mission operations:

Sensitometric Control

Sensitometric step wedges or strips are the basic tool for controlling the photographic response of printers and processors. These strips are exposed on the lB Sensitometer (Figure a precision instrument with rigidly controlled exposure conditions to insure that all strips on a given film type are identical. Before a mission arrives, an adequate supply of sensi­tometric strips is prepared and stored in a freezer to guarantee the stability of the latent images. During the mission these ~trips are processed at specified intervals and compared to establish standards to maintain process control. Pre-processed strips are printed onto duplicate film, also at specified intervals, and then processed and compared to appropriate standards. All sensitometric strips are read on a Densitometer (Figure l2} and the data is plotted to obtain the characteristic or H&D curve that is compared to the standard.

Physical Quality Control

Uniformly exposed or "flashed" film is used to assure that the physical quality of the film from a processor is as high as possible. Prior to mission arrival, long lengths of raw film stock are given uniform exposure on the Rawstock Flasher (Figure 13). Exposure conditions for the flasher are selected so that the return density of the processed film will be the optimum to reveal even the most subtle processing defect. Flash material is processed immediately before and after the original camera films and at the specified in­tervals with sensitometric strips on the duplicate processors.

Figure 11 .". lB Sensitometer GAMBIT

TOP SECRET H~ON -16-

Handle via BYEMAN Control System Only

c--,

I

11)

m _________ .,---_-=-~___:=-=~Approved for Release: 2018/06/25 C0503217 4= __ =_====~ ____ ~

Page 16: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r I

r L.

r I 1.

,-, \

I

,.-I

~

J

,--I \

L

r L

r

l.

l l

----------- -- -- - -- -- - - ---- - -

Approved for Release: 2018/~6/25 CO'?'Q~~l? 4

TOP SECRET HEXAGON

Fj~ure 12 - Densitometer

Figure 13 • Rawstock Flasher

GAMBIT TOP SECRET H~ON

-17-

BIF-008B-GH-04259-I-75-

Handle IIi a BYEMAN Control System Only

.===============Approved for Release: 2018/06/25 C0503217 4 _____________ ~

Page 17: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

MISSION DATA

Approved for Release: 2018/06/25 CO~E.~~l ~ 4

TO .. SECAIiT ~GON BIF-008B-GH-04259-1-75-

As a typical mission is flying, data that is needed at certain stages of the Production operation are received via the data link. This data is then processed on the Univac 9300 Computer "(Figure 14) to provide the inputs that are needed for various operations. Included in these inputs are frame number, length and classification in­formation for the Optical Titling System, Geographic Area Breakdown information for the original negative breakdown and compositing operations, and custome~ distribution require­ments for duplicate copies."

Some of this data is used to make t~e identification friskets for the original negative film after processing. These "idents,j are generated on the Ident Printer (Figure 15) by exposing onto raw film all the identification required for each roll of film, i.e., mission number, camera, date, security classification, Geographic Area, etc. This film is then processed and cut into the proper lengths to be spliced,on the indi­vidual rolls during the original negative breakdown operation.

PREVENTIVE MAINTENANCE AND CERTIFICATION OF HARDWARE

Prior to the arrival of each mission"preventive maintenance/certification work is performed on the various pieces of equipment used by Production. This maintenance activity helps to assure high quality output from the equipment, avoid hardware failures that may jeopardize the customer's film or delay shipment~ and increase the useful life of the equipment. The, Bridgehead facility includes a well-equipped Maintenance Shop (Figure 16) staffed by technicians skilled in the maintenance of ground-handling equip­ment for aerial photography.

Figure 14 - Univac 9300 Computer GAMBIT

TOP SECRET H~ON -18-

Handle via BYEMAN Con tro I System On I y

_ J

'l I

--------,----------Approved for Release: 2018/06/25 C05032174---------------

Page 18: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r I l.

r l

I

,-I

Approved for Release: 2018/06/25 C05032174

GAMBIT fOP SEeR!T ~GON

Figure 15 - Ident Printer

Figure 16 ~ Maintenance Shop

GAMBIT TOP SECRET HEXAGON

-19 - -

Approved for Release: 2018/06/25 C05032174

8/F-008B-GH-042S9-1-7S-

Handl e vi a BYEMAH Control System Only

Page 19: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP' SECRET ~GON

SECTION III

MISSION PRODUCTION

1. MISSION PROCESSING AND REPRODUCTION SEQUENCE

BIF-008B-GH-042S9-1-7S-

Figures 17 and 18 provide detailed work flow diagrams for Hexagon and Gambit processing and reproduction.

In the pages that follpw, Section III describes in chrono­logical order the major operations of these processing cycles.

:--t

GAMBIt I OP S~CRET HEXAGON

-20-

Approved for Release: 2018/06/25 C05032174

Handl e vi a BYEMAN Control System Only

~

I I I . ,

Page 20: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r I l

r I , L _

r L _

r . I ,

L

r ,

r­I

,--i

" , I

r-

r­!

r

r L

r-

i

[ r--I

Approved for Release: 2018/06/25 C05032174

GAMBIT TOPSECAET ~GON BIF-008B-GH-042S9-1-7S-

." COPI .. ··----~T= "H "

MISSION FLOW eMARl

cvr AI TAIII·Off 1100'

I.IIIInII

r

IIIIICf O. IIH ,.,. AU. IIUICnI

SCM D. __

PIIIIIY 2 a.ln

011 CAY\IIA

, "PI lUff NIle ..

IMIPItI • NIOIITY

Fiqure 17

TlTLi I .. PKT

(. TUCIII. ....

TlTLI ....... I. ."

r--lC=:l I U.I .... i' PlIIIIIII'I .

I. CLIlII TITLIJ II'IOOWII I IlIO'V O .....

"Gil MISSION FLOW CHART

r::~ II -..2!.... ~DlO'~' laD ... - alMI', _ DlO I i PlIIIY . RII PIOCIII: I'OIIIT TICIIIT ~~:::::::::::'_J i WT. Ik. SAMflIlC , 011 lII0I11

~~I ri::;:~==':::!'J ,. __ r#I'I... _ ~ 0UPl I ! PlIIII'

,.. .. - :~'-I, 12:. i -'"'.!!. I CU$lOlllll 1111""" NOIIITOII --.... ---- -.-. . ~ . : DUNS L--J •

, PIIG I fOIl . SIIIPMOIT: I ,

FiClure 18

GAMBIT TO,. SECRET HEXAGON

-21-

Handle via BYEMAN Control System Only

Approved for Release: 2018/06/25 C05032174 ______________ _

Page 21: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT TOfi SECRET HEXAGON

2. RECEIPT OF MISSION

BIF-008B-GH-042S9-I-7S-

The film payload, in the Satellite Recovery Vehicle (SRV), arrives at a local airport on a USAF Courier Aircraft (Figure 19) and is transported via truck to the Bridgehead Processing Facility.

Upon receipt, the SRV (Figures 20 and 21), i$ removed from its shipping container, weighed and placed in a special holding frame which aligns the SRV with the Presp1ice Complex.

Figure 19

Shipping Container in Aircraft

GAMBIT TOP SECRET HEXAGON

-22-

Handle Ilia BYEMAN Control System Onl y

-,

Approved for Release: 2018/06/25 C05032174 _____________ _

Page 22: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r 1

r I I I

r--I l

r

1

r

I l .

r­i

r L

r­I

---------- -------------------------------------------~ ~ ________ l

Approved for Release: 2018/06/25 C05032174· GAMBIT

TO,. SECRET HEXAGON

, I' I

~\---a~ • , r.Y .:.

o ,

_ < ~ D ~ .-::. ~ ----;;---~ -= ":. . -~

Figure 20 - Hexagon SRV

Figure 21 - Gambit SRV

GAMBIT TO,. SECRET HEXAGON

. -23-

BIF-OOBB-GH-042S9-1-7S-

Handle vi a BYEMAN Control System Onl y

.. ~ ____________________________ Approved for Release: 2018/06/25 C05032174

Page 23: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

3. DOWNLOADING/PRESPLICE

GAMBIT TOP' SECRET ~GON BIF-008B-GH-042S9-1-7S-

The downloading/presplice operation consists of despooling the SRV payload tb permit inspection for defects tnat might create problems during processing and to configure the film roll in "as flown" or "heads out" order for the processor. This operation takes place in the dark, but non-contacting infrared detectors and viewers are utilized to assist the operators. The film payload is transported across the. Presplice Complex under controlled tension and onto a take-up spool dolly which will later be ~ligned to the feed end of a processor. (Figures 22 and 23). After an entire roll has been despooled and suitable photographic control materials have been prespliced to each end, a light-tighi cover is placed over the take-up spool dolly and it is moved to.a processor room. '.

GAMBIT TOP SECRET HEXAGON

-24-Approved for Release: 2018/06/25 C05032174

Handle via BYEMAN Control System Only

Page 24: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r

L

r r L.

r l

r : I l

r , l

[

[

[

[

[

~ r f l

Approved for Release: 2018/06/25 C05032174 GAMBIT

fOP· SECRET HEXAGON - BIF-008B-GH-042S9-1-7S-

Figure 22 - Hexagon SRV Interfaced with Presplice Complex

Figure 23 - Gambit SRV Interfaced with Presplice Compl ex.

GAMBIT. TOP SECRET HEXAGON

-25-

Approved for Release: 2018/06/25 C05032174

Handle via BYEMAN Control System On1.y

Page 25: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT TO .. 'S~CR!T ~GON

4. ORIGINAL NEGATIVE PROCESSING

BIF-008B-GH-042S9-1-7S-

There are two Yardleigh Processors (Figure 24) at Bridgehead for the continuous processing of original negatives of any length. They may be operated simulataneously when there are two ·film polls, as from the Forward and Aft Cameras of a Hexagon Mission. The through­put rate is from 23-27 feet per minute, depending on the· sensitometric properties of the particular film being processed.

The transport dolly that was loaded during Presplice is po~i­tioned at the feed end of a Yardleigh Processor, room lights are turned off and the cover is removed. The head of the roll is spliced to leader which is already threaded through the machine. Previous nstart~upsN have established that the machine is in sensitometric control and not causing physical defects such as scratches. The sequence of processing steps is:

1. Static viscous layer development.

2. Fix

3. Dye Removal

4. Wash

5. Photoflo

6. Dry

The vi$cOUS d~veloper is extruded onto the emulsion side of the film through a coating hopper and provides a dual gamma sensitometry.

During the processing operation, which may last for 24 hours, critical machine parameters such as temperatures, solution pressures and transport speed are monitored by a computerized system (Figure 25) to assure stable photographic control throughout the processing run.

GAMBIT

TOP SECRET H~ON -26-

Approved for Release: 2018/06/25 C05032174

Handle via BYEMAN Control System Onl y

l

-.

Page 26: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r L

r I l_

r

r­t I l _

r I I

t

r l

r I I

ir ; t I

r

L

~.

[

[

[ r

Approved for Release: 2018/06/25 C05032174 GAMBIT

TOP S!CRfT HEXAGON -

Figure 24 - Yardleigh Processor

Figure 25 - Yardleigh Monitor Area

GAMBIT TOP SECRfT HEXAGON

-27-

I=""""",~=======_~=~---,Approved for Release: 2018/06/25 C0503217 4 _

BIF-008B-GH-042S9-1-7S-

. I

.'4 .{!~ .' l' . ,

Handle via BYEMAN Control System Onl y

Page 27: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

5. OPTICAL TITLING

Approved for Release: 2018/06/25 C05032174

GAMBIT TOr· SECRET HEXAGON BIF-008B-GH-042S9-1-7S-

Titles, consisting of mission and frame number, date of photography, security classification, and other information, are exposed on the film optically during the processing operation. The developer action proceeds· to the point where camera-exposed framemarks can be detected to provide image location information. Immediately following framemark detection, the optical titling system exposes single- or double-row man-readable characters and machine-readable binary code along the edge of the .film (Figure 26). The developer action continues to process these characters to a legible and reproducible density (Figure 27).

Titling is controlled by a computer (Figure 28) that has previously received a film format and title information "roadmap" that is prepared from information received via the data link (see page 18). Inputs are provided to continuously check· HIm format and location against this data, to inhibit titling if a camera or format error exists, and to restart titling when synchronization is re-established. Software has been designed to accommodate a variety of possible camera anomalies.

The title exposing devices utilize fiber optics to achieve the small size required as a source and permit mounting of the actual exposing devices outside of the processor frame. The exposing heads are mounted on a carriage which tracks the film edge to insure proper title positioning in the available edge space. Progr~mmable logic and footage and framemark detectors p'rovide output commands to the titling exposure devices.

Figure 26 - Optical Titling Station

GAMBIT TOP SECRET HEXAGON

-28-

.============~~ __ Approved for Release: 2018/06/25 C05032174

Handl e vi a BY EM AN Control System Only

,....., I I

Page 28: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

------------------====~-- - ----

r l

r I

l

r i l

,-I

r

Approved for Release: 2018/06/25 C05032174

GAMBIT TO,. SECRET HEXAGON B/F-008B-GH-042S9-I-7S-

CHARACTER FRAME MARK GENERATOR DETECTOR

cC? CUTOFF

I I FIX -

~--~~~~~~~~~~~~~~~--'~NH

lOGIC

ROAD MAP

OPTICAL TITLING SCHEMATIC

Figure 27 - Optical Titling Schematic

Figure 28 - Optical Titling Computer Station

GAMBIT

TOP SECRET H~ON

-29-

Handle via BYEMAN Control System Only

Approved for Release: 2018/06/25 C05032174 ______________ _

Page 29: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

6. PRELIMINARY EVALUATION

GAMBIT TOP S!CR!T HEXAGON BIF-008B-GH-04259-I-75-

Each camera roll is fed into the processor as a continuous length of film, but at regular intervals a cut is made between two frames at the processor take-up and a "lab-cut" enters the reproduction cycle. The lab-cut is quickly given a Preliminary Evaluation (Figure 29) to check for possible processo,r-induced anomalies that would dictate immediate corrective action. During this evaluation . ., temporary identification leader and trailer are spliced to each end of the roll to facilitate handling and to protect the original· negative from damage. The accuracy of the optical titling is now checked and if corrections or additional manual titling are required, it is noted for subsequent action.

7. TITLE CORRECTION/ADDITION

Since an optical title is a photographic image, prov1s1on for the correc­tion of erroneous titling requires unique procedures. The technique that is used, if necessary, involves subJecting the emulsion to an air-carried abrasive material. The erroneous portion of a title is positioned over an aperture and the nozzle­directed airbrasive removes that portion of emulsion and title exposed in the aper­ture (Figure 30). Then the correct title is applied via the conventional pigment transfer met~od using a Unimak Titler.

In the case where synchronization is lost in the optical titling system because of format errors or, other malfunction, optical titling is inhibited and portions of the record come from the processor untitled. In this case, the proper title is determined and added using the Unimak Titler (Figure 31).

Figure 29 - Preliminary Evaluation

GAMBIT TOP S!CR!T HEXAGON

-30-

Handle via BYEMAN Control System Only

r-; I

I I

Approved for Release: 2018/06/25 C05032174 ______________ _

Page 30: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

,.--------------------~~- --- ---

L _

[

'r L

r l

'I !

r

l

I l

r I

I

t-

I L.

I

l I

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP SECRET ~GON

'~,-<J)~ l

Figure 30 - Title Remover

Fi gure 31 Unimak. Ti tl er

GAMBIT TOP SECRET HEXAGON

-31-· -

B/F-008B-GH-042S9-I-7S-

..

Handl e vi a BY EM AN -Control System Only

1. _______________ Approved for Release: 2018/06/25 C05032174 _____________ _

Page 31: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C0503217 4 ~

GAMBIT J TOp· SECRET ~GON BI F-008B-GH-042S9-1-7S-

8. ORIGINAL NEGATIVE BREAKDOWN/COMPOSITING - HEXAGON

After the original negative has been evaluated and titling is complete and correct, the Hexagon negatives are cut (Figure 32) or "broken down" into sections according to the Geographic Ar~a photo­graphed. Currently, the world is divided into 24 separate "areas rt

(see page 57). These pieces of· imagery range from a few feet in length to over a thousand. Identification leader and traller are spl iced to each section of imagery. SUDsequently tnese secti.'ons are reassembled or "composited" by geographic area into rolls approximately 450 ft. long.

9. ORIGINAL NEGATIVE BREAKDOWN/COMPOSITING - GAMBIT

The approach to "breakdown" and "compositing" the Gambit original record is identical to that used for Hexagon. The major difference is the size of the sections of imagery. Because Gambit is a spotting system with a fairly short (5500 ft. per SRV) original record as compared to the Hexagon search system that returns 55,000 feet per SRV, the average piece of imagery leaving a geographic area is several inches long vice 100 ft. long. For this reason special equipment (Figure 33) is used to ultrasonically weld the sections of imagery to each other to form 150 ft. rolls that are "physically near perfect and include a minimum of special inserted identification footage.

GAMBIT

TOP SECRET H~ON

-32-

Handle via BYEMAN Control System Only

.' _______________ Approved for Release: 2018/06/25 C05032174==============-

Page 32: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT _ TOP SECRET ~GON

rs::=r---------- ----1":-----

c

Figure 32 - Breakdown/Compositing Area

Blf-008B-GH-042S9-I-7S-

Figure 33 - Gambit Geographic Area Breakdown Workplace

GAMBIT TOP SECRET HEXAGON ---33-

Approved for Release: 2018/06/25 C05032174

Handl e vi a BYEMAN Control System Only

Page 33: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT . TOP SECRET HEXAGON SI F-008B-GH-042S9-1-7S-

10. PRINTING

After breakdown/compositing, each roll of original negative is run through the Webster Film tleaner (Figure 34), to remove any foreign particles that may be on the film as a result of 'previous operations, and then taken to the Printing Area. Since density and Gontrast variations are experienced from part-to-part of the original negative, density and/or contrast optimization is accomplished during the printing operation. Both Cayuga and Redoqdo Printers are'utilized to expose contact duplicate positives and negative from satellite mission films. '

The Cayuga (Figure 35) is a computer-controlled scanning printer which scans the original negative immediately before printing and based on the densities encountered provides closed-loop feedback to control the exposing lamp intensity as required throughout each printing part. Corrected densities within the usable range are thus achieved on the duplicat~topies. All Gambit Mission duplicates are prepared using four Cayuga Printers.

The Redondo Printers permit manual control of exposure and contrast on a part-by-part basis. Exposure and contrast settings are predicted by first scanning each part on a Cayuga Printer. Hexagon Mission duplicates are pre­pared using both Cayugas and Redondo Printers (Figure 36).

Figure 34 - Webster Film·Cleaner

GAMBIT TOP Sf'eRET HEXAGON

-34-

Approved for Release: 2018/06/25 C05032174 ------------------------------

Handle via BYEMAN Control System Only

,......., ,

..-, I.

~

I

Page 34: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r ,

,-­I

~ , I

r l . I~

I

I L

I [

[ r l

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP SECRET ~GON

Fi gure 35 - Cayuga Pri nter

BIF-008B-GH-042S9-r-7S-

Figure 36 - Redondo Printing Room Under Safelight Conditions

GAMBIT TOP SECRET H~ON

-35-Approved for Release: 2018/06/25 C05032174

Handle via BYEMAN Control System Only

Page 35: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

11. DUPLICATE FILM PROCESSING

GAMBIT TO,. SECRET ~GON BIF-008B-GH-042S9-1-7S-

The exposed film rolls from the printing area are processed on four Viscous Dalton Processors (Figure 37J. These processors each operate at 100 feet per minute and are set up to handle the various duplicating film types as required for each mission. The processing sequence is the same as on the Yard 1 ei gh Processors (see page 26 1 and all the critical parameters for each machine are monitored from a central console area (Figure 38J.

Once mission originals have been processed, ,composited, edited and certified for production, Br.idgehead maintains a capability of producing up to approximately 400,000 linear feet of black and white duplicate film products per 24 hour day. This production can (and frequently does) involve product mix of film sizes, quality, scale, etc. from a wide variety of sources.

GAMBIT TOP SECR!T H~ON

-36-Approved for Release: 2018/06/25 C05032174

Handl e vi a BYEMAN Control System Only

1

Page 36: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

I I

'[ r I

L

r l [ r L

r l

l I [

I [

~

[ ~

l_

[

.~

r I

," \

Approved for Release: 2018/06/25 C05032174

GAMBIT

TOP SECRET ~GON

Figure 37 - Viscous Dalton Processor

Figure 38 - Dalton Monitoring Consoles

GAMBIT

TOP SECRET HEXAGON

-37- .

B I F-008B-GH- 04259- 1-75-

Handle via BYEMAN Control System Only

1 _______________ Approved for Release: 2018/06/25 C05032174==============

Page 37: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT

TOPS!CR!T ~GON 81 F-008B-GH-042S9-1-7S-

12. DUPLICATE COpy INSPECTION

The processed rolls of duplicate copies from the pal tons are taken to the Inspection Area. If the roll contains the first copies printed from a particular segment of imagery, it is given a special First Copy Inspection (Figure.39) in addition to the nor­mal physical quality check. This inspection includes verification that the printing parameters predicted for the part have provided optimum tone reproduction for the imagery. Once the printing para­meters are established, all subsequent copies of the part are printed the same way, with photographic control strips to confirm that ap­propriate tone reproduction has been maintained. These copies receive a careful physical quality inspection and verification of photographic control (Figure 40).

GAMBIT

TOP SEC-RET H~ON -38-

Handl e vi a BYEMAN Control System Only

l

r--; I

'). ,~

.'~

• I ( ,

f

.----______ ~ ___ _'Approved for Release: 2018/06/25 C0503217 4=============~

Page 38: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r L

I L

r L

I l

I L

r l r­

'/

l

r I

! l

r r L

[

r

Approved for Release: 2018/06/25 C05032174 GAMBIT

TOP SECAET ~GON

Figure 39 - First Copy Inspection Area

Figure 40 - Dupe Inspection Area

GAMBIT TOP SeCReT H~ON

-39-

BIF-008B-GH-042S9-I-7S-

Handle via BYEMAN Control System Only

.--------______ ~Approved for Release: 2018/06/25 C05032174==============

Page 39: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

13. LABELING

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP seCRET HEXAGON BIF-OOBB-GH-04259-1-75-

As the duplicate copies pass inspection, they ar~ taken to the Labeling Station (Fiqure 41) where labels for the film spool and can are generated and applied. These labels contain information to 'identify the film that is on each, spool.

14. PRODUCTION STATUS MONITORING

A Production Monitoring System (Figure 42) provides supervisors with periodic status reports on the progress of the reproduction operation toward satisfying the requirements speci­fied by the EXSUBCOM. From this status information, estimates of shipment availability are provided to courier and customer organizations.

GAMBIT TOP SEC'RET HEXAGON

-40'- -

Handl e vi a BYEMAH Control System Only

I

, J

IIr-------~-______ Approved for Release: 2018/06/25 C05032174==============

Page 40: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

I L

r-

L r L_

r l

r-

1

r

r­! I

r-

I I

--I

r

r (

r l

l l r I

- -- - --

Approved for Release: 2018/06/25 C05032174 GAMBIT

TO P 5 E e IU! T HEXAGON

Figure 41 - Labeling Station

Figure 42 - Production Monitoring System

GAMBIT TOP SECRET HEXAGON

-41- -.-

- --~---, -------

BIF-008B-GH-042S9-1-7S-

Handle via BYEMAN Control System-Only

.--------______ ~Approved for Release: 2018/06/25 C05032174 ____ _

Page 41: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT I OP' S~CItET HEXAGON

14. FINAL EVALUATION

BIF-008B-GH-042S9-1-7S-

When all reproductitin requirements have been satisfied, the original negative receives a final quality inspection to document its condition as it is shipped from Bridgehead, This operation is analogous to the Preliminary Evaluation immedi'ately after processing (see page 30). .

15. CUSTOMER SHIPMENTS

Labeled cans containing duplicate copies are packaged for shipment according to priority. and customer (Figures 43 and 441. For many customers the shipments are identified by group or component within their organization to facilitate distribution to the photo inter~reters. The original negatives are shipped to NPIC for archival storage. Courier Aircraft transport all shipments from Rochester.

GAMBIT TOP SECRET HEXAGON

-42-

Handle Ilia BYEMAN Control System Onl y

..--.,

.-------_-------Approved for Release: 2018/06/25 C05032174 ________ -----'-____ _

Page 42: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r

r -

,.-­,

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP SECRET HEXAGON

Figure 43 - Product Packaging

Figure 44 - Completed Shipment

GAMBIT TOP SECRET HEXAGON

-43-

Approved for Release: 2018/06/25 C05032174

BIF-008B-GH-042S9-I-7S-

Handl e vi a BY EM AN Control System Only

Page 43: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT

TOP 5!CIt!T ~GON 81 F-008B-GH-042S9-I-7S-

SILVER RECOVERY

All of the processors are connected to a Silver Recovery System (Figure 45) to recover the undeveloped silver from f\xer solutions. The fixer overflow from each processor is collected in a holding tank, from which it is pumped through the silver towers for electrolytic recovery as metallic silver. This highly efficient operation recovers the silver for credit to the cusomter and prevents pollution while conserving silver for re-use in the manufacture of sensitized materials.

The desilvered fixer is returned to the Chemical Mix Room for rejuvenation. Chemical additions are made so that the fixer can be re-used in the processors. They cycle from processor-to-silver recovery-to-rejuvenation-to-processor continues for the useful life of the fixer.

POLLUTION CONTROL

After de-silvering all used processing solutions are biologically decompos'ed in consideration of ecological and security standards. In practice, all appropriate processor effluents and Mix Room drains are tied into a 25,000 gallon chemical collection tank outside the building (Figure 46). Periodically, this effluent is transferred to a 5,000 gal. tank truck and is· taken"to the King's Landing Treatment Plant at Kodak Park for appropriate biological decomposition by the activated sludge process.

GAMBIT

TOP SECRET HEXAGON

-44 -Approved for Release: 2018/06/25 C05032174

Handle via BYEMAN Control System Onl y

1 J

Page 44: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

i' I

I l _

r

i-'

r L

l L l. l

-- - --- - - -----~-

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP' SECRET HEXAGON

~-----

-~

Fi gure 45 - Sil ver Recovery System

Figure 46 - Effluent Collection Tank

GAMBIT TOP SECRET HEXAGON

-45- -

Approved for Release: 2018/06/25 C05032174

B/F-008B-GH-042S9-1-7.5-

Handle vi a BYEMAN Con t ro I System On I y

Page 45: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

~ --Approved for Release: 2018/06/25 C05032174

GAMBIT TOI'· 5ECRET HEXAGON

SECTION III-A

PROCESSING AND REPRODUCTION CAPABILITY

FOR COLOR ACQUISITION MATERIALS

1 . INTRODUCTION

BIF-008B-GH-042S9-1-7S-

Both conventional color and false-color infrared films are normally present in at least one SRV of each satellite mission. The basic sequence of Production operations is the same as described in Section III for black-and-white original negatives. Photographic control of color processing and reproduction is substantially more complex than black-and-white, and today's equipment throughput rates are miniscule compared to current black-and-white operations. This section will cover primarily those elements that piffer from black­and-white production. Color Production operations are currently located at Lincoln Plant, which is approximately 4 miles from Bridgehead (Figure 47).

2. ORIGINAL CAMERA FILM PROCESSING

The prime processor for reversal color original films and reversal duplicates fs the Grafton (Figure 48). This is an all-liquid deep tank processor that is normally operated at through­put rates of 7 feet per minute.

GAMBIT TOP SECRET HEXAGON

-46-Approved for Release: 2018/06/25 C05032174

Handle via BYEMAN Control System Only

, j

Page 46: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

I I I

r I (

,..­,

r l ,-­I

\

r­I

! r

r t.

I l

l l

Approved for Release: 2018/06/25 C05032174

GAMBIT TO,. S~elt~T ~GON

Figure 47 - Lincoln Plant

. Figure 48 ~ Grafton Processor

GAMBIT TOP SECRET H~ON

-47-

BIF-008B-GH-04259-1-75-

Handle via BYEMAH Control System Only

.-------__ ------.Approved for Release: 2018/06/25 C05032174==============

Page 47: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

,

Approved for Release: 2018/06/25 C0503217 4 ~

GAMBIT TOP SeCRET ~GON BI F-008B-GH-042S9-1-7S-

3. COLOR PROCESSING CAPABILITY EXPANSION

, The color processing and reproduction capability is currently undergoing revision ~s ,part of technical upgrade and consolidation into co-located Bridgehead facilities at Hawkeye (see page 6). A new Chemical Mix Room (Figure 49) has b~en established and the Multi-Purpos~ Modular Processor (MP) is on-line at Bridgehead. The (MP) (Figures 50 and 51) is used to process reversal infrared color ~cquisition films from missions and supports extensive test work. Throughput rates are comparable to the Grafton. A major new Color Production Processor (CP)2 is curre~tly being designed for insta1l~tion at Bridgehead. The (CP) will have throughput rates' of up to ' 50 feet per minute, will incorporate'optical titling, and will permit production volume delivery of color duplicates simul­taneous with delivery of correlated black-and-white films.

Figure 4~ ~ Color Chemical Mix Room

GAMBIT TOP SECRET H~ON

-48-, -

Handl e vi a BY EM AN Control System Only

I ~ j

r-"'

I I

,[

.-------_--____ Approved for Release: 2018/06/25 C0503217 4=============~

Page 48: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

,-­,

r 1

I l

r I

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP SECRET ~GON 8/F-008B-GH-04259-I-75-

Figure 50 - Multi-Purpose Modular Processor (MP)2

Figure '51 ~ (MP12 Mezzanine

GAMBIT TOP SECRET H~ON

-49-

Handle IIi a BYEMAN Control System Only

i-------------__ Approved for Release: 2018/06/25 C05032174==============

Page 49: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP SECRET ~GON 81 F-008B-GH-042S9-1-7S-

4. MANUAL TITLING

The cQlor processors-dQ not currently have an optical titling capability. Therefore, color films are manually titled

-after processing using conventional pigment transfer techniques on the Unimak Film Titler (Figure 52).

5.- VIDEO COLOR ANALYZER (VCA)

The Video Color Analyzer (Figure 53) is used as an aid to check the exposure and color balance when preparing color internegatives. A color internegative is displayed on a screen as it would appear ~nder known reproduction conditions and the effect of various exposure/color balance adjustments is assessed without the need for extensive IIproof" printing.

GAMBIT . TO,. SECRET HEXAGON

-50-

. Handl e vi a BYEMAN Control System Only

,...., , I

j

a---------------Approved for Release: 2018/06/25 C05032174=======================-

Page 50: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

[

[

[

I I

r

! I \

~ "

I I

l l [

I l

r I

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP SECRET ~GON

Figure 52 - Unimak Film Titler

Figure 53 -- Video Color Analyzer

GAMBIT TOP SECRET H~ON

--51-

----~-~~~

B/F-008B-GH-042S9-I-7S-

Handl e vi a BYEMAM Control System Onl y

Approved for Release: 2018/06/25 C0503217 4~~~~~ ________ _

Page 51: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

6.

Approved for Release: 2018/06/25 C05032174

GAMBIT

TO,. SECRET ~GON 81 F-008B-GH-042S9-1-7S-

COLOR PRINTING

Two 'types of contact pri nters are used for color printing. The Rainbow Printer (Figure 54) is an additive color printer wit,h red, green and blue light sources. In­tensity and color balance is set manually on a part-by-part basis. The·five·Rainbow Printers at Lincoln Plant are used primarily to prepare the duplicate copies from Hexagon Missions.

. The Framingham Printer (Figure 55) is a subtractive color printer with a white light source and color correction fi Hers. Exposure is computer-contro 11 ed on a frame-by-frame or intra-frame basis using commands determined by off-line densitometric measurements of the original color film. The two Framingham Printers are used primarily for duplicating Gambit Missions.

GAMBIT

TOP SECRET HEXAGON

-52-

_____________ ~ __ Approved for Release: 2018/06/25 C05032174 __

Handl e vi ~ BY EM AN Control System Onl y

n ,

......... ,

..-. I ,

·1

Page 52: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r I

I I

! l "

,-.

I

- --- ---.-----

Approved for Release: 2018/06/25 C05032174

GAMBIT

TOP SECRET ~GON

Figure 54 - Rainbow Printer

Figure 55 "- Pram; ngham Printer

GAMBIT

TO P 5 E C RET HEXAGON

-53-Approved for Release: 2018/06/25 C05032174

8/ F-008B-GH-04259-I-75-

Handle via BYEMAN Control System Only

,

Page 53: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP S~CR!T ~GON

7. COLOR ENLARGING CAPABILITY

BIF-008B-GH-042S9-I-7S-

Enlargements are frequently requested by customers to augment the high volume contact reproductions. This is more common with color materials than with black-and-white. The Pocatello Color Enlarger (PaCE) (Figure 56) is used to prepare high quality color enlargements at 5x or lax magnification on roll film or paper to facilitate processing.

The Beacon Precision Enlarger (BPE) (Figure 57) is used to prepare color or black-and-white enlargements on paper or film, at magnifications up to l53x anq in sizes up to 30x40 inches. These are handled in sheet form and processed on the Automat Processor (Figure 58) or in a sink line of trays.

Figure 56 - Pocatello Color Enlarger (pOCEL

GAMBIT TOP SEeR!T W~ON

-54-Approved for Release: 2018/06/25 C05032174

Handle via BYEMAN Control System Onl y

~ J

'"""1 I

I I

~

I

.-, \

..--, I

Page 54: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r

r­I I

r

Approved for Release: 2018/06/25 C05032174 . I

GAMBIT TO,. SECRET ~GON

Figure 57 - Beacon Precision Enlarger (BPEl

Figure 58 - Automat Processor

GAMBIT I ut" SECRET HEXAGON

-55-

8IF~008B-GH-04259-1-75-

Handl e vi a BY EM AN Control System Only

~---____________ Approved for Release: 2018/06/25 C0503217 4=============~

Page 55: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT

lOP SECRET I~GON 81 F-008B-GH-04259- I-75-

SECTION IV

PRODUCTION CAPABILITIES

The processing and reproduction facility is currently equipped and staffed to support the following Satellite Recovery Vehicle payloads.

Mission

Hexagon Hexagon SIT Gambit

SRV/Yr.

8 2 4

SRV film loads usually include a mix of acquisition films. Typical linear footage breakdown for each satellite system SRV are as follows:

Acguisition Film Hexagon Hexagon SIT Gambit

B&W 54,000 5,000 3,500 B&W (experimental)' 200 1 ,400 Color (conventio~al) 2,000 300 Color (Infrared) 1 ,000 -

After processing, the Hexagon and Gambit acquisition films are,'re­ordered by Geographic Area of the world (Figure 59) to facilitate1a match of customer interest with the quantity of duplicate copies produced. Reproduction of duplicate requirements is structured to provide copies prioritized by customer.

Table I shows a breakdown of typical reproduction requirements by program and priority, listing typical quantities of duplicate film and cans shipped.

GAMBIT

TOP SECRET H~ON -56-

Handl e vi a BY EM AN Control System Only

'l ~J

1

r-"' \

'i I

'I ,

--,

--.

,....,

,......,

II---------------Approved for Release: 2018/06/25 C05032174==============-

Page 56: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

I" , ,

~

I

r­I

I \

I

r !

I'

1 , )

, I

r-I

I

Mission

Hexagon

Gambit

Hexagon SIT

Approved for Release: 2018/06/25 C05032174

Figure 59

GAMBIT TOP SECRET ~GON

- Geographic Area Breakdown.

TABLE I

TYPICAL REPRODUCTION REQUIREMENTS PER SRV

Number of Shipping Footage Priorit~ Customers B&W Color

1 1 375,000 10,000 2 4 520,000 15,000 3 18 500,000 10,000

*4 4 30,000

1 1 50,000 2,500 2 3 65,000 6,000 3 18 100,000 8,000 4 4 35,000 5,000

6' 63,000

*B&W from Color Only

GAMBIT TOP SECRET H~ON

-57-Approved for Release: 2018/06/25 C05032174

B/F-008B-GH-042S9-1-7S-

Cans/SEools

1 ,400 2,000 2,300

100

510 750 985 430

265

Handle 'Iia BYEMAN Control System Onl y

Page 57: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT TO,. SECRET ~GON BIF-008B-GH-042S9-I-7S-

b Table II shows personnel requirements per trick for both the Hexagon and Gambit systems. The Hexagon Stellar/Terrain is accomplished on a straight time basis without interference of higher priority work.

Operations

B&W Production B&W Quality Control

Support (Logistics, Maint. etc. ,)

Color Production

TABLE II

PERSONNEL REQUIREMENTS

(per 12 hr. trick)

Hexagon

54 12

35

29

Gambit

48

9

35

29

Figures 6Q and 61 show production times required and the number of hours after receipt of the SRV which different priorities and type of material will be ready for pickup. The term "Hot Ops" is used for specific imagery required to satisfy a critical need that is expedited for earliest possible delivery.

GAMBIT TO,. SECRET ~ON

-58-Approved for Release: 2018/06/25 C05032174

Handle via BYEMAN Control System Only

'I

'I

,..-"

I

-I ,

Page 58: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

I I

r­I

r-

I )

I ,

r \

r I I

r-1

Approved for Release: 2018/06/25 C05032174 GAMBIT

TOP S!CR!T HEXAGON

PRODUCTION TIME LINE --FoR--

TYPICAL HEXAGON SRY 8&.W - BlACK '- 'MUTE

IR -INFRA-RED

SUBJECT

DOW"LOADINC / PRESPLICE

ORIC.INAL NECATIVE PROCESSinG/OPTICAL TITLING

PREWAINAAV EVALUATION

TITLE CORRECTION / ADDITION

ORIGINAL NECATIVE BREAKDOWN /COMPOSITING

PRINTING

DUPLICATE FILM PROCESSINC

DUPLICATE COpy INSPECTION

LABELING

FINAL EVALUATION

HOT OPS SIlIP PARTIAL

BY .01 I PR.IORITY .01 2

.01 3£.4

ACQUISITION !-louRS FILM ,. ,. ,. .. ". , .. , .. 01'

~r; ~r;-

~ 'T7"" & r;-

• • • .. 8t.W_ [!..lL'.COlO~

B€'w (~LL:CO~oIt1

B<W ~lr COlO_Al c - -

B<W ~All_COloR.1 :J

B~W -rAlr::'COLO~l 0 ~t: {--~

i CSUJRJ :CStrilt'6 .- '.s ., rc~t~R.I~W I I

10 30 50 ,. 90 110

Figure 60

PRODUCTION TIME LINE _FOR_

TYPICAL GAMBIT SRV

1~,8 ISo! 110

,,. ".

I 1 190 2tO

SUBJECT ACQUISITIOn HOURS FILM i 10 30 50 10 90 UO 130 150 110 190 ziO'

DOWNLOADING I PRESPLICE

ORIGINAl. NEGATIVE PROCESSING /OPTICAL TlTLI NG

PRELIMINARY EVALUATION

TITLE CORRECTION / ADDITION

ORIGINAL NEGATIIIE BREAKDOWN /COMPOSITING

PRINTING

DUPLICATE FILM PROCESSING

DUPLICATE COpy INSPECTION

L ... SELING

FINAL EVALU~TION

SIlIP I-IOr OPS

BY PRI

PRIORITY PRI PRt 3 t,4

s(.w • ~.

B~W

~

B!-W -~ I

BoW @rn!J • BoW -[OO!l •

BlW 1,--41

1'

,I 1 " , (\ w 4' ,

" " ,. 10 30

1 I

.,:,! r II !.III i

Fi gure 61

GAMBIT TOP SECRET H~ON

-59-

I , 1 i I

1\1

BIF-008B-GH-04259-1-75-

Handle vi a BYEMAN Control System Onl y

Approved for Release: 2018/06/25 C05032174, ______________ _

Page 59: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174 GAMBIT

TO" SECRET ~GON

.SECTION V

" MAJOR ITEMS OF EQUIPMENT

BIF-OOBB-GH-04259-1-75-

This section describes the major items of equipment used in the -- Bridgehead Processing Facility:

- Yardleigh Film Processor - Viscous Dalton Film Processor

Grafton Film Processor

Figure 62 Figure 63 Figure 64 Figure 65 Figure 66 Figure 67 Figure 68 Figure 69 Figure 70 Figure 71 Figure" 72 Figure 73 Figure 74

- Multi-Purpose Modular Processor (Mp2) Dundee Processor

- Color Automat - Rainbow Continuous Printer - Beacon Precision Enlarger (BPE) - Cayuga Continuous Printer - Framingham Continuous Color Printer. - Redondo Niagara Printer - Kingston Continuous Printer - Continuous Rawstock Flasher

Figure 75 - Automatic Continuous Identification Printer Figure 76 - Pocatello Color Enlarger (POCE) Figure 77" - Video Color AnaJyzer, Model III Figure . 78 Presplice Complex

G Area Breakdown - Camden Inspection Table - Editing Table 30-Inch

Webster Film Cleaner Unimak Film Titler

Figure 79 Figure 80 Fi gure 81 Figure 82 Figure 83 Figure 84 Figure 85

Intensity Scale Sensitometer, Type l-B Title Remover Assembly

GAMBIT TO' SECRET H~ON

-60-

.. ______________ Approved for Release: 2018/06/25 C05032174

Handl e vi a BYEMAN Control System Onl y

,...-, I

" I

(,.....,

,..., I

Page 60: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r­I

.--!

Approved for Release: 2018/06/25 C05032174

GAMBIT TO .. SECRET HEXAGON BIF-008B-GH-042S9-1-7S-

YARDLEIGH Film Processor

Model II No. 147-001

is a viscous black-and-. white) processor dedicated

to the processing of orig­nal negative acquisition film. It will handle con­tinuous rolls of any length from 70mm to 9.5 inches w.ide. Electronic and visual monitoring provide close control over critical de­velopment criteria. Its maximum speed is 35 feet per minute.

r Figure 62,

r t

Viscous DALT.ON Film Processor

No. 141-001

~ is used to process duplica­t ting film at speeds up to

100 feet per minute. Viscous· r development makes possibl.e I sensitometric effects not l

readily obtainable by other

r processing methods.

t' .1

l r

Figure 63

GAMBIT TO,. SECRET H~ON

-61-

Handl e IIi a BYEMAN Control System Onl y

L ________________ Approved for Release: 2018/06/25 C05032174 ______________ _

Page 61: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP SECRE1= HEXAGON B/F-008B-GH-042S9-I-7S-

GRAFTON Film Processor

is a color processor that will handle both acqui­sition and duplicating film~ in continuous, lengths from 70mm to 9.5 inches wide. While primarily for reversal films, it can be modified to handle negative color films. It can flash the edge of reversal films to remove dye for subsequent titling. Its maximum output is 7-1/2 feet per minute.

Fi gure 64

Multi-Purpose Modular Processor (Mp2)

No. 148-001

is an experimental color processor that can also be used for production of both acquisition and dup­licating films in rolls of any length from 70mm to 9.5" wide. It is used mostly for reversal color films, but can be easily converted to proces,s neg-

'ative color. It can be mod­ified for edge flashing. Its maximum speed for color is 7-1/2 feet per minute.

I -- --~:--~,~' ~. I

Fi gure ·65

GAMBIT TOP SECRET H~ON

-62-

Handle via BYEMAN Control System Onl y

I I I - I

,..-..

-.

I

, _____ ~~ _________ Approved for Release: 2018/06/25 C05032174 ______________ _

Page 62: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r-I

I l

r I

r I

I r-

'r .... J . f \ !

I I

f-

l' I

Approved for Release: 2018/06/25 C05032174

Color AUTOMAT Processor

Figure 66

is used in support of en­largers and other photo­graphic activities to ,process

.black-and-white negatives and: .posi tives. It will handle reversal or negative color, internegatives and trans­parencies. It' will accommo­date a 30" x 40" single sheet or up to 46 8" x 10" sheets in one batch. It will process paper, as well as film, in both color and black-and-white.

GAMBIT TO' SECRET HEXAGON BIF-OOBB-GH-042S9-1-7S-

DUNDEE Processor Model II

is a modular film processor used to test and 'evaluate various techniques for viscous, combination spray­viscous, and deep-tank processes for black~and-white films. Processing times and temperatures can be varied over a wide range with precise control over both.

Figure 67

GAMBIT

TO' SEC,RET H~ON

-63-

Handl e vi a BYEMAN Control System Onl y

Approved for Release: 2018/06/25 C05032174 ______________ _

Page 63: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

L

BEACON Precision Enlarger

No. 023-001

makes enlargements from pre-select'ed areas of aerial roll film, with field diameters from 3.7" to .32" at'magnifi­cations from 3X to 40x in color and 3X to 153X in black and white. Enlarge­ments can be printed on duplicating film or paper up to 40" square. Subject areas can be specified by coordinate location with­in any frame on film of standard widths from 70mm to 9.5" in rolls up to 7.6" diameter.

Approved for Release: 2018/06/25 C05032174

Fi gure 68

:l GAMBIT

TOfl SECRET HEXAGON SIF-008B-GH-042S9-1-1s-

, I

RAINBOW Continuous Printer

No., 032-001

--, I

is a drumtype, contact color , I printer which reproduces photographic images on a secondary length of color duplicating film from a pri­mary color print master at a top speed of 100 feet per minute. Designed primarily to handle reversal color films, th~ printer is used in con­junction with its control unit which regulates the light intensities of three separate lamps.

l ..-,

I

., I

"I !

....., I

.-, '.1

Figure 69

GAMBIT TOP SECRET H~ON

Handl e vi a BYEMAN Control System Onl y

Approved for Release: 2018/06/25 C05032174

Page 64: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r-i

r I

r 1

r I I ,

r­I

I

r­I

I i

,~

r L

Approved for Release: 2018/06/25 C05032174 GAMBIT

TOP SECRET HEXAGON BIF-008B-GH-042S9-I-7S-

FRAMINGHAM Continuous Color Printer

No. 050-001

. Fi gure 70

is a continuous programmable frame-by-frame density con­trolled color printer capable of printing at 50 feet per minute, with an inter-frame density response transition of approximately one inch. The programmable frame-by­frame density control range is approximately 1.0 log ex­posure, with a manually c'on­trolled roll-by-roll color balance range for each pri­mary color. Roll film in standard widths between 70mm and 9.5 inches can be printed on this machine.

CAYUGA Continuous Printer

No. 057-001

is a black & white contact printer with intraframe auto­matic exposure control that eliminates the need for printing-condition analysis of the printmaster prior to printing. It is capable of

. automatically scanning the printmaster and feeding ob~ tained scan data through its own computer which modulates printing lamp intensity to produce a relatively even print density on the duplicate.

Figure 71

GAMBIT TOP SECRET HEXAGON

-65-

Handl e vi a BYEMAN Control Syst~m Only

1.~ ______________ ~Approved fo!, Release: 2018/06/25 C05032174

Page 65: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

REDONDO NIAGARA Printer

No. 008-800

is a second-generation continuous, drum-type cont"act printer that is used to duplicate precise copies of black-and-white negative or positive film. At speeds from 3 to 100 feet per minute and with a 400-watt lamp, it will print a wide range of print-master densities. By rewinding the print master, multiple copies can be printed.

Approved for Release: 2018/06/25 C05032174

GAMBIT TO,. SECRET HEXAGON

Figure 72

BIF-008B-GH-042S9-1-7S-

KINGSTON Continuous Printer

No. 054-001

is used to contact print photo­graphic .film over an extra-large drum to obtain minimum distortion and optimum quality. Film travel from supply to take-up during printing is 100 feet per minute with both print master and duplicating stock maintained at constant tension through the entire printing rum.

GAMBIT Figure 73 TOP SECRET HEXAGON

Handle via BYEMAN Control System Onl y

-66;".

J 1

\

'I I J

1 .J

• J

. ......

• j

"l

I J

"I I

"""'"' ,

....... I

i ___________ ~ ___ ~·Approved for Release: 2018/06/25 C05032174. ______________ _

Page 66: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

~

r-

r-' [

l. r l

l [

~ r I I

r I \

r l

r l

r l

Approved for Release: 2018/06/25 C05032174 GAMBIT

TOP SECRET HEXAGON BIF-008B-GH~04259-1-75-

I \'1 i"-

Continuous Rawstock Flasher

No. 153-001

is used to flash a strand of film to obtain an even density across the web and from one end to the other. Flashed film is used for physical quality certification of film processors and for scratch testing in various items of film handling equipment ..

' u Fi gure 74

Automatic Continuous Identification Printer

No .. 041-500

is used to print identi­fying mission data on head and trailer lengths of film for subsequent iden­tification. Characters are photographically re­corded from a matrix that is activated from computer processed input data.

Fig-ure 75

GAMBIT TOP SECIt.ET H~ON

-67-

Handle via BYEMAM Control System Only

.. ---____________ ~Approved for Release: 2018/06/25 C05032174 ______________ _

Page 67: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

POCATELLO Color Enlarger (POCE)

No. 048-001

is production-oriented for making multiple copies of 5X and lOX color enlarge­ments. Input film can be any width from 70mm to 9.5 inches on MS 26565 spools up to 7-5/8 inches flange diameter. Color balance is regulated by a control matrix; titles can be contact printed on the enlargement.

Figure 77

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP SECRET ~GON Blf-008B-GH-04259-I-75-

Figure 76

Modi f-i ed . Video Color

Analyzer, Model III No. 273-001

is used for continuous lengths of negative or positive aerial color films, from 70mm to 9.5" wide, to determine color printtng criteria for color printers and enlargers.

GAMBIT TOP' SECRET HEXAGON

Handl e vi a BY EM AN Control System Only

-68-

1 I

l J

.--. I

, )

1 I

-, I

I

,-, I

,.., I

,-., ,

1 ________ ~------_Approved for Release: 2018/06/25 C05032174, ______________ _

Page 68: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r :

r I

r l~

[

r I '--

I l _

r I , L

[ r l

r I ,

r j

[

l

r l r l ..--I , I

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP SECRET HEXAGON BIF-008B-GH-04259-I-75-

Presplice Complex

is used for downloading acquisition film from the vehicle payload and for rewinding the web onto spoo+s in preparation for processing. During rewind, film is manually and e~ectronically monitored for physical damage that might cause a problem during processing. Damaged sections can be r~moval and loose ends spliced to form a continuous web.

Figure 78

G-Area Breakdown Workplace

is used to edi't, from con­tinuous rolls of acquisition film, coverage. over selected geographic areas and to compile the t'ake for each area into ~.composite print master from which multiple duplicates can be contact printed.

Fi gure 79

GAMBIT TOP SECRET HEXAGON

-69-

Handl e vi a BYEMAN Control System Only

1I ________________ Approved for Release: 2018/06/25 C05032174 ______________ _

Page 69: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

Approved for Release: 2018/06/25 C05032174

GAMBIT

Editing Table,

30-Inch No. 222-001

Figure 80

is used for viewing, in­specting, evaluating, and editing both original neg­ative and contact printed duplicates in roll form. Manual rewinds provide close control over film transport to preclude physical damage to valuable acquisition film. Film widths from 70mm to 9.5 inches can be handled on MS 26565 aerial film spools up to 10-1/2" flange diameter.

TO,. SeCRET ~GON 8/ F-008B-GH-042S9-I-75-

CAMDEN Inspection Table

Various Models

are used for inspecting, evaluating, viewing, and editing large quantities of duplicate film. Different models have in­dividual functions such as splic ing, dens i tomet'ry , and other features.

Figure 81

GAMBIT

TOP SECRET HEXAGON

-70-

Handle via BYEMAN Control System anI y

.-, , i ~ .J

'I ,

,-, I

!

......, I

-, I

..-, I

......, I

I--------_-------Approved for Release: 2018/06/25 C05032174, ______________ _

Page 70: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

r I

I

! L _

I l

I I I

r I r­I l

I , ,

r I I I

I I , l

Approved for Release: 2018/06/25 C05032174

GAMBIT TOP SECRET HEXAGON

Figure 82

UJHMAK

Fi-lm Titler No. 309-001

is used to apply identifying information to the border and/or interframe spaces of processed aerial films. It titles negative or duplicating film, including ultra-thin base, in standard widths from ,Omm to 9.5 inches and accepts MS26565 spools up to 10-1/2 inches diameter. Titles generally consist of a fixed field of alphameric data plus an automatically sequenced frame number. Machine-readable b~nary-coded frame numbers can be titled.

BIF-008B-GH-042S9-1-7S-

WEBSTER Film Cleaner

No. 511-001

safely cleans non-adhesive dirt from the base and emtilsion surfaces of all aerial roll films, and neutralizes static elec­tric charges, thereby re­ducing further dust or lint attraction.

Figure 83

GAMBIT TOP S!CRET H~ON

_71_ Approved for Release: 2018/06/25 C05032174

Handle via BYEMAN Control System Onl y

Page 71: r' Approved for Release: C05032174 TOP SEeR!...mission arrival. MISSION PRODUCTION Describes in chronological order the typical workflow of a satellite mission payload through processing

L Approved for Release: 2018/06/25 C05032174

TITLE Remover Assembly

No. 613-001

. Figure 84

is used to remove unsat­isfactory title data that has been photographically exposed, or mechanically applied, along the film edge. Once a title has been removed, the same area can be retitled by mechanical methods.

GAMBIT TO,. SECA&T HEXAGON BIF-008B-GH-042S9-1-7S-

INTENSITY SCALE

SENSITOMETER

l

l ~I

Type 1-8, Model V

No. 824-001 ) l is used to make precise ex-posures through either a , standard stepped density tablet or a continuous density wedge onto various

l types of light-sensitive ~

film emulsions. The re­sulting sensitometric strips are used for primary sen­sitometric tests of black- l and-white or color emulsion I

characteristics,or for sensitometric control of ~ photographic processing equipment .

l

'l I

l

,....., I

I I

--,

I

~.

Fi gure 85 ..

" GAMBIT TOP' SECRET HEXAGON Handl e IIi a BYEMAN

Control System Onl y

Approved for Release: 2018/06/25 C05032174