r electrical part 2 - berkeley, california / engineering / consulting drawing no. drawing title:...

16
F9 S M M M M M M M M M M M M M M M M M M M 1 1j 1k 1L DS j,k 1k 1k 1j 2j 1L 2L 1L 2 4-AF7 1L 1L 2L 1L 2 1 1 1 2 1 1 2 1 M 1 1 1 1 1 1 2L 1L 2L 1L 2 1L 2 1g 2 1g 1g 1g DS g,h j 2j j 5 5 5 S 2 2 2 5 1L 2L 1L 5 5 5 5 DS d,e M DS B,C 1 F13/7' F4 F4 F4 F13/7' 2 5 1k 1k 2 M M M F6/4' 2 2 FEX FEX 1 1 2 F4 M 1 1 1e UNEXCAVATED AREA BELOW RAMP 1 2 F4 2 ETD 1L F2 ETD ETD 2 UNEXCAVATED AREA BELOW RAMP DAYLIGHTING ZONE 1 DAYLIGHTING ZONE VEHICLE ENTRY ZONE VEHICLE ENTRY ZONE L a,b,c,d a b c d d d c c a a a S S true N project N E3.1 GROUND LEVEL LIGHTING PLAN 1. ALL NON-EMERGENCY LIGHTING FIXTURES SHALL BE CIRCUITED TO PANEL L1B, UON. 2. ALL EMERGENCY FIXTURES AND EXIT SIGNS SHALL BE CIRCUITED TO PANEL EL1A, UON. 3. REFER TO LIGHTING CONTROL DIAGRAMS FOR SWITCHING AND OTHER CONTROL INFORMATION. ALAMEDA, CA. 94501 1305 MARINA VILLAGE PARKWAY THE POWER HOUSE Consulting Engineers (510) 769-7600 JOB #14073 Oakland Irvine Los Angeles 560 - 14th Street Suite 300 Oakland, CA 94612 Telephone 510 473 0300 Fax 510 473 0310 Architecture / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By Drawn By Date Revision 3/25/2015 7:59:25 AM C:\Users\jleite\Documents\Center St_jleite.rvt BERKELEY, CA 94704 Last saved by: PAUL(2016-04-01) Last Plotted: 2016-04-01 Filename: \\TAU\DATA\CADFILES\14073_BERKELEY CENTER STREET GARAGE\CAD\BPS-E3.1 GROUND LEVEL LIGHTING PLAN.DWG 1 DAYLIGHTING AREA EXEMPT (DAYLIGHT TRANSITION ZONE). ARCHITECTURAL 4 ZONE LIGHTING CONTROL STATION. LUTRON GRAFIK EYE OR APPROVAL EQUAL. PROVIDE INTERFACE AND POWER PACKS AS REQUIRED TO CONTROL THE LOADS SHOWN. 2

Upload: duongcong

Post on 18-Mar-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

F9

S

M

M

M

M

M

M

M

M

M

M

M

M M MM

M

M

M

M

11j 1k 1L

DSj,k

1k

1k1j

2j1L

2L

1L

2

4-AF7

1L 1L

2L

1L

2

1

1

1

2

1

1

2

1

M 1

11

1

1

1

2L

1L

2L

1L

2

1L2

1g2

1g

1g

1g

DSg,h

j

2j

j

5

5

5

S

2

2

2

5

1L 2L 1L

5

5

5 5

DSd,e

M

DS B,C

1

F13/7'

F4 F4F4

F13/7'

2

5

1k

1k 2

M M

M

F6/4'

2 2FEXFEX 1 1

2

F4

M1

1

1e

UNEXCAVATED AREABELOW RAMP

1

2 F4

2

ETD

1L

F2

ETD

ETD

2

UNEXCAVATED AREABELOW RAMP

DAYLIGHTINGZONE

1

DAYLIGHTINGZONE

VEHICLE ENTRYZONE

VEHICLE ENTRYZONE

La,b,c,d

a

b

cd

dd

cc

aa

a

S S

true

N

proj

ect

N

E3.1

GROUND LEVELLIGHTING PLAN

1. ALL NON-EMERGENCY LIGHTING FIXTURES SHALL BE CIRCUITED TO PANEL L1B, UON.

2. ALL EMERGENCY FIXTURES AND EXIT SIGNS SHALL BE CIRCUITED TO PANEL EL1A, UON.

3. REFER TO LIGHTING CONTROL DIAGRAMS FOR SWITCHING AND OTHER CONTROLINFORMATION.

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

3/25/2015 7:59:25 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

BERKELEY, CA 94704

Last

save

d by:

PAUL

(201

6-04

-01)

L

ast P

lotted

: 201

6-04

-01

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E3

.1 GR

OUND

LEVE

L LIG

HTIN

G PL

AN.D

WG

1 DAYLIGHTING AREA EXEMPT (DAYLIGHT TRANSITION ZONE).

ARCHITECTURAL 4 ZONE LIGHTING CONTROL STATION. LUTRON GRAFIK EYE ORAPPROVAL EQUAL. PROVIDE INTERFACE AND POWER PACKS AS REQUIRED TO CONTROLTHE LOADS SHOWN.

2

Page 2: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

DN

UP

DN

UPF15

F15F13/7'

F15F15 F15

F13/12'F13/12'

F13/12'F13/12'

F13/7'

F15 F15

F15

F15F15

32

1

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

AF3

DS

F11

F15

F15

4

44

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

DAYLIGHTNGZONE

DAYLIGHTINGZONE

L 7

L7

true

N

proj

ect

N

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

3/25/2015 7:59:25 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

BERKELEY, CA 94704

Last

save

d by:

PAUL

(201

6-04

-01)

L

ast P

lotted

: 201

6-04

-01

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E3

.2 SE

COND

LEVE

L LIG

HTIN

G PL

AN.D

WG

E3.2

SECOND LEVELLIGHTING PLAN

1. ALL NON-EMERGENCY LIGHTING FIXTURES SHALL BE CIRCUITED TO PANEL L1B, UON.1 PENDANT MOUNT EXIT SIGN WITH SWIVAL BALL AT STRUCTURE SUCH THAT SIGNBOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT SIGNS.

2 JUNCTION BOX BELOW STAIR FOR CONNECTION TO TYPE F11 FIXTURE. ROUTE CONDUITIN HOLLOW TUBE STEEL TO FIXTURE IN RAIL ASSEMBLY. DRIVERS ARE MOUNTED IN RAILASSEMBLY.

3 MOUNT F13 FIXTURES 12" OFF ART WALL.

2. ALL EMERGENCY FIXTURES AND EXIT SIGNS SHALL BE CIRCUITED TO PANEL EL1A, UON.

3. REFER TO LIGHTING CONTROL DIAGRAMS FOR SWITCHING AND OTHER CONTROLINFORMATION.

BID ALTERNATE B1(c) - EXTEND HANDRAIL LIGHTING 200 ADDITIONAL FEET (INCLUDESBOTH NORTH AND SOUTH), AND DELETE (32) TYPE AF3 FIXTURES.

4

BID ALTERNATE B1(b) -DELETE AF4 "COLOR BLAST" UPLIGHTS AT NORTH AND SOUTH5

BID ALTERNATE B1(d) -DELETE DOWNLIGHTS AT BOTTOM OF BEAMS AT STAIRS.6

ARCHITECTURAL 4 OR 8 ZONE LIGHTING CONTROL STATION. MOUNT IN STAINLESS STEELLOCKABLE CABINET, FLUSH IN CONCRETE. PROVIDE ENGRAVED LABEL "LIGHTINGCONTROLS". LUTRON GRAFIK EYE OR APPROVAL EQUAL. PROVIDE INTERFACE ANDPOWER PACKS AS REQUIRED TO CONTROL THE LOADS SHOWN.

7

ZONE LOAD DESCRIPTION WATTS LOAD TYPE

(16) AF1 EAST 80 0-10V LED1

(16) AF1 WEST 80 0-10V LED2

(16) AF2 EAST 80 0-10V LED3

(16) AF2 WEST 80 0-10V LED4

NORTH

(16) AF1 EAST 80 0-10V LED1

(16) AF1 WEST 80 0-10V LED2

(16) AF2 EAST 80 0-10V LED3

(16) AF2 WEST 80 0-10V LED4

SOUTH

(2) AF8A (PARKING SIGN LEVEL 4) 100 0-10V LED

0-10V LED

5

6 100(2) AF8B (PARKING SIGN LEVEL 4)

ADDENDUM 3: REVISIONS TO CIRCUIT NUMBERS.

Page 3: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

UP

DN

UP

DN

F15

F15F13/7'

F15F15 F15

F13/12'F13/12'

F13/12'F13/12'

F13

F15 F15

F15

F15F15

FX1 FX1 FX1

FX1FX1

FX1

FX1

FX1

3

2

1

F15

F15

F15

F15

AF2AF1

MOUNT GRAFIK EYE IN NEMA1 ENCLOSURE OR OTHER

APPROVED LOCATION

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF1

AF2AF1AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

AF2AF1

(2) AF4

(2) AF4

(2) AF4(2) AF4

(2) AF4

(2) AF4

(2) AF4

F15

F15

true

N

proj

ect

N

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

3/25/2015 7:59:25 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

BERKELEY, CA 94704

Last

save

d by:

PAUL

(201

6-04

-01)

L

ast P

lotted

: 201

6-04

-01

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E3

.3 TH

IRD

LEVE

L LIG

HTIN

G PL

AN.D

WG

E3.3

THIRD LEVELLIGHTING PLAN

1.1

2

3

2.

3.

Page 4: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

DN

UP

DN

F15

F7AF13/7'

F15F15 F15

F13/12'F13/12'

F13/12'F13/12'

F13/7'

F15 F15

F15

F15F15

FX1FX1 FX1

FX1FX1FX1

FX1

FX1

3

2

1

(2) AF4

(2) AF4

(2) AF4

(2) AF4

F15

F15

F15

F15

F15

F15

(2) AF4

(2) AF4

(2) AF4

(2) AF4

true

N

proj

ect

N

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

3/25/2015 7:59:25 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

BERKELEY, CA 94704

Last

save

d by:

PAUL

(201

6-04

-01)

L

ast P

lotted

: 201

6-04

-01

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E3

.4 FO

URTH

LEVE

L LIG

HTIN

G PL

AN.D

WG

E3.4

FOURTH LEVELLIGHTING PLAN

1.1

2

3

2.

3.

Page 5: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

UP

F15

F15F13/7'

F15F15 F15

F13/12'F13/12'

F13/12'F13/12'

F13/7'

F15 F15

F15

F15F15

3

2

1

F15

F15

F15

F15

F15

F15

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

true

N

proj

ect

N

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

3/25/2015 7:59:25 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

BERKELEY, CA 94704

Last

save

d by:

PAUL

(201

6-04

-01)

L

ast P

lotted

: 201

6-04

-01

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E3

.5 FIF

TH LE

VEL L

IGHT

ING

PLAN

.DW

G

E3.5

FIFTH LEVELLIGHTING PLAN

1.1

2

3

2.

3.

Page 6: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

DN

UP

UP

DN

F15

F13/7'

F15F15 F15

F13/12'F13/12'F13/7'

F15 F15F15F15

RAMP DOWN TO LEVEL 5

RAMP UP TO LEVEL 7

RAMP UP TO LEVEL 7

RAMP DOWN TO LEVEL 5

F15 3 TYP.

FX1FX1

FX1FX1

FX1

FX1

F13/12'

1 TYP.

FX1

J

2

F153 TYP.

F13/12'

F15

F15

F15

F15

F15

F15

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

true

N

proj

ect

N

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

3/25/2015 7:59:25 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

BERKELEY, CA 94704

Last

save

d by:

PAUL

(201

6-04

-01)

L

ast P

lotted

: 201

6-04

-01

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E3

.6 SI

XTH

LEVE

L LIG

HTIN

G PL

AN.D

WG

E3.6

SIXTH LEVELLIGHTING PLAN

1.1

2

3

2.

3.

Page 7: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

DN

UP

UP

DN

F15

F15F13/7'

F15F15 F15

F13/12'F13/12'

F13/12'F13/12'

F13/7'

F15 F15

F15

F15F15

RAMP DOWN TO LEVEL 6

RAMP UP TO LEVEL 8

RAMP UP TO LEVEL 8

RAMP DOWN TO LEVEL 6

EDGE OF STRUCTURE ABOVE

3

SEE E3.8 FOR LIGHTINGOF THIS AREA

SEE E3.8 FOR LIGHTINGOF THIS AREA

2

1

F15

F15

F15

F15

F15

F15

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

(2) AF4

EDGE OF STRUCTURE ABOVE

true

N

proj

ect

N

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

3/25/2015 7:59:25 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

BERKELEY, CA 94704

Last

save

d by:

PAUL

(201

6-04

-01)

L

ast P

lotted

: 201

6-04

-01

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E3

.7 SE

VENT

H LE

VEL L

IGHT

ING

PLAN

.DW

G

E3.7

SEVENTH LEVELLIGHTING PLAN

1.1

2

3

2.

3.

Page 8: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

DN

DN

F15

F15F13

F15F15 F15

F13

F15 F15

F15

F15F15

F15

F15

F15

F15

F15

F15

F15

4 5TYP.

F15

FX2

F15

F15

AF5

AF5

6

6

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

AF5

S S

true

N

proj

ect

N

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

3/25/2015 7:59:25 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

BERKELEY, CA 94704

Last

save

d by:

PAUL

(201

6-04

-01)

L

ast P

lotted

: 201

6-04

-01

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E3

.8-RO

OF LI

GHTIN

G PL

AN.D

WG

E3.8

ROOFLIGHTING PLAN

1.1

2

3

2.

3.

4

5

6

Page 9: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

J

JJJ

J

ST

ST

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

3/25/2015 7:59:25 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

BERKELEY, CA 94704

Last

save

d by:

PAUL

(201

6-04

-01)

L

ast P

lotted

: 201

6-04

-01

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E4

.1 EN

LARG

ED P

LANS

.DW

G

E4.1

ENLARGED PLANS

AE4.1

ELECTRICAL ROOM #2ENLARGED PLAN SCALE: 1/4"=1'-0"

BE4.1

IT/SERVER ROOMENLARGED PLAN SCALE: 1/4"=1'-0"

DE4.1

MAIN ELECTRICAL ROOM #1ENLARGED PLAN SCALE: 1/4"=1'-0"

EE4.1

GENERATOR ROOMENLARGED PLAN SCALE: 1/4"=1'-0"

1. CIRCUITS ARE TO PANEL "L1A", UON.

CE4.1

IT/SERVER ROOM - CABLE RUNWAYENLARGED PLAN SCALE: 1/4"=1'-0"

1. CIRCUITS ARE TO PANEL "L1A", UON.

FE4.1

MPOEENLARGED PLAN SCALE: 1/4"=1'-0"

GE4.1

MPOE - CABLE RUNWAYENLARGED PLAN SCALE: 1/4"=1'-0"

HE4.1

MICRO-GRIDENLARGED PLAN SCALE: 1/4"=1'-0"

Page 10: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

3/25/2015 7:59:25 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

BERKELEY, CA 94704

Last

save

d by:

PAUL

(201

6-04

-01)

L

ast P

lotted

: 201

6-04

-01

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E5

1 SIN

GLE

LINE

DIAG

RAMS

.DW

G

E5.1

SINGLE LINEDIAGRAMS

Page 11: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

3/25/2015 7:59:25 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

BERKELEY, CA 94704

Last

save

d by:

PAUL

(201

6-03

-08)

L

ast P

lotted

: 201

6-04

-04

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E5

2 PAN

EL S

CHED

ULES

.DW

G

E5.2

PANELSCHEDULES

PROJECT: BERKELEY GARAGE

LOCATION: 1ST FLOOR ELEC. PANEL - EVALOAD (KVA) C. B. C. B. LOAD (KVA)

LOAD SERVED LTG. RECP. OTHER AMP POLE A B C AMP POLE LTG. RECP. OTHER LOAD SERVEDEV CHARGER 3.6 20 2 1 * 2 20 2 3.6 EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 EV CHARGEREV CHARGER 3.6 20 2 5 * 6 20 2 3.6 EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 EV CHARGEREV CHARGER 3.6 20 2 9 * 10 20 2 3.6 EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 EV CHARGEREV CHARGER 3.6 20 2 13 * 14 20 2 3.6 EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 EV CHARGEREV CHARGER 3.6 20 2 17 * 18 20 2 3.6 EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 EV CHARGEREV CHARGER 3.6 20 2 21 * 22 20 2 3.6 EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 EV CHARGEREV CHARGER 3.6 20 2 25 * 26 20 2 3.6 EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 EV CHARGEREV CHARGER 3.6 20 2 29 * 30 20 2 3.6 EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 EV CHARGEREV CHARGER 3.6 20 2 33 * 34 20 2 3.6 EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 EV CHARGEREV CHARGER 3.6 20 2 37 * 38 20 2 3.6 EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 EV CHARGERSPACE 41 * 42 SPACE

TOTALS ----------> 72.0 72.0 <-------- TOTALSFor Office Use Only ADDITIONAL FEATURES:

VOLTAGE: 208V, 3Ø, 3W CONNECT DEMAND DEMAND PHASE BALANCE LOAD (KVA) FACTOR LOAD (KVA) A B C ELECTRIC VEHICLE CHARGERS

S.C.A.: 10,000 AIC RMS SYM. X 100% OF LOAD = <----- LIGHTING KVA 50 50 43 X NEC 220-13 = <----- RECEPTACLES % 35% 35% 30%

MOUNTING: SURFACE 144 X 1.00 = 144 <----- OTHER AMP 420 420 360 ====== ======

BUS SIZE: 600 AMP BUSING 144 KVA 400 Amps 144 KVA 400 AMPS

MAINS: MAIN LUGS ONLY 180 KVA <---- 80% Rated Breaker ----> 180 KVA 500 AMPS25% Spare Added -----------------> 625 AMPS DATE ISSUED:

THESE VALUES SUMMARIZE THE LOADS FROM ALL PANEL SECTIONS panel13.xls 05/12/98 DATE PRINTED: 04/04/16

PROJECT: BERKELEY GARAGE

LOCATION: 1ST FLOOR ELEC. PANEL - EVBLOAD (KVA) C. B. C. B. LOAD (KVA)

LOAD SERVED LTG. RECP. OTHER AMP POLE A B C AMP POLE LTG. RECP. OTHER LOAD SERVEDEV CHARGER 3.6 20 2 1 * 2 20 2 3.6 FUTURE EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGEREV CHARGER 3.6 20 2 5 * 6 20 2 3.6 FUTURE EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGEREV CHARGER 3.6 20 2 9 * 10 20 2 3.6 FUTURE EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGEREV CHARGER 3.6 20 2 13 * 14 20 2 3.6 FUTURE EV CHARGEREV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 2 17 * 18 20 2 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 2 21 * 22 20 2 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 2 25 * 26 20 2 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 2 29 * 30 20 2 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 2 33 * 34 20 2 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 2 37 * 38 20 2 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERSPACE 41 * 42 SPACE

TOTALS ----------> 72.0 72.0 <-------- TOTALSFor Office Use Only ADDITIONAL FEATURES:

VOLTAGE: 208V, 3Ø, 3W CONNECT DEMAND DEMAND PHASE BALANCE LOAD (KVA) FACTOR LOAD (KVA) A B C ELECTRIC VEHICLE CHARGERS

S.C.A.: 10,000 AIC RMS SYM. X 100% OF LOAD = <----- LIGHTING KVA 50 50 43 X NEC 220-13 = <----- RECEPTACLES % 35% 35% 30%

MOUNTING: SURFACE 144 X 1.00 = 144 <----- OTHER AMP 420 420 360 ====== ======

BUS SIZE: 600 AMP BUSING 144 KVA 400 Amps 144 KVA 400 AMPS

MAINS: MAIN LUGS ONLY 180 KVA <---- 80% Rated Breaker ----> 180 KVA 500 AMPS25% Spare Added -----------------> 625 AMPS DATE ISSUED:

THESE VALUES SUMMARIZE THE LOADS FROM ALL PANEL SECTIONS panel13.xls 05/12/98 DATE PRINTED: 04/04/16

PROJECT: BERKELEY GARAGE

LOCATION: 1ST FLOOR ELEC. PANEL - EVCLOAD (KVA) C. B. C. B. LOAD (KVA)

LOAD SERVED LTG. RECP. OTHER AMP POLE A B C AMP POLE LTG. RECP. OTHER LOAD SERVEDFUTURE EV CHARGER 3.6 20 2 1 * 2 20 2 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 2 5 * 6 20 2 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 2 9 * 10 20 2 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 2 13 * 14 20 2 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 2 17 * 18 20 2 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 2 21 * 22 20 2 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 2 25 * 26 20 2 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 --- * 20 --- 3.6 FUTURE EV CHARGERFUTURE EV CHARGER 3.6 20 2 29 * 30 SPACEFUTURE EV CHARGER 3.6 20 --- * 32FUTURE EV CHARGER 3.6 20 2 33 * 34FUTURE EV CHARGER 3.6 20 --- * 36FUTURE EV CHARGER 3.6 20 2 37 * 38FUTURE EV CHARGER 3.6 20 --- * 40SPACE 41 * 42 SPACE

TOTALS ----------> 72.0 50.4 <-------- TOTALSFor Office Use Only ADDITIONAL FEATURES:

VOLTAGE: 208V, 3Ø, 3W CONNECT DEMAND DEMAND PHASE BALANCE LOAD (KVA) FACTOR LOAD (KVA) A B C ELECTRIC VEHICLE CHARGERS

S.C.A.: 10,000 AIC RMS SYM. X 100% OF LOAD = <----- LIGHTING KVA 43 43 36 X NEC 220-13 = <----- RECEPTACLES % 35% 35% 29%

MOUNTING: SURFACE 122 X 1.00 = 122 <----- OTHER AMP 360 360 300 ====== ======

BUS SIZE: 600 AMP BUSING 122 KVA 340 Amps 122 KVA 340 AMPS

MAINS: MAIN LUGS ONLY 153 KVA <---- 80% Rated Breaker ----> 153 KVA 425 AMPS25% Spare Added -----------------> 531 AMPS DATE ISSUED:

THESE VALUES SUMMARIZE THE LOADS FROM ALL PANEL SECTIONS panel13.xls 05/12/98 DATE PRINTED: 04/04/16

PROJECT: BERKELEY GARAGE

LOCATION: 1ST FLOOR ELEC. PANEL - L1A SECTION 1LOAD (KVA) C. B. C. B. LOAD (KVA)

LOAD SERVED LTG. RECP. OTHER AMP POLE A B C AMP POLE LTG. RECP. OTHER LOAD SERVEDELEV. PIT LTS, REC. 0.4 0.2 20 1 1 * 2 20 1 1.5 IT/SVR RACKCONV. 1.1 20 1 3 * 4 20 1 1.5 IT/SVR RACKPAY STATIONS N. LOBBY 0.7 20 1 5 * 6 20 1 0.7 IT/SVR REC. CONV.CASHIER OFFICE REC. 1.1 20 1 7 * 8 20 1 0.7 IT/SVR REC. CONV.SECURITY OFFICE REC. 0.4 20 1 9 * 10 20 1 0.7 IT/SVR REC. CONV.SECURITY OFFICE REC. 0.4 20 1 11 * 12 20 1 0.6 SLIDING DOORSECURITY OFFICE REC. 0.4 20 1 13 * 14 20 1 0.8 GEN. JACKET HTRSECURITY OFFICE REC. 0.2 20 1 15 * 16 20 1 0.5 GEN. BAT. CHGRSECURITY OFFICE REC. 0.7 20 1 17 * 18 20 1 SPARESECURITY OFFICE REC. 0.5 20 1 19 * 20 20 1 0.5 PARKING CONTROLSBREAK - COUNTER REC. 0.4 20 1 21 * 22 20 1 0.5 PARKING CONTROLSBREAK - COUNTER REC. 0.4 20 1 23 * 24 20 1 0.6 PARKING DYNAMIC SIGNAGEBREAK - FRIG. 0.8 20 1 25 * 26 20 1 0.6 PARKING DYNAMIC SIGNAGEART DISPLAY SPACE REC. 0.4 20 1 27 * 28 20 1 0.4 IRRIGATION CONTROLLERCONV. ELEC, GARAGE, MPOE 0.7 20 1 29 * 30 20 1 0.7 PAY STATIONS SO. LOBBYELEC RM CONV. 0.2 20 1 31 * 32 20 1 0.3 PAY STATIONS EASTIT/SVR 1.6 20 2 33 * 34 20 1 0.4 CONV. GAR.IT/SVR 1.6 20 --- * 36 20 1 0.5 IDF CABINETIT/SVR 1.6 20 2 37 * 38 20 1 0.5 MPOE ATT DEDICATEDIT/SVR 1.6 20 --- * 40 20 1 0.5 MPOE RACK DED.SPARE 1.6 20 1 41 * 42 20 1 SPARE

TOTALS ----------> 15.0 1.7 5.5 7.0 <-------- TOTALSFor Office Use Only ADDITIONAL FEATURES:

VOLTAGE: 120/208V, 3Ø, 4W CONNECT DEMAND DEMAND PHASE BALANCE LOAD (KVA) FACTOR LOAD (KVA) A B C RECEPTACLE/EQUIPMENT LOADS

S.C.A.: 10,000 AIC RMS SYM. X 100% OF LOAD = <----- LIGHTING KVA 10 10 923 X NEC 220-13 = 17 <----- RECEPTACLES % 19% 19% 17%

MOUNTING: SURFACE 29 X 1.00 = 29 <----- OTHER AMP 84 84 77 ====== ======

BUS SIZE: 225 AMP BUSING 53 KVA 146 Amps 46 KVA 128 AMPS

MAINS: MAIN LUGS ONLY 66 KVA <---- 80% Rated Breaker ----> 57 KVA 160 AMPS25% Spare Added -----------------> 200 AMPS DATE ISSUED:

THESE VALUES SUMMARIZE THE LOADS FROM ALL PANEL SECTIONS panel13.xls 05/12/98 DATE PRINTED: 04/04/16

PROJECT: BERKELEY GARAGE

LOCATION: 1ST FLOOR ELEC. PANEL - L1A SECTION 2LOAD (KVA) C. B. C. B. LOAD (KVA)

LOAD SERVED LTG. RECP. OTHER AMP POLE A B C AMP POLE LTG. RECP. OTHER LOAD SERVEDCONV. SO. LOBBIES 1.3 20 1 43 * --- 0.9 CISTERN PUMPPAY STATION 2ND SOUTH 0.4 20 1 45 * 46 15 3 0.9 CISTERN PUMPCONV. NORTH ELEV. LOBBIES 1.3 20 1 47 * --- 0.9 CISTERN PUMPPAY STATION 2ND NORTH 0.4 20 1 49 * --- 0.6IT/SVR ROOM 0.8 20 1 51 * 52 15 3 0.6 ROLL DOWN DOORIT/SVR ROOM 0.8 20 1 53 * --- 0.6

0.6 --- * --- 0.6ROLL DOWN DOOR 0.6 15 3 57 * 58 15 3 0.6 ROLL DOWN DOOR

0.6 --- * --- 0.60.6 --- * --- 0.6

ROLL DOWN DOOR 0.6 15 3 63 * 64 15 3 0.6 ROLL DOWN DOOR0.6 --- * --- 0.60.6 --- * --- 0.6

ROLL DOWN DOOR 0.6 15 3 69 * 70 15 3 0.6 ROLL DOWN DOOR0.6 --- * --- 0.60.6 --- * --- 0.6

ROLL DOWN DOOR 0.6 15 3 75 * 76 15 3 0.6 ROLL DOWN DOOR0.6 --- * --- 0.6

SOUTH ELEVATOR CAB LTS 20 1 79 * 80 20 1 SPARESOUTH ELEVATOR CONV. REC. 20 1 81 * 82 20 1 SPARESPARE 20 1 83 * 84 20 1 SPARE

TOTALS ----------> 2.5 9.3 11.4 <-------- TOTALSFor Office Use Only ADDITIONAL FEATURES:

VOLTAGE: 120/208V, 3Ø, 4W CONNECT PHASE BALANCE LOAD (KVA) A B C

S.C.A.: 10,000 AIC RMS SYM. <----- LIGHTING KVA 8 7 83 <----- RECEPTACLES % 33% 31% 35%

MOUNTING: SURFACE 21 <----- OTHER AMP 65 61 68 ======

BUS SIZE: 225 AMP BUSING 23 KVA

MAINS: MAIN LUGS ONLY 29 DATE ISSUED: DATE PRINTED: 04/04/16

PROJECT: BERKELEY GARAGE

LOCATION: 1ST FLOOR ELEC. PANEL - L1CLOAD (KVA) C. B. C. B. LOAD (KVA)

LOAD SERVED LTG. RECP. OTHER AMP POLE A B C AMP POLE LTG. RECP. OTHER LOAD SERVEDEF-4, EF-5 0.2 20 1 1 * 2 20 2 1.5 EWH-1FC-4 0.2 15 2 3 * --- 1.5 EWH-1FC-4 0.2 --- * 6 20 1 0.2 COMP-1FC-1 0.2 15 2 7 * 8 20 1 0.2 EF-6, FD-3FC-1 0.2 --- * 10 20 2 1.6 HP-1FC-5 0.1 15 2 11 * --- 1.6 HP-1FC-5 0.1 --- * 14 20 1 SPAREFC-2 0.2 15 2 15 * 16 20 1 SPAREFC-2 0.2 --- * 18 20 1 0.2 EF-6, EF-7 ON 4TH FLOORTF-1, HWCP-1, COND. PUMP 0.6 20 1 19 * 20 30 2 1.9 HP-3EWH-2 3.0 40 2 21 * --- 1.9 HP-3EWH-2 3.0 --- * --- 0.4 EF-1SPARE 20 1 25 * 26 15 3 0.4 EF-1HWCP-2 0.2 20 1 27 * --- 0.4 EF-1HP-5 0.7 20 2 29 * --- 0.4 EF-2HP-5 0.7 --- * 32 15 3 0.4 EF-2SPARE 20 1 33 * --- 0.4 EF-2HP-4 1.9 30 2 35 * 36 20 2 1.7 HP-2HP-4 1.9 --- * --- 1.7 HP-2SPARE 20 1 39 * 40 20 1 SPARESPARE 20 1 41 * 42 20 1 SPARE

TOTALS ----------> 13.7 16.8 <-------- TOTALSFor Office Use Only ADDITIONAL FEATURES:

VOLTAGE: 120/208V, 3Ø, 4W CONNECT DEMAND DEMAND PHASE BALANCE LOAD (KVA) FACTOR LOAD (KVA) A B C HVAC LOADS

S.C.A.: 10,000 AIC RMS SYM. X 100% OF LOAD = <----- LIGHTING KVA 10 10 11 X NEC 220-13 = <----- RECEPTACLES % 33% 32% 36%

MOUNTING: SURFACE 30 X 1.00 = 30 <----- OTHER AMP 82 81 90 ====== ======

BUS SIZE: 225 AMP BUSING 30 KVA 85 Amps 30 KVA 85 AMPS

MAINS: MAIN LUGS ONLY 38 KVA <---- 80% Rated Breaker ----> 38 KVA 106 AMPS25% Spare Added -----------------> 132 AMPS DATE ISSUED:

THESE VALUES SUMMARIZE THE LOADS FROM ALL PANEL SECTIONS panel13.xls 05/12/98 DATE PRINTED: 04/04/16

PROJECT: BERKELEY GARAGE

LOCATION: 1ST FLOOR ELEC. PANEL - L1BLOAD (KVA) C. B. C. B. LOAD (KVA)

LOAD SERVED LTG. RECP. OTHER AMP POLE A B C AMP POLE LTG. RECP. OTHER LOAD SERVEDLEVEL 1 WEST {4} 1.8 20 1 1 * 2 20 1 1.0 LEVEL 2 PARKING {4}LEVEL 1 EAST {4} 1.5 20 1 3 * 4 20 1 0.3 LEVEL 2 LOBBIES {4}LEVEL 1 PARKING {4} 0.7 20 1 5 * 6 20 1 SPARELEVEL 3 PARKING {4} 1.0 20 1 7 * 8 20 1 1.0 PARKING SIGN SOUTH {4}LEVEL 3 LOBBIES {4} 0.3 20 1 9 * 10 20 1 1.0 PARKING SIGN NORTH {4}LEVEL 4 PARKING {4} 1.0 20 1 11 * 12 20 1 SPARELEVEL 4 LOBBIES {4} 0.3 20 1 13 * 14 20 1 SPARELEVEL 5 PARKING {4} 1.0 20 1 15 * 16 20 1 SPARELEVEL 5 LOBBIES{4} 0.3 20 1 17 * 18 SPACELEVEL 6 PARKING {4} 1.0 20 1 19 * 20 SPACELEVEL 6 LOBBIES {4} 0.3 20 1 21 * 22 SPACELEVEL 7 PARKING {4} 1.0 20 1 23 * 24 SPACELEVEL 7 LOBBIES {4} 0.3 20 1 25 * 26 SPACELEVEL 8 PARKING {4} 1.0 20 1 27 * 28 SPACELEVEL 8 LOBBIES {4} 0.3 20 1 29 * 30 SPACESPARE 20 1 31 * 32 SPACESPARE 20 1 33 * 34 SPACESPARE 20 1 35 * 36 SPACESPARE 20 1 37 * 38 SPACESPARE 20 1 39 * 40 SPACESPARE 20 1 41 * 42 SPACE

TOTALS ----------> 12.0 3.3 <-------- TOTALSFor Office Use Only ADDITIONAL FEATURES:

VOLTAGE: 120/208V, 3Ø, 4W CONNECT DEMAND DEMAND PHASE BALANCE LOAD (KVA) FACTOR LOAD (KVA) A B C LIGHTING LOADS

S.C.A.: 10,000 AIC RMS SYM. 15 X 100% OF LOAD = 15 <----- LIGHTING KVA 6 5 3 X NEC 220-13 = <----- RECEPTACLES % 42% 36% 22%

MOUNTING: SURFACE X 1.00 = <----- OTHER AMP 54 46 28 BREAKER NOTES: ====== ======

BUS SIZE: 100 AMP BUSING 15 KVA 43 Amps 15 KVA 43 AMPS

MAINS: MAIN LUGS ONLY 19 KVA <---- 80% Rated Breaker ----> 19 KVA 53 AMPS {4}=CKT. CONTROLLED BY LCP25% Spare Added -----------------> 66 AMPS DATE ISSUED:

THESE VALUES SUMMARIZE THE LOADS FROM ALL PANEL SECTIONS panel13.xls 05/12/98 DATE PRINTED: 04/04/16

PROJECT: BERKELEY GARAGE

LOCATION: 1ST FLOOR ELEC. PANEL - EL1ALOAD (KVA) C. B. C. B. LOAD (KVA)

LOAD SERVED LTG. RECP. OTHER AMP POLE A B C AMP POLE LTG. RECP. OTHER LOAD SERVEDFACP 0.6 20 1 1 * 2 20 1 1.1 LIGHTING LEVEL 1 {4}FA POWER SUPPLIES 1.2 20 1 3 * 4 20 1 SPARELIGHTING LEVEL 2 {4} 1.1 20 1 5 * 6 20 1 1.1 LIGHTING LEVEL 3 {4}SPARE 20 1 7 * 8 20 1 1.1 LIGHTING LEVEL 4 {4}SPARE 20 1 9 * 10 20 1 1.1 LIGHTING LEVEL 5 {4}SPARE 20 1 11 * 12 20 1 1.1 LIGHTING LEVEL 6 {4}SPARE 20 1 13 * 14 20 1 1.1 LIGHTING LEVEL 7 {4}SPARE 20 1 15 * 16 20 1 1.1 LIGHTING LEVEL 8 {4}SPARE 20 1 17 * 18 20 1 SPARESPARE 20 1 19 * 20 20 1 SPARESPARE 20 1 21 * 22 20 1 SPARESPARE 20 1 23 * 24 20 1 SPARESPACE 25 * 26SPACE 27 * 28SPACE 29 * 30SPACE 31 * 32SPACE 33 * 34SPACE 35 * 36SPACE 37 * 38SPACE 39 * 40SPACE 41 * 42 1.0

TOTALS ----------> 2.9 7.6 1.0 <-------- TOTALSFor Office Use Only ADDITIONAL FEATURES:

VOLTAGE: 120/208V, 3Ø, 4W CONNECT DEMAND DEMAND PHASE BALANCE LOAD (KVA) FACTOR LOAD (KVA) A B C EMERGENCY EGRESS

S.C.A.: 10,000 AIC RMS SYM. 8 X 100% OF LOAD = 8 <----- LIGHTING KVA 4 3 4 X NEC 220-13 = <----- RECEPTACLES % 34% 29% 37%

MOUNTING: SURFACE 4 X 1.00 = 4 <----- OTHER AMP 32 28 36 BREAKER NOTES: ====== ======

BUS SIZE: 150 AMP BUSING 11 KVA 32 Amps 11 KVA 32 AMPS

MAINS: MAIN LUGS ONLY 14 KVA <---- 80% Rated Breaker ----> 14 KVA 40 AMPS {4}=CKT. CONTROLLED BY LCP25% Spare Added -----------------> 50 AMPS DATE ISSUED:

THESE VALUES SUMMARIZE THE LOADS FROM ALL PANEL SECTIONS panel13.xls 05/12/98 DATE PRINTED: 04/04/16

PROJECT: BERKELEY GARAGE

LOCATION: 1ST FLOOR ELEC. PANEL - EL1BLOAD (KVA) C. B. C. B. LOAD (KVA)

LOAD SERVED LTG. RECP. OTHER AMP POLE A B C AMP POLE LTG. RECP. OTHER LOAD SERVED3.2 --- * 2 20 1 0.8 2 WAY COMM FIRE DEPT

ELEVATOR #1 {1} 3.2 40 3 3 * 4 20 1 0.6 2 WAY COMM FIRE DEPT3.2 --- * 6 20 1 SPARE3.2 --- * 8 20 1 SPARE

ELEVATOR #2 {1} 3.2 40 3 9 * 10 20 1 SPARE3.2 --- * 12 20 1 SPARE3.2 --- * 14 20 1 SPARE

ELEVATOR #3 {1} 3.2 40 3 15 * 16 20 1 SPARE3.2 --- * 18 20 1 SPARE3.2 --- * 20 SPACE

ELEVATOR #4 {1} 3.2 40 3 21 * 22 SPACE3.2 --- * 24 SPACE

25 * 26 SPACE27 * 28 SPACE29 * 30 SPACE31 * 32 SPACE33 * 34 SPACE35 * 36 SPACE37 * 38 SPACE39 * 40 SPACE41 * 42 SPACE

TOTALS ----------> 38.9 1.4 <-------- TOTALSFor Office Use Only ADDITIONAL FEATURES:

VOLTAGE: 120/208V, 3Ø, 4W CONNECT DEMAND DEMAND PHASE BALANCE LOAD (KVA) FACTOR LOAD (KVA) A B C LEGALLY REQUIRED STANDBY

S.C.A.: 10,000 AIC RMS SYM. X 100% OF LOAD = <----- LIGHTING KVA 14 14 13 X NEC 220-13 = <----- RECEPTACLES % 34% 34% 32%

MOUNTING: SURFACE 40 X 1.00 = 40 <----- OTHER AMP 115 113 108 BREAKER NOTES: ====== ====== {1}= SHUNT TRIP

BUS SIZE: 225 AMP BUSING 40 KVA 112 Amps 40 KVA 112 AMPS

MAINS: MAIN LUGS ONLY 50 KVA <---- 80% Rated Breaker ----> 50 KVA 140 AMPS25% Spare Added -----------------> 175 AMPS DATE ISSUED:

THESE VALUES SUMMARIZE THE LOADS FROM ALL PANEL SECTIONS panel13.xls 05/12/98 DATE PRINTED: 04/04/16

Page 12: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

CONVERSION MANAGEMENT ASSOCIATES, INC.1620 Montgomery Street Suite 320, San Francisco, CA 94111

415.597.8414

BERKELEY, CA 94704

11/19/201514877

PERMIT SET11/19/2015

Last

save

d by:

PAUL

(201

6-03

-02)

L

ast P

lotted

: 201

6-03

-08

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E5

3 SIN

GLE

LINE

DIAG

RAMS

.DW

G

E5.3

SINGLE LINEDIAGRAMS

C-01-1

C-02-1

C-03-1

C-04-1

C-05-1

C-06-1

C-07-1

C-08-1

C-09-1

C-10-1

C-11-1

C-12-1

C-13-1

C-04-2

C-05-2

C-06-2

C-01-2

C-02-2

C-03-2

C-03-3

C-04-3

C-01-3

C-02-3

C-03-4

C-04-4

C-01-4

C-02-4

C-03-5

C-04-5

C-01-5

C-02-5

C-03-6

C-04-6

C-01-6

C-02-6

C-03-7

C-04-7

C-01-7

C-02-7

C-03-8

C-03-8

C-01-8

C-01-8

NVRSECURITYSYSTEMPC

42" DISPLAYX3

42" DISPLAYX3

RXCR ES RXCR ES RXCR ES

CR

ES

LOCATE AT BIKELINK ENTRY DOORWALL

LOCATED AT IT/SVRROOM.

Page 13: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

4/7/2015 11:28:49 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

CONVERSION MANAGEMENT ASSOCIATES, INC.1620 Montgomery Street Suite 320, San Francisco, CA 94111

415.597.8414

BERKELEY, CA 94704

11/19/201514877

PERMIT SET11/19/2015

Last

save

d by:

EDDY

(201

6-03

-03)

L

ast P

lotted

: 201

6-03

-08

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E6

1 ELE

CTRI

CAL D

ETAI

LS.D

WG

E6.1

ELECTRICALDETAILS

Page 14: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

4/7/2015 11:28:49 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

CONVERSION MANAGEMENT ASSOCIATES, INC.1620 Montgomery Street Suite 320, San Francisco, CA 94111

415.597.8414

BERKELEY, CA 94704

11/19/201514877

PERMIT SET11/19/2015

Last

save

d by:

PAUL

(201

6-03

-07)

L

ast P

lotted

: 201

6-03

-08

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E6

2 ELE

CTRI

CAL D

ETAI

LS.D

WG

E6.2

ELECTRICALDETAILS

FILE : 070-02305-20-2013

(N.T.S.)

4"

2" MIN. AT SLAB ON GRADE1" MIN.

f'c (MIN.) = 3000 PSI

DISTRIBUTION BOARDS : 3 PER SIDE PER CUBICLE.TRANSFORMERS : 2 PER SIDE. (< 500 KVA).TRANSFORMERS : 3 PER SIDE PER SECTION. (> 500 KVA).MOTOR CONTROL CENTERS : 2 PER SIDE PER CUBICLE.

DRILLED ANCHORSIZE AS REQUIRED

EQUIPMENT ENCLOSURE

EMBEDMENTMIN. 3 1/2" U.O.N.

SPACING TO SUITEQUIP. DIMENSION

BOTTOMOF SLAB

STONE AGGREGATECONCRETE

CONCRETE HOUSEKEEPINGPAD U.O.N.

ANGLE STEEL

LIGHT FIXTUREDRIVER

2"

5"

1/4" LED LIGHT UNBER RAIL(TYPE F11)

BLOCKING ASREQUIRED

TYPE F11

LED DRIVER

PROVIDE VENTILATED SHEETMETAL ACCESS COVER

ROUTE FLEXIBLE METAL CONDUITINSIDE TUBE STEEL

PVC SCH 40 IN DECK

METAL PANEL

BOTTOM CHRPOF STAIR

CONCRETEDECK

ELEVATION/SECTION - NORTH/SOUTH

SHEET METALENCLOSURESWITH DIVIDER)FOR VOLTAGESEPARATION

CONDUIT RISERS

3/4" OR 1"C. ROUTED INTOPPING SLAB

REMOVABLE COVERSFOR ACCESS

COLUMN (BEYOND)

SEE ALSOA6.02,#D/E6.2

2.2'

PLAN VIEW

SEE ALSOA6.02,#C/E6.2

DATA

POWER

OPENTO

BELOWAND

ABOVE

EDGE OF SLAB

3/4"C.

3/4"C.

1"C.

REMOVABLEACCESS PANEL,TYP BOTH SIDES

COLUMN

STUB UP

TOADDITIONALCHARGERSTATIONS

EDGE OFTOPPINGSLAB

ELECTRIC VEHICLECHARGER STATIONPEDESTAL

1"C.

Page 15: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

4/7/2015 11:28:49 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

CONVERSION MANAGEMENT ASSOCIATES, INC.1620 Montgomery Street Suite 320, San Francisco, CA 94111

415.597.8414

BERKELEY, CA 94704

11/19/201514877

PERMIT SET11/19/2015

Last

save

d by:

PAUL

(201

6-03

-02)

L

ast P

lotted

: 201

6-03

-08

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E6

3 TEL

ECOM

DET

AILS

.DW

G

E6.3

DETAILS

Page 16: R Electrical Part 2 - Berkeley, California / Engineering / Consulting Drawing No. Drawing Title: Date Project No. Scale Checked By ... UON. BOTTOM IS AT 7'-6" AFF. TYPICAL ALL EXIT

4/7/2015 11:28:49 AM

C:\Users\jleite\Documents\Center St_jleite.rvt

ALAMEDA, CA. 945011305 MARINA VILLAGE PARKWAYTHE POWER HOUSE

Consulting Engineers

(510) 769-7600 JOB #14073

OaklandIrvine

Los Angeles

560 - 14th Street Suite 300 Oakland, CA 94612Telephone 510 473 0300 Fax 510 473 0310

Architecture / Engineering / Consulting

Drawing No.

Drawing Title:

DateProject No.

ScaleChecked ByDrawn By

DateRevision

CONVERSION MANAGEMENT ASSOCIATES, INC.1620 Montgomery Street Suite 320, San Francisco, CA 94111

415.597.8414

BERKELEY, CA 94704

11/19/201514877

PERMIT SET11/19/2015

Last

save

d by:

PAUL

(201

6-03

-02)

L

ast P

lotted

: 201

6-03

-08

Filen

ame:

\\TAU

\DAT

A\CA

DFIL

ES\14

073_

BERK

ELEY

CEN

TER

STRE

ET G

ARAG

E\CA

D\BP

S-E6

4 TEL

ECOM

DET

AILS

.DW

G

E6.4

DETAILS