7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
1/14
Research Experience in Carbon SequestrationJune 21, 2013
Update on the Plant Barry CarbonCapture and Geologic Storage
Demonstration Project
Richard A. Esposito, Ph.D.
Southern Company
-
7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
2/14
Plant Barry CCS Demonstration
Carbon capture from Plant Barry(equivalent to 25MW of electricity).
12 mile CO 2 pipeline constructed byDenbury Resources.
CO2
injec on into ~9,400 J. deepsaline forma on (Paluxy) aboveCitronelle Field.
Monitoring of CO 2 storage duringinjec on and three years post-injec on.
-
7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
3/14
Status (as of May 30 2013)
139,200 metric tons captured (since uly 2011) CO2 capture unit ran intermiSently 14 months prior to start of storage
program. 55,866 metric tons injected & stored (since August 2012)
9 months elapsed between gran ng of Class V permit and authoriza on toinject.
IntermiSent opera ons based on forced and planned outages and dispatch
-
7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
4/14
Flue Gas / Utilities
Capture Project Sequestration Project
Plant Barry
(APC)
Capture Plant
(SCS/EPRI)
Sequestration
Operations
Pore Space
Alabama Power Company Denbury Resources
Pipeline
SO collaborating with MHI Location: APC s Plant Barry Execution/contracting: SO
Project: DOE s SECARB Phase III Prime contractors: SSEB and EPRI CO 2 : Southern Company supplying Sequestration: Denbury Citronelle Field ARI - monitoring and geology
CO2
Mobile
Montgomery
Birmingham
Citronelle Oil FieldPlant Barry, Bucks AL
Alabama Project Partner Framework
-
7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
5/14
Organization Chart
Advanced ResourcesInternational
Storage
TransportCapture
Permi\ng
Plant Integra on& Construc on
iteHost
MMAAc vi es
FieldOpera ons
ReservoirModeling
Publiceduca on/outreach
UICPermi\ng
GeologicModeling
Mitsubishi HeavyIndustries
Design TechnologyProvider
AdvancedAmines
EconomicEvalua on
KnowledgeTransfer
3rd PartyEvalua on
NEPA Prepara on
DOE
ite Prep/Drilling
Contractors
Field
Opera ons
ite
Host
DenburyResources
SO. STATES ENERGY BOARD
DenburyResources
Pipeline
Permi\ng &Construc on
Field
Opera ons
Pipeline
Design
-
7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
6/14
25-MW CCS Demo
World
s largest carbon capture facility on a fossil-fueled power plant
90% CO 2 capture @ 99.97 purity Capture operations began in June
2011 with integrated injectionoperations in August 2012
300 feet
150 feet
Alabama Power Plant Barry
-
7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
7/14
-
7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
8/14
Construction snapshot
2010 2013
-
7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
9/14
Right-of-Way Ownership 1 mi (2 km) inside Plant Barry property 8 mi (13 km) along existing power corridor 2 mi (3 km) undisturbed forested land Permanent cleared width 20 ft (6 m) Temporary construction width 40 ft (12 m)
Right-of-Way Habitat 9 mi (14.5 km) of forested and commercial
timber land
3 mi (5 km) of emergent, shrub, andforested wetlands Endangered Gopher Tortoise habitat
110 burrows in or adjacent toconstruction area
Pipeline Right-of-Way
-
7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
10/14
Directional drilled 18 sectionsof the pipeline under roads,
utilities, railroad tracks,tortoise colonies, andwetlands (some up to 3,000
feet long and up to 60 ftdeep).
DOT 29 CFR 195 liquidpipeline; buried 5 feet
with surfacevegetation
maintenance.
-
7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
11/14
Mainline valve station along pipeline Check meter station & building at Citronelle Field
CO2 Pipeline and Injection Infrastructure
Horizontal CO 2 Booster Pump @ D-9-7 #2 Wellsite
-
7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
12/14
Storage Scope & Objectives
Scope: Demonstrate safe, secure CO 2 injection
and storage in regionally significant salinereservoirs in the southeast U.S. region
Objectives: Perform risk registry and assessment Evaluate storage capacity and injectivity Test the adaptation of commercially
available oil field tools and techniques for
monitoring CO 2 storage Permit pipeline and injection, stakeholder
acceptance through outreach & education
-
7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
13/14
Project Integration Questions
The demonstra on of integra on of capture from a coal-redpower plant with transport and injec on into a deep salineforma on is pioneering for a CC project.
Key integra on ques ons: What business rela onships and contracts must be
established?
How can CO 2 transporta on & injec on impact capture unit?
How can plant shutdown impact CO 2 transporta on andinjec on?
What types of communica ons and control systems areneeded?
-
7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project
14/14
Questions