    Research Experience in Carbon SequestrationJune 21, 2013

    Update on the Plant Barry CarbonCapture and Geologic Storage

    Demonstration Project

    Richard A. Esposito, Ph.D.

    Southern Company

  • 7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project

    2/14

    Plant Barry CCS Demonstration

    Carbon capture from Plant Barry(equivalent to 25MW of electricity).

    12 mile CO 2 pipeline constructed byDenbury Resources.

    CO2

    injec on into ~9,400 J. deepsaline forma on (Paluxy) aboveCitronelle Field.

    Monitoring of CO 2 storage duringinjec on and three years post-injec on.

  • 7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project

    3/14

    Status (as of May 30 2013)

    139,200 metric tons captured (since uly 2011) CO2 capture unit ran intermiSently 14 months prior to start of storage

    program. 55,866 metric tons injected & stored (since August 2012)

    9 months elapsed between gran ng of Class V permit and authoriza on toinject.

    IntermiSent opera ons based on forced and planned outages and dispatch

  • 7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project

    4/14

    Flue Gas / Utilities

    Capture Project Sequestration Project

    Plant Barry

    (APC)

    Capture Plant

    (SCS/EPRI)

    Sequestration

    Operations

    Pore Space

    Alabama Power Company Denbury Resources

    Pipeline

    SO collaborating with MHI Location: APC s Plant Barry Execution/contracting: SO

    Project: DOE s SECARB Phase III Prime contractors: SSEB and EPRI CO 2 : Southern Company supplying Sequestration: Denbury Citronelle Field ARI - monitoring and geology

    CO2

    Mobile

    Montgomery

    Birmingham

    Citronelle Oil FieldPlant Barry, Bucks AL

    Alabama Project Partner Framework

  • 7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project

    5/14

    Organization Chart

    Advanced ResourcesInternational

    Storage

    TransportCapture

    Permi\ng

    Plant Integra on& Construc on

    iteHost

    MMAAc vi es

    FieldOpera ons

    ReservoirModeling

    Publiceduca on/outreach

    UICPermi\ng

    GeologicModeling

    Mitsubishi HeavyIndustries

    Design TechnologyProvider

    AdvancedAmines

    EconomicEvalua on

    KnowledgeTransfer

    3rd PartyEvalua on

    NEPA Prepara on

    DOE

    ite Prep/Drilling

    Contractors

    Field

    Opera ons

    ite

    Host

    DenburyResources

    SO. STATES ENERGY BOARD

    DenburyResources

    Pipeline

    Permi\ng &Construc on

    Field

    Opera ons

    Pipeline

    Design

  • 7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project

    6/14

    25-MW CCS Demo

    World

    s largest carbon capture facility on a fossil-fueled power plant

    90% CO 2 capture @ 99.97 purity Capture operations began in June

    2011 with integrated injectionoperations in August 2012

    300 feet

    150 feet

    Alabama Power Plant Barry

  • 7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project

    7/14

  • 7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project

    8/14

    Construction snapshot

    2010 2013

  • 7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project

    9/14

    Right-of-Way Ownership 1 mi (2 km) inside Plant Barry property 8 mi (13 km) along existing power corridor 2 mi (3 km) undisturbed forested land Permanent cleared width 20 ft (6 m) Temporary construction width 40 ft (12 m)

    Right-of-Way Habitat 9 mi (14.5 km) of forested and commercial

    timber land

    3 mi (5 km) of emergent, shrub, andforested wetlands Endangered Gopher Tortoise habitat

    110 burrows in or adjacent toconstruction area

    Pipeline Right-of-Way

  • 7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project

    10/14

    Directional drilled 18 sectionsof the pipeline under roads,

    utilities, railroad tracks,tortoise colonies, andwetlands (some up to 3,000

    feet long and up to 60 ftdeep).

    DOT 29 CFR 195 liquidpipeline; buried 5 feet

    with surfacevegetation

    maintenance.

  • 7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project

    11/14

    Mainline valve station along pipeline Check meter station & building at Citronelle Field

    CO2 Pipeline and Injection Infrastructure

    Horizontal CO 2 Booster Pump @ D-9-7 #2 Wellsite

  • 7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project

    12/14

    Storage Scope & Objectives

    Scope: Demonstrate safe, secure CO 2 injection

    and storage in regionally significant salinereservoirs in the southeast U.S. region

    Objectives: Perform risk registry and assessment Evaluate storage capacity and injectivity Test the adaptation of commercially

    available oil field tools and techniques for

    monitoring CO 2 storage Permit pipeline and injection, stakeholder

    acceptance through outreach & education

  • 7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project

    13/14

    Project Integration Questions

    The demonstra on of integra on of capture from a coal-redpower plant with transport and injec on into a deep salineforma on is pioneering for a CC project.

    Key integra on ques ons: What business rela onships and contracts must be

    established?

    How can CO 2 transporta on & injec on impact capture unit?

    How can plant shutdown impact CO 2 transporta on andinjec on?

    What types of communica ons and control systems areneeded?

  • 7/28/2019 R. Esposito - Update on the Plant Barry Carbon Capture and Geologic Storage Demonstration Project

    14/14

    Questions