The Mining Recorder,P. O. Box 984,Kirkland Lake, Ontario P2N 1A2
Re: Canadian Nickel Co Township, Ontario.
Dear Sir:
Ltd. 173 Claim Group, Holloway
Jo ac^pppan-y our under
Enclosed, please find copies of invoices JJiL&c.h.eniic-al w-or-k-*- We are applying for work credits one day for each #15. 00 spent. The expenditures occured from August l to November 15, 1984.
reporl cdL.. expenditures,
173 claim group is registered in the name of Canadian Nickel Co. , Copper Cliff, Ontario and is under option to R. J. Kasner Co. , P. O. B.px 993, Kirkland Lake, Ontario P2N 3L1. R. J. Kasner
(1) Argentex Ltd. and (3)
Resource Exploration Corporation, Discovery Mines Ltd.
(2) Lenora.Explorations
Subsequently, work was carried out by all four companies for Canadian Nickel's account. The attached invoices are, then, for different companies, but charged to the whole group as per R. J. Kasner Co.'s agreement with Canadian Nickel Ltd.
Company owned equipment has been charged out at going rates, and no invoices are attached. ;
Mr. Kasner is paid an Exploration Management fee of $3,000.00 per month by Lenora and $2,000.00 by Argentex, and this has been charged accordingly.
If you have any questions, please contact either Glenn Kasner at (705)-568-8263, or R. J. Kasner.
Yours very truly,
R. J. KASNER CO. LTD.,
R. J. Kasner
cc: Glenn C. Kasner Geo. Duguay.
R. J. KASNER CO. LTD.
Suite 181 B. 44 Victoria St. Toronto, Ontario M5C 1 Y2
947-1465/6
P.O Box 993 Kirkland Lake, Ontario P2N 3L1
(7O5) 642-3393
INVOICE
TO: Argentex Resources Exploration Corporation P.O. Box 546, KIRKLAND LAKE, Ontario. P2N 3L1
RE; Overburden Drilling Holloway Township Claims
All in costs including assaying, transportation, supervision, etc.
149,401.19
Please Remit,
R. J. KASNER CO. LTD.
R.J. Kasner President
RJK/mc
per month overdue accounts
"KND1TURES ON CANADIAN NICKEL CO. LTD. 173 CLAIM GOUR?
August l, 1984 - November 15, 1984
August 1-3
September 1
October 1 -
November 1 -
R. J. Kasner
1 A004 LJV009
- 30 A004 LJV009
31 A004 LJV009
15 A004 LVJ009
Co. Ltd.
21 1
255
6 19
i*
.484. ,035.
,228. .926.
.152. ,436.
,100. 804.
37 22
74 69
24 88
27 85
-
l 22,519.
31,155.
25,589.
14,905.94,169.
59
43
12
1226
Supervision, 3.5 months @ $5,000.00
Company owned Equipment
All Terrain.e Vehicle 3.5 months @ $700.00
2-4x4 trucks3.5 months @ ^1,200.00 each
D7 Bulldozer14 days x 10 hours @ $55.00/hour
Timberjack Backhoe14 days x 10 hours @ $40.00/hour
Miscellaneous expenses @ 10%
1.7,500.00
2,450.00
8,400.00
7,700.00
5,600.00 Al,650.00 135,819.26
13.581.93
149,401.19
Total days credit - 9,960
"EXPENDITURES ON CANADIAN N!CKEL co. LTD. 173 CLAIM GOURPAugust l, 1984 - November 15, 1984
August 1-31
September 1
October 1-31
November 1-15
R. J. Kasner Co
A004 LJV009
30 A004 LJV009
A004 LJV009
A004 LVJ009
. Ltd.
21 1
255
6 19
14
.484. ,035.
,228. .926.
,152. ,436.
.100. 804.
37 22
74 69
24 88
27 85
* 22,
31,
25,
14,94,
519.
155.
589.
905.169.
59
43
12
1226
Supervision, 3.5 months @ $5,000.00
Company owned Equipment
All Terraine Vehicle 3.5 months @ $700.00
2-4x4 trucks3.5 months @ $1,200.00 each
D7 Bulldozer14 days x 10 hours @ $55.00/hour
Timberjack Backhoe14 days x 10 hours Q $40.00/hour
Miscellaneous expenses @ 10/5
$ 17,500.00
2,450.00
8,400.00
7,700.00
5.600.00 41.650.00135,819.26
13.581.93
149,401.19
Total days credit r 9j 960
RECEIVEDJAN 3 i 1985
MINING LANDS SECTION
320i2seeeaa 2.7755 HOLLOWAY 900
Ftbruary 12, 1985 our mtlMining Recorder's
Flits 669
Canadian Nickel CoMpany Llmlttd Copptr Cliff, Ontario POM l HO
Dtar Sirs:
RE: Overburden Drilling and Data for Assaying sutMltttd on Mining Claim L 688052, tt al, In tht Township of Holloway
This will acknowltdgt rtctlpt of one stt of Involcts for tht abovt-Mntlontd survey on January 31, 1985.
In ordtr to complete your submission, pltast providei
1) A technical rtport discussing tht Ovtrburdtn Drilling Program.
2) Plan naps showing tht locations of tht drilling.'Sample location nap and assay results of tht humus survty.
3)
4) Signed receipts or canctlltd chtquts for all of thi expenditures being clalMd.
Pltast forward tht above Information, In duplicate, to this office quoting flit 2.775S.
For further Information, pltast contact Doug Ishtrwood at (416)965-4888.
Yours sincerely,
S. E. YundtDirectorLand Management BranchWhitney Block,.Room 6643 Queen's Park Toronto, Ontario M7A 1M3 Phone:(416)965-4888
D. Isherwood:mc
cc: Mining RecorderKirkland Lake, Ontario
cc: R.J. Kasner Suite 1816 44 Victoria Street Toronto, Ontario M5C 1Y2
REGISTERED
F1)ei'2.7755March 28, 1985
Canadian Nickel Co Ltd Copper Cliff, OntarioPOM 1NO
Dear Sirs:
RE: Overburden Drilling A Data for Assaying submitted on Mining Claims L 588052, et al In the Township of Holloway
Enclosed 1s a copy of our letter dated February 12, 1985 requesting additional Information for the above-mentioned survey. We are still awaiting signed receipts or cancelled cheques as proof of payment.
Unless you can provide the required data by April 10* 1985 the mining recorder will be directed to cancel thv work credits recorded on December 10* 1984.
For further Information, please contatt Mr. Ray Plchette at (416)965-4888.
Yours sincerely,
S.E. YundtDirectorLand Management Branch
Whitney Block, Room 6643 Queen's Park, Toronto Telephone: 416/965-6918
S. Hurst;Mc
cc: Mining RecorderKirkland Lake, Ontario
Encl.
cc: R.J. KasnerToronto, Ontario
cc: C. KasnerKirkland Lake, Ontario
R. J. KASNER CO. LTD.
Suite 1 81 B, AA Victoria St. Toronto, Ontario MSC 1 Y2
B) 947-1465/6
P.O. Box 393 Kirkland Lake. Ontario P2N 3L1
(7O5) B4S-33S3
March 29, 1985.
Ministry of Natural Resources, Land Management Branch, Whitney Block, Queen's Park, TORONTO, Ontario, M7A 1W3
Re: File: 2.7755
Dear Sirs:
Enclosed, please find copies of all cancelled cheques with related invoices, in duplicate. Reports, maps etc. will be or have been forwarded under separate cover.
Yours truly,
R. J. KASNER CO. LTD. ,
fX ^ j
s J' •••'f
(Mrs.) M. Lawrence, Accountant.
Enclosures
cc: R. J. Kasner
RECEIVED
WIN* IAHDS SECTIOH
May 14, 1985 File: 2.7755
Canadian Nickel Co. Ltd. Copper Cliff* Ontario POM 1NO
DeirrSltts:
Re: Overburden Drilling and Data for Assaying submitted on Mining Claims L 588052* et al* In the Township of Holloway
I have examined the receipts sent to this office In support of the above-mentioned submission, and have determined that 133,988.20 only Is applicable towards the assaying and overburden drilling costs.
The remaining receipts appear to represent other costs Incurred 1n the performance of your exploration program, I.e., auto repairs, groceries, I1necutt1ng, office supplies etc.. These costs do not appear to be applicable to your overburden drilling and assaying work.
I have had difficulty determining the actual overburden drilling and assaying costs from the examination of your receipts. Please provide us with a breakdown, describing the cost Incurred In the performance of the overburden drilling and assaying.
If j have not received the cost breakdown by May 24, 1985, I will assume the above-mentioned amount was In fact the costs Incurred .for the Overburden Drilling and Assaying* and assessment will proceed accordingly.
For further Information, please contact Dennis Klnvlg at (416)965-4888.
Yours sincerely,
S.E. YundtD1rectorLand Management BranchWhitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1H3 Phone:(416)965-4888
D. K1nv1g:mccc: Mining Recorder
Kirkland Lake, Ontario File: 1569
cc: R.O. Kasner Co. Ltd Toronto* Ontario
ccci R.J. KasnerKirkland Lake* Ontario
RGENTEX RESOURCE EXPLORATION CORPORATION
HEAD OFFICE EXECUTIVE OFFICESte. 500, 67 Richmond St. W. Suite 1816, 44 Victoria StreetTORONTO, Ontario M5H IZ5 TORONTO. Ontario M5C IY2
(416)361-0737 1416)947-1465/6
May 28, 1985
Mr. Dennis Kinwig,Land Management Branch,Queen's Park, Whitney Block, Room 6643TORONTO, Ontario.M7A 1W3
Dear Sir,
Please find enclosed necessary receipts to cover overburden drilling on Argentex's 50 claims in Holloway Township.
As discussed in your office, the report is in metric and not in feet. I am sorry for any confusion this report caused regarding meters and feet - it is difficult to interpret.
All in total, including backhoe drilling, there is approximately 2158 feet of drilling for an all in cost of $62.23 per foot which is including industry costs.
Yours Truly,
ARGENTEX RESOURCE EXPLORATION CORPORATION
R.J. Kasner President
RJK/mc Encl.
RECEIVEDJUN u 4 1985
IMNMG WDS SECTION
M,S N^U Report of Work,'p!ivsicol, Geological,
arid Expenditures)
Mining Act
Instructions' - Pirasr type or print.•- If f umber of mining claims t'lWyd.
exceed:, space on this form, attach a list.Note: — Only days credits calculated in the
"Expenditures" section may he enteredin the "Expend. Days C'.",
- Do not use shaded areas belov
Claim Holocr(s)
Township o' Area
.Holloway- ...— _ . —[Prospector's Licence No.
AddressCANADIAN .NICKEL.-CO, -LTTX
Copper Cliff, OntarioSurvey Company
^ R. J. Kasner Co. Ltd.Name and Address of Author (of Geo-Technical report)
Suite 1816, 44 Victoria Street,
Date of Survey (from Si to). 1,08 84 |15 11 84j Day J Ma J Vr. j Day | Mo. j Yr.
Toronto, Ontario M5C 1Y2
Total Miles of line Cut
Credits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:
Enter 40 days. (This includes line cutting!
For each additional survey: using the same grid:
Enter 20 days (for each)
Man Days
Complete reverse side ; " ' .".
( "CA'KVS'M- pM:ft^-| " Q lffic iom/^W ,. r, , V- i /i
jj8j9j]0]liliLl^i^
Airborne Credits
Note: Special provisions credits do not apply to Airborne Surveys.
Geophysical
- Electromagnetic
- MagrJ^pr^t^ g
- Radiometric
- Other Ut U U
Geoloik'ING LAf'Geochemical
Geophysical
ectromagnetic
l\ - Magnetometer
\J - ladjometric
l-:/" C ther
.Le^&o !ical
Geochemical
Electromagnetic
Magnetometer
Radiometric
Days per Claim
fVE
T19H
ijs-saDays per Claim
- r —— - ——
———— ~
Days per Claim
Mining Claims Traversed (List in numerical sequence)
Expenditures {excludes power stripping)Type of Work Peiformed
Reverse Circulation Drilling, HumusPerformed on Oaim(s)
See Attached List
Calculation of Expenditure Days Credits
Total Expenditures
S149,401.19 -j- 1
Total Days Credits
5 = 9960Instructions
Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.
N Prefix
L
)N
lining Claim Number ''-
588052
53
-..-..-..54...,____ 5,5 -—
56
57
-588147 .
352588154
__ -.155 -—,.
156
157
r ___ LSB——
-5S8161 _ -
- - __ 162 _ -
r -163 - J.-64-
L5-8S068599026
Expend. Days Cr.
60
60
-6JL-60
60
-6JL
-6J)
-6..Q —
-6JL-
60
-60
-60-
-60—
-60—
-60—
-60 — -
-60 —
60-60— 60
N/
Prefix
—L...
J
ft/ JKi^
lining ClaimNumber
-599027 ^
028
__ 0-2,9 _ .
___ 012 --
. ---013 ——
-— --fl^—
-- -0-3-6--037
__ -03S __ .
040
042 ——
\ 043 -
^JC—0-45— ~
^ ——— 046 ——
047
\ 048049
Expend. Days Cr.
...6.0...60
...SIL-D CJ
yy -.6.0—-60.--60.
..60.-.-60-
-60— -60- -60 - -60— -60 -60 ~-60 —
-60 -
60
60fiO
\Total numbeAof mining claims covereaby this | —t -"X report of work\ \ \ S
Date
Dec. 7, 1984Recorded Holder or Agent (Signature)ed H Age
For Office Use OnlyTotal Days Cr. Recorded
ou 0̂Dale(JECt 01984Date Approved as Recorded
\Mining Recorder/A
; . jK \Branch Direc'toVj 1 X,
Certification Verifying Report of Workl hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.
Name arid Postal Address of Person Certifying
A.-'J~5 f.',f--riSsMDate Certified
7 , R 4
Ceriified^by (Signa
, S.i/ys i t}-,1362 IBI.-Bt
O-\* 7jtryof
.*a Re
'..ario*~}
Report of Work(Geophysical, Geological, Geochemical and Expenditures)
Mining Act
Instructions: — Please type or print.— If number of mining claims traversed
exceeds space on this form, attach a list.Note: — Only days credits calculated in the
"Expenditures" section may be enteredin the "Expend. Days Cr." columns.
— Do not use shaded areas below.Type of Surveyls)
Claim Holder(s)
Township or Area
Prospector's Licence No.
Survey Company [DDate of Survey (from 81 to)
Name and Address of Author (of Geo-Technical report)__ ^ ___ _ ____ l Day j Mo. L^r^L-Day l Mo. \ Yr. | _
Total Miles of line Cut
Credits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:Enter 40 days. (This includes line cutting)
For each additional survey: using the same grid:
Enter 20 days (for each)
Man Days
Complete reverse side and enter total(s) here
Airborne Credits
Note: Special provisions credits do not apply to Airborne Surveys.
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical— FreerElectromagnetic
DECOMagnetometer
R ~*4-^JLLfvll.M A 1 AM aQ lpFTB3lf|q\l j . 1 li lvl1*111111*0 L.rUl
Days perClaim
Days per Claim
l */ g dV/ s fer
Claim
M985
)S SEC'Expenditures (excludes power stripping)
Mining Claims Traversed (List in numerical sequence)
Type of Work Performed
Performed on Claim(s)
Calculation of Expenditure Days Credits
Total ExpendituresTotal
Days Credits
SInstructions
Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.
)
10
Mining ClaimPrefix
L
tt
Number
599050
051
052
053
588251
252
253
254
255
256
257
258
—-- _ 25JL- 260
261
262
263
264
____ 2fi5—
268
Expend. Days Cr.
60
60
60
60
60
60
60
60
60
60
60
60
,6J) --
60
60
60
6JD
-6JL^
-6.0—
...6.0L .fin
Mining ClaimPrefix
L
1
Number
588270
271
272
588273.
588014
588165
588169
170
171
588175
176
. __ ,JL77 --
178
179
588182
183
184
___ .185.—.
186
___ JLB7 _ .
. .18.fi. .18Q
Expend. Days Cr.
60
60
60
60
55.8
55.8
55.8
55.8
55.8
55.8
55.8
55.8
SJL-JL
55.8
55.8
55.8
55.8
5JLJL
5.5^.8,.
55., Jl
Total number of mining claims covered by this report of work.
Date Recorded Holder or Agent (Signature)
For Office Use OnlyTotal Days Cr. Recorded
Date Recorded
Date Approved as Recorded
Mining Recorder
Branch Director
Certification Verifying Report of Workl hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.
fj jntl Postal Address of Person Certifying
Date Certified l Certified by (Signature)
jjryof .atural
Report of Work(Geophysical, Geological, Geochemical and Expenditures)
Mining Act
Instructions: - Please type or print.— If number of mining claims traversed
exceeds space on this form, attach a list.Note: — Only days credits calculated in the
"Expenditures" section may be enteredin the "Expend. Days Cr." columns.
— Do not use shaded areas below.Type of Survey(s)
Claim Holder(s)
Township or Area
Prospector's Licence No.
Address
Jarvey Company
Name and Address of Author (of Geo-Technical report)
Date of Survey (from 81 to)
pay j Mo. l Yr. | Day | Mo. | Yr.
Total Miles of line Cut
Credits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:
includes line cutting)
For each additional survey:using the same grid:
Enter 20 days (for each)
Man Days
Complete reverse side and enter total(s) here
Airborne Credits
Note: Special provisions
to Airborne Surveys.
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Electromagnetic
Magnetometer
Radiometric
Days per Claim
Days per Claim
——————
Days per Claim
Expenditures (excludes power stripping)Type of Work Performed
Performed on Claim(s)
Calculation of Expenditure Days Credits
Total ExpendituresTotal
Days Credits
InstructionsTotal Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.
Date Recorded Holder or Agent (Signature)
Certification Verifying Report of Work
Mining Claims Traversed (List in numerical sequence)Mining Claim
Prefix
L
-
Number
588540
588558
559
560
561
562
563
564
565
566
567
568 '
569
570
571
572
573574
575
599010 '. _ . JQll-
012
Expend. Days Cr.
55.8'H'
If
".
II.
".
H.
II -
H-
•l.
I..
II
II
II.
",
H-
1. '
1. -
II -
II
,,
Mining ClaimPrefix
L
-
' : "
'
Number
599014
015
016
017
018
019
020
021
022
023
024
025
Ot C Q 2 ft
fe^
Expend. Days Cr.
55.8"
n
n
n
"
"
"
II
II
M
te| ^^
tO
^TTl f\ B
Total number of mining claims covered by this T 7 3 report of work.
For Office Use OnlyTotal Days Cr. Recorded
Date Recorded
Date Approved as Recorded
Mining Recorder
Branch Director
l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.
Name and Postal Address of Person Certifying
Date Certified Certified by (Signature)
o- /'
Report of Work (Geophysical, Geological, Geochemical and Expenditures)
Mining Act
Instructions: — Please type or print.— If number of mining claims traversed
exceeds space on this form, attach a list.Note: — Only days credits calculated in the
"Expenditures" section may be enteredin the "Expend. Days Cr." columns.
— Do not use shaded areas below.Type of Survey(s) Township or Area
Claim Holder(s) Prospector'* Licence No.
Address
Survey Company
Name and Address of Author (of Geo-Technical report)
Date of Survey (from 8. to) (Total Miles of line Cut
Day l Mo. | Yf. | Day | Mo. | Yr.
Credits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:Enter 40 days. (This includes line cutting)
For each additional survey: using the same grid:
Enter 20 days (for each)
Man Days
Complete reverse side and enter total (s) here
Airborne Credits
Note: Special provisions credits do not apply to Airborne Surveys.
Geophysical
- Electromagnetic
- Magnetometer
- Radiornetric
- Other
Geological
Geochemical
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
eRtrEnCnEc| ty
Magnetometer
JS&GcO ? 191
Days per Claim
—————— -
Days per Claim
—— ————
Days per Claim
ED
Jb
Mining Claims Traversed (List in numerical sequence)
Expenditures (excludes povType of Work Performed '""mill] LrtNUb oLCllON
Performed on Claim(s)
Calc ulation of Expenditure Days Credits
Total Expenditures
S -5-1
•-
Total Days Credits
5 =
Instructions Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.
Date Recorded Hold er or Agent (Signature)
Mining ClaimPrefix
L
- .
Number
588190
191
192
193
194
195
196
197
198.
588274
275
276 -
211
278
___ 219
281
2R?
283
284
9Rfi
9R7
Expend. Days Cr.
55.8•i
n
"
..
..
n
H
..
H
,.
, ,,
,,
n
,,
n
,,
,,
,,
H
,,
M
,,
Mining ClaimPrefix
L
i
Number
588288
289
290
291
292
293
588388
389
588468
469
588470
471
476
L —— 417 —— 478
480
48]
.351514,
. -535
536
^RR^Q
Expend. Days Cr.
55.8II
II
"
"
..
"
II
1,
1.
M
II
II
II
II
II
II
II
II
II
It
II
II
Total number of mining claims covered by this report of work.
For Office Use OnlyTotal Days Cr. Recorded
Date Recorded
Date Approved as Recorded
Mining Recorder
Branch Director
Certification Verifying Report of Work1 hereby certify that 1 have a personal and intimate knowledge of the facts set forth in the Report or witnessed same during and/or after its completion and the annexed report is true.
Name and Postal Address of Person Certifying
Date Certified
of Work annexed hereto, having performed the work
Certified by (Signature)
l fl
Performed on claims:
L. 588150 588149 588146 58814? 79669?599049599050599051599052599053 599041 599040 599039 599038 59903?
599036588562588561588291588292
Ministry ofNatural
Ontaric
Technical Assessment Work Credits Date
1985 06 24
2.7755Mining Recorder's Report of
o. 56g
Recorded Holder
CANADIAN NICKEL CO LTDTownship or Area
HOLinWAY TOWNSHIP
Type of survey and number of Assessment days credit per claim
Geophysical
Other
Section 77 (19) Sse "Mining Claims Attetted'
Geological
days
riays
riays
days
. .. days
1 column
riavs
Man days CD Airborne CD
Special provision CD Ground CD
CD Credits have been reduced because of partial coverage of claims.
CD Credits have been reduced because of corrections to work dates and figures of applicant.
Special credits under section 77 (16) for the
Mining Claims Assessed
S149,401.19 SPENT ON OVERBURDEN DRILLING AND SAMPLE ASSAYS ON MINING CLAIMS:
L 588054 588149-50 588154-55 599027 to 29 inclusive 599030 to 34 inclusive 599042 to 44 inclusive 599046 599049 to 51 inclusive 599053 799627
9960 ASSESSMENT WORK DAYS ARE ALLOWED WHICH MAY BE GROUPED IN ACCORDANCE WITH SECTION 76(6 OF THE MINING ACT.
following mining claims
No credits have been allowed for the following mining claims
l _ l not sufficiently covered by the survey LJ Insufficient technical data filed
The Mining Recorder may reduce the above credits if necessary in order that the total number of approved assessment days recorded on each claim does not exceed the maximum allowed as follows: Geophysical — 80; Geological—40; Geochemical — 40; Section 77 (19)—60:eze tssret
1985 06 24 Your File: 569 Our File: 2,7755
Mining Recorder Ministry of Natural Resources 4 Government Road East Kirkland Lake, Ontario P2N 1A2
Dear Sir:
RE: Assaying submitted under Section 77(19) of the Mining Act RSO 1980, on Mining Claims L 588054, et al, 1n Holloway Township
The enclosed statement of assessment work credits for assaying expenditures has been approved as of the above date.
Please Inform the recorded holder of these mining claims and so Indicate on your records.
Yours sincerely,
S.E. YundtDirectorLand Management Branch
Whitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1W3 Phone:(416)965-4888
D. K1nv1g:mc
cc: Canalian Nickel Co. LtdCopper Cliff, OntarioPOM 1NO
cc: G. KlsnerP.O. Box 1053Kirkland Lake, OntarioP2N 3L1
cc: Resident GeologistKirkland Lake, Ontario
Encl.
Mining Lands Section
Control Sheet
File No 2- 7751T
TYPE OF SURVEY ____ GEOPHYSICAL
____ GEOLOGICAL
GEOCHEMICAL
EXPENDITURE
MINING LANDS COMMENTS:
2-77? 3
Signature of Assessor
Date
FRECHEVILLE TWP M.348
l M. 2M. 3M. 4 M. -5M.
IL
.525491 5254921
l ' ^ ,525494 1525493
5962SJXI- A '"oi9 yioes"2722') \(27222)t1——*
:6325O4|632505
'632507
596260 \L. i 10878"
^•^257
©\43923
10476©
, L. © Y" © 10477 \82*7
:y^\ L - .e !L\43922 \ 34834
23 M.- i L.L. ©\10080 \ '0082
L. ®\? 10081
10697
©\t. ^ IU70 ©
© 1069910534
©l
"®
596253i158
32935
10904
3483S
32936"ll 59 6245
34836'
Li.
628049
L \ 57959O .579593
.579588
L.66f9l2 l L l"' l - - -.L. Se, 911 , i
1 661910 !- 1— — — -^ L
l®\'~~^
43078 \ 43079579586
57957 r 579595
579592 579591
,Lr579589^ 579587
©i!43072 43073
l ' L , l 598638 j59
—~cJ\ 598640
l L. ® 43062
V ®
678647 T --
! 7995^5, 799 5341
2ZM.--
LI
588Z5I |5ye 252 l 588253—— __ L ___ L. _ .
,0*** ^J~" ®\ /5*^9 1S* 8̂ ̂ "K" \ " l993̂ " |*9̂ ^SM 7^,588,76^^88,77 '.588 U8 '583179 J 737785^ '^37784 TSTWTjWMtj 73783Jl' - \V*'\ A"-*\-—- riL--1-t--|-r—|-ir—*-i—HL ^--5-—hI---j-r --v-L--- 1 - ;T |T - )U -I
l 73791
l
38369 '588270'588271 '5882T2 l
l 15882731il3998 10219 V***"|588573 J588574 |588S75 's990,0 ',588I92 '588193 1588194 (988199 |-S8Sl9.6^ ^' l -'^.SV*
^m**m—amm^^^^^^--^~T^^