ra spms 180512.xls
TRANSCRIPT
RISK ASSESSMENT FORM
Project / Work Description:
Risk Assessment Team (Name/s):
Date Conducted: Next Review Date:
Hazard Identification Risk Evaluation Risk Control
1a. 1b 1c. 1d. 2a. 2b. 2c. 2d. 3a 3b 3c 3d 3e 3f
S/N Work activity Hazard Severity Likelihood RPN* Severity Likelihood RPN* Remarks
*RPN - Risk Prioritization Number
School / Department & Exact Location Of The Work Performed:
Approved By Supervisor / Reporting Officer: (Name, Date & Signature)
Possible Accident/ Ill health to persons, fire or
property loss
Existing Risk Control
Additional Risk Control Measures
Follow up by (name) & date
Instructions for using the Risk Assessment form
Header
Column 1b
Column 1c
Column 1d
Column 2a
Fill up all sections in the header of the RA form. Note 1: Discuss with your supervisor/reporting officer on the next review date for the RA. Normally the next review date is up to one year ahead. The RA is also reviewed: (1) When there are changes in work processes/activities (2) After any accidents/incidents Note 2: Check your Division rules about team or individual submission for RA
Describe the work activity to be carried out. Note: Please do not fill in names of machines/equipment to be used. Therefore, a computer is not an activity, but working on a computer is
Identify hazard(s) associated with the activity to be carried out. Examples of hazards include chemical, biological, electrical, mechanical, physical, ergonomics, psychosocial, slip & fall etc.
Identify possible accidents/ill health associated with each identified hazard. Examples of possible accidents/ill health include fires, explosions, cuts, burns, frost bites, fractures etc.
Indicate risk control measures that are already in place to eliminate or minimise risks. Methods to control risks may be analysed according to the Hierarchy of Controls: Elimination, Substitution, Engineering Controls, Administrative Controls and Personal Protective Equipment (PPE). Elimination of the hazard should take first priority while PPE should be the last line of defence. Elimination Example: Use water based solvents instead of organic based solvents Substitution Example: Use a less toxic solvent Engineering Controls Example: Use of fume cupboard or gloves boxes Administrative Controls Example: Work instructions. Good laboratory practices. Training on proper use of chemicals PPE Example: Use of safety eyewear plus respiratory protection, use of gloves
Column 2b
Column 2c
Column 2d
Column 3a
Column 3b
Column 3c
Column 3d
Column 3e
Column 3f Enter any remarks
S=Severity Severity is the degree or extent of injury or harm caused by the hazards, or as a result of an accident. Choose the most likely severity from a value between 1 and 5, rather than the most extreme. Refer to the Risk Matrix tab for the severity table
L=Likelihood Likelihood of occurance of an accident, incident or ill health is defined as the probability that the said accident, incident or ill health will happen. Choose the likelihood from a value between 1 and 5. Consider the records of such events happening in the past when deciding on the likelihood. Refer to the Risk Matrix tab for the likelihood table
RPN=Risk Prioritisation Number RPN=Severity X Likelihood All RPNs should not be more than 6
Additional risk control measures are required when the RPN indicated in column 2d exceeds 6. If the RPN is 6 or less, enter "NA" in the column
S=Severity S may reduce upon introduction of additional control measures
L=Likelihood L may reduce upon introduction of additional control measures
RPN=Risk Prioritisation Number RPN will reduce upon introduction of additional control measures
Enter the name of the person appointed to oversee the implementation of the additional control measures. Enter the follow-up date.
Fill up all sections in the header of the RA form. Note 1: Discuss with your supervisor/reporting officer on the next review date for the RA. Normally the next review date is up to one year ahead. The RA is also reviewed: (1) When there are changes in work processes/activities (2) After any accidents/incidents
Check your Division rules about team or individual
Describe the work activity to be carried out. Note: Please do not fill in names of machines/equipment to be used. Therefore, a computer is not an
Identify hazard(s) associated with the activity to be carried out. Examples of hazards include chemical, biological, electrical, mechanical, physical, ergonomics, psychosocial, slip & fall etc.
Identify possible accidents/ill health associated with each identified hazard. Examples of possible accidents/ill health include fires, explosions, cuts, burns, frost bites, fractures etc.
Indicate risk control measures that are already in place to eliminate or minimise risks. Methods to control risks may be analysed according to the Hierarchy of Controls: Elimination, Substitution, Engineering Controls, Administrative Controls and Personal Protective Equipment (PPE). Elimination of the hazard should take first priority while PPE should be the last line of defence.
Example: Use water based solvents instead of organic based solvents
Example: Use a less toxic solvent
Example: Use of fume cupboard or gloves boxes Administrative
Example: Work instructions. Good laboratory practices. Training on proper use of chemicals PPE Example: Use of safety
Enter any remarks
S=Severity Severity is the degree or extent of injury or harm caused by the hazards, or as a result of an accident. Choose the most likely severity from a value between 1 and 5, rather than the most extreme. Refer to the Risk Matrix tab for the
L=Likelihood Likelihood of occurance of an accident, incident or ill health is defined as the probability that the said accident, incident or ill health will happen. Choose the likelihood from a value between 1 and 5. Consider the records of such events happening in the past when deciding on the likelihood. Refer to the Risk Matrix tab for the likelihood table
RPN=Risk Prioritisation Number RPN=Severity X Likelihood All RPNs should not be more
Additional risk control measures are required when the RPN indicated in column 2d exceeds 6. If the RPN is 6 or
S=Severity S may reduce
L=Likelihood
RPN=Risk Prioritisation Number RPN will reduce upon introduction of additional control measures
Enter the name of the person appointed to oversee the implementation of the additional control measures. Enter the
Risk Assessment Matrix
Risk Prioritisation Number = Severity x Likelihood
Severity Table
Pt Severity level Workplace Safety Workplace Health Environment Fire Damage Downtime Incurred
5 Critical
Spills to Outside Campus
4 Very Serious
Spills to Outside Building
3 Serious
2 Marginal
1 Negligible
First aid treatment only
No or superficial injury No Exposure
Likelihood Table
Pt Likelihood level Likelihood of Occurrence / Exposure Criteria
5 Frequent Likely to occur many times per year
4 Moderate Likely to occur once per year
3 Occasional Might occur once in three years
2 Remote Might occur once in five years
Fatality, single or multiple
Acute Poisoning, Failure of Major Bodily Functions
More Than $10 million damages
More than 1 year for full re-instatement
Permanent Body Injury or Loss of Use for more than 30 days
Infection with No Known Cure
Infection - outside Campus area
Injury requiring 30 days of hospitalisation
and/or medical leave
Moderate exposure, Reversible injury to Bodily Functions on
prolong recovery
More Than $1 million damages
More than 3 months for full re-instatement
Temporary Body Injury or Loss of Use for more
than 10 days but not exceeding 30 days
Infection with Known Cure but
extensive treatment
Infection - outside Building area but within
Campus
Injury requiring 10 days of hospitalisation
and/or medical leave
Mild exposure, Reversible injury to
Bodily Functions with less than 30 days
recovery
Spills to Outside Laboratory/Room
More Than $100k damages
More than 1 month for full re-instatement
Temporary Body Injury or Loss of Use
for up to 10 days
Infection with Known Cure but
extensive treatment
Infection - outside Laboratory area but
within building
Injury requiring maximum of 3 days of
medical leave only
Very Mild exposure, Reversible injury to
Bodily Functions with less than 3 days
recovery
Spills to Outside Workplace but within
laboratoryMore Than $10k
damagesMore than 5 days for
full re-instatement
Temporary Body Injury or Loss of Use
for 3 days or less
Infection with Known Cure but
treatment needed
Infection - outside workplace but within
Laboratory
Very Mild exposure, Reversible injury to
Bodily Functions with less than 3 days
recovery
Spills within Workplace only
Less than $5k damages
No significant downtime
No Infection or infection with no effects within
workplace
1 Unlikely Might occur once in ten years
Risk level Determination - 5 x 5 Matrix
SEVERITY
LIKE
LIH
OO
D
Action TableColour Score Risks Action
16 - 25 High
12 - 15 Warning
8 -10 Medium
Critical(5)
Very Serious(4)
Serious(3)
Marginal (2)
Negligible(1)
Frequent(5)
25Operation not
permissible
20Operation not
permissible15
High priority10
Review at appropriate time
5Risk acceptable
Moderate(4)
20Operation not
permissible
16Operation not
permissible12
High priority8
Review at appropriate time
4Risk acceptable
Occasional (3)
15High priority
12High priority
9Review at appropriate
time6
Risk acceptable3
Risk acceptable
Remote(2)
10Review at
appropriate time
8Review at
appropriate time6
Risk acceptable4
Risk acceptable2
Risk acceptable
Unlikely(1)
5Risk acceptable
4Risk acceptable
3Risk acceptable
2Risk acceptable
1Risk acceptable
Review the risk assessment records every year or whenever there are changes in processes, work activities or upon any incident occurrence, whichever is earlier.
Operation not Permissible
Stop operation & review controls. If necessary abort experimentation.
High priority remedial action
Proceed with extreme caution with PI present at all times. Implement additional (secondary) controls immediately. Review
within 7 days. Emergency control measures shall be in place.
Take remedial action at appropriate time
Proceed with care. Additional control is advised. Review shall be implemented within 30 days.
1 - 6 Warning
Risk acceptable: Residual risk
If possible, risk reduction should be further considered, particularly severity.
There are no imminent dangers. Frequent review shall be in place especially changes in procedures, materials or environment.
RISK ASSESSMENT FORM
Project / Work Description: Working with Femtosecond Laser Systems
Risk Assessment Team (Name/s): Johnny (Team Leader), Alice, Roland, Kenny
Date Conducted: 11th March 2012 Next Review Date: 10th March 2013
Hazard Identification Risk Evaluation Risk Control
1a. 1b 1c. 1d. 2a. 2b. 2c. 2d. 3a 3b 3c 3d
S/N Work activity Hazard Severity Likelihood RPN* Severity Likelihood RPN*
1 Physical Hazard Severe Eye Injuries 3 2 6 NA NA NA NA
Electrical Hazard 4 3 12 4 1 4
School / Department & Exact Location Of The Work Performed:(Example: SPMS -PAP - Lab A)
Approved By Supervisor / Reporting Officer: (Name, Date & Signature)Prof Tan (Project Supervisor), 16th March 2012
Possible Accident/ Ill health to persons, fire or
property loss
Existing Risk Control
Additional Risk Control Measures
Operation of Femtosecond Laser Systems
Beam blocks and beam dumps used to blocked off laser beams. Only authorised users are allowed to operate the system. Users are equipped with laser goggles
Electrocution due to high voltage
Warning signs are displayed beside system to warn users of high voltage
Regular servicing and maintenance of laser system by vendor Only authorised users are allow to operate the system
*RPN - Risk Prioritization Number
RISK ASSESSMENT FORM
Project / Work Description: Working with Femtosecond Laser Systems
Risk Control
3e 3f
Remarks
NA NA
NA
Follow up by (name) & date
(Johnny) 13th March 2012
*RPN - Risk Prioritization Number
RISK ASSESSMENT FORM
Risk Assessment Team (Name/s): Benny
Date Conducted: 11th March 2012 Next Review Date: 10th March 2013
Hazard Identification Risk Evaluation
1a. 1b 1c. 1d. 2a. 2b.
S/N Work activity Hazard Severity
1 Irritant Chemicals 1
2 3
School / Department & Exact Location Of The Work Performed:(Example: SPMS -CBC - Lab K)
Possible Accident/ Ill health to persons, fire or
property loss
Existing Risk Control
Weighing chemicals for the synthesis work
Irritation when come in contact with skin and eyes
Handle under fumehood. Put on required PPE - safety glasses, lab coat, long pants, gloves, covered shoes.
Prepare glassware and add chemical into chemical reactor
Glass breakage due to overpressure
(chemical reaction)
Cuts on skin/eye due to flying particles
Inspect glassware before use. Put on required PPE - safety glasses, lab coat, long pants, gloves, covered shoes.
*RPN - Risk Prioritization Number
RISK ASSESSMENT FORM
Project / Work Description: Chemical works
Risk Evaluation Risk Control
2c. 2d. 3a 3b 3c 3d 3e 3f
Likelihood RPN* Severity Likelihood RPN* Remarks
3 3 NA NA NA NA NA NA
3 9 3 1 3 (Benny) Ongoing NA
Approved By Supervisor / Reporting Officer: (Name, Date & Signature)Prof Xiao (Project Supervisor), 16th March 2012
Additional Risk Control Measures
Follow up by (name) & date
Install pressure control / relief valves Supervisor to brief group to pull down fumehood sash
*RPN - Risk Prioritization Number
RISK ASSESSMENT FORM
Risk Assessment Team (Name/s): Joey
Date Conducted: 11th March 2012 Next Review Date: 10th March 2013
Hazard Identification Risk Evaluation
1a. 1b 1c. 1d. 2a. 2b.
S/N Work activity Hazard Severity
1 Sorting of documents / Use of paper 1
1
School / Department & Exact Location Of The Work Performed:(Example: Office)
Possible Accident/ Ill health to persons, fire or
property loss
Existing Risk Control
Contact with sharp edges (from paper edges and bent plaster dividers
Cuts and lacerations to hand and fingers
Handle files and documents with care, avoiding fingers running along the edge of papers. Discard bend plastic folders.
Punching holes for document to be filed
Strike by moving parts or caught between moving parts
Fingers may get injured (crush) during punching
Proper usage of hole punch Do not overload paper for punching Maintenance of hole puncher
Muscular starins 3
*RPN - Risk Prioritization Number
Punching holes for document to be filed
Ergonomic hazard (repetive similar action)
Staff to adopt good ergonomice practice e.g. table height. Job rotations; avoid prolong repetitive punching operation. Brief staff on proper usage of hole punch.
RISK ASSESSMENT FORM
Project / Work Description: General Office Activities
Risk Evaluation Risk Control
2c. 2d. 3a 3b 3c 3d 3e 3f
Likelihood RPN* Severity Likelihood RPN* Remarks
4 4 1 3 3 Office Staff (April 2012) NA
3 3 NA NA NA NA NA NA
Approved By Supervisor / Reporting Officer: (Name, Date & Signature)Mr Lim (Manager), 16th March 2012
Additional Risk Control Measures
Follow up by (name) & date
Provide finger cots to staff to lift paper
1 3 NA NA NA NA NA NA