radically sustainable homes next generation assembly...3 mckinsey - reinventing construction...
TRANSCRIPT
Radically Sustainable Homes Next Generation Assembly
health + opportunity Basic need that impacts
From materials + operations20% of Global GHG Emissions 1&2
Housing Matters
Largest Expense for most people
1 Architecture 2030 2 U.S. EIA !2
A Tale of 2 Problems
Day 10 Day 10
+
Inefficient process based on specialty trades x shortage of specialty trades = housing shortage and increasing costs
!3
NODE’s Combining hardware and software to deliver zero emission, non-toxic, housing to all income levels: 10X more efficiently
!4
Solution Slide–Click–Lock
Patents-pending
1
23
Easy, fast, plug+play assembly
A new, non-specialized, workforce
Flat-pack ships anywhere
!5
Solution: Activate a New Workforce
labor1/104 non-construction people can assemble entire system
175 k
93 k
822 k
6.2 million
Unemployed
!6
Guaranteedprice + schedule
Hassle-Freestart to finish
Non-toxic
Zeroemissions
Consumers want something better
!7
Increased Housing Decreased Carbon - Price & Scale Key
1000
500
166K
400K
TIMELINE
CarbonSaved ( Tons )
NODEHomes Made
CARBON
Helps Housing Shortage
Reduces Climate Change
HOMES
More NODE Homes
Theory of change: bold approach through new product category & new delivery system + IP moat + then license
Construction TechAssembly kit R+D Supply chain based + NODE
NODE Crews Assemble Flexible workforce later
!9
Business Model
D2C
Direct to Consumer Homes Developers later
Technology Roadmap
Distributedenergy
DesignVR + Ordering
Housingas a serviceAssembly
+ Quality ControlFlexibleWorkforce
Enabling TechnologyToday
Flywheel Technology18 months
Future Technology
Component-based system + digital technologies mobilizing a lower-skilled workforce translates to network effects
!10
!11
Repeatable Manufactured Parts: Rinse & Repeat
Tested Systems on Two Projects
Integrated Renewable Energy Systems
Water Collection + Filtering
Low Impact Foundations
100% Non Toxic Materials
Energy efficiency systems - 90% less energy
!12
Slide-Click-Lock Development
Proprietary Hardware
Framing + Insulation
Foundation
Windows+ Doors
Utility Core
ElectricalRuns
PlumbingRuns
SidingInstallation
Sensors
App + Software
!13
Go To Market
Prototype ADUs with paying clients
Inbound leads + Tours
GrowTrain Workforce
Paid Social Media + Articles
1 2 3Scale
Developer Clients
Paid Media + Events
!14
Workforce Roadmap
Traditional Construction Employees
Recruit + Train New Workforce Scale 1 2 3
!15
Unit Economics
Materials Labor Mark ups Outcomes
Status quotoday
Sales Price
Full Price 10,000 man-hours 4 markups $350 /sf $350-1,000
/sf
NODE at scale
40% savings bulk
1,000 man-hours 1 markup $100 /sf $150-350
/sf
NODE at 24 months
15% savings bulk
6,000 man-hours 1 markup $200 /sf $250-350
/sf
!16
Financial Projections
Timeline2019
6 Projects in Beta System Rapid Prototyping
2020Developer + Multifamily
Customers Process Software
2021Scale Supply Chain
Scale Assembly Workforce Software
2022Assembly Workforce + Housing as a Service
Software
3 21100
400
REVENUE EBITDA # of projects
2000
2021
!17
+ $50B Markets Multifamily
$150B West
$500B US Residential
+$138B Canadian
$10B SFR Seattle + NoCal
CA Wildfire Rebuild2
$10+ Billion
Affordable Housing3
Energy Mandates
Hurricane Rebuild4
Educational Housing
Healthcare Companies
7.2 Million Units
CA, Austin, Denver+
$10-20 Billion4
EmergingEmerging
Massive Market
!18
1 Statisa 2 Daily Caller News Daily Caller Foundation 3 Metaprop NYC 4 Harvard Joint Center for Housing Harvard JCHS
1
Cases
Trends
Infinite designs, multiple use cases at multiple price points.
Capital intensive, last mile problem, relies on skilled trade labor on site. i.e.: Katerra, Plant Prefab, Blockable, Acre
Risky cost and schedule. Relies on skilled trade labor. Lack of clear QC.
What we’re not What we are
Cutting edge sustainability zero carbon footprint and non-toxic materials
Easy to ship, no wide load or crane. Supply chain based, capital light.
Slide-Click-Lock streamlined assembly activates a new, low-skilled, workforce solving the labor shortage.
Accessible + Flexible Radically Sustainable
Component Flat Pack Simplified AssemblyTraditional Construction
Modular + Other Prefab
Competition
!19
Patents FiledBusiness method + utility patents
Progress
built with alpha system2 Projects Complete
2017-2018
Customer funded beta system6 Projects
Developer Partners2 signed
Customer Pipeline60+ qualified
2019 Milestones
$1.5 MillionRevenue Target
100+ qualifiedExpand Pipeline
!20
Lakshmi GondiArchitecture +Industrial Design
Molly MooreSales Director
Amit LieFinance + Accounting
Kelly BethkeDevelopment
Tested, Obsessed + Driven
Bec Chapin
Domain Expert Housing Startups
Co-founder + COODon Bunnell
Serial Entrepreneur IPO Exit
Co-founder + CEOChrysanthe Gussis
Scale Expert Formerly Solar City
Board Chair
!21
Advisors
Aaron FairchildGreen Canopy Homes
Ankur SrivastavaSwarmsales
Matt BernardyKnock Rentals
Tim GodzichQB Health
Emily LawrenceAceable
Alex RoetterKitty Hawk
Doug MooreMcKinstry
Tom WymanBorealis Ventures SketchUp
Craig HusaImpact Bioenergy
Zach NiesTechstars
Sameer RashidHEVO PowerSupercollider.io
!22
Seed Raise
$1.5M Convertible Note - $5M cap & 20% discount$600k+ closed to date
Use of FundsSlide-Click-Lock development 18 months of runway Expand pipeline Execute 6 projects
Milestones6 projects in the field & beta system developed 40 projects in pipeline 2020
www.node.eco [email protected]
!23
ExitIPO or RBF
Appendix
!24
Appendix
Projections
!25
Backyard CottageHomeowner wants income.
Pain: Too small for busy builders.
Status: delivered
Small MultifamilyUrban developer wants to increase speed, profitability and sustainability.
Pain: Labor shortages, delays and cost overruns.
Status: LOI signed
Single Family HomeLandowner wants a new house.
Pain: Complex, risky + time consuming.
Status: in feasibility
Solution: NODE system with guaranteed price and schedule
!26
Customer Profiles
Platform for Opportunity
Distributedenergy
Painlessadditions
Technologyupgrades
Designvisualize + order online
Housingas a service
Connectedhome
FlexibleWorkforce
Permit+ site report software
!27
Engineering + Design Roadmap
Innovative foundation tested on 2nd project
Click-in windows
Off-the-shelf clip-on siding system
Off-the-shelf, plug + play, electrical &
plumbing connectionsFactory-assembled utility core
Proprietary wall, floor + roof systems
Proprietary exoskeleton
!28
Industry Failure is an Opportunity
Cost to build out of current housing shortage2
$2.1 TrillionRate household formations outpaced construction1
43%
1 Housing Underproduction in the US Report 2 Metaprop NYC 3 McKinsey - Reinventing Construction
Potential increase by moving to manufacturing-based building system3
10x Productivity
!29
McKinsey: Productivity Decline for U.S. Residential Construction1
!301McKinsey - Reinventing Construction