RADWG 3 rd - 2014 22 th May 2014. G. Spiezia (EN/STI/ECE). AGENDA. Matters arising Summary of workshop on FPGA CHARM: update and news Status report of radiation test campaigns at Fraunhofer Radiation damage studies at F4E for ITER. RADWG mandate. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: RADWG 3 rd   - 2014 22 th   May 2014

RADWG 3RD - 201422TH MAY 2014

G. Spiezia (EN/STI/ECE)

Page 2: RADWG 3 rd   - 2014 22 th   May 2014

AGENDA Matters arising

Summary of workshop on FPGA

CHARM: update and news

Status report of radiation test campaigns at Fraunhofer

Radiation damage studies at F4E for ITER

Page 3: RADWG 3 rd   - 2014 22 th   May 2014

RADWG mandate Working group to share information among

accelerator sectors groups dealing with radiation Presentation and discussion on radiation facilities, test

setups and results Organization of the Radiation Test plan Out side CERN (PSI, CEA, Fraunhofer and others) At CERN (CNRAD, H4IRRAD CHARM)

Communication on calculations and measurements of the radiation levels in the CERN machines

Report of the equipment failure due to radiations and their follow-up Review

Discussion of the mitigation actions Update/Summary of relevant workshop and conferences

Page 4: RADWG 3 rd   - 2014 22 th   May 2014

G. Spiezia EN/STI/ECE

Facilities

EFFECTS

SEE

DD

TID

PSI

CEA

Co60 source

Standard facilities PSI. Proton beam (>15 tests per

year) CEA, Fraunhofer. Displacement

damage (3 tests per year) Fraunhofer. Co60. Total Ionizing

dose (blanket contract)

In-house test areas CNRAD, H4IRRAD (Past) CHARM

Crucial effort in Coordination and planning

PSIPSI

Page 5: RADWG 3 rd   - 2014 22 th   May 2014

PSI test – Next slotsDate Equipment

Owner Test group DUT

01-04 March EN/STI EN/STI Cypress memory, Radmon deported module

28-31 March TE/EPC, BE/BI EN/STI Mos, PWM driver, voltage regulator

11-14 April EN STI EN STI Zener, Oscillators, SRAM

25-28 April QPS, EN/STI QPS, EN/STI ADCSRAM tests (Samsung, ADC)

17-18 May EN/STI EN/STI FPGA (Oslo Collaboration-TBC), Components for TE/EPC BE/BI, SRAM, RADMON

7-8 June TE/EPC TE/EPC FGC lite

PIF facility will stop from July to October http://

radwg.web.cern.ch/RadWG/Pages/PSI_tests/2014_PSI.htm

Page 6: RADWG 3 rd   - 2014 22 th   May 2014

PSI test

MCP1826-Adjustable (BE/BI) Output stable up to 1kGy Vin threshold decreases (minor effect)

Opto TLP 127 (TE/EPC) CTR degradation

0 50 100 150 200 250 300 350 400 450 5000

20

40

60

80

100

120

140

CTR 30mA

1234 (ref)

0 50 100 150 200 250 300 350 400 450 5000

20

40

60

80

100

120

CTR 60mA

5678 (ref)

Page 7: RADWG 3 rd   - 2014 22 th   May 2014

PSI test

Cypress on RadMon Able to distinguish two

different flux (6E6 and 1.4E7 p/cm2/s)

Central memories counts more (sample to sample spread??)

0123

4567

5-6

5-6

4-74-7

1-20-3

ToshibaCypress

0-3

Page 8: RADWG 3 rd   - 2014 22 th   May 2014

PSI test SRAM Cypress CY7C1059 8Mbit

Cross section of ~2.3-3 10-14 cm2

Page 9: RADWG 3 rd   - 2014 22 th   May 2014

Workshops AMICSA Workshop organized by ESA with

CERN collaboration ASICS and mixed signal components Talks from industries 30 June-1 July 2014 http://

indico.cern.ch/conferenceTimeTable.py?confId=277669#20140630

Page 10: RADWG 3 rd   - 2014 22 th   May 2014

Conferences

NSREC 2014 - Paris Combined with RADECS July 14-18 2014 http://www.nsrec.com/ details on the call

for papers and the short course program

SEE symposium 19-22 May http://radhome.gsfc.nasa.gov/radhome/see_mapld/#

Page 11: RADWG 3 rd   - 2014 22 th   May 2014

Back-up

Page 12: RADWG 3 rd   - 2014 22 th   May 2014

Displacement damage tests Transport of the irradiated material from CEA was

completed on December 2013 IT beacon Diodes for BLM Light EN/EL Reports to be transmitted

Request for 2014 not accepted by CEA

Tests to be organized with other facilities (Fraunhofer)

Page 13: RADWG 3 rd   - 2014 22 th   May 2014

Fraunhofer institute - Germany All the information and the news are

on the web: https://twiki.cern.ch/twiki/bin/view/FraunhoferRadTests/WebHome

Page 14: RADWG 3 rd   - 2014 22 th   May 2014

Rad-Tol projects The list of the projects with R2E

concerns was presented last year Reviews are organized for the project

follow-ups; last one was for the Beam Instrumentation equipment http://indico.cern.ch/e/R2E_BI_2013

List of Rad-tol projects are on the website:

http://radwg.web.cern.ch/RadWG/Pages/Rad-related_projects.htm