RAILING INSTALL GUIDE.

Gossen Corporation | 2030 West Bender Road | Milwaukee, WI 53209 | Customer Support: 800-8984-0342 | gossencorp.com

Page 2: Railing Install Guide - Gossengossencorp.com/pdf/Railing_Installation_Guide.pdf · RAILING INSTALL GUIDE. Gossen Corporation | | 2030 West Bender Road Milwaukee, WI 53209 Customer

1

READ ALL INSTRUCTIONS COMPLETELY BEFORE STARTING.

TOOLS NEEDED • 100 tooth Circular or Miter saw using a carbide-tipped blade

• #2 square drive screw bit

• Cordless drill with 5/32” drill bit

• Level

• Tape measure

• Hacksaw or Sawzall

• PLR construction adhesive

It is the responsibility of the Installer to meet or exceed all local building code, safety and load requirements. Installation must be compliant with local building codes and the Installation Guidelines below. Gossen Corporation accepts no liability or responsibility for the improper installation of

this product. Gossen Performance Railing System may not be suitable for every application, and it is the sole responsibility of the Installer to be sure that Gossen Performance Railing System meets all requirements for the intended use. Since all installations are unique, it is the Installer’s responsibility to determine specific requirements for each Railing application. The following of Installation Guidelines differing from Gossen’s Guidelines will void the Warranty. Gossen Corporation recommends that a licensed architect, engineer or local building official review all applications before installation. If you need further assistance, please call us at 800-558-8984 or visit our website at gossencorp.com.

LEVEL RAILING INSTALL

EACH PERFORMANCE RAILING KIT CONTAINS:• Top & Bottom PVC Rail

• Aluminum Top Sub Rail

• Level/Stair installation hardware: Brackets, Fasteners, Baluster for Spacer Block & Crush Block

• Balusters are sold separately in cartons of 14 for 6-foot Kits & 19 for 8-foot Kits for both 36” and 42” Rail heights

When using a drill gun, be sure to set the appropriate

choke setting to avoid over torque and stripping fasteners.

!

Top & Bottom Rail Kit6’ kit or 8’ kit Aluminum Top Sub Rail

Hardware PackBrackets & Screws

Baluster36” and 42”14 piece kit or 19 piece kit

Post Sleeves39’, 48”, 108” Heights

Aluminum Stiffener Bars

Post Cap

Post Skirt

Optional Structural Steel Post

!

(1)

(2)(1)(3)(6)(8)(4)

7

6

5

5

3

3

2

2

1

1

1

4

(7)(5)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

818-IN012815

Page 3: Railing Install Guide - Gossengossencorp.com/pdf/Railing_Installation_Guide.pdf · RAILING INSTALL GUIDE. Gossen Corporation | | 2030 West Bender Road Milwaukee, WI 53209 Customer

2

! OPTIONAL: A Structural Steel Post (SMI-100) is available when 4x4 post is not used.

! NOTE: For an even number of Balusters, the center point of the Bottom Rail is between two Baluster holes. For odd number of Balusters, the center is in the middle of a Baluster hole.

! DO NOT cut PVC Top Rail at this time.

• Slide Post Skirt over standard pressure treated 4x4 Structural Post.• Install Post Sleeve over 4x4 Structural Post (Be sure fit isn’t too tight).• Measure Distance between mounting surfaces of posts.• Add 3/4” x 2-1/4” Wood Block (not supplied) between the Post Sleeve & 4 x 4” Structural Post before installing Top Bracket in Step 6. Block must be 6” or longer. (Note: length of block must not exceed length of the Post Sleeve).

BOTTOM RAIL & ALUMINUM TOP SUB RAIL CUTTING2

A. Bottom PVC Rail• Locate center of Rail.

• Measure & cut equal distance off center of both ends to get correct final length.

B. Top Aluminum Sub Rail• Cut Aluminum Top Sub Rail using same method as Bottom Rail, only reducing the length of cut by 1/8” at each end.

• Aluminum Top Sub Rail should measure a total of 1/4” shorter than Bottom Rail.

• Ensure equal spacing between the two end Balusters’ pre-drilled holes and the ends of the Aluminum Top Sub Rail and pre-punched markers for Bottom Rail.

To determine Balusters needed, divide needed length of Bottom Rail by 4.87. Round up to a whole number to get number of Balusters. For Example: a 65” section will require 13 (65 divided by 4.87) Balusters.

Cut Aluminum Top Sub Rail 1/4” short of measurement between posts (1/8” at both ends).

POST SLEEVE INSTALL1

(SMI-100)

LEVEL RAILING INSTALL

Aluminum Top Sub Rail

Center

Measurement Between Posts

Bottom PVC Rail

POST SLEEVE

3/4” X 2-1/4” WOOD BLOCK

4X4 STRUCTURAL

POST

Center

Odd

Even

Page 4: Railing Install Guide - Gossengossencorp.com/pdf/Railing_Installation_Guide.pdf · RAILING INSTALL GUIDE. Gossen Corporation | | 2030 West Bender Road Milwaukee, WI 53209 Customer

3

! Check Local Building Code for any exceptions.

! DO NOT secure Bottom Bracket to Post Sleeve at this time.

Check With Local Building Code for Rail height compliance.!

! NOTE: Hinge Bracket works with level & stair application.

• Lay out Bottom Rail, Balusters & Aluminum Top Sub Rail on a non-abrasive flat surface such as cardboard.

A. Using a 5/32” bit, Pre-drill hole through Bottom Rail at marked indentations for Bottom Baluster screws. Be sure these align with pre-drilled holes in Aluminum Top Sub Rail after it is cut to length. Use Aluminum Top Sub Rail as template for drilling Bottom Rail. • If different Top Rail height is desired, cut Balusters to desired length.

B. Install Bottom Bracket to Bottom Rail using supplied #10 x 1/2” pan head screws in hole at end of Bracket. • Mounting Tab should be facing down and flush with end of Bottom Rail.

C. Align Balusters with pre-drilled holes in Bottom Rail. Using supplied #8 x 1-1/2” bugle head screws, fasten ends of Balusters to Bottom Rail. The bottom of the Balusters should rest against the raised edge on top of the Bottom Rail. The ends of the two bottom Baluster screws should go through the long slot in the Bottom Bracket and into the Baluster. • To ensure proper spacing, cut supplied Baluster as a spacer - 3-5/8”. Maintain maximum and equal spacing between Balusters.

D. Position Bottom Rail 1-1/4” flat Aluminum Stiffener inside center of Bottom Rail cavity and secure with two #10 x 1/2” screws. (See Section 5 on Crush Block Install.)

E. Position Aluminum Top Sub Rail on Baluster ends and screw top of two end Balusters through Aluminum Top Sub Rail. Secure remaining Balusters. Use spacer block, if needed.

LEVEL RAILING INSTALL

• Install #10 x 2-1/4” screw to within 1/8” of mounting surface.

• Check screw head clearance using Bottom Bracket and adjust clearance between screw head and Post mounting surface to obtain a snap-in fit.

• Position Bracket in center of post (2-5/8” on 5-1/4” Post Sleeve) so lower edge of Bottom Bracket is no more than 3” from Deck surface. Mark position of lower edge of Bottom Bracket, add 5/16” and drill a 5/32” hole.

BOTTOM RAIL BRACKET INSTALL

RAILING & BALUSTER ASSEMBLY

3

4

C.

A.

D.

B.

Center

3”

Pre-Drill

Center

E. E.

OPTIONAL

C.

B.

D.

Page 5: Railing Install Guide - Gossengossencorp.com/pdf/Railing_Installation_Guide.pdf · RAILING INSTALL GUIDE. Gossen Corporation | | 2030 West Bender Road Milwaukee, WI 53209 Customer

4

! Crush Blocks are cut from extra Baluster in Rail Kit.

NOTE: Top Rail Bracket works with level & stair applications.!

LEVEL RAILING INSTALL

INSTALL CRUSH BLOCK & MOUNTING RAIL SECTION

SECURING TOP RAIL BRACKETS

5

6

• Cut Crush Block to correct length for installation into cavity of Bottom Rail in center. From the supplied Baluster, use the end with the shaved sides for ease of installation into Bottom Rail cavity.

• To get correct length, measure distance from walking surface to bottom edge of Bottom Rail and add 1-3/16”.

• Use one Crush Block for 6-Foot Kits and 8-Foot Kits.

• This should be a tight fit from Bottom Rail to Deck surface as the Crush Block is required to eliminate any sagging of the Railing between the Posts.

• Insert Crush Block into center of Bottom Rail cavity.

• Take entire Rail & Baluster assembly and lift into place sliding Bottom Rail Bracket over bottom mounting screw.

A. Before securing the Top Rail Bracket, make sure the Wood Block is in place. (See Step 1.)

• Slide Top Rail Bracket onto top section of a Aluminum Top Sub Rail flush with end.

• Face vertical mounting tabs at end for level applications.

• With Railing assembly resting on Bottom Bracket Screw, position Aluminum Top Sub Rail square and plumb with Bottom Rail centered on Post Sleeve.

• Pre-drill 5/32” through Bracket holes & screw Bracket to Post. The #10 x 3” Screws enter at an angle toward center of post.

B. Attach Top Rail Bracket to Aluminum Top Sub Rail with supplied #10 x 1/2” screw. Before securing, align Aluminum Top Sub Rail to ensure uniform spacing between end Balusters and Post Sleeves.

A.

6’ Kit

1/2 1/2

8’ Kit

B.

A.

B.

1/21/2

Page 6: Railing Install Guide - Gossengossencorp.com/pdf/Railing_Installation_Guide.pdf · RAILING INSTALL GUIDE. Gossen Corporation | | 2030 West Bender Road Milwaukee, WI 53209 Customer

5

! DO NOT over tighten and make sure screws do not penetrate the top of the PVC Top Rail.

LEVEL RAILING INSTALL

TOP RAIL INSTALLATION7• Measure distance between Post Sleeves at top and cut PVC Top Rail to this dimension.

• Position Aluminum “U” Channel Spacer over top of Aluminum Top Sub Rail in center of span.

• Drop PVC Top Rail down over installed Aluminum Top Sub Rail and secure with supplied #8 x 1-1/2” pan head screws up through bottom of Aluminum Top Sub Rail into PVC Top Rail.

NOTE: If there is no available hole in the Aluminum Top Sub Rail between the Baluster and Post Sleeve, Pre-drill Aluminum Top Sub Rail and install screw at closest distance to Post Sleeve as possible.

• Install Post Cap.

CUSTOMER SERVICE: 800-558-8984 | Main Office: 414-228-9800 • Fax: 414-228-9077 | 2030 West Bender Road • Milwaukee, WI 53209

Page 7: Railing Install Guide - Gossengossencorp.com/pdf/Railing_Installation_Guide.pdf · RAILING INSTALL GUIDE. Gossen Corporation | | 2030 West Bender Road Milwaukee, WI 53209 Customer

6

Make certain both Bottom Rail & Aluminum Top Sub Rail spacing match.!

! DO NOT cut Top Rail at this time

STAIR RAILING INSTALLATION

POST SLEEVE INSTALLATION

BOTTOM RAIL & ALUMINUM TOP SUB RAIL LAYOUT

BOTTOM RAIL & ALUMINUM TOP SUB RAIL CUTTING

1

2

3

• Lay Bottom Rail between Posts, resting the Rail on the steps.

• Balance out Balusters on both ends with equal and maximum spacing to the ends.

• Mark Bottom Rail where it intersects with Posts for both length & angle.

• Aluminum Top Sub Rail will be marked the same way, but deduct 1/8” from both ends.

• Cut Bottom Rail to length by locating center.

• Measure & cut equal distance off the center to both ends to get correct final length.

• Cut Aluminum Top Sub Rail using same method as Bottom Rail, only reducing length of cut by 1/8” at each end.

• Aluminum Top Sub Rail should measure total of 1/4” shorter than Bottom Rail. Ensure equal spacing between two end Balusters’ pre-drilled holes and the ends of the Aluminum Top Sub Rail and pre-punched markers for Bottom Rail.

• Both rails will be cut at same angle as marked at Top Post & Bottom Post.

• Same as Level Instructions (Page 3)

CENTER

Aluminum Top Sub Rail

Bottom Rail

Bottom Rail Length

Top Rail Length

(See Page 2 for Baluster Spacing)

Page 8: Railing Install Guide - Gossengossencorp.com/pdf/Railing_Installation_Guide.pdf · RAILING INSTALL GUIDE. Gossen Corporation | | 2030 West Bender Road Milwaukee, WI 53209 Customer

7

! NOTE: Check Local Building Codes for any exceptions.

BOTTOM RAIL BRACKET INSTALL

BALUSTER CUTTING

RAILING & BALUSTER ASSEMBLY

4

5

6

• Position Bottom Bracket in center of Post (2-5/8” on 5-1/4” Post Sleeve). Position of screw in center of Post will depend on the rise and run of Stair Treads. When measuring for Bottom Rail, the Rail should be no more than 3” from nose of stair tread.

• Cut Baluster ends at the same angle as the stairs.

• Follow same procedure as outline in Level Railing Instructions (Illustrated on Page 3).

NOTE: When pre-drilling a hole through the Bottom Rail at the marked indentations, make sure to drill holes at the same angle as the stairs so screws align straight with stair Balusters.

(See 4, 5 & 6 of Level Railing Install).

• Mark position of lower edge of Bottom Bracket, add 5/16” & drill a 5/32” hole.

• Install #10 x 2 - 1/4” screw to within 1/8” of mounting surface.

• Check screw head clearance using Bottom Bracket and adjust clearance between screw head & Post mounting surface to obtain snap-in fit.

TOP RAIL INSTALL7 • Follow procedure as outlined in level railing instructions (Page 5). Note: Cut PVC Top Rail at same angle as the stairs.

Center

STAIR RAILING INSTALLATION

3”

3”