railroad commission of texas completion guidance oil and gas regulatory conference september 25,...

71
RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

Upload: mark-griffin

Post on 30-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

RAILROAD COMMISSION OF TEXAS

Completion Guidance

Oil and Gas Regulatory ConferenceSeptember 25, 2013Speaker - Jim Moore

Page 2: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

2

Terms & Definitions

• UIC : Underground Injection Control • UIC Number : 9 digit number assigned to Well• W-2 : Oil/Injection/Disposal Well Completion • G-1 : Gas/Injection/Disposal Well Completion• H-1 Number : aka F- number, Project number, Water

Injection Permit No., 5 digits• W-14 Number : aka Permit number, Salt

Water Disposal Permit No., 5 digits• API Number : 10-14 digit number assigned to Well• Well Number : D or L D D D L L , 6 digits

Page 3: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

3

Terms & Definitions (cont.)

• RRC District Number• RRC Oil Lease No. : 5 digit Number • RRC Gas ID : 6 digit Number• W-1 : Permit to Drill, Recomplete or Re-Enter• Plat : Lease Map, Survey Location• RRC–designated Field Name, Field Number• H-1 Field Name : correlative to injection/disposal

Formation (deepest if more than one Formation)• W-14 Field Name : correlative to disposal

Formation, or to disposal fluids source Formation

Page 4: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

4

Terms & Definitions (cont.)

• W-15 : Cementing Report • W-12 : Inclination Report• P-4 : Certificate of Compliance and

Transportation Authority• L-1 : Electric Log Status Report • GAU : Groundwater Advisory Unit, formerly

TCEQ, formerly TNRCC, formerly T.D.W.R.

Page 5: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

5

LOG IN TO ONLINE SYSTEM

Operator needs both Security Administrator Designation (SAD) &User ID.

Each User ID has certain filing rights per program.

Page 6: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

6

FORM - SECURITY ADMINISTRATOR DESIGNATION (SAD)

Page 7: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

7

RRC HOMEPAGE

Select Online Filings

Page 8: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

8

ONLINE FILINGS

Select Security Administration For Filing Operations (Oil and Gas Operators)

Page 9: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

9

DATA SUBMISSION REQUIREMENTS

Select user account creation/ maintenance for a multi-step tutorial

Page 10: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

10

ONLINE APPLICATIONS

Select Completions

Select Account Administration to setup User ID’s

Page 11: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

11

FILING OPTIONS / MESSAGES

File a New Completion or Update Existing Completion Packet

Check Messages, Find Unresolved Messages for All Packets with this User ID

Completions Menu

Page 12: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

12

WELL COMPLETION PACKAGE

Click Search

EnterDrilling Permit No. orAPI No.

Page 13: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

13

WELLS FOUND

Multiple Field Names Allowed on Drilling Permit

Field Name Must Match Injection/Disposal Permit

Select NewPacket

Page 14: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

14

FORM W-1 DRILLING PERMIT

Page 15: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

15

W-1 APPLICATION FOR PERMIT TO DRILL, RECOMPLETE OR RE-ENTER

REQUIRED FOR :New WellDeepeningRe-enterPlug Back / Re-Completion / Workover FieldRefer to State Wide Rule (SWR) 5Online filing available(512) 463-6751

Page 16: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

16

PACKET DATA – NEW

Purpose of FilingType of CompletionWell TypeWellbore ProfilePacket Type

Page 17: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

17

PACKET DATA – NEW (cont.)

Page 18: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

18

PACKET DATA – NEW (cont.)

Page 19: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

19

PACKET DATA – NEW (cont.)

(ForWaterSupplyWell)

Page 20: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

20

PACKET DATA – NEW (cont.)Wellbore Profile is Auto-Populated based on W-1, Drilling Permit

Page 21: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

21

PACKET DATA – NEW (cont.)

Page 22: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

22

PACKET DATA – CREATE

Click Create Packet tab

Tracking Number gets assigned

Purpose of FilingType of CompletionWell TypeVertical ProfilePacket Type

Done

Page 23: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

23

PACKET DATA OIL / W-2

Fill in Well Data

60-70% View or Scroll

Search for Current Field & Reservoir

Table for Workover, Reclass or Well Number Change

Enter H-1 or W-14 Permit No. & Date

Save

Next W-2

Page 24: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

24

W-2 PAGE 1

Page 1: Potential Test Data not required when filing for Active or Shut-In UIC (Well Type)

Save, then Next Page #

Page 25: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

25

W-2 PAGE 2

Save

Fill In Well Data

System responds with red text warnings if critical data is missing on this page.

Page 26: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

26

W-2 PAGE 3

Form W-12“Waterboard Letter” Date or SWR-13 Exception Date Form W-15

Page 27: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

27

W-2 PAGE 4

Casing Record

Liner Record

Tubing Record

Page 28: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

28

W-2 PAGE 4 (Casing Record)

Multi-Stage Tool Depth Weight B #/FT are only fields that can be left blank.

If using multi-stage (DV) tool, use separate line for each cement stage.

Page 29: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

29

W-2 PAGE 4 (Liner Record)

Liner record if applicable, attach W-15 for new liner

Page 30: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

30

W-2 PAGE 4 (Tubing Record)

Tubing Size & Depth Set (Feet) Packer Set Depth

Page 31: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

31

W-2 PAGE 5

Actual Perfs, not Permitted IntervalCheck Yes only for Unperf’d Shut-In

List all Work Chronologically, attach W-15 for new BP, Cement Squeeze, Squeeze Perfs, etc.

List 3 Formation Tops

Please add Remarks

Page 32: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

32

W-2 PAGE 6

Certify (or Re-certify due to RRC analyst Messages)

Electronic Signature

Red text warnings if critical data is missing on W-2 pages.

Next Complete Additional Forms

Page 33: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

33

ADD ADDITIONAL FORMS

Online Forms

Attachment FormsBy Type

Select W-15 Cementing Report

Complete Additional Forms

Determine All Required Forms

Page 34: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

34

ATTACHMENTS W-15

Current Attachments

Browse to your file location such as Desktop (.pdf, .tif) of W-15 filled out

Upload

Page 35: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

35

FORM W-15 CEMENTING REPORT

Page 36: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

36

W-15 CEMENTING REPORT

REQUIRED FOR :New WellRemedial Cementing, Casing RepairsCement / Block Squeeze (CS), Squeeze Perfs,

Bridge Plug (BP), Plug BackInjection/Disposal Permit Special Conditions,

H-1/H-1A, W-14

Page 37: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

37

ATTACHMENTS W-12

Current Attachments

Pick 1 of 2 ways to initiate the next Upload Attachment step, click here or go back to Complete Additional Forms

Page 38: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

38

ATTACHMENTS W-12 (cont.)

Select W-12

Pull-Down or Pull-Up Menu for Attachment Type

Page 39: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

39

ATTACHMENTS W-12 (cont.)

Current Attachments

Browse to your file location such as Desktop (.pdf, .tif) of W-12 filled out

Upload

Page 40: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

40

FORM W-12 INCLINATION REPORT

Page 41: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

41

ATTACHMENTS W-12 (cont.)

Current Attachments

Select Complete Additional Forms to Add W-12 Inclination Report Online Form

Page 42: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

42

ADD ADDITIONAL FORMS (cont.)

Online Forms

Attachment FormsBy Type

Select W-12 Inclination Report

Complete Additional Forms

Page 43: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

43

W-12 ONLINE FORM

Well Information

Shot Point InformationCertify (or Re-certify due to RRC analyst Messages)

Electronic Signature

Complete Additional Forms

Page 44: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

44

W-12 INCLINATION REPORT

REQUIRED FOR : Total Depth > 2000 feetNew WellRe-Entry requires new survey if one was not

already filed when the well was originally drilled

Deepening Refer to SWR 11

Page 45: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

45

Directional Surveys, Gyro, MWD

REQUIRED FOR :New Drill if the Wellbore Profile is Directional or

Horizontal. Applicable to some Re-Entry, or Deepening.New Drill if the Wellbore Profile is Vertical and the W-

12 violates SWR 11(c)(1)(A). Applicable to some Re-Entry, or Deepening.

Directional Surveys can only be filed/uploaded by the responsible service company.

Follow RRC Engineering Unit & Support Upload Procedures (512) 463-1126.

Page 46: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

46

ADD ADDITIONAL FORMS (cont.)

Online Forms

Select P-4 Certificate of Compliance and Transportation Authority

Complete Additional Forms

Page 47: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

47

P-4 ONLINE FORM

Service Well, YesCertify (or Re-certify due to RRC analyst Messages)

Gatherers and/or Purchasers info blank for injection/disposal well.*

RRC Gas ID or Oil Lease No. is blank/zero

Page 48: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

48

P-4 CERTIFICATE OF COMPLIANCE

APPLICABLE TO :Initial Potential, Reclass, Well Record Only

when a new Oil Lease / Gas ID number needs to be assigned

Some Workover/Re-Completions from one RRC-designated Field to another RRC-designated Field

Zero lease injection/disposal permits

Page 49: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

49

ADD ADDITIONAL FORMS (cont.)

Online Forms

Select L-1 Electric Log Status Report

Complete Additional Forms

Page 50: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

50

L-1 ONLINE FORM CONFIDENTIAL

Certify (or Re-certify due to RRC analyst Messages)

Electronic Signature

For Basic Electric Log Run with Confidentiality

Complete Additional Forms to Attach L-1 Electric Log Header

Page 51: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

51

ADD ADDITIONAL FORMS (cont.)

Online Forms

Attachment FormsBy Type

Select L-1 Electric Log Header

Complete Additional Forms

Page 52: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

52

ATTACHMENTS L-1 LOG HEADER

Current Attachments

Browse to your file location such as Desktop (.pdf, .tif) of Log Header

Upload

Page 53: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

53

ATTACHMENTS L-1 LOG HEADER (cont.)

Current Attachments

Page 54: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

54

SAMPLE ELECTRIC LOG HEADERS

Page 55: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

55

L-1 ONLINE FORM - LOG RUN

Certify (or Re-certify due to RRC analyst Messages)

Electronic Signature

For Basic Electric Log Run, Log Attached

Page 56: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

56

MAIL LOG TO RRC AUSTIN

Mail Continuous Log to RRC Austin• 1701 N. Congress • Austin, Texas 78701

Or• P.O. Box 12967• Austin, Texas 78711-2967

Write Tracking Number on Log

Page 57: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

57

ADD ADDITIONAL FORMS (cont.)

Online Forms

Attachment FormsBy Type

Select Groundwater Advisory Unit Letter

Complete Additional Forms

Page 58: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

58

ATTACHMENTS GAU LETTER

Current Attachments

Browse to your file location such as Desktop (.pdf, .tif) of GAU Letter

Upload

Page 59: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

59

ATTACHMENTS GAU LETTER

Current Attachments

Page 60: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

60

SAMPLE GAU LETTER

Page 61: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

61

SUBMIT PACKET

Certified Online Forms: W-2, W-12, P-4 Data, L-1 Status

Current AttachmentsW-15, W-12, L-1 Log Header, GAU Letter

SubmitService Well Yes

Submit

Page 62: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

SUBMIT PACKET (“2nd” screen)

62

Submit

NoNo

Attempt to SubmitWith Forms LackingAnswered No

Submit

Page 63: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

63

SUBMIT PACKET FORMS LACKING

Submit with required forms missing or uncertified?: Yes

And / Or Submit with required attachments missing?:

YesSubmit Packet with 1 or both questions marked Yes from the Submit Packet “2nd” screen.If RRC analysts give Final Approval to the Completion Packet with Forms Lacking, then the Operator will need to provide the missing forms or attachments as soon as possible.

Page 64: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

64

SUBMIT PACKET (cont.)

… submitted successfully message

Page 65: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

65

MESSAGES

Messages Tab

Page 66: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

66

PROBLEM RESOLUTION

• Check for RRC analysts Messages on Packet.• Provide additional data, forms, attachments. • Re-certify all Online Forms that are released.• Re-submit Packet if released.• Problem resolution– W-1 Amendment– H-1/H-1A or W-14 Amendment– UIC “pre-severance” or severance letter– Refer to SWR 16

Page 67: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

67

QUESTIONS

Page 68: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

68

INJECTION-STORAGE PERMITS & SUPPORT

Section (512) 463-6792David Hill, Manager (512) [email protected] Moore (512) [email protected] (Bob) Freymuller (512) [email protected] Mabruk (512) [email protected] Davis (512) [email protected] Burns (512) [email protected] Ashley Johnston (512) [email protected]

Page 69: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

69

RRC HOMEPAGESelect Online Research (Queries), to Search for Scanned Images of Filed Well Data, GAU Letters, H-1/H-1A & W-14 Applications

Page 70: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

70

ONLINE RESEARCH QUERIES

Select Oil & Gas Imaged Records Query Menu, Launch Application

Page 71: RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore

71

OIL AND GAS IMAGED RECORDS QUERY MENU – LINKS TO NEUBUS WEBPAGE

Oil & Gas Well Records;Search by API No.

GroundwaterProtection Letters;Search by API No., or District/Lease No.

W-14, H-1/H-1A; Search by Permit or Project No.