railroad commission of texas introducing rrc lonestar and

16
Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) 1 Railroad Commission of Texas Introducing RRC LoneSTAR and Forms P-5, W-3C and W-3X Online Filing August 5, 2021 The meeting will begin shortly.

Upload: others

Post on 17-Mar-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)1

Railroad Commission of Texas

Introducing RRC LoneSTAR and Forms P-5, W-3C

and W-3X Online Filing

August 5, 2021

The meeting will begin shortly.

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Introducing RRC LoneSTAR and Forms P-5, W-3C and W-3X Online Filing

Jennifer GilmoreAugust 2021

2

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Power Point Presentation

This presentation is available for download from the RRC website at https://www.rrc.texas.gov/oil-and-gas/workshops-and-conferences/rrc-regulatory-webinars/regulatory-webinars-2021-schedule/

3

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Topics

• RRC LoneSTAR Overview

• LoneSTAR - Release 1

• P-5 Filings in LoneSTAR

• Financial Assurance Information

• Forms W-3C and W-3X in LoneSTAR

• Additional functionality in LoneSTAR

4

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

P-5 Filings in LoneSTAR (2 of 2)

• Multi-biennium mainframe transformation project

• Project is slated to consist of 4 releases

• Release 1 will contain P-5 renewal and Inactive well filing functionality – Coming early 2022!

5

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

P-5 Filings in LoneSTAR (2 of 2)

• Online filing of P-5, W-3X and W-3X Forms

• Transparency regarding the tracking of your SWR15 inactive well compliance

• Access to P-5 renewal and SWR15 compliance filings (that have been filed within Lonestar) in one place

• Siloed processing of forms 6

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

P-5 Filings in LoneSTAR (2 of 2)

• Industry will be able to electronically file their P-5, P-5O, P-5A forms through the LoneSTAR system

• Functionality will include the ability to pay P-5 filing fees through the LoneSTAR system

• There will be a direct link to the Texas Secretary of State that will pre-populate the name-styling and officer listing for your convenience.

7

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

P-5 Filings in LoneSTAR (2 of 2)

• You will have the ability to see a history of your P-5 filings within the new system

• The system will contain business rules that conduct validations as you update information.

• Expedited processing and approval times when you utilize the online filing system.

8

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Financial Assurance Information

• Financial assurance documents must still be submitted in hard-copy with original signatures

• Financial assurance documents will be scanned and available for viewing within your LoneSTAR account

9

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Forms W-3C in LoneSTAR

• Ability to file forms W-3C electronically

• Auto-approvals for certain filings

• Option to file for multiple wells at once easily through the LoneSTAR system

10

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Forms W-3X in LoneSTAR

• Ability to file forms W-3X electronically

• Functionality built in to view your 10% plugging/restoring progress

• Auto-approvals for certain filings

• Abeyance of plugging report letters will be viewable and expiration dates automatically calculated 11

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

New System Terminology

• Due to data limitations in our legacy system, the RRC has introduced the “Long Name” and “Short Name” data field within the LoneSTAR system.

• If your entity name is longer than 32 characters, you will be assigned a “Short Name” that can be migrated back into our legacy system.

12

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Important Changes

• Filing rights will have to be designated through the new single sign-on system (RAMP)

13

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

• Only people who have been designated with filing rights through RAMP will be able to file documents on the company’s behalf in LoneSTAR.

14

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Questions?

Please contact us

with any questions you may have.

P-5 Department: 512-463-6772

[email protected]

33

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Evaluation & Archive Video

Evaluation

• Please complete the evaluation available on the RRC website at https://survey.alchemer.com/s3/6403402/2021-RRC-Regulatory-Webinars-Oil-Gas-and-Pipeline-Safety-Evaluation

Archive Video

• A link to the archive video of the webcast will be available on the same webpage as the presentation.

16