RAILROAD COMMISSION OF TEXAS

Oil and Gas Well Completions

AdvancedRegulatory Seminar – Midland 2013

Pamela ThompsonKatie McNally

Page 2: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Form W2

• How and When to File with the Railroad Commission of Texas

2

Page 3: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM W2

OIL WELL POTENTIAL TEST

Required by Statewide Rules 16 & 51

Effective February 2011, Completion forms for All Districts in Texas should be filed on-line or mailed directly to the Austin Office within 30 days of completion (Statewide Rule 16)

Include Lease number, if the well will be added to an existing lease

3

Page 4: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM W2

OIL WELL POTENTIAL TEST

File potential test information within 10 days of the test date (Statewide Rule 51)

Wells needing an allowable must include a test

Non-producing wells and service wells, no test required

4

Page 5: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

ALLOWABLE EFFECTIVE DATE Allowable set based on date of receipt

Allowable effective date may be backdated to the completion date if the form is submitted online or stamped in the Austin office within 10 days of the test date (test information needs to include a 24 hour test)

Item 14 - Completion date is the date the well was capable of producing by the opening of a valve or flipping of a switch

5

Page 6: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM W2FRONT OF FORM

All information on the front of the W-2 must be completed

Operator name and P-5 operator number API Number.

Field name must be accurate as it is shown on the proration schedule and listed on your drilling permit.

6

Page 7: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM W2FRONT OF FORM

Lease name and well number.

Purpose of filing Initial Potential Retest Reclass Well Record Only

7

Page 8: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM W2BACK OF FORMBack of form should be completely filled out

Include permit number; identifies the well

Item 29 - date drilling rig moves off site

Item 31 - lease line calls to the surface location

Item 33 - directional survey other than Inclination Survey (W12)

8

Page 9: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM W2BACK OF FORMItems 34, 35 & 36 are True Vertical Depths (TVD), also Measured Depths if well is Horizontal or Directional

Item 46 - Perforations are shown for the well in measured depths (MD)

Item 48 - Need at least three geological markers in measured depths (MD)

Remarks section on front and back of W-2; provide any additional information relative to the well

9

Page 10: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

OIL & GAS COMPLETIONS ADDITIONAL FORMS

• How and When to File with the Railroad Commission of Texas

10

Page 11: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM W10 OIL WELL STATUS REPORT

•W-10 is not required with the Initial Oil Completion

•Statewide Rule 53

•Survey and retest are on the same form

•Due date and effective date cannot be changed on surveys but can be changed on retests

•Report oil to the nearest 1/10 of barrel (whole numbers on the rest of the form)

•Cover overage program in oil has eliminated filing of many retests

•Effective September 2013 – The Online W-10/G-10 filing system will be available

11

Page 12: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM W15

CEMENTING REPORT

Statewide Rules 13 & 14

Required with all new W2 completions, dry hole completions, and any cementing or plugging jobs

District Office has primary audit responsibility

12

Page 13: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM L1ELECTRIC LOG STATUS REPORT•File with all new gas, oil, deepened wells, and dry holes

•L1 Options:– Basic Electric Log Not Run– Basic Electric Log Run and Confidentiality is

requested– Basic Electric log covering this interval already on

file with Commission – Log attached and to what form

13

Page 14: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Acreage Assignment

• P15

• Proration plats

• Proration Acreage List

14

Page 15: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

P15 STATEMENT OF PRODUCTIVITY OF ACREAGE

•P-15 is required for gas wells in fields that have special field rules• P-15 only required for oil wells when specified by docket (refer to field rules)•P-15 assigns acreage to individual wells•This acreage is productive acreage that is assigned to the well in order for the well to received an allowable

15

Page 16: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

PRORATION PLAT• Proration plats are the standard in fields that have

special field rules, unless otherwise stated in the field rules (field rules will specify whether proration plats, p-15’s, acreage lists, lease plats, or no plats required)

• Plats are required to show:

• the outline of the proration unit,

• show the lease line distances,

• the distances to the nearest well

• Plats are to be certified and to scale

16

Page 17: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

PRORATION PLAT

ADDITIONAL INFORMATION

If you receive a request to file a plat, please identify the plat with a district and lease number, API number, or Permit number when filing hardcopy.

17

Page 18: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Proration Acreage List

• Proration Acreage Lists are required in addition to a P-15 and a lease plat if specifically stated in the field rules

18

Page 19: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Proration Acreage List• The Proration Acreage List should include the following:

– Field name

– Lease name

– All wells completed and permitted within the lease

– A RRC identifier or tracking # for each well or permitted well

• RRC lease number

• API number

• Permit number

– Total Acreage in the lease

– Acreage assigned to each well

– Number of acres not assigned to wells19

Page 20: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

P15, Proration Plat, Acreage List

Additional Information

•Additional Form P-15’s, Proration Plats, or Proration Acreage List may be required to reassign acreage for oil wells on the same lease

•When filing online, Proration Plats, Proration Acreage Lists, and Lease plats can be uploaded under the attachments page

20

Page 21: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM W12

• INCLINATION REPORTGeneral Information

21

Page 22: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM W12 (INCLINATION REPORT)

General Information•Required by Statewide Rule 11

•Required on all new drills and deepened wells

•Record of Inclination: – first shot point is equal to or less than 500 hundred

feet– and subsequent points are no more than 1000 feet– Last shot point within 1000’ of TD

•W-12 must be signed by the contractor that performed the test and the operator.

22

Page 23: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM W12 (INCLINATION REPORT)

W12 or Directional Survey

•Item 22 - “yes” answer requires a directional survey

•Item 22 – “no” answer requires a W12

• W-12 is not required if a directional survey is filed for entire well bore

23

Page 24: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM W12 (INCLINATION REPORT)

W12 Not Required

•A W12 is not required for a well drilled to a total depth of 2000’ feet of less.

•A W12 is not required for a well that is deepened less than 300’.

24

Page 25: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM W-12 (INCLINATION REPORT)

Online•The Online Version of the W12 has to be completed and certified

•A copy of the W12 with signatures is also required to be uploaded in the attachments of the online packet.

•Directional surveys can be uploaded online but only by the surveying company if they have access to do so.

25

Page 26: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Form P4

• Certificate of Compliance and Transportation Authority General Information

26

Page 27: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM P4 Statewide Rule 58 P-4 Form is a certificate of compliance as well as

authorization for gathering the product Same form for oil and gas wells One form P4 each oil lease (and one for each

individual gas well) All P-4’s other than new lease P-4’s submitted with

online completion should be submitted directly to the Austin office

Copies and instructions are available on RRC website

27

Page 28: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM P4 Fill out the P-4 in it’s entirety - listing complete

company names (even if information is not being changed)

All percentages need to add up to 100%

Always show a system code for the gas purchaser

Show the company that actually moves the stock; purchaser is not required for liquid (oil) gatherer

28

Page 29: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM P4 • Item 12 – check appropriate box for changes

being made• P-4’s can be used to:

– Change an operator name– Change a gatherer or purchaser name– Change a lease name– Sub-divide or consolidate oil leases (P-6, &

before & after plat must be attached)• Operator change P-4’s must be signed by both

companies• Requires original signatures

29

Page 30: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM P4 Online

•At this time only New Lease P4’s can be filed online with a “new” well completion.•RRC cannot process a P4 if the Operator, Gatherer, or Purchaser ‘s P5 in delinquent or inactive. (hardcopy or online)•P-4’s that are attached will not be processed, those should be mailed in hardcopy to the Austin office

30

Page 31: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

FORM P8 REQUEST FOR CLEARANCEStatewide Rule 80

Filed before the well is assigned an ID or Lease numberAn allowable will be needed to cover this productionP-8’s can be filed on-line District office handles all P-8 approvals. P-8’s are cross referenced with the Online System to verify that completions are submitted and are free of outstanding violations and/or un-resolved messages Copy of Form P-4 must be attached

31

Page 32: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

SWR10

• FILING PROCEDURES(Down-Hole Commingle)

32

Page 33: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

SWR10 Exception

Purpose

Allows two or more Railroad Commission fields to be produced, down-hole commingled, in the same production string.

33

Page 34: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

SWR10Completion Requirements

•SWR10 exception Data Sheet must be filled out and approved by the Engineering Department.

•For information about the Exception Data Sheet, please contact the Railroad Commission Engineering Department

•The Exception Data Sheet Form and instructions can be found on the Railroad Commission website at the following link:

http://www.rrc.state.tx.us/forms/forms/og/docfiles/rule10w.doc

34

Page 35: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

SWR10 Completion Requirements

•SWR10 Exception should be approved before the completions are filed.

•A well is considered non-compliant if the application has not been approved by the Railroad Commission Engineering Department.

35

Page 36: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

SWR10 - Filing Completions

The completion for a SWR10 is completed the same as any other completion with these exceptions:

•The operator should reference SWR 10 approval in the remarks section of the completion

•If operator plans to complete downhole commingling at a later date , they must indicate in remarks “leave permit open for future SWR 10”

36

Page 37: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

SWR10 - Filing Completions

• If Down hole commingling with a gas field , list all RRC ID #’s in remarks

• If these remarks are not posted on the completion, the drilling permit could be closed and you will be required to file an additional drilling permit.

37

Page 38: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

SWR10

Oil Wells•File one W2 for the reporting field only.

•Must have an approved Drilling Permit

•If the well is already assigned a lease # in one of the non-reporting zones , then the existing lease # should be listed in the work over section of the Packet Data

38

Page 39: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

SWR10

Oil Wells•Must report perforations, formation tops, and completion intervals for each field completed.

•The SWR10 approval letter must be attached and the fields must match the drilling permit.

•When completing SWR10 wells make sure that the approved fields are valid, i.e. not consolidated

39

Page 40: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

SWR10 - Additional InformationAdditional Information

When a gas field and an oil field are downhole commingled, the reporting field is decided based on the oil top allowable vs. the gas field type. The reporting zone will be listed on the SWR 10 approval letter. For more information contact Railroad Commission Engineering Department.

40

Page 41: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

SWR10 - Additional Information Additional Information

For oil wells in oil only fields, only 1 lease number will be carried on schedule at a time.

For gas wells or oil wells that are SWR 10 w/ gas id #’s, the non reporting zones will

remain on schedule with allowable code SWR 10

41

Page 42: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

SWR10

What is a Blanket Order (SWR10)•A final order granted through hearing for SWR10 exception

•Request for a specific combination of fields

•Order may not provide for “blanket SWR 10 authority” but may allow for Abbreviated SWR10 Data Sheets

•Such applications may be approved without individual notice and hearing.

42

Page 43: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

DOWN-HOLE COMMINGLING (SWR 10)

Spraberry (Trend Area) and Various Fields

•When downhole commingling, the primary reporting field and the non reporting fields should remain identical throughout all wells on the lease. (see slides 54-55 for examples)

•If RRC Analyst reviewing the completion is unable to determine if a well is downhole commingled , a cross section may be requested.

43

Page 44: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Form P12

• Certificate of Pooling Authority

44

Page 45: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Form P12When and Where to file•Statewide Rule 40

•When two or more tracts are pooled to form a unit :

– to obtain a drilling permit,– to file a completion, – or reform a pooled unit

•P12’s should be filed with the drilling permit application and the completion packet.

45

Page 46: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Form P12Requirements•P12 information must be accurate and filled out according to the P12 instructions

•Must attach a certified plat that shows all tracts

– Tracts on the plat must correspond to tract identifiers and associated information on the P12

•Purpose of Filing

– Drilling Permit

– Completion

46

Page 47: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

From P12Requirements

•Each tract on the P12 must be listed separately with the following information:

– The number of acres of each tract– Identify drill site tract with a *– Must show any non-pooled and/or unleased interest

that exists– Total acres in the pooled unit must equal the sum of all

acres in individual tracts listed

•If the pooled unit contains more tracts than what can be listed on a single form, the operator must use as many form P12’s as it takes to list the pooled tracts individually

47

Page 48: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

SWR40• Acreage assigned to a well for drilling and

development, or for allocation of allowable, shall not be assigned to any other well or wells projected to or completed in the same reservoir; such duplicate assignment of acreage is not acceptable.

48

Page 49: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Permian Basin

• Field Shopping

49

Page 50: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Field ShoppingPROBLEM•Completing an oil well - Same Lease – Different Field (but in the same formation as existing wells in the lease)

– I.E. Complete wells #1-4 in Spraberry (Trend Area) and well #’s 5 & 6 in Sallie Ann (Spraberry Wolfcamp)

– Or wells #1-4 have SWR 10 exception for Spraberry (Trend Area), and Garden City , S. (Strawn) but wells # 5 & 6 have SWR 10 exception for Spraberry (Trend Area) and Dewey Lake (Strawn)

50

Page 51: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Field ShoppingSolution

•Wells completed in the same lease and same formation must consistently use the same fields (primary reporting fields and secondary SWR 10 fields )

•Operators will be required to re-file:– Drilling Permit– SWR37– SWR38– SWR10

51

Page 52: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Top 30 Problems That Can Delay A Completion Packets Final Approval

1. Failing to respond to messages online from the RRC, even if you have already corrected the problem *

2. Not filing all required forms with the packet

3. Over-assigning acreage *4. Log headers do not have

all the required information

6. Amending Drilling permit ASAP and follow up for approval

7. Make sure all questions are answered correctly and completely.

8. Adding a second P-4 or attaching a gatherer change P-4

9. P-4 gatherers/purchasers names are incorrect or P-5’s are not active

52

Page 53: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Top 30 Problems That Can Delay A Completion Packets Final Approval

10. Electronic forms are not completed, certified, and submitted

11. Filing information that is not needed

12. Attachments not properly labeled *

13. Make sure that the following are correct:

• Type of Completion• Purpose of Filing• Well Type

13. Drilling permit not approved or submitted prior to drilling the well

14. Failing to file PVT/Compositional Analysis when G-5 does not meet the requirements

15. Lease lines should match drilling permit, if not – leave remarks as to why they changed *

53

Page 54: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Top 30 Problems That Can Delay A Completion Packets Final Approval

16. Use remarks to explain any changes, amendments or anything additional you want the analyst to know

17. P-12’s/Plat attached do not display properly

18. W-12 not filled out correctly or is incomplete *

19. No change in completed, commenced, and completion dates when the well is worked over or recompleted

21. Not addressing SWR information in remarks (i.e. perfs, formations) *

22. If a well is worked over or recompleted, showing how the prior perfs were isolated.

23. Hard copy filings that are filed with incomplete or missing information

24. Erroneous zeroes are added in the spaces that require well numbers

54

Page 55: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

25. Shut- In/Time of Run for G-1’s (1 Point Test) should be 1440 minutes (24 hours)

26. Well is completed in formations that are outside the designated correlative interval for the field and a SWR10 has not been filed *

27. Formation record should show the formation names that define each completed field *

28. Required acreage forms not filed i.e. proration plats, p-15s/acreage lists/lease plats *

29. Failure to check field rules before filing *

30. Not utilizing the RRC Website to retrieve well information

Top 30 Problems That Can Delay A Completion Packets Final Approval

55

Page 56: RAILROAD COMMISSION OF TEXAS Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally

Contact Information

E-MAIL - [email protected]

Please take advantage of our Well Compliance Phone Queue System for immediate assistance

with general proration questions, online filings, opening packets etc. A knowledgeable member of the Proration Staff will assist you.

• 512-463-6975