Track Construction
Point Replacement at Frankfurt Stadion Station
Replacement of an EW 190 (single point)
switch at Frankfurt Stadion.
Client : DB Netz AG Frankfurt
Construction Period 06/2014 to 08/2014
Point and Track Replacement at Pressig Station
Renovation of 1900 m track and 11 points at
Pressig Station
Client : DB Netz AG Nürnberg
Construction Period : 06/2014 to 10/2014
Points Renewal at Rödelheim
Scope of work: Renewal of 3 points and
ca. 833 m track (with ballast cleaning
machine)
Order volume: ca. 447,000.00 Euro
Client: DB Netz AG Frankfurt
Construction Period: 05.05. to 23.05.2014 +
04.09. to 14.09.2014
Page 2
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
Track System HLB
Friedrichsdorf- Brandoberndorf line:
Work on the track system between
Friedrichsdorf and Köppern, km 0.262 - km
1.993 and the Hasselborn stop, km 32.824-
km 32.386
Sleeper replacement: complete replacement
of conventional ballast substructure and
track replacement / change of sleepers,
cleaning of ballast substructure with
complete replacement in places, as well as
sleeper replacement at point 421,
Friedrichsdorf station.
Order volume: ca. € 900,000
Client: HLB Basis AG
Main work carried out over 2 weekends
07 + 08/2014
Work for KSW
Scope of Work: Renewal of 2 tracks with
reconditioned materials to a total length of
ca. 900m, construction of derailment guards
Order volume: ca. €250,000
Client: Kreisbahn Siegen Wittgenstein
Construction period: 2 weeks 11/2014
Page 3
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
ARGE Siegen – Weidenau / Hering – KAF
Siegen Station: Renovation of 7 points and
1 level crossing
Weidenau Station: Renovation of 7 points and
1 level crossing
Particulars: Tamping in Siegen station with 2
tamping machines for the level crossing
Client: DB Netz AG Hagen
Construction Period: Oct. - November 2013
Points Renovation in Frankfurt am Main Süd Station
Renovation of 16 points
An MFS material conveyor and a Hering125 tonne
crane were deployed.
A quality audit was carried out at the construction
site and was passed.
Order Value: 983,927 €
Client: DB Netz AG Frankfurt
Construction Period: Feb. – May 2013
Track Renovation in Stockheim Station
Renovation of two tracks (222 and 176 m), where
the ballast substructure had to be extended and
completed in parts. Tamping of the renovated tracks
and almost all of the station (5 tracks and 15
points).
Furthermore: Renewal of the sidings, removal of
two points, introduction of a buffer stop.
Order Value: 124,570 €
Client: DB Netz AG Frankfurt
Construction Period: 22.04. – 08.05.2013
Page 4
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
Track Works at Buderus Edelstahl, Wetzlar
At the Buderus Edelstahl GmbH factory premises,
construction of ca. 900 m track, renovation of 8
points, removal of ca. 400 m of track, as well as
laying ca. 1.200 m² asphalt, 200 m of track in
„Dresdner Oberbau“, and shoring up ca. 200 m³
cement.
Order Value: 1.2 million €
Client: Buderus Edelstahl GmbH, Wetzlar
Construction Period: 12/2012 – 05/2013
Auxiliary Bridges in St. Goar
Construction of an auxiliary bridge
Subsequent fitting of a 60 tonne steel
superstructure with a Hering 150 tonne crane,
laying of tracks over the superstructure, as well as
tamping and welding works.
Assignment carried out under very cramped
conditions.
Order Value: 125,506 €
Client: Fritz Herzog AG, Andernach
Construction Period: February 2013
Track Renovation at Gießen Main Station / Bergwald
Renovation of Track 20 (200 m track, complete
renewal of the ballast substructure) at Gießen Main
Station / 31.03. + 01.04.:
Renovation of Point 178 (190 double level crossing
point, complete renewal of the ballast substructure)
at Gießen auxiliary station/ Easter (06.4. to 10.04.):
Renovation of three 500 points at Gießen-Bergwald
station (complete renewal of ballast substructure +
formation protection layer), Renovation of track 76
(200 m track with complete renewal of ballast
substructure) at Gießen Main Station.
Order Value: 1,068,631 €
Client: DB Netz AG, NL Mitte, Frankfurt
Construction Period:
End March – End April 2012 Seit 5
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
Ballast substructure cleaning for Hessische Landesbahn
Cleaning of 1440 m ballast substructure with
MGW maaschine (RM 95-800W) + 6 MFS
material conveyors (Hering)
Installation of 1440m geomembrane
Renewal of 2300 sleepers
Integration of 1500 tons base gravel
Integration of 1400 tons tamping gravel
Renewal of 2 level crossings (Bodan)
Order Value: 499,617 €
Client: HLB Basis AG Frankfurt
Construction Period: 15.06. to 18.06.2012 +
22.06. to 25.06.2012
Renovation works on the Railway Bridge at
Hamburg Veddel
Railway employees led the replacement of 516
bridge girders. On a stretch of line 260 m
before and 30 m behind the bridge, two Hering
crews operated in parallel over three weekends
from the middle of November to the start of
December 2011. Rails, sleepers and gravel
were replaced with the aid of MFS hoppers,
road rail excavators and tamping machines.
Order Value: 570,000 €
Client: DB Netz AG Nürnberg
Construction Period: 6 weekends in total
(29.10. – 05.12.2011)
Page 6
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
Newbuild HP „Mannheim ARENA /
Maimarkt“ (SAP-Arena, Mannheim)
Work on tracks from Oct. 2010: Installation of 2
auxiliary bridges; track and points renovation,
gradient alterations, cleaning of ballast
substructure.
Summer 2011: Construction of an outer
platform (length 210 m, breadth 4.45 m = 934
m²) as well as a central platform (length 210 m,
breadth 6.50 to 10.50 m = 1825 m²), Installed
using Hering railway cranes (125 t and 50 t)
Late summer 2011: Installation of Bodenheim®
light roofs over the platforms (L x B 50 x 4.45 m
and 100 x 10 m). The various tasks were
carried out under contract to DB Netz AG
Karlsruhe and with DB ProjektBau GmbH
Karlsruhe as project leaders.
Order Value: 2,227,871 €
Construction Period: Summer 2010 – late
summer 2011
Track Renovation for Gontermann-Peipers
Track renovation at the factory premises in
Siegen
Renewal of 50 m oven track.
Cutting out of the old track, type Dresdner
Oberbau, installation of new track. Infilling with
cement using an HGV with a cement mixer and
pumps.
Operation carried out during plant closure.
Order Value: ca. 100,000.00 Euro
Client: Gontermann-Peipers GmbH, Siegen
Construction Period: 17. – 24. August 2011
Page 7
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
Track Renovation
Neunkirchen-Salchendorf Line
Track renovation on the Neunkirchen-
Salchendorf line to a length of 553 m.
Replacement of old sleepers and rails with new
ones using excavators, wheel loaders, HGVs
and tamping machines. Within the scope of the
Health and Safety Management system, a site
audit was carried out on 21 July 2011. Auditors
from BG Bau checked the site and came to a
positive conclusion.
Order Value: ca. 201,000 EuroClient: Kreisbahn Siegen-WittgensteinConstruction Period: 14 – 29 July 2011
Track Renovation at Limburg Main Station
Removal of a cleaning bridge in the station,
complete demolition of the cleaning plant.
Renewal of 7 tracks for a total length of 1,700
m. Removal of 5,800 tons of gravel, infilling
with new gravel. Installation of 2,600 sleepers,
4 new buffers.
Order Value: ca. 400,000.00 Euro
Construction Period: 04/2011 – 06/2011
Client: DB Netz AG Frankfurt
Page 8
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
Track Renovation Vogelsberg Railway
/ Modernisation Measures
Participation in implementing Packages 3 and 4
within the scope of Economic Stimulus Plan II.
Package 3: in cooperation with the DB
Bahnbau Gruppe Berlin, renovation of 2
stretches of line, gradient modification, removal
and installation of 12 crossings, working over
the tracks with a DGU machine.
Package 4 (Implementation by Hering Bau):
Renovation of 6 crossings, technical adaptation
of signals, civil engineering works, sanitisation
of 3 culverts.
Order Value: ca. 1,800,000 Euro (inc. civil
engineering)
Client: DB Netz AG
Construction Period: 10/2010 – 12/2010
Frankfurt
Track Works for Erndtebrücker Ironworks
Installation of a inside curved turnout and 49-
301:9 and three points PH37-140-1:6 as well
as a craneway (124 m l).
New tracks were mounted on concrete
sleepers (711 m long, of which ca. 295 m were
installed using the „Dresdner Oberbau“
method).
Order Value: ca. 1,100,000.00 E
Client: Erndtebrücker Eisenwerke GmbH & Co.
KG
Construction Period: 11/2009 – 04/2010
Page 9
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
Track and Points Renovation
in Bad Hönningen
Renovation of 5 concrete points and 2,145 m of
track, complete renewal of the ballast substructure
inc. the formation protection layer.
Installation of underground drainage (1,425 m) and
34 shafts.
Work was carried out also on: 9,000 tons gravel,
6,500 tons FPL, 2,000 tons filter gravel, 300 tubes,
24 inspection shafts 2.50 m high, 9 drainage shafts
5 m high, 20,000 m² geotextile.
Order Value: ca. 1,600,000 €
Construction Period: Easter – 01.12.2009,
Remaining works to 01.05.2010
Client: DB Netz AG Mitte, Koblenz
Track Construction for Mainz
Customs and Inner Harbour
Construction of a track facility for the container
terminal at Mainz Customs and Inner Harbour.
Installation of 3,800 m track and 11 points,
ca. 1,000 m cable, plus 14 shafts and level
crossings,
1,300 m fencing inc. 2 gates for the fire service,
ca. 4,500 m cable removal inc.shafts, replacement
ca. 9,000 tons earth, delivery and installation of ca.
13,000 tons FPL and ca. 16,000 tons track gravel,
7 level crossings.
Order Value: ca. 3,700,000 Euro
Client: Stadtwerke Mainz AG und Frankenbach
Container Terminals GmbH
Construction Period: 11/2009 – 07/2010
Page 10
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
Track and Point Renovation
Eschweiler and Aachen
Eschweiler Station:
Renewal of 3 points (W1.2 and 12),
Renovation of 180 m track
Aachen Main Station:
Renovation of points W 75 and W 76
Order Value: 674,600.-- €
Construction Period: Eschweiler 24.05. -
07.06., Aachen 19.06. - 23.06.2009
Work was carried out within the scope of the
Arbeitsgemeinschaft WE Eschweiler
Track Renewal Hanau Harbour
Renewal of 2 tracks 120 m long
(tracks were manufactured by Dresdner
Oberbau)
Removal of 4 points inc. filling-in of gaps
Ground improvements 1,500 m² per rotary hoe
1,200 m² asphalted.
Order Value: 250,000 €
Client: Stadtwerke Hanau
Construction Period: March 2009
Page 11
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
Track and Point Renovations Heilbronn Station
Renovation of 2 points and 3,600 m track
Order Value: 1,100,000 €
Client: DB Netz AG Region Südwest
Construction Period: April – October 2015
ACS Untere Lahn
Lot 1 Balduinstein
Lot 2 Laurenburg
Lot 3 Obernhof
Lot 4 Nassau
Order Value: 4,251,798 €
Client: DB Netz AG
Construction Period: March 2015 – October 2016
Renewal of 4 points in Wetzlar. 2 points in the
goods station and 2 points in the station.
Application of MFS-Technik systems and Hering
cranes.
Particulars: The site was greatly affected by the
launch of SSI at Friedberg, as some of the lines
around our site were closed. This impeded delivery
of the tamping machines, etc.
Order Value: 450,000 €
Client: DB Netz AG Frankfurt
Construction Period: October 2015
Points Renewal Wetzlar
Page 12
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
Essen-Stadtwald –Essen Werden both Directions
- 5,400m, construction of 2 tracks
- 2,000m track installation in 3 stations
- 3 lots of point renovations
- Replacement of 250 sleepers
- Construction of 240m tracks incl. underground
drainage in tunnel
Order Value: 2.2 million €
Client: DB Netz AG - Duisburg
Construction Period: July – October 2013
Hildesheim-Groß Gleidingen - Extension of 2 Tracks
- Laying and extension of 34,000 m track
- Construction of 17 points
- Renewal of 24 level crossings
Order Value: 7.4 million €
Client: DB Netz AG - Hannover
Construction Period: April 2011 – November 2012
Station Renovation Aachen Campus - Clearing Area
- 4,676m track removal
- 1,290m track installation
- 31 points removed
- 6 points installed
- 1,870m roadbed shoulders created
- 39 12m-high lighting masts installed
- 1,200m cable trenches established
- Creation of a power shaft in site-mixed concrete
with a volume of 700m³
- 8,342m tamping work
Order Value: 3.9 million €
Client: DB Netz AG -Duisburg
Construction Period: July – December 2013
Page 13
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
Track and Drainage Works
TWE Teutoburger Wald Gütersloh
- 332 m track superstructure renewal
- 340.7 m installation of a base later with geotextile
- 416.8 m drainage installation
Order Value: 0.380 million €
Client: TWE Teutoburgerwald-Eisenbahn AG,
Gütersloh
Construction Period: October 2012
- 2,495m track construction
- 3 points installed
- 1,200m cable trenches constructed
- Renewal of 2 level crossings
- Construction of 1,100m underground drainage
Order Value: 2.5 million €
Client: DB Netz AG -Duisburg
Construction Period: July – November 2014
Station Renovations Hagen - Hohenlimburg
New Build ICE Plant Köln-Nippes
- Laying of 15,000 m track
- Installation of 47 points
- Installation of 16,300 m cabling
Order Value: 18.0 million €
Client: DB Netz AG
Construction Period:
December 2015 – January 2017
Page 14
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
Metropolitan Railway Tunnel in Karlsruhe
- 9,300m grooved and Vignole rail track as
ballasted or non-ballasted track system
- 2,600m track system Rheda City Karlsruhe
- 23 level crossings
- 42 points
Order Value: 5.5 million €
Client: ARGE Tiefbau Karlsruhe
Construction Period:
March 2012 – November 2014
- Demolition of the existing wooden platform
- Construction of a 35 cm-high platform using
concrete angular paving stones
- Length 50 m
- additionally, 2 ramps each 5.30 m long
Order Value: 0.250 million €
Client: KVB Kölner Verkehrsbetriebe
Construction Period:
December 2012 – January 2013
- 7,702m track installed and removed in parts
- 21 points installed and removed in places
- 8 level crossing sites
Order Value: 18.0 million €
Client: Stadtbahnlinie Düsseldorf Wehrhahnlinie
Construction Period: March 2008 – October 2014
Track Works Wehrhahnlinie Düsseldorf
Renovation Disembarkation Platform Ubierring - Köln
Page 15
RAILWAY CONSTRUCTION
REFERENCES
Track Construction
Renovation of a Dual-Track Line
Heumarkt Lot D2.06 - Köln
-125m track deviation / repositioning up to 3.5m
- 260m Vignole track installed as high-speed track
- 114m fixed guide rails installed
- 340 non-prestressed reinforcement bi-block
sleepers installed
- 75m grooved tracks installed
- 290m³ concrete installation (base plates and
concrete infill) for high-speed and grooved tracks
- Track links using 2 EW (single point) grooves
100:1-6
- 305m derailment/crash guards installed/ extended
-100m drainage ditches
- Removal of 365m grooved track
- Removal of 200m crash and derailment protection
- Demolition of 435m³ of concrete (base plates and
concrete infill)
- Demolition of 480m² of asphalt in the vehicle
crossing/bridge to the nearby street.
Order Value: 0.580 million €
Client: KVB Kölner Verkehrsbetriebe
Construction Period: April – August 2012
- Replacement of 360m grooved track profile Ri60N
with flat rolled steel sleepers
- Installation of 320m³ concrete
- 720m new rails
- Installation of 1,200m² of girders
- Integration of 1,200m² melted asphalt
Order Value: 0.350 million €
Client: VIA Verkehrsgesellschaft mbH, Essen
Construction Period: May – June 2014
Track Construction Work at Weidkamp Essen