Page 1: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

Burbach Site/ Essen Site

Railway Construction

RAILWAY CONSTRUCTION

REFERENCES

SELECTED REFERENCES

Hering Bahnbau GmbH

Standort Essen

Krablerstraße 165

D-45326 Essen

Hering Bahnbau GmbH

Standort Burbach

Neuländer 1

D-57299 Burbach

Page 2: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Point Replacement at Frankfurt Stadion Station

Replacement of an EW 190 (single point)

switch at Frankfurt Stadion.

Client : DB Netz AG Frankfurt

Construction Period 06/2014 to 08/2014

Point and Track Replacement at Pressig Station

Renovation of 1900 m track and 11 points at

Pressig Station

Client : DB Netz AG Nürnberg

Construction Period : 06/2014 to 10/2014

Points Renewal at Rödelheim

Scope of work: Renewal of 3 points and

ca. 833 m track (with ballast cleaning

machine)

Order volume: ca. 447,000.00 Euro

Client: DB Netz AG Frankfurt

Construction Period: 05.05. to 23.05.2014 +

04.09. to 14.09.2014

Page 2

Page 3: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Track System HLB

Friedrichsdorf- Brandoberndorf line:

Work on the track system between

Friedrichsdorf and Köppern, km 0.262 - km

1.993 and the Hasselborn stop, km 32.824-

km 32.386

Sleeper replacement: complete replacement

of conventional ballast substructure and

track replacement / change of sleepers,

cleaning of ballast substructure with

complete replacement in places, as well as

sleeper replacement at point 421,

Friedrichsdorf station.

Order volume: ca. € 900,000

Client: HLB Basis AG

Main work carried out over 2 weekends

07 + 08/2014

Work for KSW

Scope of Work: Renewal of 2 tracks with

reconditioned materials to a total length of

ca. 900m, construction of derailment guards

Order volume: ca. €250,000

Client: Kreisbahn Siegen Wittgenstein

Construction period: 2 weeks 11/2014

Page 3

Page 4: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

ARGE Siegen – Weidenau / Hering – KAF

Siegen Station: Renovation of 7 points and

1 level crossing

Weidenau Station: Renovation of 7 points and

1 level crossing

Particulars: Tamping in Siegen station with 2

tamping machines for the level crossing

Client: DB Netz AG Hagen

Construction Period: Oct. - November 2013

Points Renovation in Frankfurt am Main Süd Station

Renovation of 16 points

An MFS material conveyor and a Hering125 tonne

crane were deployed.

A quality audit was carried out at the construction

site and was passed.

Order Value: 983,927 €

Client: DB Netz AG Frankfurt

Construction Period: Feb. – May 2013

Track Renovation in Stockheim Station

Renovation of two tracks (222 and 176 m), where

the ballast substructure had to be extended and

completed in parts. Tamping of the renovated tracks

and almost all of the station (5 tracks and 15

points).

Furthermore: Renewal of the sidings, removal of

two points, introduction of a buffer stop.

Order Value: 124,570 €

Client: DB Netz AG Frankfurt

Construction Period: 22.04. – 08.05.2013

Page 4

Page 5: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Track Works at Buderus Edelstahl, Wetzlar

At the Buderus Edelstahl GmbH factory premises,

construction of ca. 900 m track, renovation of 8

points, removal of ca. 400 m of track, as well as

laying ca. 1.200 m² asphalt, 200 m of track in

„Dresdner Oberbau“, and shoring up ca. 200 m³

cement.

Order Value: 1.2 million €

Client: Buderus Edelstahl GmbH, Wetzlar

Construction Period: 12/2012 – 05/2013

Auxiliary Bridges in St. Goar

Construction of an auxiliary bridge

Subsequent fitting of a 60 tonne steel

superstructure with a Hering 150 tonne crane,

laying of tracks over the superstructure, as well as

tamping and welding works.

Assignment carried out under very cramped

conditions.

Order Value: 125,506 €

Client: Fritz Herzog AG, Andernach

Construction Period: February 2013

Track Renovation at Gießen Main Station / Bergwald

Renovation of Track 20 (200 m track, complete

renewal of the ballast substructure) at Gießen Main

Station / 31.03. + 01.04.:

Renovation of Point 178 (190 double level crossing

point, complete renewal of the ballast substructure)

at Gießen auxiliary station/ Easter (06.4. to 10.04.):

Renovation of three 500 points at Gießen-Bergwald

station (complete renewal of ballast substructure +

formation protection layer), Renovation of track 76

(200 m track with complete renewal of ballast

substructure) at Gießen Main Station.

Order Value: 1,068,631 €

Client: DB Netz AG, NL Mitte, Frankfurt

Construction Period:

End March – End April 2012 Seit 5

Page 6: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Ballast substructure cleaning for Hessische Landesbahn

Cleaning of 1440 m ballast substructure with

MGW maaschine (RM 95-800W) + 6 MFS

material conveyors (Hering)

Installation of 1440m geomembrane

Renewal of 2300 sleepers

Integration of 1500 tons base gravel

Integration of 1400 tons tamping gravel

Renewal of 2 level crossings (Bodan)

Order Value: 499,617 €

Client: HLB Basis AG Frankfurt

Construction Period: 15.06. to 18.06.2012 +

22.06. to 25.06.2012

Renovation works on the Railway Bridge at

Hamburg Veddel

Railway employees led the replacement of 516

bridge girders. On a stretch of line 260 m

before and 30 m behind the bridge, two Hering

crews operated in parallel over three weekends

from the middle of November to the start of

December 2011. Rails, sleepers and gravel

were replaced with the aid of MFS hoppers,

road rail excavators and tamping machines.

Order Value: 570,000 €

Client: DB Netz AG Nürnberg

Construction Period: 6 weekends in total

(29.10. – 05.12.2011)

Page 6

Page 7: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Newbuild HP „Mannheim ARENA /

Maimarkt“ (SAP-Arena, Mannheim)

Work on tracks from Oct. 2010: Installation of 2

auxiliary bridges; track and points renovation,

gradient alterations, cleaning of ballast

substructure.

Summer 2011: Construction of an outer

platform (length 210 m, breadth 4.45 m = 934

m²) as well as a central platform (length 210 m,

breadth 6.50 to 10.50 m = 1825 m²), Installed

using Hering railway cranes (125 t and 50 t)

Late summer 2011: Installation of Bodenheim®

light roofs over the platforms (L x B 50 x 4.45 m

and 100 x 10 m). The various tasks were

carried out under contract to DB Netz AG

Karlsruhe and with DB ProjektBau GmbH

Karlsruhe as project leaders.

Order Value: 2,227,871 €

Construction Period: Summer 2010 – late

summer 2011

Track Renovation for Gontermann-Peipers

Track renovation at the factory premises in

Siegen

Renewal of 50 m oven track.

Cutting out of the old track, type Dresdner

Oberbau, installation of new track. Infilling with

cement using an HGV with a cement mixer and

pumps.

Operation carried out during plant closure.

Order Value: ca. 100,000.00 Euro

Client: Gontermann-Peipers GmbH, Siegen

Construction Period: 17. – 24. August 2011

Page 7

Page 8: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Track Renovation

Neunkirchen-Salchendorf Line

Track renovation on the Neunkirchen-

Salchendorf line to a length of 553 m.

Replacement of old sleepers and rails with new

ones using excavators, wheel loaders, HGVs

and tamping machines. Within the scope of the

Health and Safety Management system, a site

audit was carried out on 21 July 2011. Auditors

from BG Bau checked the site and came to a

positive conclusion.

Order Value: ca. 201,000 EuroClient: Kreisbahn Siegen-WittgensteinConstruction Period: 14 – 29 July 2011

Track Renovation at Limburg Main Station

Removal of a cleaning bridge in the station,

complete demolition of the cleaning plant.

Renewal of 7 tracks for a total length of 1,700

m. Removal of 5,800 tons of gravel, infilling

with new gravel. Installation of 2,600 sleepers,

4 new buffers.

Order Value: ca. 400,000.00 Euro

Construction Period: 04/2011 – 06/2011

Client: DB Netz AG Frankfurt

Page 8

Page 9: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Track Renovation Vogelsberg Railway

/ Modernisation Measures

Participation in implementing Packages 3 and 4

within the scope of Economic Stimulus Plan II.

Package 3: in cooperation with the DB

Bahnbau Gruppe Berlin, renovation of 2

stretches of line, gradient modification, removal

and installation of 12 crossings, working over

the tracks with a DGU machine.

Package 4 (Implementation by Hering Bau):

Renovation of 6 crossings, technical adaptation

of signals, civil engineering works, sanitisation

of 3 culverts.

Order Value: ca. 1,800,000 Euro (inc. civil

engineering)

Client: DB Netz AG

Construction Period: 10/2010 – 12/2010

Frankfurt

Track Works for Erndtebrücker Ironworks

Installation of a inside curved turnout and 49-

301:9 and three points PH37-140-1:6 as well

as a craneway (124 m l).

New tracks were mounted on concrete

sleepers (711 m long, of which ca. 295 m were

installed using the „Dresdner Oberbau“

method).

Order Value: ca. 1,100,000.00 E

Client: Erndtebrücker Eisenwerke GmbH & Co.

KG

Construction Period: 11/2009 – 04/2010

Page 9

Page 10: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Track and Points Renovation

in Bad Hönningen

Renovation of 5 concrete points and 2,145 m of

track, complete renewal of the ballast substructure

inc. the formation protection layer.

Installation of underground drainage (1,425 m) and

34 shafts.

Work was carried out also on: 9,000 tons gravel,

6,500 tons FPL, 2,000 tons filter gravel, 300 tubes,

24 inspection shafts 2.50 m high, 9 drainage shafts

5 m high, 20,000 m² geotextile.

Order Value: ca. 1,600,000 €

Construction Period: Easter – 01.12.2009,

Remaining works to 01.05.2010

Client: DB Netz AG Mitte, Koblenz

Track Construction for Mainz

Customs and Inner Harbour

Construction of a track facility for the container

terminal at Mainz Customs and Inner Harbour.

Installation of 3,800 m track and 11 points,

ca. 1,000 m cable, plus 14 shafts and level

crossings,

1,300 m fencing inc. 2 gates for the fire service,

ca. 4,500 m cable removal inc.shafts, replacement

ca. 9,000 tons earth, delivery and installation of ca.

13,000 tons FPL and ca. 16,000 tons track gravel,

7 level crossings.

Order Value: ca. 3,700,000 Euro

Client: Stadtwerke Mainz AG und Frankenbach

Container Terminals GmbH

Construction Period: 11/2009 – 07/2010

Page 10

Page 11: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Track and Point Renovation

Eschweiler and Aachen

Eschweiler Station:

Renewal of 3 points (W1.2 and 12),

Renovation of 180 m track

Aachen Main Station:

Renovation of points W 75 and W 76

Order Value: 674,600.-- €

Construction Period: Eschweiler 24.05. -

07.06., Aachen 19.06. - 23.06.2009

Work was carried out within the scope of the

Arbeitsgemeinschaft WE Eschweiler

Track Renewal Hanau Harbour

Renewal of 2 tracks 120 m long

(tracks were manufactured by Dresdner

Oberbau)

Removal of 4 points inc. filling-in of gaps

Ground improvements 1,500 m² per rotary hoe

1,200 m² asphalted.

Order Value: 250,000 €

Client: Stadtwerke Hanau

Construction Period: March 2009

Page 11

Page 12: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Track and Point Renovations Heilbronn Station

Renovation of 2 points and 3,600 m track

Order Value: 1,100,000 €

Client: DB Netz AG Region Südwest

Construction Period: April – October 2015

ACS Untere Lahn

Lot 1 Balduinstein

Lot 2 Laurenburg

Lot 3 Obernhof

Lot 4 Nassau

Order Value: 4,251,798 €

Client: DB Netz AG

Construction Period: March 2015 – October 2016

Renewal of 4 points in Wetzlar. 2 points in the

goods station and 2 points in the station.

Application of MFS-Technik systems and Hering

cranes.

Particulars: The site was greatly affected by the

launch of SSI at Friedberg, as some of the lines

around our site were closed. This impeded delivery

of the tamping machines, etc.

Order Value: 450,000 €

Client: DB Netz AG Frankfurt

Construction Period: October 2015

Points Renewal Wetzlar

Page 12

Page 13: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Essen-Stadtwald –Essen Werden both Directions

- 5,400m, construction of 2 tracks

- 2,000m track installation in 3 stations

- 3 lots of point renovations

- Replacement of 250 sleepers

- Construction of 240m tracks incl. underground

drainage in tunnel

Order Value: 2.2 million €

Client: DB Netz AG - Duisburg

Construction Period: July – October 2013

Hildesheim-Groß Gleidingen - Extension of 2 Tracks

- Laying and extension of 34,000 m track

- Construction of 17 points

- Renewal of 24 level crossings

Order Value: 7.4 million €

Client: DB Netz AG - Hannover

Construction Period: April 2011 – November 2012

Station Renovation Aachen Campus - Clearing Area

- 4,676m track removal

- 1,290m track installation

- 31 points removed

- 6 points installed

- 1,870m roadbed shoulders created

- 39 12m-high lighting masts installed

- 1,200m cable trenches established

- Creation of a power shaft in site-mixed concrete

with a volume of 700m³

- 8,342m tamping work

Order Value: 3.9 million €

Client: DB Netz AG -Duisburg

Construction Period: July – December 2013

Page 13

Page 14: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Track and Drainage Works

TWE Teutoburger Wald Gütersloh

- 332 m track superstructure renewal

- 340.7 m installation of a base later with geotextile

- 416.8 m drainage installation

Order Value: 0.380 million €

Client: TWE Teutoburgerwald-Eisenbahn AG,

Gütersloh

Construction Period: October 2012

- 2,495m track construction

- 3 points installed

- 1,200m cable trenches constructed

- Renewal of 2 level crossings

- Construction of 1,100m underground drainage

Order Value: 2.5 million €

Client: DB Netz AG -Duisburg

Construction Period: July – November 2014

Station Renovations Hagen - Hohenlimburg

New Build ICE Plant Köln-Nippes

- Laying of 15,000 m track

- Installation of 47 points

- Installation of 16,300 m cabling

Order Value: 18.0 million €

Client: DB Netz AG

Construction Period:

December 2015 – January 2017

Page 14

Page 15: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Metropolitan Railway Tunnel in Karlsruhe

- 9,300m grooved and Vignole rail track as

ballasted or non-ballasted track system

- 2,600m track system Rheda City Karlsruhe

- 23 level crossings

- 42 points

Order Value: 5.5 million €

Client: ARGE Tiefbau Karlsruhe

Construction Period:

March 2012 – November 2014

- Demolition of the existing wooden platform

- Construction of a 35 cm-high platform using

concrete angular paving stones

- Length 50 m

- additionally, 2 ramps each 5.30 m long

Order Value: 0.250 million €

Client: KVB Kölner Verkehrsbetriebe

Construction Period:

December 2012 – January 2013

- 7,702m track installed and removed in parts

- 21 points installed and removed in places

- 8 level crossing sites

Order Value: 18.0 million €

Client: Stadtbahnlinie Düsseldorf Wehrhahnlinie

Construction Period: March 2008 – October 2014

Track Works Wehrhahnlinie Düsseldorf

Renovation Disembarkation Platform Ubierring - Köln

Page 15

Page 16: RAILWAY CONSTRUCTION REFERENCES -  · PDF fileRailway Construction RAILWAY CONSTRUCTION REFERENCES SELECTED REFERENCES ... 6,500 tons FPL, 2,000 tons filter gravel,

RAILWAY CONSTRUCTION

REFERENCES

Track Construction

Renovation of a Dual-Track Line

Heumarkt Lot D2.06 - Köln

-125m track deviation / repositioning up to 3.5m

- 260m Vignole track installed as high-speed track

- 114m fixed guide rails installed

- 340 non-prestressed reinforcement bi-block

sleepers installed

- 75m grooved tracks installed

- 290m³ concrete installation (base plates and

concrete infill) for high-speed and grooved tracks

- Track links using 2 EW (single point) grooves

100:1-6

- 305m derailment/crash guards installed/ extended

-100m drainage ditches

- Removal of 365m grooved track

- Removal of 200m crash and derailment protection

- Demolition of 435m³ of concrete (base plates and

concrete infill)

- Demolition of 480m² of asphalt in the vehicle

crossing/bridge to the nearby street.

Order Value: 0.580 million €

Client: KVB Kölner Verkehrsbetriebe

Construction Period: April – August 2012

- Replacement of 360m grooved track profile Ri60N

with flat rolled steel sleepers

- Installation of 320m³ concrete

- 720m new rails

- Installation of 1,200m² of girders

- Integration of 1,200m² melted asphalt

Order Value: 0.350 million €

Client: VIA Verkehrsgesellschaft mbH, Essen

Construction Period: May – June 2014

Track Construction Work at Weidkamp Essen