Points, Crossings and Yards of Railways Prepared By: K.R.THANKI (BE Civil) LECTURER CIVIL ENGINEERING DEPARTMENT GOVERNMENT POLY TECHNIC , JUNAGADH,GUJARAT-INDIA. 06/28/2022 1

Upload: krunal-thanki

Post on 12-Apr-2017

92 views

Category:

Engineering


0 download

TRANSCRIPT

Page 1: Railwaypcyby K R Thanki

Points, Crossings and Yards of Railways

Prepared By:

K.R.THANKI (BE Civil)

LECTURER CIVIL ENGINEERING DEPARTMENTGOVERNMENT POLY TECHNIC ,

JUNAGADH,GUJARAT-INDIA.

05/0

3/20

23

1

Page 2: Railwaypcyby K R Thanki

Points and Crossings:The arrangements by which different routes, diverging from the first track, are connected to faciliate the diversion of trains from one track to another track without any obstruction are known as points and crossings.

05/0

3/20

23

2

Points and Crossings:

K.R.

THAN

KI

(BE

Civi

l)

Page 3: Railwaypcyby K R Thanki

05/0

3/20

23

3

Turn out:

A complete set of points and crossings provides for diverting the trains from a main track to a branch track is known as turn out.

K.R.

THAN

KI

(BE

Civi

l)

Page 4: Railwaypcyby K R Thanki

05/0

3/20

23

4

Turn out:

Right Hand Turn out:

Animated diagram of a right-hand railroad switch, rail track A divides into two track B (the straight track) and track C (the diverging track)

K.R.

THAN

KI

(BE

Civi

l)

Page 5: Railwaypcyby K R Thanki

05/0

3/20

23

5

Turn out:

Right Hand Turn out: K.R.

THAN

KI

(BE

Civi

l)

Page 6: Railwaypcyby K R Thanki

05/0

3/20

23

6

Turn out:

Left Hand Turn out: K.R.

THAN

KI

(BE

Civi

l)

Page 7: Railwaypcyby K R Thanki

05/0

3/20

23

7

Turn out:

Component parts and Functions :

1) A pair of Points (Switches):

A switch, turnout or [set of] points is a mechanical installation enabling railway trains to be guided from one track to another.

K.R.

THAN

KI

(BE

Civi

l)

Page 8: Railwaypcyby K R Thanki

05/0

3/20

23

8

Turn out:

Switches

K.R.

THAN

KI

(BE

Civi

l)

Page 9: Railwaypcyby K R Thanki

05/0

3/20

23

9

Turn out:

Component parts and Functions :

2) A pair of Stock rails:

Stock rails along with their respective tongue rails from a pair of switches or points.

Function of stock rails is to facilitate smooth working of tongue rails.

K.R.

THAN

KI

(BE

Civi

l)

Page 10: Railwaypcyby K R Thanki

05/0

3/20

23

10

Turn out:

Stock rails

K.R.

THAN

KI

(BE

Civi

l)

Page 11: Railwaypcyby K R Thanki

05/0

3/20

23

11

Turn out:

Component parts and Functions :

3) V Crossing:

The function of V crossing is to provide gaps between the rails tobe crossed so that wheel flanges can pass through the gaps without any obstruction.

K.R.

THAN

KI

(BE

Civi

l)

Page 12: Railwaypcyby K R Thanki

05/0

3/20

23

12

Turn out:

V Crossing

K.R.

THAN

KI

(BE

Civi

l)

Page 13: Railwaypcyby K R Thanki

05/0

3/20

23

13

Turn out:

Component parts and Functions :

4) Two check rails:

Function of these rails is to check the tendency of wheels to climb over the crossing.

K.R.

THAN

KI

(BE

Civi

l)

Page 14: Railwaypcyby K R Thanki

05/0

3/20

23

14

Turn out:

Two check rails

K.R.

THAN

KI

(BE

Civi

l)

Page 15: Railwaypcyby K R Thanki

05/0

3/20

23

15

Turn out:

Component parts and Functions :

5) Four lead rails:

Function of these rails is to Lead the track from heel of switches to the toe of crossing.

K.R.

THAN

KI

(BE

Civi

l)

Page 16: Railwaypcyby K R Thanki

05/0

3/20

23

16

Turn out:

lead rails

K.R.

THAN

KI

(BE

Civi

l)

Page 17: Railwaypcyby K R Thanki

05/0

3/20

23

17

Turn out:

Component parts and Functions :

6) Switch tie plate:

Function of switch tie plate is to maintain gauge distance at front of switch.

K.R.

THAN

KI

(BE

Civi

l)

Page 18: Railwaypcyby K R Thanki

05/0

3/20

23

18

Turn out:

Component parts and Functions :

7) Stud(Stop):

A Bent plate which is jointed to stock rail is called stop.

Function of stop is to maintain the alignment.

K.R.

THAN

KI

(BE

Civi

l)

Page 19: Railwaypcyby K R Thanki

05/0

3/20

23

19

Turn out:

Component parts and Functions :

8) Side Chairs:

Function of Side chair is to support the tongue rails throughout their length.

K.R.

THAN

KI

(BE

Civi

l)

Page 20: Railwaypcyby K R Thanki

05/0

3/20

23

20

Turn out:

Component parts and Functions :

9) Stretcher bar:

Function of Stretcher bar is to connects toes of both the tongue rails so that each tongue rail moves through same distance.

K.R.

THAN

KI

(BE

Civi

l)

Page 21: Railwaypcyby K R Thanki

05/0

3/20

23

21

Turn out:

Component parts and Functions :

10) Rods,Cranks,Lever:

Function of Rods,Cranks,Lever is to operate the points.

K.R.

THAN

KI

(BE

Civi

l)

Page 22: Railwaypcyby K R Thanki

05/0

3/20

23

22

Turn out:

Rods,Cranks,Lever

K.R.

THAN

KI

(BE

Civi

l)

Page 23: Railwaypcyby K R Thanki

05/0

3/20

23

23

Turn out:

Component parts and Functions :

11) Locking System:

Function of Locking System is to Maintain timing between signal and tong rails.

K.R.

THAN

KI

(BE

Civi

l)

Page 24: Railwaypcyby K R Thanki

05/0

3/20

23

24

Turn out:

Locking System

K.R.

THAN

KI

(BE

Civi

l)

Page 25: Railwaypcyby K R Thanki

05/0

3/20

23

25

Crossings:

Crossing:The arrangements by which different routes, are connected without any obstructions is called crossings.

K.R.

THAN

KI

(BE

Civi

l)

Page 26: Railwaypcyby K R Thanki

05/0

3/20

23

26

Crossings:

Crossing Types:

According to Angle

According to

Diversion

K.R.

THAN

KI

(BE

Civi

l)

Page 27: Railwaypcyby K R Thanki

05/0

3/20

23

27

Crossings:

Acute Angle

Obtuse Angle

According to Angle

K.R.

THAN

KI

(BE

Civi

l)

Page 28: Railwaypcyby K R Thanki

05/0

3/20

23

28

Crossings:According to Diversion

Spring

Gathering Lines

DiamondScissors

Crossover

K.R.

THAN

KI

(BE

Civi

l)

Page 29: Railwaypcyby K R Thanki

05/0

3/20

23

29

Crossings:

Acute angleWhen angle of crossing rails become acute angle then this crossing is called Acute crossing or V crossing or Frog.

According to Angle

K.R.

THAN

KI

(BE

Civi

l)

Page 30: Railwaypcyby K R Thanki

05/0

3/20

23

30

Crossings:

V crossing

K.R.

THAN

KI

(BE

Civi

l)

Page 31: Railwaypcyby K R Thanki

05/0

3/20

23

31

Crossings:

V crossing

K.R.

THAN

KI

(BE

Civi

l)

Page 32: Railwaypcyby K R Thanki

05/0

3/20

23

32

Crossings:

Obtuse AngleWhen angle of crossing rails become Obtuse angle then this crossing is called Obtuse crossing.

According to Angle

K.R.

THAN

KI

(BE

Civi

l)

Page 33: Railwaypcyby K R Thanki

05/0

3/20

23

33

Crossings:

Obtuse crossing

K.R.

THAN

KI

(BE

Civi

l)

Page 34: Railwaypcyby K R Thanki

05/0

3/20

23

34

Crossings:

Right angle or SquareWhen angle of crossing rails become Right angle then this crossing is called Right angle crossing or Square crossing.

According to Angle

K.R.

THAN

KI

(BE

Civi

l)

Page 35: Railwaypcyby K R Thanki

05/0

3/20

23

35

Crossings:

Right angle crossing

K.R.

THAN

KI

(BE

Civi

l)

Page 36: Railwaypcyby K R Thanki

05/0

3/20

23

36

Crossings:

Spring Crossing:In this crossing wing rail is strongly connected to V part by

helical spring so that’s why this crosssing is called spring crossing.

These crossings used in USA but not in INDIA.

According to Diversion

K.R.

THAN

KI

(BE

Civi

l)

Page 37: Railwaypcyby K R Thanki

05/0

3/20

23

37

Crossings:

Spring Crossing

K.R.

THAN

KI

(BE

Civi

l)

Page 38: Railwaypcyby K R Thanki

05/0

3/20

23

38

Crossings:

Crossover CrossingFunction of this crossing is to connect two parallel or diverging tracks.

According to Diversion

K.R.

THAN

KI

(BE

Civi

l)

Page 39: Railwaypcyby K R Thanki

05/0

3/20

23

39

Crossings:

CrossoverCrossing

K.R.

THAN

KI

(BE

Civi

l)

Page 40: Railwaypcyby K R Thanki

05/0

3/20

23

40

Crossings:

Scissors Crossing(Double cross):This type of crossing consists 4 pair of switch6 Acute crossings2 Obtuse crossingscheck railsAnd this type is use at goods yard.

According to Diversion

K.R.

THAN

KI

(BE

Civi

l)

Page 41: Railwaypcyby K R Thanki

05/0

3/20

23

41

Crossings:

Double cross

K.R.

THAN

KI

(BE

Civi

l)

Page 42: Railwaypcyby K R Thanki

05/0

3/20

23

42

Crossings:

Diamond CrossingWhen two tracks crosses each other at less than 90 angle then it forms diamond shape so it is called Diamond Crossing

According to Diversion

K.R.

THAN

KI

(BE

Civi

l)

Page 43: Railwaypcyby K R Thanki

05/0

3/20

23

43

Crossings:

Diamond Crossing

K.R.

THAN

KI

(BE

Civi

l)

Page 44: Railwaypcyby K R Thanki

05/0

3/20

23

44

Crossings:

Diamond Crossing

K.R.

THAN

KI

(BE

Civi

l)

Page 45: Railwaypcyby K R Thanki

05/0

3/20

23

45

Crossings:

Gathering Lines:When there is more than two track divert from one line then it is called Gathering lines.

According to Diversion

K.R.

THAN

KI

(BE

Civi

l)

Page 46: Railwaypcyby K R Thanki

05/0

3/20

23

46

Crossings:

Gathering Lines

K.R.

THAN

KI

(BE

Civi

l)

Page 47: Railwaypcyby K R Thanki

05/0

3/20

23

47

Crossings:

Gathering Lines

K.R.

THAN

KI

(BE

Civi

l)

Page 48: Railwaypcyby K R Thanki

05/0

3/20

23

48

Ash pit:

Functions of Ash pit :

To collect ash which are produced from steam engine.Depth of ash pit varies from 0.76m to1.20m and constructed from concrete.

K.R.

THAN

KI

(BE

Civi

l)

Page 49: Railwaypcyby K R Thanki

05/0

3/20

23

49Ash pit

Ash pit:

K.R.

THAN

KI

(BE

Civi

l)

Page 50: Railwaypcyby K R Thanki

05/0

3/20

23

50

Turn Table:

Function of Turn Table:To Turn the engine.

K.R.

THAN

KI

(BE

Civi

l)

Page 51: Railwaypcyby K R Thanki

05/0

3/20

23

51Turn Table

Turn Table:

K.R.

THAN

KI

(BE

Civi

l)

Page 52: Railwaypcyby K R Thanki

05/0

3/20

23

52Turn Table

Turn Table:

K.R.

THAN

KI

(BE

Civi

l)

Page 53: Railwaypcyby K R Thanki

05/0

3/20

23

53

K.R.

THAN

KI

(BE

Civi

l)

THANK YOU………FOR ANY OTHER INFORMATION PLEASE CONTECT ME TO

Email : [email protected]